36C10B25Q0121.docx
DOCX document 113 KB Posted
- Solicitation number
- 36C10B25Q0121
About this file
This is a Request for Information (RFI) issued by the Department of Veterans Affairs Technology Acquisition Center for Privacy and Security Event Tracking System (PSETS) Application in ServiceNOW Development and Support Contract. The response date is January 15, 2025 at 10:00 AM Eastern Time.
The scope of work requires contractor support for the modernization, implementation, and utilization of ServiceNow tools throughout the VA Enterprise, specifically for the PSETS application which tracks privacy and security incidents. Key requirements include project management, help desk support, system access management, operational maintenance, development/engineering enhancements, reporting capabilities, and leading bi-weekly progress meetings. The contract will have a 12-month base period with four 12-month option periods, plus optional 45-day transition support and optional help desk support tasks. The work will be performed at contractor facilities. The requirement falls under NAICS code 541519 and PSC 7H20. No travel is anticipated. The contractor must provide tier 2 help desk support for approximately 1,200 users during standard business hours if that option is exercised.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C10B25Q0121 0001.docx | DOCX document | |
| 36C10B25Q0121_2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information: 36C10B25Q0121 Privacy and Security Event Tracking System (PSETS) Application in ServiceNOW Development and Support Contract
VA-25-00030535
| SUBJECT* |
| PSETS Services and Help Desk Support - New Task Order (VA-25-00030535) |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 07724 |
| SOLICITATION NUMBER* |
| 36C10B25Q0121 |
| RESPONSE DATE/TIME/ZONE |
| 01-15-2025 10AM EASTERN TIME, NEW YORK, USA |
| ARCHIVE |
| 99 DAYS AFTER THE RESPONSE DATE |
| RECOVERY ACT FUNDS |
| N |
SET-ASIDE
| PRODUCT SERVICE CODE* |
| 7H20 |
| NAICS CODE* |
| 541519 |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
Technology Acquisition Center
23 Christopher Way Eatontown NJ 07724
POINT OF CONTACT*
PLACE OF PERFORMANCE
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
DESCRIPTION
Sources Sought Notice Sources Sought Notice See Attached.
| *= Required Field |
| Sources Sought Notice |
Sources Sought Notice
PERFORMANCE WORK STATEMENT (PWS)
DEPARTMENT OF VETERANS AFFAIRS
Office of Information & Technology Compliance, Risk and Remediation Data Breach Response Service (DBRS)
Privacy and Security Event Tracking System (PSETS) Application in ServiceNOW Development and Support Contract
Date: 12/19/2024
VA-25-00030535
PWS Version Number: 1.0
Contents
| 1.0 | BACKGROUND | 7 |
| 2.0 | APPLICABLE DOCUMENTS | 7 |
| 3.0 | SCOPE OF WORK | 10 |
| 4.0 | PERFORMANCE DETAILS | 11 |
| 4.1 | PERFORMANCE PERIOD | 11 |
| 4.2 | PLACE OF PERFORMANCE | 12 |
| 4.3 | TRAVEL | 12 |
| 5.0 | SPECIFIC TASKS AND DELIVERABLES | 12 |
| 5.1 | PROJECT MANAGEMENT | 12 |
| 5.1.1 | CONTRACTOR PROJECT MANAGEMENT PLAN | 12 |
| 5.1.2 | REPORTING REQUIREMENTS | 12 |
| 5.2 | PSETS IN NOW SUPPORT | 13 |
| 5.2.1 | DEVELOPMENT SUPPORT FOR PSETS IN NOW | 13 |
| 5.2.2 | TESTING | 14 |
| 5.3 | OPTION PERIODS | 15 |
| 5.4 | HELPDESK SUPPORT (OPTIONAL TASK 1) | 15 |
| 5.5 | TRANSITION PLANNING AND EXECUTION (OPTIONAL TASK 2) | 16 |
| 6.0 | GENERAL REQUIREMENTS | 16 |
| 6.1 | ENTERPRISE AND IT FRAMEWORK | 16 |
| 6.1.1 | VA TECHNICAL REFERENCE MODEL | 16 |
| 6.1.2 | FEDERAL IDENTITY, CREDENTIAL, AND ACCESS MANAGEMENT (FICAM) | 17 |
| 6.1.3 | INTERNET PROTOCOL VERSION 6 (IPV6) | 18 |
| 6.1.4 | TRUSTED INTERNET CONNECTION (TIC) | 18 |
| 6.1.5 | STANDARD COMPUTER CONFIGURATION | 19 |
| 6.1.6 | VETERAN FOCUSED INTEGRATION PROCESS (VIP) AND PRODUCT LINE MANAGEMENT (PLM) | 19 |
| 6.1.7 | PROCESS ASSET LIBRARY (PAL) | 20 |
| 6.1.8 | AUTHORITATIVE DATA SOURCES | 20 |
| 6.1.9 | SOCIAL SECURITY NUMBER (SSN) REDUCTION | 21 |
| 6.2 | SECURITY AND PRIVACY REQUIREMENTS | 21 |
| 6.2.1 | POSITION/TASK RISK DESIGNATION LEVEL(S) | 21 |
| 6.2.2 | CONTRACTOR PERSONNEL SECURITY REQUIREMENTS | 22 |
| 6.3 | METHOD AND DISTRIBUTION OF DELIVERABLES | 24 |
| 6.4 | PERFORMANCE METRICS | 24 |
| 6.5 | FACILITY/RESOURCE PROVISIONS | 25 |
| 6.6 | GOVERNMENT FURNISHED PROPERTY | 26 |
| 6.7 | SHIPMENT OF HARDWARE OR EQUIPMENT | 27 |
| ADDENDUM A – ADDITIONAL VA REQUIREMENTS, CONSOLIDATED | 28 |
BACKGROUND
The Department of Veterans Affairs (VA), Office of Information Technology (OIT), Data Breach Response Service (DBRS) is directly responsible at the agency level for the oversight, review, analysis and adjudication of all Privacy and Security related events that occur within the Department of Veterans Affairs (VA) globally. By serving as impartial arbiters of all suspected or confirmed losses of VA information, the DBRS ensures VA’s compliance with the independent review requirements for all losses of Sensitive Personal Information (SPI) in accordance with VA policies and Federal Laws. The DBRS created and manages the Privacy and Security Event Tracking System (PSETS). PSETS is a complex custom designed application currently running on the ServiceNOW (NOW) platform and contained within the NOW Security Incident Response Module. The PSETS system requires continued integration and business process refinement, as well as continued development to align processes to emergent regulations and the changing threat landscape. It consists of two (2) major components:
1. VA Network - Provides for availability and maintains access security to the application.
2. ServiceNOW - Collects information on suspected privacy and security incidents and complaints. NOW provides for views and forms to allow input and output of data. Security is further enhanced by setting privileges as to what data element a user can access.
