36C10X21Q0192_1.docx
DOCX document 89 KB Posted
- Attached to
- R614--BVA Shredding Services (VA-21-00062433)
- Solicitation number
- 36C10X21Q0192
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C10X21Q0192 0002.pdf | ||
| 36C10X21Q0192 0002_1.docx | DOCX document | |
| 36C10X21Q0192 0001_1.docx | DOCX document | |
| 36C10X21Q0192 0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C10X21Q0192
| SUBJECT* |
| BVA Shredding Services (VA-21-00062433) |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 21703 |
| SOLICITATION NUMBER* |
| 36C10X21Q0192 |
| RESPONSE DATE/TIME/ZONE |
| 07-16-2021 14:00 EASTERN TIME, NEW YORK, USA |
| ARCHIVE |
| 30 DAYS AFTER THE RESPONSE DATE |
| RECOVERY ACT FUNDS |
| N |
| SET-ASIDE |
| SDVOSBC |
| PRODUCT SERVICE CODE* |
| R614 |
| NAICS CODE* |
| 561990 |
| CONTRACTING OFFICE ADDRESS |
| Strategic Acquisition Center - Frederick |
Department of Veterans Affairs
5202 Presidents Court, Suite 103 Frederick MD 21703
POINT OF CONTACT*
Contract Specialist Riley Bender riley.bende@va.gov 240-215-0580
PLACE OF PERFORMANCE
| ADDRESS |
| Board of Veterans Appeals |
425 I Street NW
Washington DC
| POSTAL CODE |
| 20001 |
| COUNTRY |
| USA |
ADDITIONAL INFORMATION
| AGENCY’S URL |
| https://www.va.gov/opal/sac/index.asp |
| URL DESCRIPTION |
| To learn more about SAC and its mission, please click here |
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
DESCRIPTION
Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice The Contractor shall provide monthly (once a month) on-site mobile document shredding services at the Board of Veterans Appeals Site at 425 I Street NW, Washington DC for the destruction of paper. Mobile shredding shall take place onsite the Government’s facility and a certificate of destruction issued thereafter. Documents to be destroyed encompass unclassified documents that may contain personal identifiable information/sensitive information. Procedures for removing and destroying these materials must be in compliance with Federal privacy laws and Department of Veterans Affairs (VA) policies including, but not limited to, VA Directive 6371 and VA Handbook 6300.1 on the destruction of sensitive records. Onsite shredding of Sensitive Information, such as Personally Identifiable Information (PII) may be required and must be protected from unauthorized disclosure.
| *= Required Field |
| Combined Synopsis/Solicitation Notice |
Combined Synopsis/Solicitation Notice
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
DUNS:
DUNS+4:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. 2/2012)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
36C10X21Q0192 07- -2021 Riley Bender, Riley.Bender@va.gov 240-215-0580 07-16-2021 14:00
EDT
36C10X Strategic Acquisition Center - Frederick Department of Veterans Affairs 5202 Presidents Court, Suite 103 Frederick MD 21703 X X 561990 $12 Million N/A X Department of Veterans Affairs Board of Veterans Appeals (BVA) 425 I Street, NW Washington DC 20001 36C10X Strategic Acquisition Center - Frederick Department of Veterans Affairs 5202 Presidents Court, Suite 103 Frederick MD 21703
TBD
VAFSC
U.S. Department of Veterans Affairs Financial Services Center
PO BOX 149971
(see Section B.3 invoicing/payment) Austin TX 78714-8917 1-(877)-489-6135 See CONTINUATION Page Board of Veterans Appeals (BVA) Shredding Services Questions are due by July 13, 2021 14:00 ET and can be emailed directly to the Contract Specialist at Riley.Bender@va.gov.
See B.2 for PERFORMANCE WORK STATEMENT and B.3 for PRICE/COST Schedule.
