36C24123R0143 0001_1.docx

DOCX document 16 KB Posted

Attached to
C1AZ--650-24-108 Elevator Upgrades Federal contract opportunity
Solicitation number
36C24123R0143
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

View the file

Other files for this federal contract opportunity

Other files attached to C1AZ--650-24-108 Elevator Upgrades, newest first.
File Type Posted
A0001 Elevator Inspection Report COR-CS.pdf PDF
Limitations on Subcontracting Certification.docx DOCX document
Drawings Elevator Upgrades.pdf PDF
36C24123R0143.docx DOCX document
Past Performance Questionnaire - Elevator Upgrades.docx DOCX document
SOW Elevator Upgrades 6-2-23.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Modification to a Previous Notice Modification to a Previous Notice

SUBJECT*
650-24-108 Elevator Upgrades

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
03104
SOLICITATION NUMBER*
36C24123R0143

BASE NOTICE TYPE

RESPONSE DATE/TIME/ZONE
07-14-2023 14:30 EASTERN TIME, NEW YORK, USA
ARCHIVE
99 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N

SET-ASIDE

PRODUCT SERVICE CODE*
C1AZ
NAICS CODE*
541330
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

VAMC Manchester

718 Smyth Road Manchester NH 03104

POINT OF CONTACT*

PLACE OF PERFORMANCE

ADDRESS

POSTAL CODE

COUNTRY

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

DESCRIPTION

AMENDMENT A0001 to SF330 36C24123R0143 Question 1: Reference Solicitation Section F.1.b; Is the intent to provide 2-3 pages long section E resumes for each supervisory team member?

Answer 1:

(a) The intent behind the number of resume pages pertains to limitations for how long each resume should be for all of the proposed non-key personnel; therefore, resumes for Non-key personnel should not exceed 3 pages.

(b) Regarding Section E within the SF330 Form itself: Section E within the SF330 Form is specifically designed for providing resume/qualification information for all proposed Key Personnel; therefore Key Personnel resumes (to include the Section E page of the SF330 Form) should not exceed 3 pages (i.e., Firm’s can use continuation pages if more space is needed beyond the space provided under Section E of the SF330 Form itself – not to exceed 3 pages altogether).

Question 2: The SOW (Section 2. Project Scope of Work) references a previous elevator inspection report. Is that report available for review?

Answer 2: Yes, see attached report. Note that attached report is only for reference.

Question 3: The list of required disciplines in the Solicitation and the SOW list “Specialty Work,” is there a particular role/specialty focus in mind?

Answer 3: Both responses below (a and b) pertain to Section G.1.a., of the SF330 notice.

(a) Besides the Vertical Transportation Specialist discipline, if Firm has a discipline that is named differently or that is interchangeable with disciplines under Section G.1.a; and if performing dual duties, then Firm must clearly describe differences and identify all personnel who will perform dual duties under the contract. In addition to disciplines described under Section G.1.a., of the SF330 notice, Firm’s may also propose disciplines that they believe may be required to successfully perform work under this project.

(b) The primary intent of the “Specialty Work” discipline is for hazardous material work. Also refer back to (a) above for intent behind “Specialty Work” discipline. As an example, the work that will be performed by the Vertical Transportation Specialist is an example of “Specialty Work.”

Question 4: On page 4 of the solicitation, it states to, “Provide brief (2-3 pages) resumes describing professional qualifications of the Firm’s proposed team members, who will specifically serve as Supervisors, Project Managers, Designers of Record, or frequent subcontractor(s) who will perform technical tasks associated with this Project.” In the standard SF330 form, section E resumes are limited to one page with 5 relevant projects. Please clarify if the intent is to provide the standard SF330 section E resume on one or multiple pages.

Answer 4:

(a) The intent behind the number of resume pages pertains to limitations for how long each resume should be for all of the proposed non-key personnel; therefore, resumes for Non-key personnel should not exceed 3 pages.

(b) Regarding Section E within the SF330 Form itself: Section E within the SF330 Form is specifically designed for providing resume/qualification information for all proposed Key Personnel; therefore Key Personnel resumes (to include the Section E page of the SF330 Form) should not exceed 3 pages (i.e., Firm’s can use continuation pages if more space is needed beyond the space provided under Section E of the SF330 Form itself – not to exceed 3 pages altogether).

ATTACHMENT:

See attached document: A0001 Elevator Inspection Report COR-CS.

*= Required Field
Modification to a Previous Notice

Modification to a Previous Notice

File details come from the government source that posted it. Updated .