APPLICABLE DOCUMENTS
In the performance of the tasks associated with this Performance Work Statement, the Contractor shall comply with the following:
1. 44 U.S.C. § 3541-3549, “Federal Information Security Management Act (FISMA) of 2002”
2. “Federal Information Security Modernization Act of 2014”
3. Federal Information Processing Standards (FIPS) Publication 140-2, “Security Requirements for Cryptographic Modules”
4. FIPS Pub 199. “Standards for Security Categorization of Federal Information and Information Systems,” February 2004
5. FIPS Pub 200, “Minimum Security Requirements for Federal Information and Information Systems,” March 2006
6. FIPS Pub 201-2, “Personal Identity Verification of Federal Employees and Contractors,” August 2013
7. 10 U.S.C. § 2224, "Defense Information Assurance Program"
8. 5 U.S.C. § 552a, as amended, “The Privacy Act of 1974”
9. Public Law 109-461, Veterans Benefits, Health Care, and Information Technology Act of 2006, Title IX, Information Security Matters
10. 42 U.S.C. § 2000d “Title VI of the Civil Rights Act of 1964”
11. VA Directive 0710, “Personnel Security and Suitability Program,” June 4, 2010, https://www.va.gov/vapubs/index.cfm
12. VA Handbook 0710, “Personnel Security and Suitability Program,” May 2, 2016, https://www.va.gov/vapubs/index.cfm
13. VA Directive and Handbook 6102, “Internet/Intranet Services,” August 5, 2019
14. 36 C.F.R. Part 1194 “Information and Communication Technology Standards and Guidelines,” January 18, 2017
15. Office of Management and Budget (OMB) Circular A-130, “Managing Federal Information as a Strategic Resource,” July 28, 2016
16. 32 C.F.R. Part 199, “Civilian Health and Medical Program of the Uniformed Services (CHAMPUS)”
17. NIST SP 800-66 Rev. 1, “An Introductory Resource Guide for Implementing the Health Insurance Portability and Accountability Act (HIPAA) Security Rule,” October 2008
18. Sections 504 and 508 of the Rehabilitation Act (29 U.S.C. § 794d), as amended, January 18, 2017
19. Homeland Security Presidential Directive (12) (HSPD-12), August 27, 2004
20. VA Directive 6500, “VA Cybersecurity Program,” February 24, 2021
21. VA Handbook 6500, “Risk Management Framework for VA Information Systems VA Information Security Program,” February 24, 2021
22. VA Handbook 6500.2, “Management of Breaches Involving Sensitive Personal Information (SPI),” March 12, 2019
23. VA Handbook 6500.5, “Incorporating Security and Privacy into the System Development Lifecycle,” March 22, 2010
24. VA Handbook 6500.6, “Contract Security,” March 12, 2010, (Appendix C updated April 22, 2024, VA Notice 24-12)
25. VA Handbook 6500.8, “Information System Contingency Planning,” April 6, 2011
26. VA Handbook 6500.10, “Mobile Device Security Policy,” February 15, 2018
27. VA Handbook 6500.11, “VA Firewall Configuration,” August 22, 2017
28. OIT Process Asset Library (PAL), https://www.va.gov/process/ . Reference Process Maps at https://www.va.gov/process/maps.asp and Artifact templates at https://www.va.gov/process/artifacts.asp
29. One-VA Technical Reference Model (TRM) (reference at https://www.va.gov/trm/TRMHomePage.aspx)
30. VA Directive 6508, “Implementation of Privacy Threshold Analysis and Privacy Impact Assessment,” October 15, 2014
31. VA Handbook 6508.1, “Procedures for Privacy Threshold Analysis and Privacy Impact Assessment,” July 30, 2015
32. VA Handbook 6510, “VA Identity and Access Management,” January 15, 2016
33. VA Directive and Handbook 6513, “Secure External Connections,” October 12, 2017
34. VA Directive 6300, “Records and Information Management,” September 21, 2018
35. VA Handbook, 6300.1, “Records Management Procedures,“ March 24, 2010
36. NIST SP 800-37 Rev 2, “Risk Management Framework for Information Systems and Organizations: A System Life Cycle Approach for Security and Privacy,” December 2018
37. NIST SP 800-53 Rev. 5, “Security and Privacy Controls for Federal Information Systems and Organizations,” September 23, 2020 (includes updates as of 12/10/2020)
38. VA Directive 0735, “Homeland Security Presidential Directive 12 (HSPD-12) Program,” October 26, 2015
39. VA Handbook 0735, “Homeland Security Presidential Directive 12 (HSPD-12) Program,” March 24, 2014
40. OMB Memorandum 05-24, “Implementation of Homeland Security Presidential Directive (HSPD) 12 – Policy for a Common Identification Standard for Federal Employees and Contractors,” August 5, 2005
41. OMB Memorandum M-19-17, “Enabling Mission Delivery Through Improved Identity, Credential, and Access Management,” May 21, 2019
42. OMB Memorandum, “Guidance for Homeland Security Presidential Directive (HSPD) 12 Implementation,” May 23, 2008
43. Federal Identity, Credential, and Access Management (FICAM) Roadmap and Implementation Guidance, December 2, 2011, (NOTE: Part A of the FICAM Roadmap and Implementation Guidance, v2.0, was replaced in 2015 with an updated Architecture (https://arch.idmanagement.gov/#what-is-the-ficam-architecture)
44. NIST SP 800-116 Rev 1, “Guidelines for the Use of Personal Identity Verification (PIV) Credentials in Facility Access,“ June 2018
45. NIST SP 800-63-3, 800-63A, 800-63B, 800-63C, “Digital Identity Guidelines,” updated March 02, 2020
46. NIST SP 800-157, “Guidelines for Derived PIV Credentials,” December 2014
47. NIST SP 800-164, “Guidelines on Hardware-Rooted Security in Mobile Devices (Draft),” October 2012
48. Draft National Institute of Standards and Technology Interagency Report (NISTIR) 7981, “Mobile, PIV, and Authentication,” March 2014
