36C24118Q0348-00004000.docx
DOCX document 42 KB Posted
- Solicitation number
- 36C24118Q0348
About this file
36C24118Q0348 00004 36C24118Q0348 00004.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24118C0070-000.docx | DOCX document | |
| 36C24118Q0348-00003000.docx | DOCX document | |
| 36C24118Q0348-00002001.xlsx | XLSX spreadsheet | |
| 36C24118Q0348-00002000.docx | DOCX document | |
| 36C24118Q0348-00001000.docx | DOCX document | |
| 36C24118Q0348-001.docx | DOCX document | |
| 36C24118Q0348-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITE
M 10A.
15C. DATE
SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE
SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 00004 05-29-2018 689-18-3-4815-0037
NONE
Department of Veterans Affairs Network Contracting Office 1 Contracting Officer (90c) 830 Chalkstone Avenue Providence RI 02908 Mercedes Blanton, (401) 455-4904 or Mercedes.Blanton@va.gov Department of Veterans Affairs Network Contracting Office 1 Contracting Officer (90c) 830 Chalkstone Avenue Providence RI 02908 To all Offerors/Bidders
36C24118Q0348 05-11-2018
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:
9:00
AM
, 05/30/2018 See CONTINUATION Page 689-3680162-4815-856700-2580 0100C10Z4 X The above referenced solicitation in block 9A for Solid Waste Disposal services for the VA Connecticut Healthcare System located in Connecticut is hereby modified as follows:
1. Vendor question and Government answer is listed below.
2. Questions are in BLACK and answers are in RED.
3. Pricing/Cost Schedule has been revised; please see below.
4. The hour and date specified for receipt of offers is extended by 1 day, now due on 05/30/2018 by 9:00 AM.
5. Last day for questions will be Wednesday, May 30, 2017 by 8:00 AM.
CONTINUATION PAGE
A.2 QUESTIONS AND ANSWERS
1. Question: Can the VA please verify whether the service schedule for CLINs 0011, 0012, 0014 is either bi-monthly, every other week or once a month since there is a discrepancy in the narrative of the CLIN and the estimated total in parenthesis?
Answer: The services for CLINS 0011, 0012 and 0014 are every other week; please see revised price schedule below.
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 0001 |
| Bldg. 1 35yd solid waste compactor serviced biweekly (Tues./Fri.) at West Haven |
(estimated 104 annual pickups)
Contract Period: Base POP Begin: 06-01-2018 POP End: 05-31-2019
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 0002 |
| Bldg. 1, 50 yd. recycling compactor serviced weekly (Tues.) at West Haven |
(estimated 52 annual pickups)
Contract Period: Base POP Begin: 06-01-2018 POP End: 05-31-2019
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 0003 |
| Bldg. 2, 17 yd. solid waste compactor serviced bi-weekly (Tues. and Fri.) at West Haven |
(estimated 104 annual pickups)
Contract Period: Base POP Begin: 06-01-2018 POP End: 05-31-2019
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 0004 |
| Bldg. 2, 17 yd. recycling compactor serviced weekly (Tues.) at West Haven |
(estimated 52 annual pickups)
POP End: 05-31-2019
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 0005 |
| Bldg. 1, 30 yd. metal recycling open top serviced weekly (Wed.) at West Haven |
POP End: 05-31-2019
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 0006 |
| Bldg. 1, 30 yd. General waste open top serviced weekly at West Haven |
POP End: 05-31-2019
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 0007 |
| Bldg. 1, 30 yd. General waste open top serviced bi-monthly at West Haven |
(estimated 24 annual pickups)
POP End: 05-31-2019
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 0008 |
| Bldg.36, 4 yd. Single Stream recycling front end load container serviced weekly at West Haven |
POP End: 05-31-2019
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 0009 |
| Bldg.36, 4 yd. Solid Waste front end load container serviced weekly at West Haven |
POP End: 05-31-2019
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 0010 |
| Rental of 35 96-gallon toters for the internal use (no service from Contractor) at West Haven |
(estimated 12 annual pickups)
POP End: 05-31-2019
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 0011 |
| Bldg. 3, 30 yd. Solid Waste compactor serviced every other week at Newington |
(estimated 26 annual pickups)
POP End: 05-31-2019
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 0012 |
| Bldg. 3, 30 yd. Single Stream recycling compactor serviced every other week at Newington |
POP End: 05-31-2019
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 0013 |
| Bldg. 3, 30 yd. Metal recycling open top serviced monthly at Newington |
POP End: 05-31-2019
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 0014 |
| Bldg. 3, 30 yd. Wood recycling open top serviced every other week at Newington |
(estimated 26 annual pickups)
Base Year Total Amount: $________________________
Note: 100% of the credit for metal recycling will be credited on the monthly invoice.
The Government will evaluate prices for the option under FAR 52.217-8 by using the last year’s option prices to calculate the price for six months of effort, and adding that amount to the base and other option years to arrive at the total.
