36C24119R0045-006.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- VISN 1 SATOC Providence
- Solicitation number
- 36C24119R0045
About this file
This document contains a presolicitation notification for a construction procurement and a template for pricing labor, materials, subcontractors, and overhead costs.
The Department of Veterans Affairs intends to award single award task order contracts (SATOCs) for construction services at the Bedford VA Medical Center and Providence VA Medical Center. Work will involve repairs, renovations and minor alterations to existing facilities and infrastructure. Task orders will range from $25,000 to $75,000, with a $500,000 ceiling. Contractors must have bonding capacity up to $500,000 and a local office. The acquisition is set aside for service-disabled veteran-owned or veteran-owned small businesses. The NAICS code is 236220 and the size standard is $36.5 million. One SATOC will be awarded per location, though two may be awarded to one contractor. The base period of performance is five years.
The pricing template provides sections to include direct labor costs, materials, subcontractors, and overhead coefficients without assigned values. Additional costs may include taxes, benefits, shipping and handling. Items excluded from additional costs but included in coefficients are local overhead, general and administrative costs, and fee.
36C24119R0045 VISN 1 SATOC SEED Task Order Pricing Sheet.xlsx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24119D0032-000.docx | DOCX document | |
| 36C24119D0031-000.docx | DOCX document | |
| 36C24119R0045-A0002000.docx | DOCX document | |
| 36C24119R0045-A0002003.pdf | ||
| 36C24119R0045-A0002002.pdf | ||
| 36C24119R0045-A0002001.docx | DOCX document | |
| 36C24119R0045-A0002004.pdf | ||
| 36C24119R0045-A0001000.docx | DOCX document | |
| 36C24119R0045-008.zip | ZIP file | |
| 36C24119R0045-009.zip | ZIP file | |
| 36C24119R0045-005.docx | DOCX document | |
| 36C24119R0045-007.docx | DOCX document | |
| 36C24119R0045.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA SATOC display only
| Labor | ADD ADDITIONAL LINES IF NECESSARY | ||||||
| Direct Labor | H&W Labor | Total Additional Costs per pers | Full Cost Labor /Person | ||||
| Base | |||||||
| Rate | DLH | H&W Rate | |||||
| Additional costs are: | |||||||
| labor type | PTO accrual | ||||||
| one person | $ - 0 | $ - 0 | Sick Accrual | ||||
| one person | $ - 0 | $ - 0 | Holiday accrual | ||||
| one person | $ - 0 | $ - 0 | federal and state payroll taxes | ||||
| one person | $ - 0 | $ - 0 | fringe benefits | ||||
| one person | $ - 0 | $ - 0 | |||||
| one person | $ - 0 | $ - 0 | |||||
| one person | $ - 0 | $ - 0 | Items Not included in Additional costs, but Part of Coefficient | ||||
| one person | $ - 0 | $ - 0 | Local O/H | ||||
| one person | $ - 0 | $ - 0 | G&A | ||||
| one person | $ - 0 | $ - 0 | Fee | ||||
| one person | $ - 0 | $ - 0 | |||||
| one person | $ - 0 | $ - 0 | |||||
| one person | $ - 0 | $ - 0 | |||||
| Total Labor Cost | $ - 0 |
| Vendor | Unit | Unit $ | Qty | Additional Costs | Total Material Cost /Item | ||||
| Materials | Additional costs are: | ||||||||
| one item | ea | $ - 0 | $ - 0 | Sales Tax | |||||
| one item | ea | $ - 0 | $ - 0 | Material Handling | |||||
| one item | ea | $ - 0 | $ - 0 | Shipping | |||||
| one item | ea | $ - 0 | $ - 0 | ||||||
| one item | ea | $ - 0 | $ - 0 | Items Not included in Additional costs, but Part of Coefficient | |||||
| one item | ea | $ - 0 | $ - 0 | Local O/H | |||||
| one item | ea | $ - 0 | $ - 0 | G&A | |||||
| one item | ea | $ - 0 | $ - 0 | Fee | |||||
| one item | ea | $ - 0 | $ - 0 | ||||||
| one item | ea | $ - 0 | $ - 0 | ||||||
| one item | ea | $ - 0 | $ - 0 | ||||||
| one item | ea | $ - 0 | $ - 0 | ||||||
| Total Material Cost | $ - 0 |
| Subcontractors | Vendor | Unit | Unit $ | Qty | Total Material Cost /Item | |||
| Each Subcontractor Price Item | Note: | |||||||
| one subcontractor | ea | $ - 0 | All subcontractor are required to include sales tax in their quotes | |||||
| one subcontractor | ea | $ - 0 | ||||||
| one subcontractor | ea | $ - 0 | Items Not included in Additional costs, but Part of Coefficient | |||||
| one subcontractor | ea | $ - 0 | Local O/H | |||||
| one subcontractor | ea | $ - 0 | G&A | |||||
| one subcontractor | ea | $ - 0 | Fee | |||||
| one subcontractor | ea | $ - 0 | ||||||
| one subcontractor | ea | $ - 0 | ||||||
| one subcontractor | ea | $ - 0 | ||||||
| one subcontractor | ea | $ - 0 | ||||||
| one subcontractor | ea | $ - 0 | ||||||
| one subcontractor | ea | $ - 0 | ||||||
| Total Subcontractor Cost | $ - 0 | |||||||
| Bond Cost (if Required) | as directed by each task order |
| Total all Costs | $ - 0 | ||
| Coefficient | X.XX | Coefficient includes: | |
| Local O/H | |||
| Total | $ - 0 | G&A | |
| Fee | |||
| Insert Coefficient where X.XX is |
File details come from the government source that posted it. Updated .