49. VA Memorandum, VAIQ #7100147, “Continued Implementation of Homeland Security Presidential Directive 12 (HSPD-12),” April 29, 2011 (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)
50. IAM Identity Management Business Requirements Guidance document, May 2013, (reference Enterprise Architecture Section, PIV/IAM (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)
51. VA Memorandum “Personal Identity Verification (PIV) Logical Access Policy Clarification,” July 17, 2019, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4896
52. Trusted Internet Connections (TIC) 3.0 Core Guidance Documents, https://www.cisa.gov/publication/tic-30-core-guidance-documents
53. OMB Memorandum M-19-26, “Update to the Trusted Internet Connections (TIC) Initiative,” September 12, 2019
54. OMB Memorandum M-08-23, “Securing the Federal Government’s Domain Name System Infrastructure,” August 22, 2008
55. Sections 524 and 525 of the Energy Independence and Security Act of 2007, (Public Law 110–140), December 19, 2007
56. Section 104 of the Energy Policy Act of 2005, (Public Law 109–58), August 8, 2005
57. Executive Order 13834, “Efficient Federal Operations,” dated May 17, 2018
58. Executive Order 13221, “Energy-Efficient Standby Power Devices,” August 2, 2001
59. VA Directive 0058, “VA Green Purchasing Program,” July 19, 2013
60. VA Handbook 0058, “VA Green Purchasing Program,” July 19, 2013
61. Office of Information Security (OIS) VAIQ #7424808 Memorandum, “Remote Access,” January 15, 2014, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28
62. Clinger-Cohen Act of 1996, 40 U.S.C. §11101 and §11103
63. “Veteran Focused Integration Process (VIP) Guide 4.0,” January 2021, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4371
64. VA Memorandum “Proper Use of Email and Other Messaging Services,” January 2, 2018, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28
65. “DevSecOps Product Line Management Playbook” version 2.0, May 2021, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4946
66. NIST SP 500-267B Revision 1, “USGv6 Profile,” November 2020
67. OMB Memorandum M-21-07, “Completing the Transition to Internet Protocol Version 6 (IPv6),” November 19, 2020
68. Social Security Number (SSN) Fraud Prevention Act of 2017
69. Section 240 of the Consolidated Appropriations Act (CAA) 2018, March 23, 2018
SCOPE OF WORK
The Contractor shall provide development support for the modernization, implementation, and utilization of Service Management tools throughout the VA Enterprise from the Infrastructure Operations, Enterprise Service Management center of excellence. The term Service Management Tools collectively refers to ServiceNow.
The Contractor shall provide:
1. Project Management associated with ServiceNOW.
2. Help Desk support for users.
3. NOW system access management.
4. NOW Operational and Maintenance Sustainment support to include change management and process implementation.
5. Development/engineering of enhancement implementation support.
6. Reporting development and process implementation support.
7. Lead bi-weekly contract progress meetings to the VA’s contract oversight team (PM, COR, CO, etc.) and provide agenda at least one day prior.
8. Development work updates and briefings in accordance with the platform team’s sprint cadence.
9. Provide quarterly summary reports in NOW or another format as requested by the VA.
Improvements will include operational efficiencies, increased user satisfaction, and to eliminate any potential risk of disrupting the availability and reliability of essential services. To ensure a high level of service quality and meet user expectations, these issues must be remedied with clearly defined outcomes by the vendor from the specified requirements in the PWS.
PERFORMANCE DETAILS
1.1 PERFORMANCE PERIOD
The Period of Performance (PoP) shall be twelve (12) months from the date of award with four (4) 12-month option periods, if exercised, and one (1) 45-day optional task for transition support and an optional task for helpdesk support which may be exercised at any time during the period of performance.
Any work at the Government site shall not take place on Federal holidays or weekends unless directed by the Contracting Officer (CO).
There are eleven (11) Federal holidays set by law (USC Title 5 Section 6103) that VA follows:
Under current definitions, five (5) are set by date:
| New Year's Day | January 1 | |
| Juneteenth | June 19 | |
| Independence Day | July 4 | |
| Veterans Day | November 11 | |
| Christmas Day | December 25 |
If any of the above falls on a Saturday, then Friday shall be observed as a holiday. Similarly, if one falls on a Sunday, then Monday shall be observed as a holiday. Should a deliverable, if not electronic, fall on a holiday, the deliverable will be due the next business day.
The other six (6) are set by a day of the week and month:
| Martin Luther King's Birthday | Third Monday in January |
| Washington's Birthday | Third Monday in February |
| Memorial Day | Last Monday in May |
| Labor Day | First Monday in September |
| Columbus Day | Second Monday in October |
1.2 PLACE OF PERFORMANCE
Tasks under this PWS shall be performed at Contractor facilities. The Contractor shall identify the Contractor’s place of performance in their proposal submission.
1.3 TRAVEL
The Government does not anticipate travel under this effort.
