This is a combined synopsis/solicitation for generator maintenance and emergency repair services. The Department of Veterans Affairs Strategic Acquisition Center Frederick is seeking these services for its Quantico Information Technology Center facilities. Quotes are due by February 12, 2021. The solicitation will result in a single-award contract to maintain and provide emergency repairs for generators and related equipment at the two QITC buildings. The period of performance is a one-year base period from March 25, 2021 through March 24, 2022, with four one-year option periods. The solicitation is conducted under FAR Part 13 Simplified Acquisition Procedures and has a NAICS code of 811310 for electrical equipment repair and maintenance services. The small business size standard is $8 million.

View the file

Other files

File Type Posted
36C10X21Q0064_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Opportunity Amendment to a Previous Combined Solicitation

PRODUCT SERVICE CODE

SUBJECT

CONTRACTING OFFICE'S

ZIP-CODE

SOLICITATION NUMBER

BASE NOTICE TYPE

RESPONSE DATE/TIME/ZONE

ARCHIVE

DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

SET-ASIDE

NAICS CODE

CONTRACTING OFFICE

ADDRESS

POINT OF CONTACT

(POC Information Automatically Filled from User Profile Unless Entered)

DESCRIPTION

See Attachment

AGENCY'S URL

URL DESCRIPTION

AGENCY CONTACT'S EMAIL

ADDRESS

EMAIL DESCRIPTION

ADDRESS

POSTAL CODE

COUNTRY

ADDITIONAL INFORMATION

GENERAL INFORMATION

PLACE OF PERFORMANCE

* = Required Field Contract Opportunity Amendment to a Previous Combined Solicitation J061 QITC Generator Maintenance and Repairs and Emergency Repairs

21703 36C10X21Q0064

02-22-2021 10:00

EASTERN TIME, NEW YORK, USA

N

811310 Strategic Acquisition Center - Frederick Department of Veterans Affairs

5202 Presidents Court, Suite 103 Frederick MD 21703 https://www.va.gov/opal/sac/index.asp To learn more about SAC and its mission, please click here

The purpose of the amendment is to:

1. Incorporate changes to PWS section, B.3 Cost Schedule

2. Provide new due date for question and answer session and extend the due date/time for quotes as identified in Block 11 of the SF 30.

3. All changes and updates are in blue text for ease of reference.

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

02-11-2021

36C10X Strategic Acquisition Center - Frederick Department of Veterans Affairs

5202 Presidents Court, Suite 103

36C10X

Department of Veterans Affairs

5202 Presidents Court, Suite 103

To all Offerors/Bidders

36C10X21Q0064 01-27-2020

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: February 22, 2021, 10:00am ET

The purpose of this amendment is to:

1. Incorporate changes to PWS section, B.3 Cost Schedule

2. Provide new due date for question and answer session.

3. Extend the due date /time for quotes as identified in Block 11 above.

4. All Government responses and changes to the PWS are marked in BLUE text.

5. All other terms/conditions of the solicitation remains the same.

Todd Synder Contracting Officer

Table of Contents

SECTION B - CONTINUATION OF SF 1449 BLOCKS5
B.1 CONTRACT ADMINISTRATION DATA5
B.2 PERFORMANCE WORK STATEMENT6
B.3 PRICE/COST SCHEDULE26
B.4 DELIVERY SCHEDULE33
SECTION C - CONTRACT CLAUSES35
C.1 NOTICE OF HYBRID CONTRACT35
C.2 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (OCT 2018) ALTERNATE I (JAN 2017)35
C.3 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)46
C.4 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)46
C.5 VAAR 852.212-70 PROVISIONS AND CLAUSES APPLICABLE TO VA ACQUISITION OF COMMERCIAL ITEMS (APR 2020)47
C.6 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)49
C.7 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (NOV 2020)49
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS58
D.1 ATTACHMENT A: PAST PERFORMANCE QUESTIONNAIRE (PPQ)58
SECTION E - SOLICITATION PROVISIONS61
E.1 52.212-1 INSTRUCTION TO OFFERORS (ADDENDUM)61
E.2 52.212-2 EVALUATION—COMMERCIAL ITEMS (OCT 2014)66
E.3 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (DEC 2019)68
E.4 52.203-19 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS or STATEMENTS—REPRESENTATION (NOV 2018)87
E.5 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (DEC 2019)87
E.6 52.225-2 BUY AMERICAN CERTIFICATE (MAY 2014)89
E.7 52.225-18 PLACE OF MANUFACTURE (AUG 2018)89
E.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)90

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contracting Officer 36C10X

Department of Veterans Affairs 5202 Presidents Court, Suite 103 Frederick MD 21703

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X]
52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or
[]
52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly[]
b. Semi-Annually[]
c. Other[]

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

U.S. Department of Veterans Affairs Financial Services Center

PO BOX 149971

(see Section B.3 invoicing/payment) Austin TX 78714-8917

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO
DATE

Page 1 of Page 1 of Page 1 of Page 1 of Page 1 of Page 1 of Page 1 of Page 1 of Page 1 of Page 1 of Page 1 of Page 1 of

B.2 PERFORMANCE WORK STATEMENT

1.0 BACKGROUND

The mission of the Department of Veterans Affairs (VA), Office of Information & Technology (OI&T), Service Delivery and Engineering, Enterprise Operations is to provide support to VA Departments including VA Administration departments. This is to provide IT support for the Administrations that benefits and provides services to Veterans of the United States. In meeting these goals, OI&T strives to provide high quality, effective, and efficient Information Technology (IT) services to those responsible for providing care to the Veterans at the point-of-care as well as throughout all the points of the Veterans’ health care in an effective, timely and compassionate manner. VA depends on Information Management/Information Technology (IM/IT) systems to meet mission goals.

