36C10B19R0043-A0004001.pdf
PDF 727 KB Posted
- Solicitation number
- 36C10B19R0043
About this file
36C10B19R0043 A0004 36C10B19R0043 A0004.pdf
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C10B19R0043 A0004
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 66
TAC-20-53098
Department of Veterans Affairs
Technology Acquisition Center
23 Christopher Way
Eatontown NJ 07724
Department of Veterans Affairs
Technology Acquisition Center
23 Christopher Way
Eatontown NJ 07724
To all Offerors/Bidders
36C10B19R0043
X
See Continuation Page
Juan Quinones
Contracting Officer
CONTINUATION PAGE
The purpose of this Amendment, A0004, to RFP 36C10B19R0043 titled, “Cisco Business
Critical Enterprise Service Agreement is as follows:
1. Section B.4, Price Schedule: Sub Contract Line Item Numbers (SLIN) X004AA, X004AB and X004AC have been incorporated to separately price Cisco Collaboration
Service Elements. SLIN X004 for Collaboration Flex Enterprise Service Workspace was renumbered to X004AD
2. Section B.4, Price Schedule: Contract Line Item Numbers X008, X009 and X0010 have been incorporated to price not to exceed Optional Quantities for Cisco Collaboration
Service Elements.
3. Section C: Added FAR 52.217-7, “Option for Increased Quantity -- Separately Priced
Line Item”
4. Section D, Pricing Sheet (Attachment 3): Revised to separately price Cisco Collaboration
Service Elements and remove the weightings and bands relative to Collaboration Flex.
5. Section E.1: FAR clause 52.252-1 has been updated to incorporate FAR 52.204-24, “Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment” by reference.
6. Sections E.9 and E.10 have been revised to reflect the changes made due to the separately priced Cisco Collaboration Service Elements and to remove the weightings and bands relative to Collaboration Flex.
7. The proposal submission date has been extended to Monday, September 16, 2019 at 3PM
EST.
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.4 PRICE SCHEDULE
All deliverables must be submitted electronically to the VA Program Manager (PM), Contracting
Officer’s Representative (COR), and Contracting Officer unless otherwise specified in the line item. Please be advised that in accordance with Federal Acquisition Regulation (FAR) Part
2.101, a “day” means, unless otherwise specified, a CALENDER day. Additionally, deliverables with due dates falling on a weekend or holiday shall be submitted the following Government work day after the weekend or holiday.
The Price Schedule contains Contract Line Items Numbers (CLIN) identified as not separately priced (NSP). This means the price for the line item is included in the price of another, related line item. The Contractor shall not invoice the Government for any portion of the contract line item which contains an NSP until the Contractor has delivered the total quantity of all related contract line items and the Government has accepted them.
The Contractor shall meet all Deliverable Metrics/Service Level Agreements (SLA) as described in the Performance Work Statement (PWS). However, if the Contractor’s performance falls below a required service level, the Contractor shall only be paid for the lower service level provided. See Section B.5 Performance Work Statement, Section 6.4.1 for Deliverable
Metrics/SLA Performance.
NOTE: Vendors are instructed to see solicitation Section E for proposal submission instructions inclusive of the price proposal. Section B.4 Price schedule is for informational purposes only for solicitation. Vendors are cautioned that alterations to the line items as specified below may render quotes unacceptable. All questions shall be directed to the Contract Jamie McPherson, Jamie.McPherson@va.gov and Contracting Officer, Juan Quinones, Juan.Quinones@va.gov prior to the closing date and time specified in the Request for Proposal (RFP).
F.O.B.: Destination
Inspection/Acceptance: Destination
Electronic Submission to: VA PM, COR, and CO
BASE PERIOD
Period of Performance (PoP) shall be 12 months from the date of award.
CLIN DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE
0001 Program Management in accordance with (IAW) Performance Work
Statement (PWS) 5.1.
Period of performance (PoP) is 12 months from date of award.
