RFI_PMIS CFM_QA.pdf
PDF 138 KB Posted
- Attached to
- DA10--CFM PMIS Solution (VA-24-00057428)
- Solicitation number
- 36C10B24Q0299
About this file
This document is a Request for Information (RFI) issued by the Department of Veterans Affairs (VA) Construction and Facilities Management (CFM) for their CFM Project Management Information System (PMIS) procurement.
The RFI provides questions and answers related to the PMIS system requirements. Key details include that the PMIS solution must be a Software-as-a-Service (SaaS) offering that is FedRAMP authorized at the Moderate FISMA Impact Level, even if it is a single-tenant environment. The VA will not accept a FedRAMP-approved hosting platform/infrastructure alone, the solution itself must achieve FedRAMP authorization. Responses to the RFI are due by April 2, 2024 at 10:00 AM EDT for the related pre-solicitation opportunity, Solicitation Number 36C10B24Q0299 for the "DA10--CFM PMIS Solution (VA-24-00057428)".
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C10B24Q0299_2.docx | DOCX document | |
| RFI_PMIS CFM v2.pdf | ||
| 36C10B24Q0299_1.docx | DOCX document | |
| PD_PMIS CFM_Draft.pdf | ||
| RFI_PMIS CFM.pdf | ||
| 36C10B24Q0299.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Veterans Affairs (VA) Construction and Facilities Management (CFM)
CFM Project Management Information System (PMIS) SEWP Request #303454
Questions and Answers (Q&A) March 28, 2024
Note: THIS IS A REQUEST FOR INFORMATION (RFI), ONLY, issued in accordance with Federal Acquisition Regulation (FAR) 15.201(e), for the purpose of conducting market research.
# Ref Questions VA Response
1. FedRAMP Since the SaaS application Oracle would be recommending is a “Single Tenant” SaaS environment would FedRAMP still be a requirement?
a. We are working with another VA office and learned VA requires FedRAMP Authorization for only Multi- Tenant Applications. Single Tenant applications go through a different path that didn’t require FedRAMP.
Yes. As stated in the draft Product Description for the CFM PMIS, the SaaS offering must be FedRAMP approved at a Moderate FISMA Impact Level.
2. FedRAMP Would the VA accept our solution on a FedRAMPED hosted platform/infrastructure?
a. Although the SaaS application being recommended would not be Fed RAMPED the environment would be
No, the solution itself must achieve FedRAMP authorization.