Infrastructure Operation’s Quantico Information Technology Center (QITC) occupies space and has a computer room (data center) located at 5101 Russell Road and 5105 Russell Road, Quantico Virginia. These data center site has generators needed to provide backup power to the facilities. The equipment is comprised of Generac generators and related equipment. The equipment requires regular monthly inspections and maintenance which will include annual fuel tank polishing and treatment of bulk fuel storage tanks to assure continuous 24x7x365 backup power for cooling and heating computer room and office space. The data center house servers and storage and other networking equipment that is used to provide mission-critical support to the National Cemetery Administration (NCA).

2.0 APPLICABLE DOCUMENTS

In the performance of the tasks associated with this Performance Work Statement (PWS), the Contractor shall comply with the following:

1. 5 U.S.C. § 552a, as amended, “The Privacy Act of 1974”

2. 42 U.S.C. § 2000d “Title VI of the Civil Rights Act of 1964”

3.0 SCOPE OF WORK

The Contractor shall provide maintenance, and emergency or system repairs on generators and related equipment to include annual fuel tank polishing and treatment of bulk fuel storage tanks, Fuel Treatment at the following VA facilities.

1)QITC located at 5101 Russell Road in Quantico, VA. 22134 has one (1) 1,000 Gal. above ground generator belly tank. Facility using annually 1,500 Gals. of Diesel #2 Fuel (Dyed).
2)QITC located at 5105 Russell Road in Quantico, VA. 22134 has one (1) 350 Gal. aboveground generator belly tank. Facility using annually 750 Gals. of Diesel #2 Fuel (Dyed). located at VA data center located at Quantico, VA.

The Contractor to provide diesel fuel testing, filtration, and polishing services for specified tanks above.

FUEL TESTING

The contractor shall perform fuel testing services, prior to fuel polishing on all QITC fuel tanks, One (1) time a year, to ensure compliance with the latest ASTM standards D2709-sedimant and water percentage and impurities testing; testing for particulate ability; and microorganism test for presence of bacteria, yeast, and fungus. The contractor shall provide an analytical report, documenting the findings of each test, a statement of the level of compliance to each ASTM standard in accordance with ASTM specification D975, and identify the recommended treatment, including all chemical corrections, to ensure compliance with ASTM standards.

TREATMENT AND POLISHING

Upon approval by the COR, the contractor shall provide annual diesel fuel treatment on QITC bulk storage tanks per ASTM standards in accordance with the analytical report. Annual fuel treatment shall include polishing by centrifugal filtering method and cleaning. In addition, the contractor shall provide treatment of VA-QITC diesel fuel as needed per fuel testing report recommendation. Upon completion of each service visit, the contractor shall remove all waste, surplus materials, and debris and leave premises clean, and the contractor shall be responsible for all disposal fees and services.

FINAL FUEL TESTING

The contractor shall perform final fuel testing services (i.e. after polishing is complete) on all QITC fuel tanks to ensure compliance with the latest ASTM standards, one (1) time a year. The contractor shall provide an analytical report, documenting the findings of the final test, and a certification statement of the level of compliance to each ASTM standard in accordance with ASTM specification D975. In the event the final test indicates the fuel does not meet ASTM specifications, the contractor shall recommend treatment, including all chemical corrections, to ensure compliance with ASTM standards. Upon the COR’s approval the contractor shall re-perform tasks 5.2 and 5.3 until the tests indicate that ASTM specifications are met.

Fuel delivery shall be delivered same day or within one day after receipt of order. The contractor shall provide Dye Diesel Fuel by the gallons at the following locations.

4.0 PERFORMANCE DETAILS

4.1 PERFORMANCE PERIOD

The period of performance shall be for 12-month Base year and up to 4 Option years from March 25, 2021 through March 24, 2022 Base Year and continued thru March 24, 2026 if all option years are utilized.

Any work at the Government site shall not take place on Federal holidays or weekends unless directed by the QITC Chief Engineer (CE), Contracting Officer (CO), or Contracting Officer Representative (COR) due to equipment failure or similar emergency which requires repair work. There are ten (10) Federal holidays set by law (USC Title 5 Section 6103) that VA follows.

Under current definitions, four are set by date: New Year's Day January 1 Independence Day July 4 Veterans Day November 11 Christmas Day December 25

If any of the above falls on a Saturday, then Friday shall be observed as a holiday. Similarly, if one falls on a Sunday, then Monday shall be observed as a holiday.

