36C24119Q0503-003.docx
DOCX document 13 KB Posted
- Solicitation number
- 36C24119Q0503
About this file
36C24119Q0503 QASP PERFORMANCE REQUIREMENT SUMMARY.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| -18225.docx | DOCX document | |
| 36C24119Q0503-0002000.docx | DOCX document | |
| 36C24119Q0503-0001001.pdf | ||
| 36C24119Q0503-0001005.pdf | ||
| 36C24119Q0503-0001003.pdf | ||
| 36C24119Q0503-0001010.pdf | ||
| 36C24119Q0503-0001011.pdf | ||
| 36C24119Q0503-0001006.pdf | ||
| 36C24119Q0503-0001007.pdf | ||
| 36C24119Q0503-0001000.docx | DOCX document | |
| 36C24119Q0503-0001008.pdf | ||
| 36C24119Q0503-0001002.pdf | ||
| 36C24119Q0503-0001009.pdf | ||
| 36C24119Q0503-0001004.pdf | ||
| 36C24119Q0503-001.xlsx | XLSX spreadsheet | |
| 36C24119Q0503-000.docx | DOCX document | |
| 36C24119Q0503-003.docx | DOCX document | |
| 36C24119Q0503-002.docx | DOCX document | |
| 36C24119Q0503-000.docx | DOCX document | |
| 36C24119Q0503-002.docx | DOCX document | |
| 36C24119Q0503-001.xlsx | XLSX spreadsheet |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE REQUIREMENT SUMMARY: The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
| Performance Objective |
| Standard |
| Performance Threshold |
| Method of Surveillance |
The contractor shall provide timely responses to telephone service request.
2 Hour response time
| 99% |
| Periodic Surveillance |
Customer Compliant
| The contractor shall arrive onsite in response to a service call service call |
| Service Technician shall be onsite within 2 to 4 hours of the initial service call |
| 99% |
| Periodic Surveillance |
Customer Compliant
| The contractor shall provide service availability with an expected uptime of 99% |
| 99% uptime of the overall system |
| 99% |
| Periodic Surveillance |
Customer Compliant
The Government will utilize a Quality Assurance Surveillance Plan (QASP) throughout the life of the contract to ensure that the Contractor is performing the services required by this PWS in an acceptable manner. The Government reserves the right to alter or change the QASP at its own discretion. A Performance Based Service Assessment Survey will be used in combination with the QASP to assist the Government in determining acceptable performance levels. The COR will determine if the performance of the Contractor is below a metric standard and deem it unacceptable. The COR will then notify the Contracting Officer.
File details come from the government source that posted it.