VA Brockton HBPC Shops_2Oct20.pdf
PDF 756 KB Posted
- Solicitation number
- 36C24122Q1139
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2022-07-13_Outpatient MH Services Layout 3-4B_DIRTT updated floor plan.pdf | ||
| Vendor questions.pdf | ||
| Statement of Work-VA Brockton.pdf | ||
| 36C24122Q1139.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
- 26Aug19 First Issue BLM
DW-101
DW-101
DW-101
DW-101
DW-101
C
D
A
B
E F
I
J
GH
HBPC
HBPC
A-605
A-605C
A-620
REF
HBPC
AO & STORAGE
BD2
BDT2
B D
B D
T
DW-101
DW-101
DW-101
DW-101
DW-101
6'-8 5/8"
3'-6 9/16"
5'-8 15/16"
C
D
A
B
E F
I
J
GH
BD2
BDT2
B D
B D
T
This drawing represents DIRTT Environmental Solution Ltd.'s
("DIRTT") interpretation of the design intent and serves as
DIRTT's shop drawings for manufacturing purposes. The details and scope of these shop drawings represent the product that will be produced by DIRTT and delivered to site. Any additions or changes to, or deletions or deviations from, these drawings will be regarded as a change order and processed accordingly. Manufacturing will not commence without approval of these shop drawings.
You agree to immediately notify DIRTT of any discrepancies between the on-site dimensions and ceiling heights and those contained in the approved drawings. Upon notification, DIRTT shall take all reasonable steps to make the necessary changes, but shall not be responsible for any additional costs or schedule delays associated with such changes.
You agree to provide a sample of all contractor-supplied hardware to DIRTT within one week of approval of shop drawings. Wherever possible, actual samples of hardware are to be provided to DIRTT. DIRTT shall not be responsible for any additional costs or schedule delays associated with changes in hardware specifications.
THESE DRAWINGS ARE THE CONFIDENTIAL AND
PROPRIETARY INFORMATION OF DIRTT ENVIRONMENTAL
SOLUTIONS LTD. ANY REPRODUCTION, ALTERATION,
DISCLOSURE OR USE OF THIS DRAWING OTHER THAN
AS AGREED TO BY DIRTT ENVIRONMENTAL SOLUTIONS
LTD. IS EXPRESSLY PROHIBITED.
DISCLAIMER
CLIENT APPROVAL
APPROVED DRAWING PACKAGE
APPROVED, AS NOTED
REVISED, RESUBMIT
Authorized Signing Officer Date
This drawing represents DIRTT Environmental Solutions (DIRTT)'s interpretation of the design intent and severs as our shop drawings for manufacturing purposes. The details and scope in these drawings represent the product that will be produced by DIRTT and delivered to site. All additions, changes, or deviations from this approval drawing package will be regarded as a change order and processed accordingly. Approval of this drawing package is one of the conditions precedent to commencement of manufacturing.
DIRTT Environmental Solutions
DRAWING INDEX
DW-101 PLANS & DETAILS
DW-201 ELEVATIONS & SCHEDULES