See CONTINUATION Page x X Roxana Cepeda
VA-OAO-2018-AB1F81BA
Page 1 of Table of Contents
| SECTION B - CONTINUATION OF SF 1449 BLOCKS | 6 |
| B.1 CONTRACT ADMINISTRATION DATA | 6 |
| B.2 PERFORMANCE WORK STATEMENT | 8 |
| B.3 PRICE/COST SCHEDULE | 18 |
| SECTION C - CONTRACT CLAUSES | 21 |
| C.1 FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (OCT 2018) | 21 |
| C.2 FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) | 27 |
| C.3 FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 27 |
| C.4 VAAR 852.212-70 PROVISIONS AND CLAUSES APPLICABLE TO VA ACQUISITION OF COMMERCIAL ITEMS (APR 2020) | 27 |
| C.5 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018) | 29 |
| C.6 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 30 |
| C.7 FAR 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (JAN 2021) (JUL 2020) (DEVIATION) | 30 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 38 |
| SECTION E - SOLICITATION PROVISIONS | 39 |
| E.1 FAR 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL ITEMS (JUN 2020) | 39 |
| E.2 FAR 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020) | 43 |
| E.3 FAR 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014) | 46 |
| E.4 FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 47 |
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR: TBD
b. GOVERNMENT: Roxana Cepeda, Contracting Officer 36C10X Strategic Acquisition Center - Frederick Department of Veterans Affairs 5202 Presidents Court, Suite 103 Frederick MD 21703
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
| [X] |
| 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or |
| [] |
| 52.232-36, Payment by Third Party |
3. INVOICES: Invoices shall be submitted in arrears:
| a. Quarterly | [] |
| b. Semi-Annually | [] |
| c. Other | [X] Following inspection/acceptance of COR |
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
TUNGSTEN (fka OB10) ELECTRONIC INVOICE SUBMISSION FSC e-INVOICE PROGRAM THRU AUSTIN PORTAL
FSC MANDATORY ELECTRONIC INVOICE SUBMISSION FOR AUSTIN PAYMENTS
Contractor POC: TBD Contracting POC: Riley Bender, Riley.Bender@va.gov Contracting Officer: Roxana Cepeda, Roxana.Cepeda@va.gov COR (Contracting Officers Representative): Lashone Majors, Lashone.Majors2@va.gov Purchase Order Number: TBD Vendor Electronic Invoice Submission Methods:
Fax, email and scanned documents are not acceptable forms of submission for payment requests. Electronic form means an automated system transmitting information electronically according to the accepted data transmissions below.
· VA’s Electronic Invoice Presentment and Payment System – The Financial Services Center (FSC) in Austin, TX uses a third-party contractor, Tungsten, to transition vendors from paper to electronic invoice submission. Please go to this website: http://www.tungsten-network.com/US/en/veterans-affairs/ to begin submitting electronic invoices, free of charge.
· A system that conforms to the X12 electronic data interchange (EDI) formats established by the Accredited Standards Center (ASC) chartered by the American National Standards Institute (ANSI). The X12 EDI Web site is http://www.x12.org.
Vendor e-invoice Set-up information:
Please contact Tungsten at the phone number or email address listed below to begin submitting your electronic invoices to the VA Financial Services Center in Austin, TX for payment processing. If you have questions about the payment status of a properly submitted invoice, the e-invoicing program, or Tungsten, please contact the FSC at the phone number or email address listed below.
· Tungsten e-Invoice setup information: 1-877-489-6135
· Tungsten e-Invoice email: VA.Registration@tungsten-network.com
· VA TUNGSTEN Number: AAA544240062
· FSC e-Invoice contact information: 1-877-353-9791
· FSC e-Invoice email: vafsccshd@va.gov http://www.fsc.va.gov/einvoice.asp http://www.fsc.va.gov/einvoice.asp ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
| AMENDMENT NO |
| DATE |
Page 1 of Page 1 of Page 1 of Page 1 of
B.2 PERFORMANCE WORK STATEMENT
1. Scope of Work:
The Contractor shall provide monthly (once a month) on-site mobile document shredding services at the Board of Veterans Appeals Site at 425 I Street NW, Washington DC for the destruction of paper. Mobile shredding shall take place onsite the Government’s facility and a certificate of destruction issued thereafter. Documents to be destroyed encompass unclassified documents that may contain personal identifiable information/sensitive information. Procedures for removing and destroying these materials must be in compliance with Federal privacy laws and Department of Veterans Affairs (VA) policies including, but not limited to, VA Directive 6371 and VA Handbook 6300.1 on the destruction of sensitive records. Onsite shredding of Sensitive Information, such as Personally Identifiable Information (PII) may be required and must be protected from unauthorized disclosure.
2. Place of Performance: Location of facility is 425 I Street, NW, Washington, D.C. 20001. Contract will cover BVA and VSO Offices covering four floors of office space.