Contract Period: Base POP Begin: 06-01-2018 POP End: 05-31-2019
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 1001 |
| Bldg. 1 35yd solid waste compactor serviced biweekly (Tues./Fri.) at West Haven |
(estimated 104 annual pickups)
Contract Period: Option 1 POP Begin: 06-01-2019 POP End: 05-31-2020
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 1002 |
| Bldg. 1, 50 yd. recycling compactor serviced weekly (Tues.) at West Haven |
(estimated 52 annual pickups)
Contract Period: Option 1 POP Begin: 06-01-2019 POP End: 05-31-2020
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 1003 |
| Bldg. 2, 17 yd. solid waste compactor serviced bi-weekly (Tues. and Fri.) at West Haven |
(estimated 104 annual pickups)
Contract Period: Option 1 POP Begin: 06-01-2019 POP End: 05-31-2020
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 1004 |
| Bldg. 2, 17 yd. recycling compactor serviced weekly (Tues.) at West Haven |
Contract Period: Option 1 POP Begin: 06-01-2019 POP End: 05-31-2020
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 1005 |
| Bldg. 1, 30 yd. metal recycling open top serviced weekly (Wed.) at West Haven |
POP End: 05-31-2020
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 1006 |
| Bldg. 1, 30 yd. General waste open top serviced weekly at West Haven |
POP End: 05-31-2020
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 1007 |
| Bldg. 1, 30 yd. General waste open top serviced bi-monthly at West Haven |
POP End: 05-31-2020
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 1008 |
| Bldg.36, 4 yd. Single Stream recycling front end load container serviced weekly at West Haven |
POP End: 05-31-2020
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 1009 |
| Bldg.36, 4 yd. Solid Waste front end load container serviced weekly at West Haven |
POP End: 05-31-2020
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 1010 |
| Rental of 35 96-gallon toters for the internal use (no service from Contractor) at West Haven |
POP End: 05-31-2020
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 1011 |
| Bldg. 3, 30 yd. Solid Waste compactor serviced every other week at Newington |
POP End: 05-31-2020
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 1012 |
| Bldg. 3, 30 yd. Single Stream recycling compactor serviced every other week at Newington |
POP End: 05-31-2020
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 1013 |
| Bldg. 3, 30 yd. Metal recycling open top serviced monthly at Newington |
POP End: 05-31-2020
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 1014 |
| Bldg. 3, 30 yd. Wood recycling open top serviced every other week at Newington |
Option Year One (1) Total Amount: $________________________
POP End: 05-31-2020
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 2001 |
| Bldg. 1 35yd solid waste compactor serviced biweekly (Tues./Fri.) at West Haven |
(estimated 104 annual pickups)
Contract Period: Option 2 POP Begin: 06-01-2020 POP End: 05-31-2021
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 2002 |
| Bldg. 1, 50 yd. recycling compactor serviced weekly (Tues.) at West Haven |
(estimated 52 annual pickups)
Contract Period: Option 2 POP Begin: 06-01-2020 POP End: 05-31-2021
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 2003 |
| Bldg. 2, 17 yd. solid waste compactor serviced bi-weekly (Tues. and Fri.) at West Haven |
(estimated 104 annual pickups)
Contract Period: Option 2 POP Begin: 06-01-2020 POP End: 05-31-2021
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 2004 |
| Bldg. 2, 17 yd. recycling compactor serviced weekly (Tues.) at West Haven |
Contract Period: Option 2 POP Begin: 06-01-2020 POP End: 05-31-2021
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 2005 |
| Bldg. 1, 30 yd. metal recycling open top serviced weekly (Wed.) at West Haven |
POP End: 05-31-2021
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 2006 |
| Bldg. 1, 30 yd. General waste open top serviced weekly at West Haven |
POP End: 05-31-2021
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 2007 |
| Bldg. 1, 30 yd. General waste open top serviced bi-monthly at West Haven |
POP End: 05-31-2021
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 2008 |
| Bldg.36, 4 yd. Single Stream recycling front end load container serviced weekly at West Haven |
POP End: 05-31-2021
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 2009 |
| Bldg.36, 4 yd. Solid Waste front end load container serviced weekly at West Haven |
POP End: 05-31-2021
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 2010 |
| Rental of 35 96-gallon toters for the internal use (no service from Contractor) at West Haven |
POP End: 05-31-2021
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 2011 |
| Bldg. 3, 30 yd. Solid Waste compactor serviced every other week at Newington |
POP End: 05-31-2021
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 2012 |
| Bldg. 3, 30 yd. Single Stream recycling compactor serviced every other week at Newington |
POP End: 05-31-2021
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 2013 |
| Bldg. 3, 30 yd. Metal recycling open top serviced monthly at Newington |
POP End: 05-31-2021
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 2014 |
| Bldg. 3, 30 yd. Wood recycling open top serviced every other week at Newington |
Option Year Two (2) Total Amount: $________________________
POP End: 05-31-2021