The other six are set by a day of the week and month:

Martin Luther King's Birthday Third Monday in January Washington's Birthday Third Monday in February Memorial Day Last Monday in May Labor Day First Monday in September Columbus Day Second Monday in October Thanksgiving Fourth Thursday in November

4.2 PLACE OF PERFORMANCE

Tasks under this PWS shall be performed at the following VA facilities located in: VA Quantico Information Technology Center 5101 Russell Road and 5105 Russell Road (Two buildings on the same campus) Quantico, VA 22134

4.3 TRAVEL

The Government anticipates travel under this effort to perform the tasks associated with the effort, or to meet with QITC staff as deemed necessary to address any issues with equipment maintained. Contractor shall include all estimated travel costs in the maintenance firm-fixed price line item. The total estimated number of trips to conduct maintenance is 12 site visits for the campus of two (2) buildings each year, total of 12 trips. Each is anticipated to last less than a day.

For separately billable emergency/repair services that are not part of maintenance, travel charges will be included as part of billed hourly labor rates.

5.0 SPECIFIC TASKS AND DELIVERABLES

5.1 TASK & DELIVERABLES TABLE

Task Number
Task Description/Deliverable
Timeframe
3.0
In accordance with the Scope of Work perform 12 monthly maintenance inspections per year at the data center in accordance with the PWS and perform Emergency repair maintenance within 2 hours of notification.
March 25, 2021 through March 24, 2026.
3.0
Results of tested/replaced communication lines
Daily when maintenance is performed
5.2.1
Contract Project Management Plan
One (1) copy of the CPMP shall be delivered before the notice to proceed is issued.
5.2.2
Reporting Requirements
Maintenance Report after each site visit once maintenance inspections commences and, Delivery of Work receipt

Diesel Fuel Sample Test Report, Treatment and Polishing Report, Final Diesel Fuel Sample Test Report

5.2.3
Maintenance to be performed at both Data Center. All work must be performed by Generac certified equipment technicians
12 monthly Inspections per year.

5.2 PROJECT MANAGEMENT

5.3 CONTRACTOR PROJECT MANAGEMENT PLAN

The Contractor shall deliver a Contractor Project Management Plan (CPMP) that lays out the Contractor’s work to be performed in conducting maintenance, and timeline for such work to be completed or scheduled. The CPMP shall take the form of both a narrative and graphic format that displays the schedule, milestones, and resource support. The CPMP shall also include how the Contractor shall coordinate and execute planned, routine, and ad hoc data collection reporting requests as identified within the PWS. The Contractor shall notify the Government of the completion of scheduled maintenance in accordance with the proposed schedule, including requested repairs. The requested repairs shall be separately billed when not covered under maintenance.

Deliverables:

A. Contractor Project Management Plan

5.2.2 REPORTING REQUIREMENTS

The Contractor shall provide the QITC Data Center Operations Chief and his assigned CE, and/or COR with a Maintenance/Repair Report after each site visit in which maintenance or repairs are provided. The Report shall describe the work completed during each site visit in which maintenance or repairs are provided.

This document shall be submitted in hardcopy and electronic form to the Chief, COR or his assignee. This may take the form of an on-site signed work order or invoice with attached signed work order within 3 business days of leaving the site after maintenance or repair work is conducted. The Contractor shall advise the QITC Chief, or COR of required repairs that fall outside the scope of maintenance before work is conducted so VA staff can provide their agreement to repair work, and to discuss work needed after hours or on weekends and holidays

This document shall cover all work completed during the site visit. The report shall also identify any problems that arose and a description of how the problems were resolved. If problems have not been completely resolved, the Contractor shall provide an explanation including their plan and timeframe for resolving the issue. The Contractor shall monitor performance against the CPMP and report any deviations. The Contractor shall keep in communication with VA accordingly, so that issues that arise are transparent to both parties to prevent escalation of outstanding issues. In addition, The Contractor shall provide the COR with Delivery Report, no more than two (2) days after Fuel Servicing. Progress Reports in electronic form in Microsoft Word and Project formats. The report shall include detailed instructions/explanations for each required data element, to ensure that data is accurate and consistent. These reports shall reflect data as of the last day of the preceding delivery.

The Delivery Reports shall cover all work completed during the reporting period and work planned for the subsequent reporting period. The report shall also identify any problems that arose and a description of how the problems were resolved. If problems have not been completely resolved, the Contractor shall provide an explanation including their plan and timeframe for resolving the issue. The report shall also include an itemized list of all Electronic and Information Technology (EIT) deliverables and their current Section 508 conformance status. It is expected that the Contractor will keep in communication with VA accordingly so that issues that arise are transparent to both parties to prevent escalation of outstanding issues.

Deliverable:

a. Maintenance/Repair Report

b. Delivery of Work receipt

c. Diesel Fuel Sample Test Report

d. Treatment and Polishing Report

e. Final Diesel Fuel Sample Test Report

5.2.3 MAINTENANCE

The Contractor shall perform maintenance and emergency or required repairs on the following equipment:

LOCATION
EQUIPMENT
MANUFACTURER
MODEL
SERIAL #
Size
5101 Russell Road, Quantico, VA 22134
Generator
Generac
10478720100
2101233
200kW
5101 Russell Road, Quantico, VA 22134
Engine
John Deere
6068HF485
PE6068L062765
6.8L
5101 Russell Road, Quantico, VA 22134
ATS
Generac
10516810100
98135
600 Amp
5105 Russell Road, Quantico, VA 22134
Generator
Generac
13298200200
2111882
130kW
5105 Russell Road, Quantico, VA 22134
Engine
FPT Industrial
F4GE9685A
J602-00893460
130KW
5105 Russell Road, Quantico, VA 22134
ATS
Generac
13298200100
105325
600 Amp

The preventive maintenance shall include:

A. 12 monthly inspections/maintenance per year of generators, automatic transfer switches, and related equipment at each of the data center sites listed above.