3. All work is to be performed Monday through Friday between 8:00 am and 4:30 pm, except during Federal Government closures and holidays. Any work at the Government site shall not take place on Federal holidays or weekends unless directed by the Contracting Officer (CO).
There are ten Federal holidays set by law (5 U.S.C. § 6103) that the VA follows:
| New Year’s Day |
| January 1 |
| Independence Day |
| July 4 |
| Veterans Day |
| November 11 |
| Christmas Day |
| December 25 |
| Martin Luther King’s Birthday |
| Third Monday in January |
| Washington’s Birthday |
| Third Monday in February |
| Memorial Day |
| Last Monday in May |
| Labor Day |
| First Monday in September |
| Columbus Day |
| Second Monday in October |
| Thanksgiving |
| Fourth Thursday in November |
If any of the above falls on a Saturday, then Friday is observed as a holiday. If any falls on a Sunday, then Monday is observed as a holiday.
4. Abbreviations used throughout this document will be interpreted as follows:
1. BVA – Board of Veterans Appeals
2. COR – Contracting Officer’s Representative
3. e-QIP Electronic Questionnaires for Investigations Processing system
4. IT – Information Technology
5. LAN – Local Area Network
6. OPM – Office of Personnel Management
7. SIC – Security Investigations Center
8. VSO – Veteran Service Organization
9. VA – Department of Veterans Affairs
10. VA TMS – Talent Management System
B. SPECIFIC TASKS/REQUIREMENTS
1. For the paper media, the contractor will provide and install 7 large wheeled totes (approx. 96 gallon capacity) and 68 small bins (approximately 30 gallon capacity and suitable for professional office space), with locks and five (5) sets of keys to be provided to the Contracting Officer’s Representative (COR). The contractor will place totes and bins in rooms throughout the building as determined by the COR. The Contractor and the COR will coordinate the delivery of the containers within two days of contract award. Container delivery will be completed within seven days of contract award and the schedule for monthly pick-up shredding service will be coordinated within seven days of contract award.
2. For non-paper multi-media, the contractor will provide and install 2 large wheeled totes (approx. 96 gallon capacity) and two small bins (approximately 30 gallon capacity and suitable for professional office space), with locks and five (5) sets of keys to be provided to the COR. The contractor will place totes and bins in rooms throughout the building as determined by the COR.
3. The contractor’s personnel will be solely responsible for emptying all media totes and bins monthly as approved by the COR. The pick-ups will occur during a pre-scheduled time, submitted to and approved by the COR at the beginning of the Period of Performance, and any changes to the schedule must be approved by the COR in advance.
4. Contractor must be able to provide 6 additional, non-scheduled media pick-ups within two business days of being notified by the COR.
C. DESTRUCTION PROTOCOL
1. Destruction of materials will be in compliance with VA’s Records Disposition Program which states: The destruction of restricted records must be by pulping, macerating, shredding, or otherwise definitively destroying the information contained in the records. VA Handbook 6300.1, Chapter 6, Paragraph 7. The destruction must be witnessed by a BVA employee or, at BVA’s discretion, by a contractor employee certified by BVA.
2. Interim destruction of temporary paper records refers to macerating, chopping, pulverizing, or shredding of these records to a degree that may not definitively ensure that they are not readable or re-constructable to any degree, but does ensure that they are not readable or re-constructable without extraordinary effort. This destruction of temporary records is a preliminary step that will allow for secure transport of records until such time as their final destruction.
3. The final method of destruction must be pulping, macerating, or otherwise shredding to a degree that definitively ensures that temporary paper records are not readable or re-constructable to any degree. If this final destruction is performed away from a VA facility it must be performed, where practicable, by a National Association for Information Destruction (NAID) certified, bonded and insured recycler or paper mill and any intermediary processes must protect the records until final destruction is completed, definitively destroying the information contained in the records. The contractor must ensure by way of appropriate documentation and established procedures that the sensitive temporary records are fully protected from any disclosure until they are actually destroyed.
4. The BVA’s preference is for a method of destruction that permits the material to be recycled while still meeting the requirements of definitively destroying the information on the documents or other non-paper media.
5. For each pick-up, regardless of the media, a Certificate of Destruction that indicates the weight of the material picked up will be issued by the contractor for the material destroyed and provided to the COR no later than the next business day.