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 3001 |
| Bldg. 1 35yd solid waste compactor serviced biweekly (Tues./Fri.) at West Haven |
(estimated 104 annual pickups)
Contract Period: Option 3 POP Begin: 06-01-2021 POP End: 05-31-2022
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 3002 |
| Bldg. 1, 50 yd. recycling compactor serviced weekly (Tues.) at West Haven |
(estimated 52 annual pickups)
Contract Period: Option 3 POP Begin: 06-01-2021 POP End: 05-31-2022
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 3003 |
| Bldg. 2, 17 yd. solid waste compactor serviced bi-weekly (Tues. and Fri.) at West Haven |
(estimated 104 annual pickups)
Contract Period: Option 3 POP Begin: 06-01-2021 POP End: 05-31-2022
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 3004 |
| Bldg. 2, 17 yd. recycling compactor serviced weekly (Tues.) at West Haven |
Contract Period: Option 3 POP Begin: 06-01-2021 POP End: 05-31-2022
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 3005 |
| Bldg. 1, 30 yd. metal recycling open top serviced weekly (Wed.) at West Haven |
POP End: 05-31-2022
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 3006 |
| Bldg. 1, 30 yd. General waste open top serviced weekly at West Haven |
POP End: 05-31-2022
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 3007 |
| Bldg. 1, 30 yd. General waste open top serviced bi-monthly at West Haven |
POP End: 05-31-2022
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 3008 |
| Bldg.36, 4 yd. Single Stream recycling front end load container serviced weekly at West Haven |
POP End: 05-31-2022
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 3009 |
| Bldg.36, 4 yd. Solid Waste front end load container serviced weekly at West Haven |
POP End: 05-31-2022
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 3010 |
| Rental of 35 96-gallon toters for the internal use (no service from Contractor) at West Haven |
POP End: 05-31-2022
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 3011 |
| Bldg. 3, 30 yd. Solid Waste compactor serviced every other week at Newington |
POP End: 05-31-2022
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 3012 |
| Bldg. 3, 30 yd. Single Stream recycling compactor serviced every other week at Newington |
POP End: 05-31-2022
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 3013 |
| Bldg. 3, 30 yd. Metal recycling open top serviced monthly at Newington |
POP End: 05-31-2022
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 3014 |
| Bldg. 3, 30 yd. Wood recycling open top serviced every other week at Newington |
Option Year Three (3) Total Amount: $________________________
POP End: 05-31-2022
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 4001 |
| Bldg. 1 35yd solid waste compactor serviced biweekly (Tues./Fri.) at West Haven |
(estimated 104 annual pickups)
Contract Period: Option 4 POP Begin: 06-01-2022 POP End: 05-31-2023
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 4002 |
| Bldg. 1, 50 yd. recycling compactor serviced weekly (Tues.) at West Haven |
(estimated 52 annual pickups)
Contract Period: Option 4 POP Begin: 06-01-2022 POP End: 05-31-2023
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 4003 |
| Bldg. 2, 17 yd. solid waste compactor serviced bi-weekly (Tues. and Fri.) at West Haven |
(estimated 104 annual pickups)
Contract Period: Option 4 POP Begin: 06-01-2022 POP End: 05-31-2023
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 4004 |
| Bldg. 2, 17 yd. recycling compactor serviced weekly (Tues.) at West Haven |
Contract Period: Option 4 POP Begin: 06-01-2022 POP End: 05-31-2023
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 4005 |
| Bldg. 1, 30 yd. metal recycling open top serviced weekly (Wed.) at West Haven |
POP End: 05-31-2023
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 4006 |
| Bldg. 1, 30 yd. General waste open top serviced weekly at West Haven |
POP End: 05-31-2023
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 4007 |
| Bldg. 1, 30 yd. General waste open top serviced bi-monthly at West Haven |
POP End: 05-31-2023
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 4008 |
| Bldg.36, 4 yd. Single Stream recycling front end load container serviced weekly at West Haven |
POP End: 05-31-2023
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 4009 |
| Bldg.36, 4 yd. Solid Waste front end load container serviced weekly at West Haven |
POP End: 05-31-2023
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 4010 |
| Rental of 35 96-gallon toters for the internal use (no service from Contractor) at West Haven |
POP End: 05-31-2023
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 4011 |
| Bldg. 3, 30 yd. Solid Waste compactor serviced every other week at Newington |
POP End: 05-31-2023
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 4012 |
| Bldg. 3, 30 yd. Single Stream recycling compactor serviced every other week at Newington |
POP End: 05-31-2023
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 4013 |
| Bldg. 3, 30 yd. Metal recycling open top serviced monthly at Newington |
POP End: 05-31-2023
| 12.00 |
| MO |
| __________________ |
| __________________ |
| 4014 |
| Bldg. 3, 30 yd. Wood recycling open top serviced every other week at Newington |
Option Year Four (4) Total Amount: $________________________
POP End: 05-31-2023
| 12.00 |
| MO |
| __________________ |
| __________________ |
| GRAND TOTAL |
| __________________ |