The Price of this Contract Line Item
Number (CLIN) and its Sub Contract
Line Item Numbers (SLIN) shall be allocated to CLINs 0002 and 0004
12 MO NSP NSP
mailto:Jamie.McPherson@va.gov mailto:Juan.Quinones@va.gov
0001AA Contract Project Management Plan IAW paragraph 5.1.1 of the Performance
Work Statement.
Due 10 business days after receipt of contract. The Contractor shall update and maintain and deliver the CPMP throughout the period of performance.
1 LO NSP
NSP
0001AB Contractor Staff Support Roster IAW paragraph 5.1.2 of the PWS.
Due within five business days of a change or one business day prior to weekly Joint Program Management
Office (JPMO) Meeting.
1 LO NSP NSP
0001AC Cisco Business Critical Enterprise
Service Agreement (CBCESA) Monthly
Status Report IAW paragraph 5.1.3.1 of the PWS.
Due monthly throughout the PoP. The
CBCESA Monthly Status Report shall be delivered the last day of the preceding month.
12 MO NSP NSP
0001AD CBCESA Service Level Agreement
(SLA) Monitoring Plan IAW paragraph
5.1.3.2 of the PWS.
Due within 15 business days of award and updated periodically thereafter
12 MO NSP NSP
0001AE CBCESA SLA Monitoring Report IAW paragraph 5.1.3.2 of the PWS.
Due monthly after first 30 business days of award and updated periodically thereafter
12 MO NSP NSP
0001AF Technical Kickoff Meeting Minutes
IAW paragraph 5.1.4.1 of the PWS.
Due within five business days after the
Kickoff Meeting.
1 EA NSP NSP
0001AG Weekly Joint Program Management
Office (JPMO) Meeting Minutes IAW paragraph 5.1.4.2 of the PWS.
Due one day prior to the next meeting or within three business days, whichever comes first.
52 EA NSP NSP
0001AH Steering Committee Slides/Minutes IAW paragraph 5.1.4.3 of the PWS.
Due No Later Than (NLT) four hours prior to the Steering Committee Meeting throughout the PoP.
4 EA NSP NSP
0001AJ Bi-Annual PMR Minutes IAW paragraph
5.1.4.4 of the PWS.
meeting.
2 EA NSP NSP
0001AK Ad-Hoc/Tiger Team Meeting Minutes
IAW paragraph 5.1.4.5 of the PWS.
Due one day prior to the next meeting or within five business days, whichever comes first
1 LO NSP NSP
0002 Cisco Base Services (SmartNet Total
Care, Software Support Service, Business Critical Services) IAW PWS paragraphs 5.2, 5.3, 5.5, 5.6 and their subtasks.
Install Base Band ($ Million):
$800M – $900M
PoP: 12 months from date of award.
12 MO $ $
0002AA Mission Critical Device Listing IAW
PWS paragraphs 5.2.3.1.
Due within 48 hours of request from
COR and on a 6-month basis.
1 LO NSP NSP
0003 Cisco Software Support Services
(SWSS) for Cisco Collaboration Edge and Unified Session Initiation Protocol
(SIP)Proxy IAW PWS paragraph 5.3 and its subtasks.
The Price for this CLIN shall be allocated to CLIN 0002
12 MO NSP NSP
0004 Cisco Collaboration Flex Enterprise
Service IAW PWS paragraphs 5.4 and its
12 MO NSP NSP
0004AA Cisco Collaboration Flex Enterprise
Service – Knowledge Workers (KW)
IAW PWS paragraphs 5.4 and its
KW: 260,000 KWs
0004AB Cisco Collaboration Flex Enterprise
Service - Contact Center Concurrent
Agents IAW PWS paragraphs 5.4 and its
Total Contact Center Concurrent Agents:
10,500 Premium Concurrent Agents
12 MO $ $
0004AC Cisco Collaboration Flex Enterprise
Service - Active Meeting Hosts IAW
PWS paragraphs 5.4 and its subtasks.