B. All semi-annual and monthly inspections and maintenance shall include the checks outlined in Addendum C for the generator and related equipment listed above.

C. Semi-annual maintenance visit includes changing engine oil, removing and replacing oil, fuel, and air filters, which shall be provided by the Contractor as part of maintenance without separate charge.

D. Remove and clean air filters, as needed, during other (non-annual) monthly maintenance visits. This includes routine disposal of oil and filters without separate charge.

All work must be performed by Generac certified equipment technicians.

5.3 REPAIR SERVICES AND EMERGENCY EQUIPMENT RENTAL

The Contractor shall provide and perform emergency and other required repair services, and replace failed, malfunctioning, or at-risk of failure equipment, and provide short-term equipment rental when requested/required. Repair work cannot be billed for work/parts covered under maintenance. All work must be performed only by Generac certified technicians. Repairs shall only be made for work required that does not fall within the scope of regular scheduled maintenance as follows:

REPAIR SERVICES

The Contractor shall provide repair or emergency repair services when requested or needed. When the Contractor identifies or is notified by QITC staff of equipment/system failures that are not covered by maintenance, the Contractor shall travel to site within (2) two hours and assess and perform the required repairs. The Contractor shall have technicians readily available to complete required assessment and repairs 24 hours a day, 7 days a week, 365 days a year. The Contractors technicians must be on-site within two (2) hours of first contact/notice.

Required or emergency repairs will be billed using hourly labor rates. Repairs shall be made during normal business hours (from 7:00AM to 3:30PM EST) using daytime labor rates. The Contractor may use separate rates for repairs that take place after-hours or on weekends and holidays. Repairs not covered under maintenance must be pre-approved by QITC Chief, or COR. Required emergency or needed repair work may not exceed the following during any base or option period:

A. 15 hours during normal business hours (7:00AM to 3:30PM EST), B. 8 hours outside the normal business day (after hours from 3:30PM to 7:00AM EST), and/or C. 8 hours on weekends or holidays.

The hourly labor rates shall include standby time and travel costs. Standby time is time spent traveling to and from the site, waiting for parts delivery on-site, or obtaining work status.

Site visits and repair work can be requested/recommended by the QITC Chief or COR, or when Contractor technicians advise QITC staff of needed repairs not covered by maintenance. Repairs must be pre-approved by the QITC Chief or COR before work is started. Replaced equipment, materials, supplies, or repair incidentals are billable when the work has been pre-approved, and all work is completed. All billings for non-maintenance work must be invoiced, noted separately, after work is completed. Any unresolved issues shall be reported before leaving site to the Chief or COR.

EMERGENCY EQUIPMENT RENTAL

The Contractor shall have rental equipment readily available to replace major failed, malfunctioning, or at-risk of failure equipment at the data centers on a short-term basis. The Contractor shall have rental equipment available to be placed and operating on-site within one (1) day of a reported failure.

Equipment rental shall be available on a daily, weekly and/or monthly basis not to exceed two (2) months. Any equipment rental shall be separately invoiced and is not part of monthly maintenance. Any and all equipment rentals require pre-approval by the QITC Chief or COR. This would not include rental of equipment that should be readily available to the Contractor for failed parts replacement.

6.0 GENERAL REQUIREMENTS

6.1 ENTERPRISE AND IT FRAMEWORK

6.2 SECURITY AND PRIVACY REQUIREMENTS

6.2.1 POSITION/TASK RISK DESIGNATION LEVEL(S)

Position Sensitivity
Background Investigation (in accordance with Department of Veterans Affairs 0710 Handbook, “Personnel Suitability and Security Program,” Appendix A)
Low / Tier 1
Tier 1 / National Agency Check with Written Inquiries (NACI) A Tier 1/NACI is conducted by OPM and covers a 5-year period. It consists of a review of records contained in the OPM Security Investigations Index (SII) and the DOD Defense Central Investigations Index (DCII), FBI name check, FBI fingerprint check, and written inquiries to previous employers and references listed on the application for

employment. In VA it is used for Non-sensitive or Low Risk positions.

Moderate / Tier 2
Tier 2 / Moderate Background Investigation (MBI) A Tier 2/MBI is conducted by OPM and covers a 5-year period. It consists of a review of National Agency Check (NAC) records [OPM Security Investigations Index (SII), DOD Defense Central Investigations Index (DCII), FBI name check, and a FBI fingerprint check], a credit report covering a period of 5 years, written inquiries to previous employers and references listed on the application for employment; an interview with the subject, law enforcement check; and a verification of the educational degree.
High / Tier 4
Tier 4 / Background Investigation (BI) A Tier 4/BI is conducted by OPM and covers a 10-year period. It consists of a review of National Agency Check (NAC) records [OPM Security Investigations Index (SII), DOD Defense Central Investigations Index (DCII), FBI name check, and a FBI fingerprint check report], a credit report covering a period of 10 years, written inquiries to previous employers and references listed on the application for employment; an interview with the subject, spouse, neighbors, supervisor, co-workers; court records, law enforcement

check, and a verification of the educational degree.

