About this file

36C24120Q0311 QASP.pdf

View the file

Other files

File Type Posted
36C24120Q0311-005.xlsx XLSX spreadsheet
36C24120Q0311-008.pdf PDF
36C24120Q0311-003.docx DOCX document
36C24120Q0311-009.pdf PDF
36C24120Q0311-011.pdf PDF
36C24120Q0311-004.pdf PDF
36C24120Q0311-010.pdf PDF
36C24120Q0311-007.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For: West Roxbury VAMC located at 1400 VFW Parkway, West Roxbury, MA 02132‐4927

Contract Description: Maintenance, inspection, testing, and/or calibration of the Electrical Power Distribution System and all of its components.

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

What will be monitored?

How monitoring will take place.

Who will conduct the monitoring?

How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis.

However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) ‐ The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United

States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO – Craig Harris Administrative CS – John Shawki

Organization or Agency: Department of Veterans Affairs, VISN1 Consolidated Contracting

b. Contracting Officer’s Technical Representative (COR) ‐ The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR – Paul Babin

c. Other Key Government Personnel – The COR will designate staff as needed

3. CONTRACTOR REPRESENTATIVES

The following employee(s) of the contractor shall serve as the contractor’s program manager for this contract.

a. Program Manager –

4. PERFORMANCE STANDARDS

Task

Indicator

Standard

Acceptab le

Quality l

Method of

Surveillance

Incentive

All inspections, testing, and maintenance services will be performed

IAW the Statement of

Work, final approved quote and final contract.

The Contractor is required to correct and/or re‐work any

Testing, Inspections

& Maintenance services due to unsatisfactory performance or nonperformance

IAW the stated quality and level of effort in the SOW, the final approved quote and final contract. Rework shall be performed

95%

Direct

Observatio n

Potential

Exercise of

Option

Period/

Payment of Services

Rendered

5. INCENTIVES

The Government shall use “Potential Exercise of Option Period” and “Payment of Services Rendered” as incentives. Incentives shall be based on exceeding, meeting, or not meeting performance standards.

6. METHODS OF QA SURVEILLANCE

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

a. DIRECT OBSERVATION. (Can be performed through random sampling.)

7. RATINGS

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

Rating Description

Green

Yes. Performance and technical specifications are being met at an

Acceptable Quality Level (AQL).

Yellow

Yes. Performance and technical specifications are currently being met at the minimum AQL, but the following service/deliverable needs contractor attention:

(The Customer must identify what component of the deliverable and/or service

Red

No. Performance and technical specifications are not being met at AQL and the following service/deliverable needs immediate contractor resolution:

(The Customer must identify what component of the deliverable and/or service that is below the minimum AQL.)

8. DOCUMENTING PERFORMANCE

The COR shall maintain the Quality Assurance Worksheets in contract file and submit at end of the contract period to the Contracting Officer. These worksheets shall be submitted no later than 30 days after contract expiration.

9. FREQUENCY OF MEASUREMENT

The COR shall assess contract performance on a monthly basis using the Quality Assurance Worksheet.

<After award, both the contractor’s Program Manager and the COR shall sign this document.>

Signature – Contractor Program Manager

Signature – Contracting Officer’s Representative

Attachment A ‐ Quality Assurance Worksheet

QUALITY ASSURANCE WORKSHEET

Performance Rating

Deliverable/Service � Qualit y

Ratin

Causativ e

Factors

Effect on Mission Action

Required/Dat e

All testing, inspection & maintenance shall be

IAW the Statement of

Work, final approved quote and VA expectations as described in Section C.

Scope of Work.

Green

Comments Unnecessary for “Green” QA Rating.

Yellow

Red

File details come from the government source that posted it. Updated .