36C10D25Q0014 0002.docx
DOCX document 31 KB Posted
- Solicitation number
- 36C10D25Q0014
- Issued by
-
Department of Veterans Affairs
About this file
This document is an amendment to a Request for Quote (RFQ) for the construction of three custom raised flower beds and associated supplies for a Veteran approved for independent living. The amendment provides answers to 34 questions submitted by prospective offerors. Key details include:
The flower beds are to be 20' long x 4' wide x 3' high, for a total of 240 square feet across three beds. An irrigation system with timers is required for each bed. The Veteran will be responsible for providing soil/dirt. The project must be completed within 30 days of the start date, which is expected to be approximately 30 days after receipt of order. No post-installation maintenance is required. The contracting agency is the Department of Veterans Affairs. There are no set-asides, permits, or environmental compliance measures needed. Pricing terms and the budget range are not provided. This amendment does not contain any Performance Work Statement or Statement of Objectives, only questions and answers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C10D25Q0014 0001.docx | DOCX document | |
| 36C10D25Q0014.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
VA
11-06-2024 00101 Department of Veterans Affairs Veterans Benefits Administration Acquisition Directorate 1800 G Street NW Washington DC 20006 00101 Department of Veterans Affairs Veterans Benefits Administration Acquisition Directorate 1800 G Street NW Washington DC 20006 To all Offerors/Bidders
36C10D25Q0014
X X X N/A x The purpose of this amendment is to post the Questions that were asked, with their answers.
* RFQ Close date remains on 11/14/2024 @ 3PM EST.
Questions & Answers ----- For 3-Custom Raised Flower Beds with Supplies
(1) Does the Flower Beds need to be filled with dirt/loam?
a. No, the veteran is responsible for that.
(2) How many automatic timers are requested for the irrigation system?
a. Each of the 3 beds will have their own timers per the SOW.
(3) What is the distance from the exterior water spigot to the planter boxes?
a. Approximately 20-40 feet from the water spigot.
(4) Will all 3 planter boxes be in a close proximity to each other?
a. Yes, vertical, and horizontal planters boxes from the veteran’s house.
(5) What is the total square footage of the area to be landscaped / what are the dimensions?
a. 3 raised beds, that are 20’long X 4’wide = each bed 80 square feet, all 3 beds a total of 240 square feet, and each bed to be 3’ high.
(6) Could you provide information on the types of plants that are preferred for this project?
a. Vegetables primarily
(7) Will there be an irrigation system installed prior to work?
a. No, the installation of an irrigation system is part of this project.
(8) Do you offer a warranty for any plants that are 5 gallons or larger, specifically for one year on a proper watering schedule?
a. No warranty is necessary.
(9) Will you be looking to add a maintenance schedule after the installation, or will involvement be limited to the installation process?
a. No, there will be no maintenance, this is a one-time job.
(10) What is the preferred material (i.e.; wood type, stone, soil composition)?
a. Railroad Tie Posts
(11) What is the performance period for this solicitation?
a. The job shall be complete within 30 days of start date.
(12) When is the expected start date?
a. 30 days after receipt of order.
(13) Is there a specific style or aesthetic standard for the flower beds?
a. The veteran will be using these beds for mostly vegetables.
(14) What level of accessibility does the site provide for transporting materials and equipment?
a. Its at a house, so I believe typical accessibility.
(15) Are there any restrictions on work hours or specific days for site access?
a. Installation and Products will be delivered to the home of the veteran Monday-Friday between the hours of 8AM – 5PM CST, Contractor will not perform any services on the U.S. Federal Holidays per the SOW.
(16) Are there any specific landscaping or building codes we must adhere to for this project in Washington, DC?
a. This project is NOT in Washington DC, it is at a veteran’s home in Oklahoma, and the specific address will be given at award.
(17) Will environmental permits or other compliance measure be required for construction at this site?
a. Not that we are aware of.
(18) What are the start and completion dates for the project, including any phased milestones if applicable?
a. Start date is expected approximately 30 days after receipt of order, and would like completed no later than 30 days after start state.
(19) Are there allowances or contingencies for delays due to unexpected conditions (e.g., weather, site access issues)?
a. No there are not allowances for this.
(20) What is the budget range for the project, and are there funds set aside for potential additional costs if the site conditions vary unexpectedly?
a. No there are no additional funds set aside, we cannot give a budget range.
(21) Does the VA cover any pre-project costs, such as sit preparation, or will those be of the contractor/subcontractor responsibilities?
a. All costs will be contractor/subcontractor.
(22) Is there any expectation for post-construction maintenance of the flower beds, or is this a one-time installation only?
a. This is a one-time installation only project.
(23) Who will be the on-site contact for approvals and decisions during construction?
a. Veteran will be the on-site contact, If anything needs changing that involves additional funding, that request will have to be approved by the contracting officer and a modification to the contract will have to be done.
(24) Will any on-site oversight be provided by the VA or will this be managed solely by the contractor/subcontractor?
a. No on-site oversight by the VA. Assigned VRC to the case will want to see the finished product and the veteran will sign off that they are happy with finished product.
(25) Soil Preparation: Is there a need for soil replacement, tilling, or any soil conditioning before planting?
a. The area will need to be prepped, grass will be removed, ground will be leveled and tampered, landscaping will be dual layered stretched and stapled to the ground.
(26) Types of Flowers/Plants: Are there specific flower species or types that need to be planted, or would you like us to recommend options based on climate and location?
a. The veteran will be using these beds for mostly vegetables.
(27) Design Specifications: Do you have any specific design preferences or layouts, such as color schemes, seasonal planting, or patterns? Are we free to give our own designs?
a. They are 3 rectangular boxes that are to be built, no specific color schemes, it is vegetables that will be planted by the veteran, as the veteran is responsible for the soil, this is only a build.
(28) Environmental Conditions: Are there any environmental factors we should consider, such as shade, sunlight, or water accessibility in these areas?
a. No
(29) Irrigation Requirements: Will we need to install or modify an irrigation system for these flowerbeds, or is there an existing system?
a. Each flower bed will have an Irrigation/mist/drip system will be installed to water vegetation ext. timer will be installed and set to customer requests.
(30) Maintenance Requirements: Are there ongoing maintenance requirements (e.g., weeding, fertilizing, pruning) post-installation, and would you like this included in the proposal?
a. No.
(31) Mulching/Edging Needs: Will you require mulching, edging, or other ground coverings, and if so, what materials do you prefer?
a. No
(32) Access and Site Preparation: Will any equipment or materials need special site access or permissions to bring in (e.g., heavy machinery, soil, plants)?
a. No
(33) Safety and Compliance: Are there any safety, environmental, or compliance regulations specific to this project that we need to be aware of?
a. No
(34) Additional Permits or Approvals: Will any permits or approvals be necessary for installation, especially if major site modifications are required?
a. No.