The position sensitivity and the level of background investigation commensurate with the required level of access for the following tasks within the PWS are:

Position Sensitivity and Background Investigation Requirements

Task Number
Tier1 / Low / NACI
Tier 2 / Moderate / MBI
Tier 4 / High / BI

5.0

5.1

The Tasks identified above, and the resulting Position Sensitivity and Background Investigation requirements identify, in effect, the Background Investigation requirements for Contractor individuals, based upon the tasks the particular Contractor individual will be working. The submitted Contractor Staff Roster must indicate the required Background Investigation Level for each Contractor individual based upon the tasks the Contractor individual will be working, in accordance with their submitted proposal.

Contractor staff shall be escorted at all times while repairs or maintenance are performed on the grounds of the Data centers. The Contractor shall not have access to VA sensitive data, as work is conducted on the grounds of the data center. The Contractor shall not have direct access to view VA sensitive data located within the data centers.

6.2.2 CONTRACTOR PERSONNEL SECURITY REQUIREMENTS

Contractor Responsibilities:

a. The Contractor shall prescreen all personnel requiring close perimeter, but not direct access to the computer systems that house data, to ensure they maintain the appropriate Background Investigation, and are able to read, write, speak and understand the English language.

b. The Contractor shall bear the expense of obtaining background investigations.

c. Within 3 business days after award, the Contractor shall provide a roster of Contractor and Subcontractor employees to the COR to begin their background investigations. The roster shall contain the Contractor’s Full Name, Full Social Security Number, Date of Birth, Place of Birth, and individual background investigation level requirement (based upon Section 6.2 Tasks).

d. The Contractor should coordinate the location of the nearest VA fingerprinting office through the COR. Only electronic fingerprints are authorized.

e. The Contractor shall ensure the following required forms are submitted to the COR within 5 days after contract award:

1) For a Tier 1/Low Risk designation:

a) OF-306

b) DVA Memorandum – Electronic Fingerprints

2) For Tier 2/Moderate or Tier 4/High Risk designation:

a) OF-306

b) VA Form 0710

c) DVA Memorandum – Electronic Fingerprints

f. The Contractor personnel shall submit all required information related to their background investigations (completion of the investigation documents (SF85, SF85P, or SF 86) utilizing the Office of Personnel Management’s (OPM) Electronic Questionnaire for Investigations Processing (e-QIP) after receiving an email notification from the Security and Investigation Center (SIC).

g. The Contractor employee shall certify and release the e-QIP document, print and sign the signature pages, and send them encrypted to the COR for electronic submission to the SIC. These documents shall be submitted to the COR within 3 business days of receipt of the e- QIP notification email. (Note: OPM is moving towards a “click to sign” process. If click to sign is used, the Contractor employee should notify the COR within 3 business days that documents were signed via eQIP).

h. The Contractor shall be responsible for the actions of all personnel provided to work for VA under this contract. In the event that damages arise from work performed by Contractor provided personnel, under the auspices of this contract, the Contractor shall be responsible for all resources necessary to remedy the incident.

i. The Contractor, when notified of an unfavorably adjudicated background investigation on a Contractor employee as determined by the Government, shall withdraw the employee from consideration in working under the contract.

j. Failure to comply with the Contractor personnel security investigative requirements may result in loss of physical and/or logical access to VA facilities and systems by Contractor and Subcontractor employees and/or termination of the contract for default.

k. Identity Credential Holders must follow all HSPD-12 policies and procedures as well as use and protect their assigned identity credentials in accordance with VA policies and procedures, displaying their badges at all times, and returning the identity credentials upon termination of their relationship with VA.

6.3 METHOD AND DISTRIBUTION OF DELIVERABLES

The Contractor shall deliver documentation in electronic format, unless otherwise directed in Section B of the solicitation/contract. Acceptable electronic media include MS Word 2010 or newer, MS Excel 2010 or newer, MS PowerPoint 2010 or newer, MS Project 2010 or newer, MS Access 2010 or newer, MS Visio 2010 or newer, AutoCAD 2010 or newer, and Adobe Postscript Data Format (PDF).

6.4 PERFORMANCE METRICS

The table below defines the Performance Standards and Acceptable Performance Levels for Objectives associated with this effort.

Performance Objective
Performance Standard
Acceptable Performance Levels
A. Technical Needs
1. Shows understanding of requirements

2. Efficient and effective in meeting requirements

3. Meets technical needs and mission requirements

4. Offers quality services/products Satisfactory or higher

B. Project Milestones and Schedule

1. Quick response capability

2. Products completed, reviewed, delivered in timely manner Satisfactory or higher

Performance Objective
Performance Standard
Acceptable Performance Levels

3. Notifies customer in advance of potential problems

C. Project Staffing
1. Currency of expertise

2. Personnel possess necessary knowledge, skills and abilities to perform tasks Satisfactory or higher

D. Value Added
1. Provided valuable service to Government

2. Services/products delivered were of desired quality Satisfactory or higher

The Government will utilize a Quality Assurance Surveillance Plan (QASP) throughout the life of the contract to ensure that the Contractor is performing the services required by this PWS in an acceptable manner. The Government reserves the right to alter or change the surveillance methods in the QASP at its own discretion. A Performance Based Service Assessment Survey may be used in combination with the QASP to assist the Government in determining acceptable performance levels.