PROJECT DETAILS/NOTES:
FRAME AND TRIM DETAILS
EXTRUSION PROFILE: FRAME FINISH:
CURVILINEAR
ANODIZED ALUMINUM
RECTILINEAR
POWDERCOATED
BLADE
VENEER
EVIL TWIN
BASE TRIM COLOR: PVC/GLASS WIPE COLOR:
SILVER
SILVER
CHARCOAL
CHARCOAL
BLACK
BLACK
REVEAL: COPLANAR:
CLASSIC
NO
ENZO
YES
FLOOR, CEILING, AND SEISMIC DETAILS
FLOOR TYPE: WALL HEIGHT: TBD
CARPET
HARD SURFACE
CEILING TYPE: GRID TYPE:
DRYWALL BULKHEAD
9/16"
15/16"
CORNICE RAIL TILE TYPE:
LOW WALL
FLUSH
GRID
CONCEALED
TEGULAR
SEISMIC REQUIRED: HARDWARE REQUIREMENTS:
NO
YES
DOORS:
REFERENCE DOOR SCHEDULE FOR FURTHER DETAILS
ELECTRICAL PROVISION REQUIRED - SEE ELECTRICAL SHOP DRAWINGS
DATA PROVISION REQUIRED - SEE PON SHOP DRAWINGS
MILLWORK PROVISIONS REQUIRED - SEE MILLWORK SHOP DRAWINGS
ADDITIONAL NOTES:
Aluminum 3-way
Post
Solid Wall Tile
Heavy Vertical
Zipper
Solid to Solid to Solid
Barn Door
Vertical Extrusion
Base Building Wall
Barn Door to Existing Wall
" Planned Shim Space
PVC Wall Trim
Fabric Guide Zipper
Aluminum 2-way
Rectilinear Post
Stacked to Barn Door
Heavy Vertical
Zipper
Solid Wall Tile
Aluminum 2-way
Rectilinear Post
Solid to Solid
Solid Wall Tile
Heavy Vertical
Zipper
Aluminum 3-way
Post
Solid Wall Tile
Heavy Vertical
Zipper
Solid to Stacked to Existing
F a c t o r y
P r e s e t
H e i g h t
Solid Wall to Flush Grid Ceiling
11095 CEILING TRACK
FLEXIBLE PVC CEILING TRIM
Typical Solid Wall Construction
" FINISHED TILE BOTH SIDES (FINISH AS SPECIFIED)
ALUMINUM FRAME
FIBRERGLASS INSULATION
4" THICK ASSEMBLY
12802 LEVELER ASSEMBLY
11891 ALUMINUM HORIZONTAL EXTRUSION
DIRTT SOLID WALL TILE
12705 LOW PROFILE CARPET GRIPPER
11896 LOW PROFILE BASE TRACK
SANTOPRENE BASE TRIM - 16832 (Silver)
TILE FASTENING CLIP
CLOSED CELL NEOPRENE GASKET
11166 TOP HORIZONTAL ALUMINUM FRAME EXTRUSION
12586 PANEL HANGER HOOK
VERTICALL ALUMINUM FRAME EXTRUSION
CEILING GRID (BY OTHERS)
CEILING TILE (BY OTHERS)
F a c t o r y
P r e s e t
H e i g h t
Th is dr aw in g is th e co nf id en tia l a nd p ro pr ie ta ry in fo rm at io n of D
IR
TT
E nv iro nm en ta l S ol ut io ns L td
DI
RT
T) . A ny re pr od uc tio n, a lte ra tio n, d isc lo su re o r u se o f t hi s d ra w in g ot he r t ha n as a gr ee d to b y
DI
RT
T is ex pr es sly p ro hi bi te d.
D o no t u se d ra w in gs fo r s ca le p ur po se s.
A ll sit e di m en sio ns , d ra w in gs
, d et ai ls, a nd sp ec ifi ca tio ns c on ta in ed h er ei n m us t b e ve rif ie d by su b-co nt ra ct or s a nd a ny d isc re pa nc ie s m us t b e re po rt ed to
D
IR
TT
in w rit in g be fo re p ro ce ed in g w ith w or k.
S ee c ov er p ag e of d ra w in g pa ck ag e fo r f ul l d isc la im er
C:\Users\BRIANN~1.MAH\AppData\Local\Temp\ICEcad-11e32a59-25cf-4562-8587-bedbbcd0e616\ICEcad.dwg 2020-10-2 8:16:32 AM
Project:
Drawn by:
Scale:
Plot Date: 2020/10/02
DW-101
BLM
PM: NAME
940 BELMONT ST.
BUILDING 3
Project Address:
Project Name:
BROCKTON, MA
VA BROCKTON
Contact:
Contact Number:
Date Revision Initial
SHOP
DRAWINGS
Rev
AS NOTED
PLAN AND DETAILS
SHEET
DW-101
KEY PLAN2
NTS
DW-101
FLOOR PLAN1
NTS
Project Area
DW-101
INTERSECTION DETAILS3
3"= 1'-0"
AutoCAD SHX Text
FLOOR
B Mahoney Pen x
B Mahoney Text Box teg grid 15/16"
John.Vasconcelos Dimension 3'
DW-101
3'-3
3'-3
"3'-4"
6'-7
" 5'-9
2'-10
" 2'-10
" 1'1'-7"
5'-11"
3'-4"
BD2
BDT2
BD2
BDT2
BD1
BDT1
BD1
BDT1
1 2
Elevation C Elevation DElevation A Elevation B Elevation E Elevation F Elevation I
Elevation J
Elevation G Elevation H
5'-6
2'-9
"2'-9
1 2
M2
M29
M2
M2
M29
M2
M2
M2
M2
M2
M2
M2
M1
M1
M1
M1
M1
M1
M1
M4
M2
M1
M1
M1
M1
M30
M1
M1
M1
M1
M1
M1
M4
M2
M1
M1
M1
M1
M30
M2
M29
M1
M1
M1
M1
M4
M2
M29
M1
M1
M1
M1
M4
M2
M2
M2
M1
M1
M1
M1
M30
M1
M1
M1
M1
M1
M1
M1
M4
M2
M29
M2
M1
M1
M1
M1
M30
M1
M1
M1
M1
M1
M1
M4
- 26Aug19 First Issue BLM
DIRTT Finish Schedule
Ta g
Finish
Specification
M1 ANO
Grade 1 Anodized; Anodized Finish - Clear
M2 PNT
DIRTT Chroma Coat Grade 1; Chroma Coat - Scout DC15
M4 GLS
Center Mounted Tempered Glass Tile; 6mm Tempered Glass - Clear; No Edge Polish;6.0mm
M6 PWD
DIRTT Powder Coated Grade 2; Powder Coat - Shimmer DPM50 (Metallic)
M7 PWD
DIRTT Powder Coated Grade 2; Powder Coat - Shimmer DPM50 (Metallic)
M29 TFAB
Fabric Grade - Custom; Carnegie Xorel Twine #6217-35; Standard
M30 GLS
COM GLASS DIRECT TO SITE - COM Stickbuilt Glass; Default 10mm; COM Glass; Flat Polish All Edges; 10.0; ;10.0mm
DIRTT Door Schedule
Ta g
Style Name
Size Handedness
Hardware Type Closer Type Stopper Door Base Style Finish Tag Hardware Description
Center Location AFF
Door Track Type
BD1
Glass_Barn_Door_Barivot_Goldie_f Height 7' - 7 7/8" X Width 3' - 4 1/4"
LH None Soft Close N/A
Regular M1, M4, M7
Standard Back to Back Bar Pull 630 Finish - 12"
Standard Back to Back Bar Pull 630 Finish - 12"(3' - 8 13/16")
Barivot Barn Door Slim Track
BD2
Glass_Barn_Door_Barivot_Goldie_f Height 7' - 7 7/8" X Width 3' - 4 1/4"
RH None Soft Close N/A
Regular M1, M4, M7
Standard Back to Back Bar Pull 630 Finish - 12"
Standard Back to Back Bar Pull 630 Finish - 12"(3' - 8 13/16")
Barivot Barn Door Slim Track
Th is dr aw in g is th e co nf id en tia l a nd p ro pr ie ta ry in fo rm at io n of D
IR
TT
E nv iro nm en ta l S ol ut io ns L td
DI
RT
T) . A ny re pr od uc tio n, a lte ra tio n, d isc lo su re o r u se o f t hi s d ra w in g ot he r t ha n as a gr ee d to b y
DI
RT
T is ex pr es sly p ro hi bi te d.
D o no t u se d ra w in gs fo r s ca le p ur po se s.
A ll sit e di m en sio ns , d ra w in gs
, d et ai ls, a nd sp ec ifi ca tio ns c on ta in ed h er ei n m us t b e ve rif ie d by su b-co nt ra ct or s a nd a ny d isc re pa nc ie s m us t b e re po rt ed to
D
IR
TT
in w rit in g be fo re p ro ce ed in g w ith w or k.
S ee c ov er p ag e of d ra w in g pa ck ag e fo r f ul l d isc la im er
C:\Users\BRIANN~1.MAH\AppData\Local\Temp\ICEcad-11e32a59-25cf-4562-8587-bedbbcd0e616\ICEcad.dwg 2020-10-2 8:16:33 AM
Project:
Drawn by:
Scale:
Plot Date: 2020/10/02
DW-201
BLM
PM: NAME
940 BELMONT ST.
BUILDING 3
Project Address:
Project Name:
BROCKTON, MA
VA BROCKTON
Contact:
Contact Number:
Date Revision Initial
SHOP
DRAWINGS
Rev
AS NOTED
ELEVATION
SHEET
DW-201
ELEVATIONS1
1/4" = 1' - 0"
**WALL HEIGHT TBD
B Mahoney Text Box All glass from DIRTT 1/4"
| Sheets and Views |
| ICEcad-DW-101 |
| ICEcad-DW-201 |
File details come from the government source that posted it. Updated .