36C10E20Q0273_1.docx
DOCX document 23 KB Posted
- Solicitation number
- 36C10E20Q0273
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02_COMBINED SYNOPSIS SOLICITATION_X-Ray Unit_36C10E20P0273.pdf | ||
| 36C10E20Q0273.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Opportunity Amendment to a Previous Combined Solicitation
PRODUCT SERVICE CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
BASE NOTICE TYPE
RESPONSE DATE/TIME/ZONE
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field Contract Opportunity Amendment to a Previous Combined Solicitation X Ray Inspection System for VBA Sioux Falls Regional Office 438 - Sioux Falls RO 20006 36C10E20Q0273 09-01-2020
5:00 PM
EASTERN TIME, NEW YORK, USA
N 334517 Department of Veterans Affairs Veterans Benefits Administration Office of Acquisition 1800 G. Street N.W.
Washington DC 20006 Contracting Officer Stuart Stovall stuart.stovall@va.gov 540-597-1145 Department of Veterans Affairs Veterans Benefits Administration Sioux Falls Regional Office 2501 W. 22nd Street, Building 38 Sioux Falls SD 57105
USA
Stuart.Stovall@va.gov Contracting Officer Amendment to 36C10E20Q0273 **Closing date is hereby changed to Tuesday, September 1, 2020 at 5:00PM Eastern** Interested Parties Questions to 36C10E20Q0273 and VA Answers
1. Would the Government consider including an additional requirement for the X-Ray Machine to include technology/software that dramatically expands the capabilities of X-ray checkpoint system and their operators by connecting them instantly with highly trained Bomb Technicians to obtain real-time, remote X-Ray Image Interpretation for any suspicious or unknown items encountered during the screening process?
Answer: This service is not a requirement of the solicitation. However, vendors are permitted to include this type of additional service within their quotation for the equipment being solicited.
2. Even with high-definition X-ray images, ‘auto-detect’ features or ‘density alert’ capabilities installed on an X-ray machine, screeners may encounter false-alarms or instances where despite conducting an enhanced evaluation— it is still not apparent if an explosive threat or prohibited item is present. What alarm resolution procedures or technology will the Government rely upon to ensure suspicious items and potential threats are properly identified, to reduce the risk of an explosive incident, or an unnecessary evacuation of the facility?
Answer: VA Regional Office operational security procedures will not be provided regarding the solicitation for X-Ray Equipment.
3. With COVID-19 still a present threat across the globe, how will the VA obtain explosive threat resolution without having to rely upon local, in-person EOD teams to arrive on-site to make a determination, potentially risking exposure to personnel on-site?
Answer: Same answer as question #2.
4. Please clarify the item (Cart) listed within the Performance Requirements paragraph. Is that a request for a separate operator console for monitor and control panel, as opposed to side mount for the control panel?
Answer: The Cart requirement is hereby removed from the Performance Requirements.
5. Is there a specific tunnel size requirement or a “shall not exceed tunnel size” requirement? Only the unit model (6030di) is listed but most industry checkpoint systems range between 50cm x 30cm (24.4”x13”) for compact models and 60cm x 42cm (24.4”x16.5”) for standard entry/checkpoint models manufactured by most x-ray screening manufacturers.
Answer: The Performance Requirements does list a minimum tunnel size of 24” W x 13” H. There is not a “shall not exceed tunnel size” for this requirement. Both tunnel size dimensions listed within the question would be acceptable.
File details come from the government source that posted it. Updated .