D. DELIVERABLES
All deliverables shall be scheduled with the COR.
| PWS |
| Deliverable |
| Due |
| Method of Delivery |
| B.1 |
| Providing and installing (9) 96-gallon totes and (68) bins in accordance with this PWS. |
| Within seven days of contract award |
| Physical delivery |
| B.2 |
| Submitting schedule of monthly pick-up to COR |
| Within seven days of contract award |
| E-mail delivery |
| B.3 |
| Pickup and destruction of paper media in accordance with this PWS |
| Monthly, on scheduled days and during scheduled time. |
| Physical emptying and destroying of content in all bins |
| B.4 |
| Non-scheduled paper pickup and destruction of paper media as needed and directed and in accordance with this PWS |
| As needed. |
| Physical emptying and destroying of content in all bins |
| B.5 |
| Pick-up of non-paper media as needed and directed and in accordance with this PWS. |
| Two (2) times per year, on scheduled days and during scheduled time. |
| Physical emptying and destroying of content in all bins |
| B.6 |
| Non-scheduled pickup and destruction of non-paper media as needed and directed and in accordance with this PWS |
| As needed. |
| Physical emptying and destroying of content in all bins |
| B.7 |
| Certificate of Destruction |
| To be provided to the COR no later than the Next Business Day (NBD) after service has been rendered. |
| If providing at time of service, may deliver by hand. If providing by the NBD, email to COR |
| E.4 |
| Training Certificate |
| Within 1 week of initiation of contract, and annually of this date for each option year exercised. |
| Email to COR |
D. INSPECTION AND ACCEPTANCE CRITERIA
Final inspection and acceptance of all work performed will occur at the place of delivery by the COR. Final approval and acceptance of documentation required by this PWS shall be by written letter of approval and acceptance by the COR or designee.
E. SECURITY
Access to VA information systems will not be required during performance of this requirement.
1. Access:
Vendor personnel performing work under the anticipated contract must have a valid form of identification such as a driver license to access building. The vendor at time of submission must maintain the level of security required for the anticipated task order. This information is needed from the vendor for all key personnel at the submission of the vendor’s quote.
To enter the facility, contractors will be asked four questions related to COVID-19. These questions will help to reduce the spread of the virus. Contract personnel should answer questions truthfully. Based on their answers, they will be allowed to enter the facility.
Vendor will be given access to buildings in coordination with the COR
2. Informational Security The Contractor shall not make copies of VA information, electronic or otherwise, except as necessary to perform the terms of the agreement or to preserve electronic information stored on Contractor electronic storage media for restoration in case any electronic equipment or data used by the Contractor needs to be restored to an operating state.
3. Physical Security If the contract requires taking VA data to a contractor site and the data contains Personally Identifiable Information, the contractor will provide an independent physical security assessment of their facility to the COR prior to commencing work. General guidelines for physical security can be found in VA Directive 0730, Section 6 (Physical Security) and VA Memorandum (subj: IT Oversight & Compliance Information Physical Security Assessments) dated October 24, 2007.
4. Training All Contractor and subcontractor personnel requiring access to VA information and VA information systems shall complete the following before being granted access to VA information and networks:
a. Successfully complete VA Information Security Awareness training and annual refresher training as required
b. Successfully complete VA Privacy Awareness training and annual refresher training as required
c. Successfully complete any additional Information Security or Privacy training as required for VA personnel with equivalent information system access
The Contractor shall provide to the COR a copy of the training certificates for each applicable employee within 1 week of the initiation of the contract and annually thereafter, as required. These online courses are located at https:/EES-Learning.net. The VA Talent Management System (VA TMS) from any computer with Internet access at www.tms.va.gov. For training resources and other information, visit the VA TMS communications website, TMS Resources, at www.valu.va.gov/Home/TMSResources.
Failure to complete this mandatory training within the timeframe required will be grounds for suspension or termination of all physical and/or electronic access privileges and removal from work on the contract until such time as the training is completed.
F. Contractor Personnel Security
1. General All contract employees who require access to the VA site(s) and/or access to VA local area network (LAN) systems shall be the subject of a background investigation and must receive a favorable adjudication from the VA Security and Investigations Center (SIC). These requirements are applicable to all subcontractor personnel requiring the same level of Background Investigation.