SPECIFIC TASKS AND DELIVERABLES
1.4 PROJECT MANAGEMENT
1.4.1 CONTRACTOR PROJECT MANAGEMENT PLAN
The Contractor shall deliver a Contractor Project Management Plan (CPMP) that outlines the Contractor’s approach, timeline, and tools to be used in execution of the contract. The CPMP should take the form of both a narrative and graphic format that displays the schedule, milestones, risks, and resource support. The CPMP shall also include how the Contractor shall coordinate and execute planned, routine, and ad hoc data collection reporting requests as identified within the PWS. The initial baseline CPMP shall be concurred upon and updated in accordance with Section B of the contract. The Contractor shall update and maintain the VA PM approved CPMP throughout the PoP
Deliverable:
A. Contractor Project Management Plan
1.4.2 REPORTING REQUIREMENTS
The Contractor shall provide the COR with Biweekly Progress Reports in electronic form in NOW or another format as requested by the VA. The report shall include detailed instructions/explanations for each required data element, to ensure that data is accurate and consistent. These reports shall reflect data as of the last day of the preceding week.
The Bi-Weekly Progress Reports shall cover all work completed during the reporting period and work planned for the subsequent reporting period. The report shall also identify any problems that arose and a description of how the problems were resolved. If problems have not been completely resolved, the Contractor shall provide an explanation including their plan and timeframe for resolving the issue. The report shall also include an itemized list of all Information and Communication Technology (ICT) deliverables and their current Section 508 conformance status. The Contractor shall monitor performance against the CPMP and report any deviations. It is expected that the Contractor will keep in communication with VA accordingly so that issues that arise are transparent to both parties to prevent escalation of outstanding issues.
Deliverables:
A. Biweekly Progress Report
1.5 PSETS IN NOW SUPPORT
The PSET in NOW support shall comply with current laws and regulations governing IT security in the Federal Government. NOW support to the PSETS application shall satisfy federal laws and regulations regarding the protection of Protected Health Information (PHI), Personally Identifiable Information (PII) and Sensitive Personal Information (SPI).
1.5.1 DEVELOPMENT SUPPORT FOR PSETS IN NOW
In order to support evolving business requirements, the Contractor shall perform development services to provide new capabilities and enhancements to current capabilities. The Contractor shall perform functionality and security testing on all new development and application changes. The Contractor shall also perform enhancements, changes, updates, and bug fixes to the existing PSETS in NOW systems when required. VA will provide the Contractor with the required system software for update capabilities.
All development shall include new and/or updated accompanying documentation to be stored on a SharePoint provided by VA. The Contractor shall create or update System Documents when applicable or upon changes to include System Design Documents (SDDs), User Guides which shall include all new and redesigned elements of NOW and its applications. The Contractor shall document the screens, workflows, relationships, and all other aspects of the PSETS in NOW Application. The level and details of the documentation required shall allow the systems to be maintained by any DBRS staff with the requisite PSETS in NOW experience and expertise. All documentation shall include a change control table to reflect all updates and changes to the document, including page number and section of the change. All documentation shall require VA review and approval prior to being accepted as final.
The Contractor shall perform the following NOW development/upgrade tasks:
1. The Contractor shall provide an analysis of the PSETS system and develop the Implementation and Enhancement Report to include VA change requests and the schedule for each task needed to complete the enhancements.
2. Upon COR/PM approval, the Contractor shall implement the enhancements identified in the Implementation and Enhancement Report to improve functionality and customer service.
3. The Contractor shall perform bug fixes and defect resolution to resolve any PSETS in NOW Application issues and defects identified during testing upon COR/PM approval.
4. Upon COR/PM approval of newly defined or changed requirements for the PSETS in NOW Application, the Contractor shall update the PSETS in NOW Application SDD to include any new development, enhancement and/or bug fixes. The SDD shall detail application data flow for different user roles to include screen shots indicating user functionality.
5. The Contractor shall review and update the current PSETS in NOW User Guides. The Contractor shall update the User Guides to include any new roles and/or new application functionality as a result of NOW enhancements.
Deliverables:
A. Implementation and Enhancement Reports B. PSETS in NOW System Design Document C. Updated User Guides
1.5.2 TESTING
The Contractor shall create a PSETS Test Plan for all development or enhancement efforts. The PSETS in NOW Test Plan shall detail schedule, test strategy, test scripts (including security testing), criteria, cases, environments, items to be tested, risk and constraints, required resources, expected results and rollback plan to Last Known Good. The Test Plan shall be updated for Government review and approval when additional developments or enhancements are performed. The Contractor shall perform security and functionality testing on all development and/or enhancements for the PSETS in NOW Application in the developmental testing environment created by the Contractor in accordance with the Government approved Test Plan.
The Contractor shall provide a PSETS in NOW Test Report after successful completion of testing and document the results of the test. The Contractor shall identify any defects to the application based on the results. Upon successful completion of Contractor testing, the Contractor shall provide support for Government conducted User Acceptance Testing. The Contractor shall create a User Acceptance Test Plan for all development efforts. The Contractor shall deliver a User Acceptance Test Report documenting the results of the user acceptance testing and make any required changes to the application based on the results. User acceptance testing shall be considered complete upon resolution of all issues and approval of the COR. Upon successful testing of the PSETS in NOW Application in the developmental environment, the Contractor shall migrate the Application to an environment in which the end user shall have full access capabilities, which is the production environment created by the Contractor.
Deliverables:
A. PSETS Test Plan B. PSETS Test Report C. User Acceptance Test Plan D. User Acceptance Test Report
1.6 OPTION PERIODS
If the Option periods are exercised by VA, the Contractor shall perform all tasks indicated in section 5.1 – 5.3 and all subtasks, with the exception of any upgrade/migration efforts that have already been completed.
1.7 HELPDESK SUPPORT (OPTIONAL TASK 1)
The Contractor shall perform up to tier 2 PSETS in NOW helpdesk support to approximately 1200 users. Support shall be provided from 8:00 am – 4:30 pm (Eastern Time) Monday through Friday excluding holidays.
