36C10B20Q0218-003.pdf
PDF Posted
- Attached to
- D306--VBA Performance Testing Services Federal contract opportunity
- Solicitation number
- 36C10B20Q0218
About this file
36C10B20Q0218 Master Test Plan_VBA Performance Testing March CI_R1.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C10B20Q0218-004.pdf | ||
| 36C10B20Q0218-006.xlsx | XLSX spreadsheet | |
| 36C10B20Q0218-008.pdf | ||
| 36C10B20Q0218-005.pdf | ||
| 36C10B20Q0218-001.docx | DOCX document | |
| 36C10B20Q0218-009.pdf | ||
| 36C10B20Q0218-000.docx | DOCX document | |
| 36C10B20Q0218-002.xls | XLS spreadsheet | |
| 36C10B20Q0218-007.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Veterans Affairs
Veteran Benefits Administration (VBA) Performance
Testing
Master Test Plan – March
Coordinated Install
CLIN3002AD
Version 4.4
February 25, 2020
VBA Performance Testing
Test Plan ii February 2020
Revision History
Date Version Description Author
2/25/2020 4.4 March CI Test Plan FTC
1/27/2020 4.3 February CI Test Plan FTC
1/6/2020 4.2 January CI Test Plan FTC
12/30/2020 4.1 December CI Test Plan FTC
10/24/2020 4.0 October CI Test Plan FTC
Test Plan iii February 2020
Table of Contents
1. Report Details (CLIN3002)
2. Introduction
2.1. Purpose
2.2. Test Objectives
2.3. Roles and Responsibilities
2.4. Processes
3. Items to be Tested
3.1. Overview of Test Inclusions
3.2. Overview of Test Exclusions
4. Test Approach
5. Testing Techniques
5.1. Productivity and Support Tools
6. Test Criteria
6.1. Pass/Fail Criteria
6.2. Suspension and Resumption Criteria
7. Test Deliverables
8. Test Schedule
9. Test Environments
9.1. Test Environment Configurations
9.2. Base System Hardware
10. Staffing and Training Needs
11. Risks and Constraints
12. Test Metrics
13. Appendix A – 508 Compliance
Test Plan 1 February 2020
1. Report Details (CLIN3002) Date of Report: February 25, 2020
Contract: VA11816F10060005
Deliverable: CLIN 3002AD – Test Plan Report
Name Contact Information
Kesha Burch Project Manager
Email: Kesha.Burch@va.gov
Telephone: 708-483-5135
Tony Canales Contracting Officer’s Representative (COR)
Email: Tony.Canales@va.gov
Telephone: 512-484-2949
Dana Newcomb Contracting Officer (CO)
Email: Dana.newcomb@va.gov
Telephone: 732-440-9680
Name Contact Information
David Peterson Program Manager, HITC Hines, II
Telephone: 217-390-7820 Email:
david.peterson1@va.gov mailto:Kesha.Burch@va.gov mailto:Tony.Canales@va.gov mailto:Dana.newcomb@va.gov mailto:david.peterson1@va.gov
Test Plan 2 February 2020
2. Introduction
2.1. Purpose
The purpose of performance testing the Coordinated Install is to ensure that the new software does not impact performance adversely.
2.2. Test Objectives
A one-hour test emulating the one-hour peak load on VBAPROD was executed on VBAPERF.
Approximately 15% of the transactions account for over 90% of utilization in Tuxedo and
Oracle. These transactions are the core of the test suite.
There are 13 corporate applications in the test suite. The performance team examined
ClearQuest, Application Turnover Transmittals (ATT) and release notes to determine the requirements to target performance testing of this release. Corporate applications require testing whenever WebLogic applications change because they use the same database.
2.3. Roles and Responsibilities
Table 1 lists the key roles and their responsibilities for this Master Test Plan.
Table 1: Roles and Descriptions
Role Description
Performance Team Performance team builds and executes tests.
Project Manager Person that has overall responsibility for the successful planning and execution of a project; person responsible for creating the Master Test Plan in collaboration with the Development Manager.
Stakeholders Persons that hold a stake in a situation in which they may affect or be affected by the outcome.
Test Environment Team Persons that establish, maintain, and control test environments.
2.4. Processes
The processes that guide the implementation of this Master Test Plan are:
• Test Preparation
• Test Execution
• Evaluation
The references that support the implementation of this Master Test Plan are:
• Performance Testing Process - December 2019
Test Plan 3 February 2020
3. Items to be Tested Table 2 - Coordinated Install
Tuxedo Applications in the Test Suite
Awards Share PIES WINRS
VNARCH FAS RBA CSUM
COVERS HINQ MAPD CovSequenceCheck
CSEM
Web Applications in the Test Suite
WEAMS WSMS FOCAS QAWeb
Web Services
Batch Applications
FAS Batch Monthly FAS Batch Daily FAS Reports EAC
3.1. Overview of Test Inclusions
The target transaction rate for the VBAPERF test suite is 3.9M transactions per hour. The test suite was recalibrated and based on a peak hour load for Production from January 31, 2019.
3.2. Overview of Test Exclusions
Not all WebLogic applications are in scope for this contract.
4. Test Approach The standard VBAPROD test suite was executed using HP/Mercury LoadRunner. Test scripts and test cases are available at the Hines ITC under the following folder:
\\vbahintstrat9\Mercury\Master_Repository\Master_Scripts. The test data bed was established from the December 20, 2019 refresh of VBAPERF from the production system with the
December release applied.
A one-hour test emulating the one-hour peak load on VBAPROD was executed on VBAPERF.
This suite has evolved over the past several years. Approximately 15% of the transactions account for over 90% of utilization in Tuxedo and Oracle. These transactions are the core of the test suite.
5. Testing Techniques There are 13 corporate applications, 4 WebLogic applications and web services in the test suite.
The performance team examined ClearQuest, Application Turnover Transmittals (ATT) and release notes to determine the requirements to target performance testing of this release. All file://///vbahintstrat9/Mercury/Master_Repository/Master_Scripts
Test Plan 4 February 2020 applications require testing whenever database changes are made because they use the same database.
Based on this information, a test suite was created using LoadRunner. The test suite is executed a number of times to ensure consistent results.
5.1. Productivity and Support Tools
Table 3 describes the tools that will be employed to support this Master Test Plan.
Table 3: Tool Category or Types
Tool Category or Type Tool Brand Name Vendor or In-house Version
Performance Testing LoadRunner MicroFocus 12.55
6. Test Criteria
6.1. Pass/Fail Criteria
Pass/Fail criteria are decisions based on the response time of the applications. System resource utilization is also taken into consideration.
6.2. Suspension and Resumption Criteria
Tests are suspended when it is clear that response time goals will not be met or excessive errors are observed.
Resumption starts when root cause has been identified and corrected. The entire test is repeated.
7. Test Deliverables Table 4 lists the test deliverables for the Performance Testing project.
Table 4: Test Deliverables
Test Deliverables Responsible Party
Performance Test Plan David Peterson – Project Manager
Test Schedule David Peterson – Project Manager
Test Scripts Josh Wallgren – Test Architect
Use Cases Josh Wallgren – Test Architect
Production Database and File System
Storage Report (before)
David Peterson – Project Manager
Production Database and File System
Storage Report (after)
David Peterson – Project Manager
Test Issues Report David Peterson – Project Manager
Test Plan 5 February 2020
Test Deliverables Responsible Party
Test System Infrastructure Change Report David Peterson – Project Manager
Test System Data Staging Process Report David Peterson – Project Manager
Load Generation Scripting Process Report Josh Wallgren – Test Architect
Client-Server Application Specific Report David Peterson – Project Manager
Client-Server Application Specific Lessons
Learned Report David Peterson – Project Manager
Client-Server Summary Findings Report David Peterson – Project Manager
Client-Server Threshold Projection Report David Peterson – Project Manager
Client-Server Infrastructure Enhancements
Reports David Peterson – Project Manager
Web-based Application Specific Reports David Peterson – Project Manager
Web-based Application Specific Lessons
Learned Report David Peterson – Project Manager
Web-based Summary Findings Report David Peterson – Project Manager
Web-based Threshold Projection Report David Peterson – Project Manager
Web-based Infrastructure Enhancements
Reports David Peterson – Project Manager
Batch Application Specific Reports David Peterson – Project Manager
Batch Application Specific Lessons Learned
Report David Peterson – Project Manager
Batch Threshold Projection Report David Peterson – Project Manager
Batch Infrastructure Enhancements Reports David Peterson – Project Manager
Test Plan 6 February 2020
8. Test Schedule Table 5: Testing Milestones
Testing Milestones Responsible Party
Application installs Enterprise Operations
Sync changes Performance Team
Run performance test Performance Team
Analyze results Performance Team
Rerun as required Performance Team
Generate reports Performance Team
Restore environments Performance Team
9. Test Environments Hines performance test environment consists of a database server, Tuxedo servers, WebLogic servers, Active Directory servers, Apache servers and SiteMinder servers.
9.1. Test Environment Configurations
The party or parties responsible for configuring and maintaining the test environments are:
ITOPS and the Hines Performance team.
9.2. Base System Hardware
Table 6 sets forth the system resources for the test effort presented in this Test Plan.
Table 6: System Hardware Resources
Resource Quantity
VBAPERF - Oracle 1
WebLogic Servers 9
Tuxedo Servers 4
LoadRunner 6
Apache Server 3
SiteMinder Servers 2
Active Directory Uses Production servers
Test Plan 7 February 2020
10. Staffing and Training Needs Table 7 describes the personnel resources needed to plan, prepare, and execute this Master Test
Plan.
Table 7: Staffing Resources
Testing Task Quantity of
Personnel Needed
Test Process Duration/
Days
Create the Master Test Plan 1 Test
Preparation
1 day
Establish the Test Environment 7 Test
Preparation
2 days
Execute Performance Tests 4 Test Execution 10 days
11. Risks and Constraints Primary issue is software updates. Fixes are applied throughout the test cycle. This marginalizes previous results and requires additional testing.
12. Test Metrics Metrics are a system of parameters or methods for quantitative and periodic assessment of a process that is to be measured. Test metrics may include, but are not limited to:
• Response time
• CPU utilization
• Memory utilization
Test Plan 8 February 2020
13. Appendix A – 508 Compliance All deliverables are compliant with Section 508 standards’ requirements for accessibility and include final test results demonstrating Section 508 compliance.