Active Meeting Hosts: 26,000 Active
Meeting Hosts
12 MO $ $
0004AD Collaboration Flex Enterprise Service
Workspace IAW PWS paragraph 5.4.3.
Due within 30 business days of award.
1 EA NSP NSP
0005 Cisco Business Critical Services IAW
PWS Paragraphs 5.5 and its subtasks.
The Price for this CLIN and it its SLINs shall be allocated to CLIN 0002
12 MO NSP NSP
0005AA Contractor/Network Consulting
Engineering (NCE) Support Team
Roster(s) IAW PWS paragraph 5.5.1 of
Due quarterly after the date of award.
1 LO NSP NSP
0005AB Solution Delivery (SD) and
Infrastructure Operations (IO)
Documentation Reviews
IAW PWS paragraph 5.5.5.
Due within 10 business days of meeting.
0005AC Change Management Strategy Report
IAW PWS paragraph 5.5.6.
Due 180 days after award
0005AD Monthly Security Vulnerability/Common
Services Platform Collector (CSPC)
Report IAW PWS paragraph 5.5.7.
Due Monthly throughout the PoP.
12 EA NSP NSP
0005AE Hosted Lab Test Cycles Solution
Requirement Document (SRD) IAW
PWS paragraph 5.5.8.
Due within 10 business days of VA request
1 LO NSP NSP
0005AF Hosted Lab Low Level Design
Document (LLD) IAW PWS paragraph
5.5.8.
1 LO NSP NSP
0005AG Hosted Lab Test Plan IAW PWS paragraph 5.5.8.
1 LO NSP NSP
0005AH Hosted Lab Test Reports IAW PWS paragraph 5.5.8.
Due within 15 business days after testing is completed
1 LO NSP NSP
0005AJ Hosted Lab Status Reporting IAW PWS
Due monthly as part of CLIN 0001AC
0005AK Routing and Switching Architecture
Design Review Report IAW PWS paragraph 5.5.9.1.
Due within 60 days of the topic being provided by VA.
1 LO NSP NSP
0005AL Routing and Switching Stability Audit
Report IAW PWS paragraph 5.5.9.2.
1 LO NSP NSP
0005AM Routing and Switching Network Strategy
Report IAW PWS paragraph 5.5.10.
4 EA NSP NSP
0005AN Routing and Switching Consulting
Sessions IAW PWS paragraph 5.5.10.
3 EA NSP NSP
The Contractor shall deliver up to three strategy consulting sessions annually not to exceed four hours in length per session on a topic requested by a VA
Technology Program Managers (TPM) via the COR to include remote lab access. These reports shall be due within
60 days of the topic being provided by
VA.
0005AP Unified Communications (UC)
Architecture Design Review Report IAW
PWS paragraph 5.5.11.1.
Due quarterly throughout the PoP.
LO NSP NSP
0005AQ UC System Analysis Report IAW PWS paragraph 5.5.11.2.
provided by VA
1 LO NSP NSP
0005AR UC Stability Audit Report IAW PWS paragraph 5.5.11.3.
1 LO NSP NSP
0005AS UC Consulting Sessions IAW PWS paragraph 5.5.12.
The Contractor shall deliver up to two strategy consulting sessions annually not to exceed four hours in length per session on a topic requested by a VA
Technology Program Managers (TPM) via the COR to include remote lab access. These reports shall be due within
60 days of the topic being provided by
VA.
2 EA NSP NSP
0005AT UC Infrastructure Strategy Roadmap
Report IAW PWS paragraph 5.5.12 of
UC Consulting sessions annually not to exceed four hours in length per consulting session on a topic requested by the TPM to include remote lab access.
These reports shall be due within 60 days of the topic being provided by VA.
2 EA NSP NSP
0005AU Data Center/Unified Computing
Architectural Assessment Plan (AAP)
IAW PWS paragraph 5.5.13.1.
Due within 60 days of the topic/location being provided by the VA.
1 EA NSP NSP
0005AV Data Center/Unified Computing
Architecture Design Review Report
IAW paragraph 5.5.13.1 of the PWS.
5 EA NSP NSP
0005AW Data Center/Unified Computing
Consolidated Architecture Design
Review Report IAW paragraph
5.5.13.1of the PWS.
1 EA NSP NSP
0005AX Data Center/Unified Computing Stability
Audit Report IAW paragraph 5.5.13.2 of
1 EA NSP NSP
0005AY Data Center/Computing Infrastructure
Strategy Roadmap Report IAW paragraph 5.5.14 of the PWS.
1 EA NSP NSP
0005AZ Wireless LAN Architecture Design
Review Report IAW paragraph 5.5.15.1 of the PWS.
1 EA NSP NSP
0005BA Wireless LAN Stability Audit Report
IAW paragraph 5.5.15.2 of the PWS.
1 EA NSP NSP
0005BB Wireless LAN Network Infrastructure paragraph 5.5.16 of the PWS.
4 EA NSP NSP
0005BC Enterprise Video Teleconferencing
Network (EVTN) Architecture/Stability
Review Report IAW paragraph 5.5.17.1
1 EA NSP NSP
0005BD EVTN Business Video Strategy
Roadmap Report IAW paragraph 5.5.18
1 EA NSP NSP
0005BE Common Services Platform Collector /
Telepresence Management System
Derived Improvement Report IAW paragraph 5.5.19.4 of the PWS
Due within three (3) business days of request by VA, but no less than quarterly.
1 EA NSP NSP
0005BF Cisco DNA Appliance Report IAW paragraph 5.5.19.5 of the PWS
0005BG Monthly Knowledge Transfer Sessions
IAW paragraph 5.5.20.1 of the PWS
Due to the VA COR, PPM, and TPM for internal posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
12 MO NSP NSP
0005BH White Papers IAW paragraph 5.5.20.1 of the PWS
Due as needed and submitted to the VA
COR, PPM, and TPM for internal posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 LO NSP NSP
0005BJ Design Guides IAW paragraph 5.5.20.1 of the PWS posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
0005BK Case Studies IAW paragraph 5.5.20.1 of posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 LO NSP NSP
0005BL Support and Configuration Guides IAW paragraph 5.5.20.1 of the PWS posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 LO NSP NSP
0005BM Troubleshooting Guides IAW paragraph
5.5.20.1 of the PWS posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 LO NSP NSP
0005BN Deployment Guides IAW paragraph posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 LO NSP NSP
0005BP Training Documents IAW paragraph posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 LO NSP NSP
0005BQ Cisco Learning Credits (CLC)
IAW paragraph 5.5.20.2 of the PWS
The Government will authorize additional CLCs over and above the
5,125 CLCs provided with the install base price on an as-needed basis not to exceed 13,125 CLCs throughout the performance of the base period. At the
NTE
13,125
EA $ NTE$
conclusion of the base period, the remaining balance of CLCs that are not authorized for use will be de-obligated from the base period.
Initial base set of 5,125 CLCs are due within 30 business days of award.
Additional 2,000 CLC packs shall be delivered within 10 business days of request.
0005BR Cisco Platinum Learning Library
Licenses IAW paragraph 5.5.20.4 of the
PWS
200 EA NSP NSP
0005BS Annual Cisco Modeling Labs Licenses
IAW paragraph 5.5.20.5 of the PWS
Due within 30 business days of award or business days prior to end of license term period.
2 EA NSP NSP
0005BT Install Base Inventory Database Report
IAW paragraph 5.5.21.2 of the PWS
Due Quarterly and final due within 60 days prior to the end of the PoP
1 LO NSP NSP
0005BU Cisco Collaboration Flex Service Report
IAW paragraph 5.5.21.3 days prior to the end of the PoP.
4 EA NSP NSP
0005BU CBCESA User Access Report IAW paragraph 5.5.22 of the PWS.
0006 CBCESA Prime Report and
Subcontractor Reports IAW paragraph
5.6.2 of the PWS.
Due in accordance with the Schedule of
Deliverables to cover the dates between the applicable Prime Report’s and
Subcontractor’s Report period end date and VA’s fiscal year end date
(September 30) or the end date of all performance under the contract.
1 EA NSP NSP
0006AA CBCESA Service Organization Control
Bridge Letter IAW paragraph 5.6.2 of the applicable Prime Report’s and
Subcontractor’s Report period end date and VA’s fiscal year end date
(September 30) or the end date of all performance under the contract.
0007 ISO/IEC 27001 Certification IAW
Addendum B, Section B4.
Due annually
TOTAL BASE PERIOD PRICE $
OPTION PERIOD ONE
This 12-month option may be exercised in accordance with FAR 52.217-9, Option to Extend the Term of the
Contract (Mar 2000). Work shall not commence until, and unless, a formal modification is issued by the
Contracting Officer. If exercised, this option shall commence immediately after expiration of the base period.
Period of performance: October 1, 2020 through September 30, 2021
1001 Program Management in accordance
Period of performance (PoP): 12 months from date of option exercise.
Lin Item Numbers (SLIN) shall be allocated to CLINs 1002 and 1004.
1001AA Contract Project Management Plan
IAW paragraph 5.1.1 of the PWS.
The Contractor shall update and maintain and deliver the CPMP throughout the period of performance.
1 LO NSP NSP
1001AB Contractor Staff Support Roster
IAW paragraph 5.1.2 of the PWS.
weekly Joint Program Management
Office (JPMO) Meeting.
1 LO NSP NSP
1001AC Cisco Business Critical Enterprise
Service Agreement (CBCESA)
Monthly Status Report IAW paragraph
5.1.3.1 of the PWS.
CBCESA Monthly Status Report shall be delivered the last day of the preceding month.
12 MO NSP NSP
1001AD CBCESA Service Level Agreement and updated periodically thereafter.
12 MO NSP NSP
1001AE CBCESA SLA Monitoring Report
IAW paragraph 5.1.3.2 of the PWS.
Due monthly after first 30 business days of award and updated periodically thereafter.
1001AF Weekly Joint Program Management
Office JPMO Meeting Minutes IAW
Due one day prior to the next meeting or within three business days, whichever comes first.
52 EA NSP NSP
1001AG Steering Committee Slides/Minutes
IAW paragraph 5.1.4.3 of the PWS.
prior to the Steering Committee
Meeting throughout the PoP.
4 EA NSP NSP
1001AH Bi-Annual PMR Minutes IAW paragraph 5.1.4.4 of the PWS.
2 EA NSP NSP
1001AJ Ad-Hoc/Tiger Team Meeting Minutes or within five business days, whichever comes first.
1 LO NSP NSP
1002 Cisco Base Services (SmartNet Total
Care, Software Support Service, Business Critical Services) IAW PWS
The annual Reconciliation/true-up
IAW PWS 5.5.21.5 will establish the
IB inventory and Lot Price for Option
Period 1.
Install Base
Bands ($M)
Lot Price
500 - 600 $
600 - 700 $
700 - 800 $
800 - 900 $
900 - 1000 $
1000 - 1100 $
1100 - 1200 $
1200 - 1350 $
1350 - 1500 $
1002AA Mission Critical Device Listing IAW
1 LO NSP NSP
1003 Cisco Software Support Services
(SWSS) for Cisco Collaboration Edge and Unified SIP Proxy IAW PWS paragraph 5.3 and its subtasks.
PoP: 12 months from exercise of option year.
allocated to CLIN 1002.
12 MO NSP NSP
1004 Cisco Collaboration Flex Enterprise
Service IAW PWS paragraphs 5.4 and
PoP: 12 months to commence at the conclusion of the base period and after exercise of the option.
12 MO NSP NSP
1004AA Cisco Collaboration Flex Enterprise
Service – Knowledge Workers (KW)
1004AB Cisco Collaboration Flex Enterprise
Service - Contact Center Concurrent
Agents IAW PWS paragraphs 5.4 and
Total Contact Center Concurrent
Agents: 10,500 Premium Concurrent
Agents
12 MO $ $
1004AC Cisco Collaboration Flex Enterprise
12 MO $ $
1004AD Collaboration Flex Enterprise Service
Due within 30 business days of exercise of option year.
1005 Cisco Business Critical Services IAW
The Price for this CLIN and it its
SLINs shall be allocated to CLIN 1002.
12 MO NSP NSP
1005AA Contractor/Network Consulting
Engineering (NCE) Support Team
Due quarterly after exercise of option
1 LO NSP NSP
1005AB Solution Delivery (SD) and
Infrastructure Operations (IO)
Documentation Reviews IAW PWS paragraph 5.5.5.
Due within 10 business days of
1 LO NSP NSP
1005AC Change Management Strategy Report
1005AD Monthly Security
Vulnerability/Common Services
Platform Collector (CSPC) Report
IAW PWS paragraph 5.5.7.
Due monthly throughout the PoP.
1005AE Hosted Lab Test Cycles Solution request.
1 LO NSP NSP
1005AF Hosted Lab Low Level Design
1 LO NSP NSP
1005AG Hosted Lab Test Plan IAW PWS
Due within 10 business days of VA request.
1005AH Hosted Lab Test Reports IAW PWS
Due within 15 business days after testing is completed.
1 LO NSP NSP
1005AJ Hosted Lab Status Reporting IAW
Due monthly as part of CLIN 1001AC.
1005AK Routing and Switching Architecture
1 LO NSP NSP
1005AL Routing and Switching Stability Audit
1 LO NSP NSP
1005AM Routing and Switching Network
Strategy Report IAW PWS paragraph
5.5.10.
4 EA NSP NSP
1005AN Routing and Switching Consulting
The Contractor shall deliver up to three strategy consulting sessions annually not to exceed four hours in length per session on a topic requested by a VA
Technology Program Managers (TPM) via the COR to include remote lab access. These reports shall be due within 60 days of the topic being provided by VA.
1 LO NSP NSP
1005AP Unified Communications (UC)
IAW PWS paragraph 5.5.11.1.
1005AQ UC System Analysis Report IAW PWS
Due within 60 days of the topic being provided by VA.
1005AR UC Stability Audit Report IAW PWS
1 LO NSP NSP
1005AS UC Consulting Sessions IAW PWS not to exceed four hours in length per session on a topic requested by a VA
Technology Program Managers (TPM) via the COR to include remote lab access. These reports shall be due within 60 days of the topic being provided by VA.
2 EA NSP NSP
1005AT UC Infrastructure Strategy Roadmap exceed four hours in length per consulting session on a topic requested by the TPM to include remote lab access. These reports shall be due within 60 days of the topic being provided by VA.
2 EA NSP NSP
1005AU Data Center/Unified Computing
Due within 60 days of the topic/location being provided by the
VA.
1 EA NSP NSP
1005AV Data Center/Unified Computing
VA.
5 EA NSP NSP
1005AW Data Center/Unified Computing
Consolidated Architecture Design
Review Report IAW paragraph
VA.
1005AX Data Center/Unified Computing
Stability Audit Report IAW paragraph
5.5.13.2 of the PWS.
VA.
1 EA NSP NSP
1005AY Data Center/Computing Infrastructure
Strategy Roadmap Report
IAW paragraph 5.5.14 of the PWS.
VA.
1 EA NSP NSP
1005AA Wireless LAN Architecture Design
5.5.15.1 of the PWS.
VA.
1 EA NSP NSP
1005BA Wireless LAN Stability Audit Report
VA.
1 EA NSP NSP
1005BB Wireless LAN Network Infrastructure
VA.
4 EA NSP NSP
1005BC Enterprise Video Teleconferencing
Network (EVTN)
Architecture/Stability Review Report
IAW paragraph 5.5.17.1 of the PWS.
VA.
1 EA NSP NSP
1005BD EVTN Business Video Strategy
Roadmap Report IAW paragraph
5.5.18 of the PWS.
VA
1005BE Common Services Platform Collector /
Telepresence Management System quarterly.
1 EA NSP NSP
1005BF Cisco DNA Appliance Report
IAW paragraph 5.5.19.5 of the PWS
1005BG Monthly Knowledge Transfer Sessions
Due to the VA COR, PPM, and TPM for internal posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 EA NSP NSP
1005BH White Papers IAW paragraph 5.5.20.1 posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 LO NSP NSP
1005BJ Design Guides IAW paragraph 5.5.20.1 posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 LO NSP NSP
1005BK Case Studies IAW paragraph 5.5.20.1 posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 LO NSP NSP
1005BL Support and Configuration Guides posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1005BM Troubleshooting Guides IAW posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 LO NSP NSP
1005BN Deployment Guides IAW paragraph posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
10 EA NSP NSP
1005BP Training Documents IAW paragraph posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 LO NSP NSP
1005BQ Cisco Learning Credits (CLCs)
5.125 CLCs provided with the install
base price on an as-needed basis not to exceed 13,125 CLCs throughout the performance of the base period. At the conclusion of the base period, the remaining balance of CLCs that are not
Initial base set of CLCs are due within
30 business days of award. Additional
2,000 CLC packs shall be delivered within 10 business days of request.
NTE
EA $ $
1005BR Cisco Platinum Learning Library
Licenses IAW paragraph 5.5.20.4 of
Due within 30 business days of exercise of option year.
200 EA NSP NSP
1005BS Annual Cisco Modeling Labs Licenses
Due within 30 business days of award or business days prior to end of license term period.
1005BT Install Base Inventory Database Report
1 LO NSP NSP
1005BU Cisco Collaboration Flex Service
Report IAW paragraph 5.5.21.3
4 EA NSP NSP
1005BV CBCESA User Access Report IAW
1006 CBCESA Prime Report and the applicable Prime Report’s and
Subcontractor’s Report period end date and VA’s fiscal year end date
(September 30) or the end date of all performance under the contract
1 EA NSP NSP
1006AA CBCESA Service Organization Control
Bridge Letter IAW paragraph 5.6.2 of the applicable Prime Report’s and
Subcontractor’s Report period end date and VA’s fiscal year end date
(September 30) or the end date of all performance under the contract.
1007 ISO/IEC 27001 Certification IAW
TOTAL OPTION PERIOD ONE $
OPTION PERIOD 1 - OPTIONAL QUANTITIES COLLABORATION FLEX
This is an option for additional quantities in accordance with (IAW) FAR 52.217-7, Option for Increased Quantity
– Separately priced Line Item (MAR 1989). Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer.
These optional quantities may be exercised as set forth in PWS Paragraph 5.5.21.6 up to the not to exceed (NTE) quantities stated below once at the beginning of the option period of performance. The period of performance shall commence upon exercise of Option Period 1 to reflect the service inventory as a result of the true-forward process.
Period of performance: October 1, 2020 through September 30, 2021
1008 Cisco Collaboration Flex Enterprise
Service – Knowledge Workers (KW)
NTE KW Quantity: 52,000 KWs
Period of Performance: 12 months
NTE
52,000
EA $ NTE$
1009 Cisco Collaboration Flex Enterprise
Service - Contact Center Concurrent
NTE Total Contact Center Concurrent
Agents: 500 Premium Concurrent
Agents
EA $ NTE$
1010 Cisco Collaboration Flex Enterprise
NTE Active Meeting Hosts: 1000
Active Meeting Hosts
EA $ NTE$
TOTAL OPTION PERIOD 1 - OPTIONAL QUANTITIES $
TOTAL OPTION PERIOD 1 + OPTIONAL QUANTITIES $
OPTION PERIOD TWO
This 12-month option may be exercised in accordance with FAR 52.217-9, Option to Extend the Term of the
Contract (Mar 2000). Work shall not commence until, and unless, a formal modification is issued by the
Contracting Officer. If exercised, this option shall commence immediately after expiration of option period one. .