The Contractor’s helpdesk support shall include responding to:
A. open events, B. email messages, C. phone calls, D. Instant Messages, The Contractor shall submit all helpdesk support activities under an electronic Bi-Weekly Activity Report (BWAR) under 5.1.2 detailing all support requests, issues, action items, trouble calls, and resolutions. The average number of helpdesk events per day is ten (10). Examples of events may include adding new users, removing old users, and answering calls to field questions concerning the PSETS application.
Additionally, the contractor shall provide support for system integration with VA approved internal/external dashboard applications.
1.8 TRANSITION PLANNING AND EXECUTION (OPTIONAL TASK 2)
The Contractor shall provide a Transition Plan for 45 days of outgoing support for transitioning work from the existing TO, to another Contractor or Government entity. In accordance with the Government-approved plan, the Contractor shall execute the plan to complete the transition of the existing TO from the incumbent to a successor. This shall include formal coordination with Government staff and successor staff and management. It shall also include delivery of all final deliverables and transfer of all appropriate records and GFE to the COR and PM. The Transition Plan shall include:
1. Coordination with Government representatives.
2. Review, evaluation and transition of current support services.
3. Assist in the transition of historic data to the new Contractor.
4. Transfer of all necessary business and/or technical documentation.
5. Transfer of compiled and un-compiled source code, to include all versions, maintenance updates and patches.
6. Orientation to introduce incoming personnel, programs, and users to the tools, methodologies, and business processes.
7. Disposition of Contractor purchased Government owned assets, including facilities, equipment, furniture, phone lines, and computer equipment.
8. Transfer of GFE and GFI, and GFE inventory management assistance.
9. The Contractor shall provide an oral presentation, with a written Closeout Report that summarizes the delivery of services for the previous quarter. The Contractor shall identify issues and current status of any pending projects.
Deliverables:
A. Transition Plan B. Closeout Report
GENERAL REQUIREMENTS
1.9 ENTERPRISE AND IT FRAMEWORK
1.9.1 VA TECHNICAL REFERENCE MODEL
The Contractor shall support the VA enterprise management framework. In association with the framework, the Contractor shall comply with OIT Technical Reference Model (VA TRM). The VA TRM is one component within the overall Enterprise Architecture (EA) that establishes a common vocabulary and structure for describing the information technology used to develop, operate, and maintain enterprise applications. Moreover, the VA TRM, which includes the Standards Profile and Product List, serves as a technology roadmap and tool for supporting OIT. Architecture & Engineering Services (AES) has overall responsibility for the VA TRM.
1.9.2 FEDERAL IDENTITY, CREDENTIAL, AND ACCESS MANAGEMENT (FICAM)
The Contractor shall ensure Commercial Off-The-Shelf (COTS) product(s), software configuration and customization, and/or new software are Personal Identity Verification (PIV) card-enabled by accepting HSPD-12 PIV credentials using VA Enterprise Technical Architecture (ETA), https://www.ea.oit.va.gov/EAOIT/VA_EA/Enterprise_Technical_Architecture.asp, and VA Identity and Access Management (IAM) approved enterprise design and integration patterns, https://www.oit.va.gov/library/recurring/edp/index.cfm. The Contractor shall ensure all Contractor delivered applications and systems comply with the VA Identity, Credential, and Access Management policies and guidelines set forth in VA Handbook 6510 VA Identity and Access Management, VA Handbook 0735 Homeland Security Presidential Directive 12 (HSPD-12) Program, and align with the Federal Identity, Credential, and Access Management Roadmap and Implementation Guidance v2.0.
The Contractor shall ensure all Contractor delivered applications and systems provide user authentication services compliant with the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-63-3, VA Handbook 6500 Appendix F, “VA System Security Controls”, and VA IAM enterprise requirements for direct, assertion based authentication, and/or trust based authentication, as determined by the design and integration patterns. Direct authentication at a minimum must include Public Key Infrastructure (PKI) based authentication supportive of PIV card and/or Common Access Card (CAC), as determined by the business need.
The Contractor shall ensure all Contractor delivered applications and systems conform to the specific Identity and Access Management PIV requirements set forth in the Office of Management and Budget (OMB) Memoranda M-05-24, M-19-17, and NIST Federal Information Processing Standard (FIPS) 201-2. OMB Memoranda M-05-24 and M-19-17 can be found at: https://www.whitehouse.gov/sites/whitehouse.gov/files/omb/memoranda/2005/m05-24.pdf, and https://www.whitehouse.gov/wp-content/uploads/2019/05/M-19-17.pdf respectively. Contractor delivered applications and systems shall be on the FIPS 201-2 Approved Product List (APL). If the Contractor delivered application and system is not on the APL, the Contractor shall be responsible for taking the application and system through the FIPS 201 Evaluation Program.
The Contractor shall ensure all Contractor delivered applications and systems support:
1. Automated provisioning and are able to use enterprise provisioning service.
2. Interfacing with VA’s Master Person Index (MPI) to provision identity attributes, if the solution relies on VA user identities. MPI is the authoritative source for VA user identity data.
3. The VA defined unique identity (Secure Identifier [SEC ID] / Integrated Control Number [ICN]).
4. Multiple authenticators for a given identity and authenticators at every Authenticator Assurance Level (AAL) appropriate for the solution.
5. Identity proofing for each Identity Assurance Level (IAL) appropriate for the solution.
6. Federation for each Federation Assurance Level (FAL) appropriate for the solution, if applicable.
7. Two-factor authentication (2FA) through an applicable design pattern as outlined in VA Enterprise Design Patterns.
8. A Security Assertion Markup Language (SAML) implementation if the solution relies on assertion-based authentication. Additional assertion implementations, besides the required SAML assertion, may be provided as long as they are compliant with NIST SP 800-63-3 guidelines.
9. Authentication/account binding based on trusted Hypertext Transfer Protocol (HTTP) headers if the solution relies on Trust based authentication.
10. Role Based Access Control.
11. Auditing and reporting capabilities.
12. Compliance with VIEWS 00155984, PIV Logical Access Policy Clarification https://www.voa.va.gov/DocumentView.aspx?DocumentID=4896.