The level of background security investigation will be in accordance with VA Directive 0710 dated September 10, 2004 and is available at http://www1.va.gov/vapubs/viewPublication.asp?Pub_ID=487&FType=2
2. Background Investigation The work environment is considered sensitive but unclassified. VA is required under the Homeland Security Presidential Directive (HSPD) 12 “Policy for a Common Identification Standard for Federal Employees and Contractors” to perform a National Agency Check with Inquiries (NACI) for Contractors. The NACI is a brief form of background investigation that is conducted through the Office of Personnel Management (OPM). This investigation will be conducted for Contractor staff assigned to this Contract. Contractor staff will be required to provide two forms of acceptable identification, provide a current photograph, and be finger-printed. Successful clearance is required for an employee to continue working under this Contract.
Per the PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL clause of the Federal Acquisition Regulation (FAR 52.204-9):
The Contractor shall comply with agency personal identity verification procedures identified in the contract that implement Homeland Security Presidential Directive-12 (HSPD-12), Office of Management and Budget (OMB) guidance M-05-24, and Federal Information Processing Standards Publication (FIPS PUB) Number 201.
The Contractor shall insert this clause in all subcontracts when the subcontractor is required to have physical access to a federally-controlled facility or access to a Federal information system.
3. Contractor Responsibilities The Contractor shall bear the expense of obtaining background investigations or reciprocals of previous investigations held that meet or exceed the required investigation level. The cost of background investigations is based on the current Office of Personnel Management (OPM) rate at the time the application is processed at OPM. Fiscal Year 2012 rates are as follows: Low Risk (NACI) $267, Moderate Risk (MBI) $952, High Risk (BI) $3,998 or Reciprocals $27. VA will pay for investigations or reciprocals processed through the VA Security Investigations Center (SIC) and conducted by OPM in advance; however, the Contractor shall reimburse the full cost of background investigations/reciprocals to VA within 30 days of Bill of Collections received from VA. VA shall send up to three plus one final delinquent notice to the Contractor. If the Contractor does not adhere to the Bill of Collections, future invoices may be subject to be offset by VA to recoup background investigation/reciprocal costs.
Immediately after contract or task order award, the Contractor must submit the completed Attachment B form (VA Contractor Background Investigation Request Worksheet) to the COR to begin the background investigation process for all contract employees working on the contract, who will have access to VA facilities, VA systems, or privacy data.
After the VA inputs the Contractor’s information from the Attachment B, the Contractor and Contractor point of contact (POC) will receive an email notification from the SIC identifying the website link that includes detailed instructions regarding completion of the background clearance application process in the Electronic Questionnaires for Investigations Processing (e-QIP) system. E-QIP is an online, Internet accessible system where the contractor employee completes the security questionnaire required to process the background investigation.
The Contractor shall prescreen all personnel who require access to VA site(s) and/or access to VA LAN systems to ensure they maintain a U.S. citizenship or Alien Registration that authorizes them to work in the U.S. and are able to read, write, speak and understand the English language.
Contractors who have a current favorable background investigation previously conducted by OPM or Defense Security Service (DSS) may be accepted through reciprocation. When a previous clearance is currently held, it does not preclude the vendor from submitting a completed Attachment B form to the COR immediately after contract or task order award for all contract employees who will be working on the contract.
Contract performance shall not commence before SIC confirmation that it has received the Contractor’s investigative documents, that they are complete, and that the investigation information has been released to OPM for scheduling of the background investigation. Once the Contractor’s background investigation has been released to OPM for scheduling of the background investigation or the SIC has confirmed that the verified investigation will be reciprocated, contract performance may commence. The COR will notify and forward the Contractor a copy of the Certificate of Investigation when the background investigation has been favorably completed or a Certificate of Eligibility (Form 4236) if the investigation has been reciprocated. The Contractor, if notified of an unfavorable adjudication by the Government, shall withdraw the employee from consideration from working under the contract. Failure to comply with the Contractor personnel security requirements may result in termination of the contract for default.
If the security clearance investigation is not completed prior to the start date of the contract, the contract employee may work on the contract with an “initiated background investigation” status (when received from the SIC) while the security clearance is being processed. However, the Contractor will be responsible for the actions of those contract and subcontract employees they provide to perform work for VA. In the event damage arises from work performed by Contractor personnel, under the auspices of the contract, the Contractor will be responsible for resources necessary to remedy the incident.
Should the Contractor use a vendor other than OPM or DSS to conduct investigations, the investigative company must be certified by OPM/DSS to conduct Contractor investigations. The Vendor Cage Code number must be provided to the VA SIC, which will verify the information and conclude whether access to the Government’s site(s) and/or VA LAN systems can be granted.
