About this file

This amendment modifies a solicitation for the Jefferson Barracks National Cemetery Phase 5 Expansion project. The Department of Veterans Affairs intends to issue a request for proposals on January 7, 2020 seeking design-build construction services. The purpose of the project is to continue providing burial services at the existing national cemetery in St. Louis, Missouri. The amendment provides clarification to specification sections, drawings, and details a pre-proposal site visit scheduled for January 16, 2020. Offerors must acknowledge receipt of the amendment by the specified date and time. The solicitation will be set aside 100% for Service-Disabled Veteran-Owned Small Businesses.

36C10F19R0056 0001 36C10F19R0056 0001.docx

View the file

Other files

File Type Posted
36C10F19R0056-0002006.pdf PDF
36C10F19R0056-0002001.pdf PDF
36C10F19R0056-0002005.dwg DWG drawing
36C10F19R0056-0002000.docx DOCX document
36C10F19R0056-0002002.dwg DWG drawing
36C10F19R0056-0002003.pdf PDF
36C10F19R0056-0002004.dwg DWG drawing
36C10F19R0056-0001005.pdf PDF
36C10F19R0056-0001003.docx DOCX document
36C10F19R0056-0001004.pdf PDF
36C10F19R0056-0001006.docx DOCX document
36C10F19R0056-0001001.docx DOCX document
36C10F19R0056-0001002.docx DOCX document
36C10F19R0056-005.pdf PDF
36C10F19R0056-008.pdf PDF
36C10F19R0056-002.docx DOCX document
36C10F19R0056-003.docx DOCX document
36C10F19R0056-009.pdf PDF
36C10F19R0056-006.pdf PDF
36C10F19R0056-007.pdf PDF
36C10F19R0056-004.docx DOCX document
36C10F19R0056-001.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C10F19R0056 Amendment 0001

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 01-14-2020 657-313M 003C4 Department of Veterans Affairs Office of Construction and Facilities Management (00CFM3B) 1425 Tri State Parkway, Suite 140 Gurnee IL 60031 101F Department of Veterans Affairs Office of Construction and Facilities Management 1425 Tri State Parkway, Suite 140 Gurnee IL 60031 To all Offerors/Bidders

36C10F19R0056 01-07-2020

X X X

X

AMENDMENT 0001 CONTAINS THE FOLLOWING CHANGES TO THE SOLICITATION:

1.

CHANGES TO THE SPECIFICATIONS

2.

CHANGES TO THE DRAWINGS

3.

PRE-PROPOSAL SITE VISIT, JANUARY 16, 2020 - DRAFT AGENDA

SEE CONTINUATION PAGE AND ATTACHMENTS FOR DETAILS.

END OF AMENDMENT 0001

JEFFERSON BARRACKS NATIONAL CEMETERY

PHASE 5 EXPANSION

PRE- PROPOSAL AMENDMENT 0001

JANUARY 14, 2020

1. CHANGES TO THE SPECIFICATIONS

· Section 00 01 10 Table of Contents (Added Sections 01 45 00-Quality Control and 01 91 00- General Commissioning Requirements)

· Section 01 45 00 -Quality Control (New section)

· Section 01 91 00 – General Commissioning Requirements

2. CHANGES TO THE DRAWINGS

· Sheet 31 – CG502 – Site Details 1 of 4 (Added Clarification to Curb Jointing Details)

· Sheet 34 – CG505 – Site Details 4 of 4 (Added Clarification to Curb Jointing Details)

3. PRE-PROPOSAL SITE VISIT, JANUARY 16, 2020:

· Draft Agenda - see attached draft agenda

Attached File List

1. S06 00 01 10 Tbl of Cont TC - Addendum 1_01-13-20.docx

2. S06 01 45 00 QualityControl -Addendum 1_01-13-20.docx

3. S06 01 91 00 General Comisng Reqs-Addendum 1_01-13-20.docx

4. S06 31-CG502 w revision cloud.pdf

5. S06 34-CG505 w revision cloud.pdf

6. S04 2020.01.16 Jeff Brks NC Walkthrough Agenda_DRAFT.docx

END OF AMENDMENT 0001

File details come from the government source that posted it. Updated .