The required Assurance Levels for this specific effort are Identity Assurance Level 3, Authenticator Assurance Level 3, and Federation Assurance Level 3.
1.9.3 INTERNET PROTOCOL VERSION 6 (IPV6)
The Contractor solution shall support Internet Protocol Version 6 (IPv6) based upon the memo issued by the Office of Management and Budget (OMB) on November 19, 2020 (https://www.whitehouse.gov/wp-content/uploads/2020/11/M-21-07.pdf). IPv6 technology, in accordance with the USGv6 Program (https://www.nist.gov/programs-projects/usgv6-program/usgv6-revision-1), NIST Special Publication (SP) 500-267B Revision 1 “USGv6 Profile” (https://doi.org/10.6028/NIST.SP.500-267Br1), and NIST SP 800-119 “Guidelines for the Secure Deployment of IPv6” (https://doi.org/10.6028/NIST.SP.800-119), compliance shall be included in all IT infrastructures, application designs, application development, operational systems and sub-systems, and their integration. In addition to the above requirements, all devices shall support native IPv6 and dual stack (IPv6 / IPv4) connectivity without additional memory or other resources being provided by the Government, so that they can function in a mixed environment. All public/external facing servers and services (e.g. web, email, DNS, ISP services, etc.) shall support native IPv6 and dual stack (IPv6 / IPv4) users and all internal infrastructure and applications shall communicate using native IPv6 and dual stack (IPv6 / IPv4) operations.
1.9.4 TRUSTED INTERNET CONNECTION (TIC)
The Contractor solution shall meet the requirements outlined in Office of Management and Budget Memorandum M-19-26, “Update to the Trusted Internet Connections (TIC) Initiative“ (https://www.whitehouse.gov/wp-content/uploads/2019/09/M-19-26.pdf), VA Directive 6513 “Secure External Connections”, and shall comply with the TIC 3.0 Core Guidance Documents, including all Volumes and TIC Use Cases, found at the Cybersecurity & Infrastructure Security Agency (CISA) (https://www.cisa.gov/publication/tic-30-core-guidance-documents). Any deviations must be approved by the VA TIC 3.0 Working Group at vaoisesatic30team@va.gov.
1.9.5 STANDARD COMPUTER CONFIGURATION
The Contractor IT end user solution that is developed for use on standard VA computers shall be compatible with and be supported on the standard VA operating system, currently Windows 10 (64bit), Edge (Chromium based), and 365 Apps for enterprise. Applications delivered to VA and intended to be deployed to Windows 10 workstations shall be delivered as a signed .msi package with switches for silent and unattended installation and updates shall be delivered in signed .msp file formats for easy deployment using Microsoft Endpoint Configuration Manager (CM) VA’s current desktop application deployment tool. Signing of the software code shall be through a vendor provided certificate that is trusted by VA using a code signing authority such as Verizon/Cybertrust or Symantec/VeriSign. The Contractor shall also ensure and certify that their solution functions as expected when used from a standard VA computer, with non-admin, standard user rights that have been configured using the United States Government Configuration Baseline (USGCB) and Defense Information Systems Agency (DISA) Secure Technical Implementation Guide (STIG) specific to the particular client operating system being used.
1.9.6 VETERAN FOCUSED INTEGRATION PROCESS (VIP) AND PRODUCT LINE MANAGEMENT (PLM)
The Contractor shall support VA efforts IAW the updated Veteran Focused Integration Process (VIP) and Product Line Management (PLM). The major focus of the new VIP is on Governance and Reporting and is less prescriptive, with a focus on outcomes and continuous delivery of value. Product Line Management (PLM) is a framework that focuses on delivering functional products that provide the highest priority work to customers while delivering simplified, reliable, and practical solutions to the business, medical staff, and our Veterans. The VIP Guide is a companion guide to the PLM Playbook and can be found at: https://www.voa.va.gov/DocumentView.aspx?DocumentID=4371 and the PLM Playbook can be found at https://www.voa.va.gov/DocumentView.aspx?DocumentID=4946. The PLM Playbook pivots from project-centric to product-centric delivery and contains descriptive practices that focuses on outcomes. The PLM Playbook contains a set of “plays” that implement Development, Security, and Operations (DevSecOps) principles and processes such as automated development, continuous integration/continuous delivery, and release on demand. The PLM Playbook details how product lines implement Lean-Agile principles, methods, practices, and techniques through levels of maturity. VIP and PLM are the authoritative processes that IT projects must follow to ensure development and delivery of IT products.
1.9.7 PROCESS ASSET LIBRARY (PAL)
The Contractor shall perform their duties consistent with the processes defined in the OIT Process Asset Library (PAL). The PAL scope includes the full spectrum of OIT functions and activities, such as VIP project management, operations, service delivery, communications, acquisition, and resource management. PAL serves as an authoritative and informative repository of searchable processes, activities or tasks, roles, artifacts, tools and applicable standards and guides to assist the OIT workforce, Government and Contractor personnel. The Contractor shall follow the PAL processes to ensure compliance with policies and regulations and to meet VA quality standards. The PAL includes the contractor onboarding process consistent with Section 6.2.2 and can be found at https://www.va.gov/PROCESS/artifacts/maps/process_CONB_ext.pdf. The main PAL can be accessed at www.va.gov/process.
1.9.8 AUTHORITATIVE DATA SOURCES
The VA Enterprise Architecture Repository (VEAR) is one component within the overall EA that establishes the common framework for data taxonomy for describing the data architecture used to develop, operate, and maintain enterprise applications. The Contractor shall comply with the department’s Authoritative Data Source (ADS) requirement that VA systems, services, and processes throughout the enterprise shall access VA data solely through official VA ADSs where applicable, see below. The Information Classes which compose each ADS are located in the VEAR, in the Data & Information domain. The Contractor shall ensure that all delivered applications and system solutions support:
1. Interfacing with VA’s Master Person Index (MPI) (formerly the Master Veteran Index (MVI)) to provision identity attributes, if the solution relies on VA user identities. MPI is the authoritative source for VA user identity data.