6.5 FACILITY/RESOURCE PROVISIONS

The Government will not be required to provide office space, telephone service and system access as the Contractor shall only provide maintenance and repairs to generator equipment located outside the data center buildings. All procedural guides, reference materials, and program documentation for the project and other Government applications will also be provided only on an as-needed basis.

The Contractor shall request other Government documentation deemed pertinent to the work accomplishment directly from the Government officials with whom the Contractor has contact. The Contractor shall consider the COR as the final source for needed Government documentation when the Contractor fails to secure the documents by other means. The Contractor is expected to use common knowledge and resourcefulness in securing all other reference materials, standard industry publications, and related materials that are pertinent to the work.

VA will not provide access to VA specific systems/network as this will not be required for execution of the task For detailed Security and Privacy Requirements refer to ADDENDUM A Additional VA Requirements, Consolidated and ADDENDUM B - VA Information And Information System Security/Privacy Language.

6.6 GOVERNMENT FURNISHED PROPERTY

N/A

ADDENDUM A - A1.0 PHYISACL SECURITY & SAFETY REQUIREMENTS:

The Contractor and their personnel shall follow all VA policies, standard operating procedures, applicable laws and regulations while on VA property. Violations of VA regulations and policies may result in citation and disciplinary measures for persons violating the law.

1. The Contractor and their personnel shall wear visible identification at all times while they are on the premises.

2. VA does not provide parking spaces at the work site; the Contractor must obtain parking at the work site if needed. It is the responsibility of the Contractor to park in the appropriate designated parking areas. VA will not invalidate or make reimbursement for parking violations of the Contractor under any conditions.

3. Smoking is prohibited inside/outside any building other than the designated smoking areas.

4. Possession of weapons is prohibited.

5. The Contractor shall obtain all necessary licenses and/or permits required to perform the work, with the exception of software licenses that need to be procured from a Contractor or vendor in accordance with the requirements document. The Contractor shall take all reasonable precautions necessary to protect persons and property from injury or damage during the performance of this contract.

A2.0 Confidentiality and Non-Disclosure The Contractor shall follow all VA rules and regulations regarding information security to prevent disclosure of sensitive information to unauthorized individuals or organizations.

ADDENDUM B – VA INFORMATION AND INFORMATION SYSTEM SECURITY/PRIVACY LANGUAGE

B1. GENERAL

Contractors, Contractor personnel, Subcontractors, and Subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.

B2. ACCESS TO VA INFORMATION AND VA INFORMATION SYSTEMS

N/A

B3. VA INFORMATION CUSTODIAL LANGUAGE

N/A

B4. INFORMATION SYSTEM DESIGN AND DEVELOPMENT

N/A

B5. INFORMATION SYSTEM HOSTING, OPERATION, MAINTENANCE, OR USE

N/A

B6. SECURITY INCIDENT INVESTIGATION

N/A

B7. LIQUIDATED DAMAGES FOR DATA BREACH

N/A

B8. SECURITY CONTROLS COMPLIANCE TESTING

N/A

B9. TRAINING

N/A

ADDENDUM C – MONTHLY MAINTENANCE CHECKLIST- REQUIREMENT

The following inspection, maintenance, and operational checks will be made at monthly site visits:

A. FUEL SYSTEM F. ELECTRICAL SYSTEMS

· Fuel tank Level

· Fuel tank Float Switch

· Supply / Transfer Pump Operation

· Solenoid Valve Operation

· Flexible Hose & Connections

· Piping

· Fuel Strainer

· Injection Pump Lines

· Fuel Filter(s)

· Fuel monitoring and telemetry system, “omnimatrix”

B. BATTERY SYSTEMS

· Terminals Clean & Tight

· Battery Voltage, condition, and age

· Electrolyte Level

· Specific Gravity

· Charger Operation

· Charge Rate

· Equalize Charge

· Load Test for 10 Seconds

C. LUBRICATING SYSTEM

· Oil Level

· Oil Change

· Oil Leaks

· Lube Oil Heater

· Crankcase Breather

· Oil Filter

D. COOLING SYSTEM

· Coolant Level

· Antifreeze Protection Level

· Fan & Alternator Belts

· Flexible Hose & Connections

· Water Pump

· Jacket Water Heater

· Louver, Motor & Controls

· Heat Exchanger

· Radiator • Brush Condition & Rings

· Coolant Leaks

E. EXHAUST SYSTEM

· Bearings

· Leakage

· Drain Condensation Trap

· Insulation & Fire Hazards

· Exhaust System Hangers & Supports

· Flexible Exhaust Section

· Excessive Back Pressure

F. OPERATIONAL TEST

· Starter Operation

· AC Voltage

· AC Amperage

· Frequency

· Oil Pressure

· Water Temperature

· P.C. Boards

· Governor

G. General Condition

· General Inspection

· Enclosure Housekeeping

· Unusual Engine Noise, Vibration, etc

· Air Filter(s)

· Loose Wires

· Contact failures

· Relay failures

· Fuse failures

H. GENERATOR

· Rotor & Stator

· Voltage Regulator

· Excitor

· Engine

· Wire Chafing

· Tighten Controls

· Operation of Safeties & Alarms

· Operation of Switch & Rack Solenoid

· Relays

· P.C. Boards

· Turbo Charger Rotation & End Play

· Ignition Systems: Plugs, Coil, etc.

