36C24120Q0311-007.pdf
PDF Posted
- Solicitation number
- 36C24120Q0311
About this file
36C24120Q0311 Example Schedule.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24120Q0311-005.xlsx | XLSX spreadsheet | |
| 36C24120Q0311-008.pdf | ||
| 36C24120Q0311-006.pdf | ||
| 36C24120Q0311-003.docx | DOCX document | |
| 36C24120Q0311-009.pdf | ||
| 36C24120Q0311-011.pdf | ||
| 36C24120Q0311-004.pdf | ||
| 36C24120Q0311-010.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VAMC - West Roxbury 2012-2013 Electrical Maintenance Work Schedule
EESCO Work General Job # Equipment / Task Description Techs Hrs Notes
Wednesday, November 14, 2012 2.0 10.0 Main 5kV Switchgear
PM work to be done during regular weekday hours, switching per VAMC-WR direction AV Breaker "4A" (Bldg # I "A" Feeder)
Open 5kV "4A" breaker, open 480V "A" breaker, close 480V tie between 480V "A" & "B" AV Breaker (spare)
Building #1 "A" Normal Power Switchboard
5kV Disconnect Switch ("A")
750kVA Dry Type Transformer ("A")
Open 480V "A" main breaker apply LOTO to isolate xf nr from backfeed thin tie
Thursday, November 15, 2012 2.0 &0
PM work to be done during regular weekday hours, switching per VAMGWR direction 5kV Breaker "9A" (Biding #1 "B" Feeder)
Open 5kV "9A" breaker, open 480V "B" breaker, close 480V tie between 480V "A" & "B" Building #1 "B" Normal Power Switchboard
5kV Disconnect Switch ("B")
750kVA Dry Type Transformer ("B")
Open 480V "B" main breaker apply LOTO to isolate xfmr from backfeed thm tie
Wednesday, November 28, 2012 2.0 8.0
5kV Breaker "3B" (Bldg #2 "A" Feeder)
Open 5kV "3B" breaker, open 480V "A" breaker, close 480V tie between 480V "A" & "B" Building #2 "A" Normal Power Switchboard
SkV Disconnect Switch ("A")
2000kVA Dry Type Transformer ("A")
Open 480V "A" main breaker apply LOTO to isolate xfmr from backfeed thin tie
Thursday, November 29, 2012 2.0 &0
5kV Breaker "8B" (Biding #2 "B" Feeder)
Open 5kV "813" breaker, open 480V "B" breaker, close 480V tie between 480V "A" & "B" Building #2 "B" Normal Power Switchboard
5kV Disconnect Switch ("B")
2000kVA Dry Type Transformer ("B")
Open 480V "B" main breaker apply LOTO to isolate xfmr from backfeed thin tie
Saturday, December 8, 2012 3.0 12.0
PM work to be done during WEEKEND hours, switching per VAMC-WR direction 5kV Breaker "4B" (Bldg #3 "#1" Feeder)
Open 5kV "4B" breaker, open 480V "# l" breaker, close 480V tie between 480V "#1" & "#2" Building #3 "A" Normal Power Switchboard
5kV Disconnect Switch ("#1")
1500kVA Dry Type Transformer ("fl") ")
Open 480V "#I" main breaker apply LOTO to isolate xfmr from backfeed thm tie Fifteen (15) 480V Feeder Breakers ("#I" side of board)
EESCO to pull 1 to 2 breakers off live buss at a time to minimize impact on facility
Thursday, December 13, 2012 2.0 &0 Main NSTAR station
2500kVA Station Style Oil Filled Transformer
This work will need to be coordinated w/ NSTAR to isoloate incoming line upstream of transformer AV Disconnect Switch
AV Breaker
Hospital should not see a diffemce as this will be the line that it is NOT normally running on
Hospital should stay running through preferred line and AV Tie Breaker
Saturday, December 15, 2012 3.0 12.0
PM work to be done during WEEKEND hours, switching per VAMC-WR direction AV Breaker "9B" (Bldg #3 "#2" Feeder)
Open AV "4B" breaker, open 480V "#2" breaker, close 480V tie between 480V "# V & "#2" Building #3 42" Normal Power Switchboard
AV Disconnect Switch ("#2")
1500kVA Dry Type Transformer ("#2")
Open 480V "A" main breaker apply LOTO to isolate xfmr from backfeed thu tie Fifteen (15) 480V Feeder Breakers ("#2" side of board)
Board remains energized, EESCO to pull 1 to 2 breakers off at a time to minimize impact on facility
Saturday, January 5, 2013 4.0 10.0 Building #1 Normal "A" 480V Switchboard
PM work to be done during WEEKEND hours One (1) 480V Main Breaker ("A" side of board)
Nine (9) 480V Feeder Breakers ("A" side of board)
High current test set to get power from 480V spare breaker in electrical room Building #1 Normal "B" 208V Switchboard
One (1) 300kV A Dry Type Transformer
480V Feeder to the 300kVA Transformer remains LOTO for duration of outage, the 208V board is Eight (8) 208V Feeder Breakers ("B" side of board)
100% shutdown for an 8-10 hour outage
EESCO to set up two (2) high current test sets Exa mple
VAMC - West Roxbury 2012-2013 Electrical Maintenance Work Schedule
EESCO Work General Job # Equipment / Task Description Techs Firs Notes
Thursday, January 10, 2013 2.0 8.0
Main NSTAR station
/'M work to be done during regular weekday hours, switching per VAMC-WR direction 2500kVA Station Style Oil Filled Transformer
This work will need to be coordinated w/ NSTAR to isoloate incoming line upstream of transformer 5kV Disconnect Switch
AV Breaker
Switching needs to be coordinated w/ all hospital personnel aware as we will be transferring from preferred line to non-preferred line
Hospital will run through non-preferred line and tie breaker Sawrday, January 12, 2013 4.0 10.0
Building 01 Normal "B" 480V Switchboard
One (1) 480V Main Breaker ("A" side of board)
Nine (9) 480V Feeder Breakers ("A" side of board)
Building #1 Normal "A" 208V Switchboard
One (1) 300kVA Dry Type Transformer
480V Feeder to the 300kVA Transformer remains LOTO for duration of outage, the 208V board is Eight (8) 208V Feeder Breakers ("B" side of board)
100% shutdown for an 8-10 hour outage
EESCO to set up two (2) high current test sets Saturday, January 19, 2013 2.0 10.0
Building 02 Normal "General" 480V Switchboard
One (1) 480V Main Breaker ("General' side of board)
Ten (10) of seventeen (17) 480V Feeder Breakers
Building #2 Normal "Mechanical" 480V Switchboard
Ten (10) of twenty (20) 480V Feeder Breakers
Saturday, January 26, 2013 4.0 10.0
Building #2 Normal "General" 480V Switchboard
Seven (7) of seventeen (17) 480V Feeder Breakers
Building #2 Normal "Mechanical" 480V Switchboard
One (1) 480V Main Breaker ("Mechanical" side of board)
Ten (10) of twenty (20) 480V Feeder Breakers
One (1) 480V Tie Breaker
Exa mple