The investigative history for Contractor personnel working under this contract must be maintained in the databases of either OPM or the Defense Industrial Security Clearance Organization (DISCO).
4. Government Responsibilities After the COR has received Attachment B form(s) from the Contractor, the SIC will send an e-mail notification to the Contractor and their POC identifying the website link that includes detailed instructions regarding completion of the background clearance application process and what level of background was requested.
Upon receipt of required investigative documents, SIC will review the investigative documents for completion and initiate the background investigation by forwarding the investigative documents to OPM to conduct the background investigation. If the investigative documents are not complete, the SIC will notify the vendor of deficiencies and include corrective instructions.
VA will pay for investigations and reciprocals processed through the SIC and conducted by OPM in advance, however, the Contractor shall reimburse the full cost of background investigations/reciprocals to VA within 30 days of Bill of Collections from VA. VA shall send up to three plus one final delinquent notice to the Contractor. If the Contractor does not adhere to the Bill of Collections, future invoices may be subject to be offset by VA to recoup background investigation costs and may be considered grounds for default.
The COR will notify and forward the Contractor a copy of the Certificate of Investigation when the background investigation has been favorably adjudicated or a Certificate of Eligibility (Form 4236) if the investigation has been reciprocated. The COR will also notify the Contractor of an unfavorable adjudication by the Government.
5. Security Incident Investigation The term “security incident” means an event that has, or could have, resulted in unauthorized access to, loss or damage to VA assets, or sensitive information, or an action the breaches VA security procedures. The contractor/subcontractor shall immediately notify the COR and simultaneously, the designated ISO and Privacy Officer for the contract of any known or suspected security/privacy incidents, or any unauthorized disclosure of sensitive information, including that contained in system(s) to which the contractor/subcontractor has access.
G. Contractor Personnel
1. General Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.
The Contractor will be responsible for ensuring compliance by its employees with the security regulations of VA, VACO and other Government installations or Contractor facilities where work is performed under this Contract. This includes the safekeeping and display of a Government-provided photo ID badge for employees of the Contractor and any subcontractors while these employees are in federally owned or leased property as described in Section 21, Place of Performance. The Contractor will ensure the security of all VA and VHA property, building ID badges, key cards and standard keys issued to Contractor staff. For employees leaving the project permanently or for an extended period of time, the Contractor will return all badges, property, key cards, parking placards, and keys, etc. the same day the employees leave the project.
2. Key Personnel The follow personnel are considered key personnel by the Government. These are skilled and experienced professional personnel that are essential for successful vendor accomplishment of the work to be performed for this requirement.
The vendor shall provide a Program Manager who shall be responsible for the performance of the work. The Program Manager, or alternate, shall have full authority to act for the vendor on all contract matters relating to daily operation of the anticipated task order. The Program Manager, or alternate, shall be available between 8:00 a.m. to 4:30p.m., Monday through Friday except Federal holidays or when the Government facility is closed for administrative reasons. This person and an alternate shall, at all times, report directly to the Contract Officer’s Representative throughout the performance period.
All key personnel who require access to the VA facilities shall complete all required training and undergo the NACI background investigation. Copies of training certificates and results of the background investigation shall be provided to the COR.
3. Non-Key Personnel The non-key personnel are interchangeable; however, for security purposes the VA will require proof of identification for access to Government facilities.
Non-key personnel do not require the NACI background investigation. However, non-key personnel must be accompanied by key personnel when accessing VA facilities and handling Government property. Non-key personnel shall complete all required training and provide copies of certificates to the COR.
4. LIQUIDATED DAMAGES FOR DATA BREACH
a. Consistent with the requirements of 38 U.S.C. §5725, a contract may require access to sensitive personal information. If so, the contractor is liable to VA for liquidated damages in the event of a data breach or privacy incident involving any SPI the contractor/subcontractor processes or maintains under this contract.
b. The contractor/subcontractor shall provide notice to VA of a “security incident” as set forth in the Security Incident Investigation section above. Upon such notification, VA must secure from a non-Department entity or the VA Office of Inspector General an independent risk analysis of the data breach to determine the level of risk associated with the data breach for the potential misuse of any sensitive personal information involved in the data breach. The term 'data breach' means the loss, theft, or other unauthorized access, or any access other than that incidental to the scope of employment, to data containing sensitive personal information, in electronic or printed form, that results in the potential compromise of the confidentiality or integrity of the data. Contractor shall fully cooperate with the entity performing the risk analysis. Failure to cooperate may be deemed a material breach and grounds for contract termination.