· Choke & Carburetor / Fuel Injectors

· DC Alternator Amperage

J. TRANSFER SWITCH

· Transfer Switch Time Delay Start

· Time Delay Retransfer

· Time Delay Cooldown

· Restore Systems to Automatic Operations

B.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
LT
________________
________________

Project Management In Accordance With (IAW) Performance Work Statement (PWS) paragraph 5.1 This CLIN includes all tasks, labor, and materials required for the successful completion of the services detailed in PWS paragraphs 4.3 and 5.1.

The cost of CLIN 0001 shall be included in and allocated to CLIN 0002 and 0003.

Contract Period: Base POP Begin: 03-25-2021 POP End: 03-24-2022

12.00
MO
_______________
_______________

Maintenance IAW PWS paragraph 5.2 This FFP CLIN includes all labor, travel, parts, and equipment required for the successful completion of the services detailed in paragraph 5.2 of the PWS.

Contract Period: Base

1.00
LT
_______________
_______________

Repair Services and Emergency Equipment Rental IAW PWS paragraph 5.3 It is estimated that an unknown amount of emergency repairs may take place. The price shall be negotiated on a FFP basis. The Contractor will provide the proposed FFP labor rates in the labor categories below based on the Government estimated hours:

Labor Category
RateEst.
Hours
Service Technician, Business Hours
$
96
Service Technician, After Hours
$
24

Service Technician, Weekends and Holidays

$
24

Contract Period: Base

1.00
JB
________________
_____________

QITC Fuel Tank Annual & Polishing and Treatment

Contract Period: Base POP Begin: 03-25-2021 POP End: 03-24-2022

1.00
LT
_________________
_______________

Project Management In Accordance With (IAW) Performance Work Statement (PWS) paragraph 5.1 This CLIN includes all tasks, labor, and materials required for the successful completion of the services detailed in PWS paragraphs 4.3 and 5.1.

The cost of CLIN 0001 shall be included in and allocated to CLIN 0002 and 0003.

Contract Period: Option 1 POP Begin: 03-25-2022 POP End: 03-24-2023

12.00
MO
________________
________________

Maintenance IAW PWS paragraph 5.2 This FFP CLIN includes all labor, travel, parts, and equipment required for the successful completion of the services detailed in paragraph 5.2 of the PWS.

Contract Period: Option 1

1.00
LT
_______________
________________

Repair Services and Emergency Equipment Rental IAW PWS paragraph 5.3 It is estimated that an unknown amount of emergency repairs may take place. The price shall be negotiated on a FFP basis. The Contractor will provide the proposed FFP labor rates in the labor categories below based on the Government estimated hours:

Labor Category
RateEst.
Hours
Service Technician, Business Hours
$
96
Service Technician, After Hours
$
24

Service Technician, Weekends and Holidays

$
24

Contract Period: Option 1

1.00
JB
________________
_____________

QITC Fuel Tank Annual & Polishing and Treatment

Contract Period: Option 1

1.00
LT
________________
______________

Project Management In Accordance With (IAW) Performance Work Statement (PWS) paragraph 5.1 This CLIN includes all tasks, labor, and materials required for the successful completion of the services detailed in PWS paragraphs 4.3 and 5.1.

The cost of CLIN 0001 shall be included in and allocated to CLIN 0002 and 0003.

Contract Period: Option 2 POP Begin: 03-25-2023 POP End: 03-24-2024

12.00
MO
________________
_______________

Maintenance IAW PWS paragraph 5.2 This FFP CLIN includes all labor, travel, parts, and equipment required for the successful completion of the services detailed in paragraph 5.2 of the PWS.

Contract Period: Option 2

1.00
LT
________________
_______________

Repair Services and Emergency Equipment Rental IAW PWS paragraph 5.3 It is estimated that an unknown amount of emergency repairs may take place. The price shall be negotiated on a FFP basis. The Contractor will provide the proposed FFP labor rates in the labor categories below based on the Government estimated hours:

Labor Category
RateEst.
Hours
Service Technician, Business Hours
$
96
Service Technician, After Hours
$
24

Service Technician, Weekends and Holidays

$
24

Contract Period: Option 2

1.00
JB
________________
_____________

QITC Fuel Tank Annual & Polishing and Treatment

Contract Period: Option 2

1.00
LT
________________
______________

Project Management In Accordance With (IAW) Performance Work Statement (PWS) paragraph 5.1 This CLIN includes all tasks, labor, and materials required for the successful completion of the services detailed in PWS paragraphs 4.3 and 5.1.

The cost of CLIN 0001 shall be included in and allocated to CLIN 0002 and 0003.

Contract Period: Option 3 POP Begin: 03-25-2024 POP End: 03-24-2025

12.00
MO
________________
________________

Maintenance IAW PWS paragraph 5.2 This FFP CLIN includes all labor, travel, parts, and equipment required for the successful completion of the services detailed in paragraph 5.2 of the PWS.

Contract Period: Option 3

1.00
LT
_______________
________________

Repair Services and Emergency Equipment Rental IAW PWS paragraph 5.3 It is estimated that an unknown amount of emergency repairs may take place. The price shall be negotiated on a FFP basis. The Contractor will provide the proposed FFP labor rates in the labor categories below based on the Government estimated hours:

Labor Category
RateEst.
Hours
Service Technician, Business Hours
$
96
Service Technician, After Hours
$
24

Service Technician, Weekends and Holidays

$
24

Contract Period: Option 3

1.00
JB
________________
_____________

QITC Fuel Tank Annual & Polishing and Treatment

Contract Period: Option 3

1.00
LT
________________
________________

Project Management In Accordance With (IAW) Performance Work Statement (PWS) paragraph 5.1 This CLIN includes all tasks, labor, and materials required for the successful completion of the services detailed in PWS paragraphs 4.3 and 5.1.

The cost of CLIN 0001 shall be included in and allocated to CLIN 0002 and 0003.

Contract Period: Option 4 POP Begin: 03-25-2025 POP End: 03-24-2026

12.00
MO
_______________
________________

Maintenance IAW PWS paragraph 5.2 This FFP CLIN includes all labor, travel, parts, and equipment required for the successful completion of the services detailed in paragraph 5.2 of the PWS.

Contract Period: Option 4

1.00
LT
________________
________________

Repair Services and Emergency Equipment Rental IAW PWS paragraph 5.3 It is estimated that an unknown amount of emergency repairs may take place. The price shall be negotiated on a FFP basis. The Contractor will provide the proposed FFP labor rates in the labor categories below based on the Government estimated hours:

Labor Category
RateEst.
Hours
Service Technician, Business Hours
$
96
Service Technician, After Hours
$
24

Service Technician, Weekends and Holidays

$
24

Contract Period: Option 4

1.00
JB
________________
_____________

QITC Fuel Tank Annual & Polishing and Treatment

Contract Period: Option 4

GRAND TOTAL
________________

B.4 DELIVERY SCHEDULE

ITEM NUMBER
QUANTITY
DELIVERY DATE

1.00

12.00

1.00

1.00

1.00

12.00

1.00

1.00

1.00

12.00

1.00

1.00

1.00

12.00

1.00

1.00

1.00

12.00

1.00

1.00

SECTION C - CONTRACT CLAUSES

C.1 NOTICE OF HYBRID CONTRACT

This is a Firm-Fixed-Price, Labor-Hour type contract.

The following symbols will appear next to the applicable clauses and provisions throughout this document.

$ = applicable to Fixed-Price line items only.

@ = applicable to Cost-Reimbursement line items only.

& = applicable to Time-and-Material/Labor-Hour line items only.

C.2 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (OCT 2018) ALTERNATE I (JAN 2017)

(a) Inspection/Acceptance.

(1) The Government has the right to inspect and test all materials furnished and services performed under this contract, to the extent practicable at all places and times, including the period of performance, and in any event before acceptance. The Government may also inspect the plant or plants of the Contractor or any subcontractor engaged in contract performance. The Government will perform inspections and tests in a manner that will not unduly delay the work.

(2) If the Government performs inspection or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish and shall require subcontractors to furnish all reasonable facilities and assistance for the safe and convenient performance of these duties.

(3) Unless otherwise specified in the contract, the Government will accept or reject services and materials at the place of delivery as promptly as practicable after delivery, and they will be presumed accepted 60 days after the date of delivery, unless accepted earlier.

(4) At any time during contract performance, but not later than 6 months (or such other time as may be specified in the contract) after acceptance of the services or materials last delivered under this contract, the Government may require the Contractor to replace or correct services or materials that at time of delivery failed to meet contract requirements. Except as otherwise specified in paragraph (a)(6) of this clause, the cost of replacement or correction shall be determined under paragraph (i) of this clause, but the "hourly rate" for labor hours incurred in the replacement or correction shall be reduced to exclude that portion of the rate attributable to profit. Unless otherwise specified below, the portion of the "hourly rate" attributable to profit shall be 10 percent. The Contractor shall not tender for acceptance materials and services required to be replaced or corrected without disclosing the former requirement for replacement or correction, and, when required, shall disclose the corrective action taken. [Insert portion of labor rate attributable to profit.] (5)(i) If the Contractor fails to proceed with reasonable promptness to perform required replacement or correction, and if the replacement or correction can be performed within the ceiling price (or the ceiling price as increased by the Government), the Government may—

(A) By contract or otherwise, perform the replacement or correction, charge to the Contractor any increased cost, or deduct such increased cost from any amounts paid or due under this contract; or

(B) Terminate this contract for cause.

(ii) Failure to agree to the amount of increased cost to be charged to the Contractor shall be a dispute under the Disputes clause of the contract.

(6) Notwithstanding paragraphs (a)(4) and (5) above, the Government may at any time require the Contractor to remedy by correction or replacement, without cost to the Government, any failure by the Contractor to comply with the requirements of this contract, if the failure is due to—

(i) Fraud, lack of good faith, or willful misconduct on the part of the Contractor's managerial personnel; or

(ii) The conduct of one or more of the Contractor's employees selected or retained by the Contractor after any of the Contractor's managerial personnel has reasonable grounds to believe that the employee is habitually careless or unqualified.

(7) This clause applies in the same manner and to the same extent to corrected or replacement materials or services as to materials and services originally delivered under this contract.

(8) The Contractor has no obligation or liability under this contract to correct or replace materials and services that at time of delivery do not meet contract requirements, except as provided in this clause or as may be otherwise specified in the contract.

(9) Unless otherwise specified in the contract, the Contractor's obligation to correct or replace Government-furnished property shall be governed by the clause pertaining to Government property.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .