36C10F22R0039 0003.docx

DOCX document 20 KB Posted

Attached to
C1PB--Interpretive Master Plan National VA History Center
Solicitation number
36C10F22R0039
Issued by

View the file

Other files

File Type Posted
36C10F22R0039 0004.docx DOCX document
IMP Bidder Site Visit 4622 Bld 129.pptx PPTX presentation
IMP Bidder Site Visit 4622 Bld 116.pptx PPTX presentation
36C10F22R0039 0002_1.docx DOCX document
36C10F22R0039 0001.docx DOCX document
36C10F22R0039_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 003C4 Department of Veterans Affairs Office of Construction and Facilities Management (003C4D) 1425 Tri-State Parkway, Suite 140 Gurnee

IL

60031 101F

To all Offerors/Bidders

36C10F22R0039 03-24-2022

X x x ** HOUR & DATE for Receipt of Offers is EXTENDED to:

4/18/2022 12:00PM EDT

The purpose of this solicitation modification is to post RFIs from the site visit and extend the proposal due date to Monday, April 18, 2022 at 12:00PM EDT. Also attached to this modification are site photos of buildings 129 & 116.

No other changes apply.

Krystal Glasper Contracting Officer National VA History Center Interpretive Master Plan Site Visit April 6, 2022

Questions and Responses Question regarding an architectural and engineering study and how it aligns with the interpretive master plan?

Response – An architectural and engineering study is planned. The exact timing has not been determined, but the hope is that it will begin before the IMP process is completed. The IMP will provide input for consideration in the A&E study.

Question regarding why the IMP process is happening before the A&E study?

Response – This is the sequence that we are following and there are a lot of factors that will play into the project’s development.

Question regarding what other studies may influence the project?

Response – The Dayton VA Medical Center is in the process of developing a study for underutilized buildings on the campus. This includes historic buildings that could be considered for interpretation during the IMP process. The study has not begun, and the completion date has not been determined.

Question regarding what other stakeholders/factors that may influence the IMP process?

Response – The National VA History Center Foundation is the private partner for the National VA History Center and will be instrumental in fundraising. The American Heritage Veterans Center is another potential partner/stakeholder for the project.

Question regarding who is leading the project and the IMP (Dayton VA Medical center versus larger VA)?

Response – The VA History Office/National VA History Center staff and the rest of the Core Project Team are leading the project and the IMP.

Question regarding the current collection and future collecting?

Response – There is an inventory of objects that have been collected so far. The IMP will help identify what objects we need to target. The final IMP will impact our collecting scope.

Question about work that has been done so far regarding the project?

Response – The Core Project Team has completed an internal draft interpretive plan that identifies some themes and take away messages. This document will be provided to the contractor as part of the kickoff meeting. The contractor does not have to consider it a blueprint or guide for the IMP they are tasked with developing. It may be used as a starting point for conversations between the contract team and the Core Project Team (VA).

Question regarding the potential for outside interpretation. Is there a set approval process for this interpretation?

Response – Some wayside panels and walking tours current exist. There is potential for additional interpretation of historic buildings and the landscape during the IMP process. No formal process has been established regarding approval of exterior interpretation that may be developed along with the National VA History Center.

Question regarding any other public spaces/museum on campus?

Response – There was a military related museum in the Putnam Library building that recently relocated off campus. The American Veterans Heritage Center utilizes a small amount of space in the Putnam Library building for storage/office space. It is not open to the public.

Question regarding how much of the IMP will focus on the Dayton campus/story?

Response – That has not been fully determined, but the IMP will cover the entire VA story including all three administrations (VBA, VHA, NCA). The story of the National Homes for Disabled Volunteer Soldiers and Dayton specifically will be included in the story that the National VA History Center tells, but it will be one element of a much larger VA history.

Question regarding the IMP addressing staffing needs, or if VA staff have already identified staffing needs?

Response – VA staff have already identified staffing needs, but the IMP may help justify staffing needs, or identify changes in the staffing strategy. The IMP may also be a tool to identify resource allocation needs.

Question regarding if the IMP may be used for development of virtual or web-based interpretation, or is it solely focused on the physical museum?

Response – Some efforts are ongoing related to online interpretation. There are no preconceived restrictions on what interpretation the IMP can address. The hope is that it will address all efforts regarding interpretation and will tie them together.

Questions regarding outside interpretation?

Response – I mentioned the existence of the funeral tunnel in the cemetery as potential feature to be interpreted in the cemetery.

Question regarding when the interpretive wayside panels at the Grotto and building 116 were installed?

Response - I have requested this information and I will share it once it is available.

Question regarding the function and interpretation at building 129?

Response – Currently building 129 is planned to be the archival and curatorial storage and research facility. No interpretive features or programs have been planned for this building at this time, other than a potential exterior wayside panel.

See attached document: IMP Bidder Site Visit 4622 Bld 129.

See attached document: IMP Bidder Site Visit 4622 Bld 116.

File details come from the government source that posted it. Updated .