2. Interfacing with Capital Asset Inventory (CAI) to conduct real property record management actions, if the solution relies on real property records data. CAI is the authoritative source for VA real property record management data.
3. Interfacing with electronic Contract Management System (eCMS) for access to contract, contract line item, purchase requisition, offering vendor and vendor, and solicitation information above the micro-purchase threshold, if the solution relies on procurement data. ECMS is the authoritative source for VA procurement actions data.
4. Interfacing with HRSmart Human Resources Information System to conduct personnel action processing, on-boarding, benefits management, and compensation management, if the solution relies on personnel data. HRSmart is the authoritative source for VA personnel information data.
5. Interfacing with Vet360 to access personal contact information, if the solution relies on VA Veteran personal contact information data. Vet360 is the authoritative source for VA Veteran Personal Contact Data.
6. Interfacing with VA/Department of Defense (DoD) Identity Repository (VADIR) for determining eligibility for VA benefits under Title 38, if the solution relies on qualifying active duty military service data. VADIR is the authoritative source for Qualifying Active Duty military service in VA.
1.9.9 SOCIAL SECURITY NUMBER (SSN) REDUCTION
The Contractor solution shall support the Social Security Number (SSN) Fraud Prevention Act (FPA) of 2017 which prohibits the inclusion of SSNs on any document sent by mail. The Contractor support shall also be performed in accordance with Section 240 of the Consolidated Appropriations Act (CAA) 2018, enacted March 23, 2018, which mandates VA to discontinue using SSNs to identify individuals in all VA information systems as the Primary Identifier. The Contractor shall ensure that any new IT solution discontinues the use of SSN as the Primary Identifier to replace the SSN with the ICN in all VA information systems for all individuals. The Contractor shall ensure that all Contractor delivered applications and systems integrate with the VA Master Person Index (MPI) for identity traits to include the use of the ICN as the Primary Identifier. The Contractor solution may only use a Social Security Number to identify an individual in an information system if and only if the use of such number is required to obtain information VA requires from an information system that is not under the jurisdiction of VA.
1.10 SECURITY AND PRIVACY REQUIREMENTS
1.10.1 POSITION/TASK RISK DESIGNATION LEVEL(S)
In accordance with VA Handbook 0710, Personnel Security and Suitability Program, the position sensitivity and the level of background investigation commensurate with the required level of access for the following tasks within the PWS are:
Position Sensitivity and Background Investigation Requirements by Task
| Task Number |
| Tier1 / Low Risk |
| Tier 2 / Moderate Risk |
| Tier 4 / High Risk |
| 5.1 |
| |_| |
| |X| |
| |_| |
| 5.2 |
| |_| |
| |X| |
| |_| |
| 5.3 |
| |_| |
| |X| |
| |_| |
| 5.4 |
| |_| |
| |X| |
| |_| |
| 5.5 |
| |_| |
| |X| |
| |_| |
The Tasks identified above and the resulting Position Sensitivity and Background Investigation requirements identify, in effect, the Background Investigation requirements for Contractor individuals, based upon the tasks the particular Contractor individual will be working. The submitted Contractor Staff Roster must indicate the required Background Investigation Level for each Contractor individual based upon the tasks the Contractor individual will be working, in accordance with their submitted proposal.
1.10.2 CONTRACTOR PERSONNEL SECURITY REQUIREMENTS
Contractor Responsibilities:
1. The Contractor shall prescreen all personnel requiring access to the computer systems to ensure they maintain the appropriate Background Investigation, and are able to read, write, speak, and understand the English language.
Within 3 business days after award, the Contractor shall provide a roster of Contractor and Subcontractor employees to the COR to begin their background investigations in accordance with the PAL template artifact. The Contractor Staff Roster shall contain the Contractor’s Full Name, Date of Birth, Place of Birth, individual background investigation level requirement (based upon Section 6.2 Tasks), etc. The Contractor shall submit full Social Security Numbers either within the Contractor Staff Roster or under separate cover to the COR. The Contractor Staff Roster shall be updated and provided to VA within 1 day of any changes in employee status, training certification completion status, Background Investigation level status, additions/removal of employees, etc. throughout the Period of Performance. The Contractor Staff Roster shall remain a historical document indicating all past information and the Contractor shall indicate in the Comment field, employees no longer supporting this contract. The preferred method to send the Contractor Staff Roster or Social Security Number is by encrypted e-mail. If unable to send encrypted e-mail, other methods which comply with FIPS 140-2 are to encrypt the file, use a secure fax, or use a traceable mail service.
1. The Contractor should coordinate with the location of the nearest VA fingerprinting office through the COR. Only electronic fingerprints are authorized. The Contractor shall bring their completed Security and Investigations Center (SIC) Fingerprint request form with them (see paragraph d.4. below) when getting fingerprints taken.
b. The Contractor shall ensure the following required forms are submitted to the COR within 5 days after contract award:
1) Optional Form 306
2) Self-Certification of Continuous Service
3) VA Form 0710
4) Completed SIC Fingerprint Request Form The Contractor personnel shall submit all required information related to their background investigations (completion of the investigation documents (SF85, SF85P, or SF 86) utilizing the Office of Personnel Management’s (OPM) Electronic Questionnaire for Investigations Processing (e-QIP) after receiving an email notification from the Security and Investigation Center (SIC).
The Contractor employee shall certify and release the e-QIP document, print, and sign the signature pages, and send them encrypted to the COR for electronic submission to the SIC. These documents shall be submitted to the COR within 3 business days of receipt of the e-QIP notification email. (Note: OPM is moving towards a “click to sign” process. If click to sign is used, the Contractor employee should notify the COR within 3 business days that documents were signed via e-QIP).
1. The Contractor shall be responsible for the actions of all personnel provided to work for VA under this contract. In the event that damages arise from work performed by Contractor provided personnel, under the auspices of this contract, the Contractor shall be responsible for all resources necessary to remedy the incident.
1. A Contractor may be granted unescorted access to VA facilities and/or access to VA Information Technology resources (network and/or protected data) with a favorably adjudicated Special Agreement Check (SAC), completed training delineated in VA Handbook 6500.6 (updated Appendix C, Section 4), signed “Contractor Rules of Behavior”, and with a valid, operational PIV credential for PIV-only logical access to VA’s network. A PIV card credential can be issued once your SAC has been favorably adjudicated and your background investigation has been scheduled by OPM. However, the Contractor will be responsible for the actions of the Contractor personnel they provide to perform work for VA. The investigative history for Contractor personnel working under this contract must be maintained in the database of OPM.
1. The Contractor, when notified of an unfavorably adjudicated background investigation on a Contractor employee as determined by the Government, shall withdraw the employee from consideration in working under the contract.
Failure to comply with the Contractor personnel security investigative requirements may result in loss of physical and/or logical access to VA facilities and systems by Contractor and Subcontractor employees and/or termination of the contract for default.
Identity Credential Holders must follow all HSPD-12 policies and procedures as well as use and protect their assigned identity credentials in accordance with VA policies and procedures, displaying their badges at all times, and returning the identity credentials upon termination of their relationship with VA.
Deliverable:
A. Contractor Staff Roster
1.11 METHOD AND DISTRIBUTION OF DELIVERABLES
The Contractor shall deliver documentation in electronic format, unless otherwise directed in Section B of the solicitation/contract. Acceptable electronic media include: Microsoft 365, MS Word 2000/2003/2007/2010/2019, MS Excel 2000/2003/2007/2010/2019, MS PowerPoint 2000/2003/2007/2010/2019, MS Project 2000/2003/2007/2010/2019, MS Access 2000/2003/2007/2010, MS Visio 2000/2002/2003/2007/2010/2019, AutoCAD 2002/2004/2007/2010, and Adobe Postscript Data Format (PDF).
1.12 PERFORMANCE METRICS
The table below defines the Performance Standards and Acceptable Levels of Performance associated with this effort.
| Performance Objective |
| Performance Standard |
| Acceptable Levels of Performance |
| A. Technical / Quality of Product or Service |
| 1. Demonstrates understanding of requirements |
2. Efficient and effective in meeting requirements
3. Meets technical needs and mission requirements
4. Provides quality services/products
5. Incorporates “ease of use” Human Centered Design principles in any software developed.
Satisfactory or higher
| B. Project Milestones and Schedule |
| 1. Established milestones and project dates are met |
2. Products completed, reviewed, delivered in accordance with the established schedule
3. Notifies customer in advance of potential problems Satisfactory or higher
| C. Cost & Staffing |
| 1. Currency of expertise and staffing levels appropriate to perform tasks required |
2. Personnel possess necessary knowledge, skills, and abilities to perform tasks Satisfactory or higher
| D. Management |
| 1. Integration and coordination of all activities to execute effort |
| Satisfactory or higher |
The COR will utilize a Quality Assurance Surveillance Plan (QASP) throughout the life of the contract to ensure that the Contractor is performing the services required by this PWS in an acceptable level of performance. The Government reserves the right to alter or change the surveillance methods in the QASP at its own discretion. A Performance Based Service Assessment will be used by the COR in accordance with the QASP to assess Contractor performance.
1.13 FACILITY/RESOURCE PROVISIONS
The Government will provide office space, telephone service and system access when authorized contract staff work at a Government location as required in order to accomplish the Tasks associated with this PWS. All procedural guides, reference materials, and program documentation for the project and other Government applications will also be provided on an as-needed basis.
The Contractor shall request other Government documentation deemed pertinent to the work accomplishment directly from the Government officials with whom the Contractor has contact. The Contractor shall consider the COR as the final source for needed Government documentation when the Contractor fails to secure the documents by other means. The Contractor is expected to use common knowledge and resourcefulness in securing all other reference materials, standard industry publications, and related materials that are pertinent to the work.
VA may provide remote access to VA specific systems/network in accordance with VA Handbook 6500, which requires the use of a VA approved method to connect external equipment/systems to VA’s network. Citrix Access Gateway (CAG) is the current and only VA approved method for remote access users when using or manipulating VA information for official VA Business. VA permits CAG remote access through approved Personally Owned Equipment (POE) and Other Equipment (OE) provided the equipment meets all applicable 6500 Handbook requirements for POE/OE. All of the security controls required for Government furnished equipment (GFE) must be utilized in approved POE or OE. The Contractor shall provide proof to the COR for review and approval that their POE or OE meets the VA Handbook 6500 requirements and VA Handbook 6500.6 updated Appendix C, herein incorporated as Addendum B, before use. CAG authorized users shall not be permitted to copy, print, or save any VA information accessed via CAG at any time. VA prohibits remote access to VA’s network from non-North Atlantic Treaty Organization (NATO) countries. The exception to this are countries where VA has approved operations established (e.g. Philippines and South Korea). Exceptions are determined by the COR in coordination with the Information Security Officer (ISO) and Privacy Officer (PO).
This remote access may provide access to VA specific software such as Veterans Health Information System and Technology Architecture (VistA), ClearQuest, PAL, Primavera, and Remedy, including appropriate seat management and user licenses, depending upon the level of access granted. The Contractor shall utilize government-provided software development and test accounts, documents, and requirements repositories, etc. as required for the development, storage, maintenance, and delivery of products within the scope of this effort. The Contractor shall not transmit, store, or otherwise maintain sensitive data or products in Contractor systems (or media) within the VA firewall IAW VA Handbook 6500.6 dated March 12, 2010 (Appendix C updated April 22, 2024). All VA sensitive information shall be protected at all times in accordance with VA Handbook 6500, local security field office System Security Plans (SSP’s) and Authority to Operate (ATO)’s for all systems/LAN’s accessed while performing the tasks detailed in this PWS. The Contractor shall ensure all work is performed in countries deemed not to pose a significant security risk.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .