View the file

Other files for this federal contract opportunity

Other files attached to S212--Fuel Testing and Polishing Emergency Generators Amendment 00001, newest first.
File Type Posted
36C24121Q0417_1.docx DOCX document
S02_Attachment 1_Past Performance Worksheet.xlsx XLSX spreadsheet
P09_PWS (Rev-5).docx DOCX document
S20_Attachment 2 Limitation on Subcontracting.doc DOC document
36C24121Q0417.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

** AMENDMENT A00001 – Fuel Testing and Polishing Emergency Generators – Contractor Questions and Government Responses **

Please confirm receipt of all Solicitation Amendments in your solicitation submission package

1. Please identify if the tanks are above ground tanks (AST) or underground tanks (UST) Answer:

All the tanks in Newington are underground except for the 350KW portable.

In West Haven all are above ground except the 12,000‐gal tank in Generator Building Two

2. What is the fuel level (by percentage of capacity) will the tanks typically be at for a cleaning evolution?

Answer: We typically have 80 to 90 % in all tanks

3. What is the typical access to each tank for a truck/trailer?

Answer: All Day Tanks and Main tanks are within 50 feet of the roadway or driveways