This sources sought notice and related federal contract opportunity seek an architect-engineer firm to provide design services for renovations to an operating suite at the Veterans Affairs Medical Center in Togus, Maine. The renovation project has an estimated construction value of over $10 million and will include increasing operating room sizes, reorganizing the suite for improved workflow, and upgrading mechanical and electrical systems. Responses to the sources sought notice are due by September 30, 2022. Required services include design and construction phase support, commissioning and commissioning agent work, and development of documents such as checklists and specifications to facilitate the commissioning process. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1 is the contracting agency.

View the file

Other files

File Type Posted
36C24122R0187 0002.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sources Sought Notice Sources Sought Notice

SUBJECT*
402-22-753 A\E Renovate Operating Suite

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
04330
SOLICITATION NUMBER*
36C24122R0187
RESPONSE DATE/TIME/ZONE
09-30-2022 2PM EASTERN TIME, NEW YORK, USA
ARCHIVE
90 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N

SET-ASIDE

PRODUCT SERVICE CODE*
C1DZ
NAICS CODE*
541310
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

Network Contracting Office 1 (NE) VAMC Togus 1 VA Center Augusta ME 04330

POINT OF CONTACT*

Contracting Specialist Diane C. Davis diane.davis2@va.gov 207-623-8411 x3357

PLACE OF PERFORMANCE

ADDRESS
Department of Veterans Affairs

VAMC Togus

1 VA Center

Augusta Maine

POSTAL CODE
04330

COUNTRY

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION
diane.davis2@va.gov

DESCRIPTION

SOURCES SOUGHT

ARCHITECT-ENGINEER DESIGN SCOPE OF WORK

Renovate Operating Suite

PROJECT NO: 402-22-753

PROJECT NAME: Renovate Operating Suite – Togus, ME MAGNITUDE OF CONSTRUCTION: More than $10,000,000.00

1.GENERAL INTENT: The Contractor (herein referred to as “A/E”) shall provide Architect/Engineer (A/E) services to design a construction project at the VA Maine Health Care System (Togus) in accordance with this design scope of work.

2.STATEMENT OF WORK:

A/E Part One Services (also known as Design Phase) for this design project includes site visits, field investigation, studies and user interviews to prepare drawings, specifications and cost estimates for all facets of work and disciplines/trades to facilitate a complete construction project to upgrade the facility infrastructure to support the new operating suite renovations. The scope of this project will provide code compliant operating rooms in the operating suite. Renovation will include increasing operating room sizes, reorganizing suite for more efficient workflow and upgrading existing mechanical and electrical equipment to meet code requirements. The scope of this project includes, but is not limited to, the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal & emergency)), Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion, and renovation of existing space (demo, new construction, finishes, etc.). Scope to include phasing and infection control plans that will allow for functional use of this space throughout construction. The selected A/E shall prepare all required National Environmental Policy Act (NEPA) analysis and Environmental Assessment reports and documentation for any improvements made as part of this project.

A/E Part Two Services of this design project (also known as Construction Period Services) includes responding to construction contractor Requests For Information (RFIs) during the solicitation (solicitation support) and construction phases of the construction project, attendance at pre-bid, post-award and commissioning kick off construction project conferences, review of construction material submittals and shop drawings, approximately 4 site visits per month during construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications, preparation of site visit reports, coordination with project commissioning requirements, review of any construction project modifications for cost and technical acceptability, attendance and participation during the final acceptance inspection, preparation of the punch list and preparation of record drawings of the completed construction project based on the construction contractor’s as-built drawings. The A/E shall prepare a submittal log to be utilized by the VA during construction period services, maintain RFI log and provide meeting minutes for weekly construction meetings throughout the duration of construction. The A/E shall provide Commissioning and Commissioning Agent services and deliverables in accordance with the reference document, “OCFM Whole Building Commissioning Process Manual.” See “Commissioning Agent Tasks” in each section of the reference document. The Commissioning Agent shall be involved in all phases of the project, including both design and construction. It is anticipated that the Commissioning Agent will participate in the following: design reviews, owner’s requirements updates, design phase commissioning planning (will facilitate), commissioning specification reviews (will facilitate), construction project meetings, construction observation visits, equipment startup and testing, Testing Adjusting and Balancing (TAB) verification, and project commissioning (will facilitate in coordination with General Contractor). The commissioning process shall be adapted to the size and complexity of the project. Deliverables shall be as described in the reference document. Additionally, the A/E shall develop the commissioning plan, pre-functional checklists, systems functional performance test checklists, integrated system test checklists, and edited master specification templates to serve as a starting point for the commissioning process on all projects based on the following Systems to be Commissioned.