c. Each risk analysis shall address all relevant information concerning the data breach, including the following:
(1) Nature of the event (loss, theft, unauthorized access);
(2) Description of the event, including:
(a) Date of occurrence;
(b) Data elements involved, including any PII, such as full name, social security number, date of birth, home address, account number, disability code;
(3) Number of individuals affected or potentially affected;
(4) Names of individuals or groups affected or potentially affected;
(5) Ease of logical data access to the lost, stolen or improperly accessed data in light of the degree of protection for the data, e.g., unencrypted, plain text;
(6) Amount of time the data has been out of VA control;
(7) The likelihood that the sensitive personal information will or has been compromised (made accessible to and usable by unauthorized persons);
(8) Known misuses of data containing sensitive personal information, if any;
(9) Assessment of the potential harm to the affected individuals;
(10) Data breach analysis as outlined in 6500.2 Handbook, Management of Security and Privacy Incidents, as appropriate; and
(11) Whether credit protection services may assist record subjects in avoiding or mitigating the results of identity theft based on the sensitive personal information that may have been compromised.
d. Based on the determinations of the independent risk analysis, the contractor shall be responsible for paying to the VA liquidated damages in the amount of $37.50 per affected individual to cover the cost of providing credit protection services to affected individuals consisting of the following:
(1) Notification;
(2) One year of credit monitoring services consisting of automatic daily monitoring of at least 3 relevant credit bureau reports;
(3) Data breach analysis;
(4) Fraud resolution services, including writing dispute letters, initiating fraud alerts and credit freezes, to assist affected individuals to bring matters to resolution;
(5) One year of identity theft insurance with $20,000.00 coverage at $0 deductible; and
(6) Necessary legal expenses the subjects may incur to repair falsified or damaged credit records, histories, or financial affairs.
B.3 PRICE/COST SCHEDULE
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12.00 |
| MO |
| __________________ |
| __________________ |
Scheduled Media Pickup Contract Period: Base POP Begin: 09-17-2021 POP End: 09-16-2022 PRINCIPAL NAICS CODE: 561990 - All Other Support Services PRODUCT/SERVICE CODE: R614 - Support - Administrative: Paper Shredding
| 6.00 |
| EA |
| __________________ |
| __________________ |
NON-SCHEDULED Media Pickup NTE Six (6) Total During PoP Contract Period: Base POP Begin: 09-17-2021 POP End: 09-16-2022
| 12.00 |
| MO |
| __________________ |
| __________________ |
Scheduled Media Pickup Contract Period: Option 1 POP Begin: 09-17-2022 POP End: 09-16-2023
| 6.00 |
| EA |
| __________________ |
| __________________ |
NON-SCHEDULED Media Pickup NTE Six (6) Total During PoP Contract Period: Option 1 POP Begin: 09-17-2022 POP End: 09-16-2023
| 12.00 |
| MO |
| __________________ |
| __________________ |
Scheduled Media Pickup Contract Period: Option 2 POP Begin: 09-17-2023 POP End: 09-16-2024
| 6.00 |
| EA |
| __________________ |
| __________________ |
NON-SCHEDULED Media Pickup NTE Six (6) Total During PoP Contract Period: Option 2 POP Begin: 09-17-2023 POP End: 09-16-2024
| 12.00 |
| MO |
| __________________ |
| __________________ |
Scheduled Media Pickup Contract Period: Option 3 POP Begin: 09-17-2024 POP End: 09-16-2025
| 6.00 |
| EA |
| __________________ |
| __________________ |
NON-SCHEDULED Media Pickup NTE Six (6) Total During PoP Contract Period: Option 3 POP Begin: 09-17-2024 POP End: 09-16-2025
| 12.00 |
| MO |
| __________________ |
| __________________ |
Scheduled Media Pickup Contract Period: Option 4 POP Begin: 09-17-2025 POP End: 09-16-2026
| 6.00 |
| EA |
| __________________ |
| __________________ |
NON-SCHEDULED Media Pickup NTE Six (6) Total During PoP Contract Period: Option 4 POP Begin: 09-17-2025 POP End: 09-16-2026
| GRAND TOTAL |
| __________________ |
SECTION C - CONTRACT CLAUSES
C.1 FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (OCT 2018)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.—
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(6) Interest.
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C.