Period of performance: October 1, 2021 through September 30, 2022
2001 Program Management in accordance
Period of performance (PoP): 12
Lin Item Numbers (SLIN) shall be allocated to CLINs 2002 and 2004
12 MO NSP NSP
2001AA Contract Project Management Plan
IAW paragraph 5.1.1 of the
Performance Work Statement.
throughout the period of performance.
1 LO NSP NSP
2001AB Contractor Staff Support Roster weekly Joint Program Management
Office (JPMO) Meeting.
1 LO NSP NSP
2001AC Cisco Business Critical Enterprise
Service Agreement (CBCESA) be delivered the last day of the preceding month.
12 MO NSP NSP
2001AD CBCESA Service Level Agreement
(SLA) Monitoring Plan IAW paragraph
5.1.3.2 of the PWS.
Due within 15 business days of award and updated periodically thereafter
2001AE CBCESA SLA Monitoring Report
IAW paragraph 5.1.3.2 of the PWS.
Due monthly after first 30 business days of award and updated periodically thereafter
12 MO NSP NSP
2001AF Technical Kickoff Meeting Minutes
IAW paragraph 5.1.4.1 of the PWS.
Due within five business days after the
Kickoff Meeting.
1 EA NSP NSP
2001AG Weekly Joint Program Management whichever comes first.
12 MO NSP NSP
2001AH Steering Committee Slides/Minutes
IAW paragraph 5.1.4.3 of the PWS.
prior to the Steering Committee
Meeting throughout the PoP.
1 LO NSP NSP
2001AJ Bi-Annual PMR Minutes IAW paragraph 5.1.4.4 of the PWS.
Due within five business days after the meeting.
2 EA NSP NSP
2001AK Ad-Hoc/Tiger Team Meeting Minutes comes first.
1 LO NSP NSP
2002 Cisco Base Services (SmartNet Total
Care, Software Support Service, Business Critical Services) IAW PWS
Period 2.
Bands ($M)
Lot Price
500 - 600 $
600 - 700 $
700 - 800 $
800 - 900 $
900 - 1000 $
1000 - 1100 $
1100 - 1200 $
2002AA Mission Critical Device Listing IAW
1 LO NSP NSP
2003 Cisco Software Support Services
(SWSS) for Cisco Collaboration Edge
PoP: 12 months from exercise of option allocated to CLIN 1002.
12 MO NSP NSP
2004 Cisco Collaboration Flex Enterprise conclusion of Option period 1 and after exercise of the option.
12 MO NSP NSP
2004AA Cisco Collaboration Flex Enterprise
Service – Knowledge Workers (KW)
2004AB Cisco Collaboration Flex Enterprise
Service - Contact Center Concurrent
Agents
12 MO $ $
2004AC Cisco Collaboration Flex Enterprise
Active Meeting Hosts: 26,000 Active
Meeting Hosts
2004AD Collaboration Flex Enterprise Service
1 LO NSP NSP
2005 Cisco Business Critical Services IAW
PWS Paragraphs 5.5 and its subtasks.
PoP: 12 months from date of award.
The Price for this CLIN and it its
SLINs shall be allocated to CLIN 1002.
12 MO NSP NSP
2005AA Contractor/Network Consulting
Engineering (NCE) Support Team
1 LO NSP NSP
2005AB Solution Delivery (SD) and
Infrastructure Operations (IO)
Documentation Reviews IAW PWS paragraph 5.5.5.
2005AC Change Management Strategy Report
2005AD Monthly Security
Vulnerability/Common Services
2005AE Hosted Lab Test Cycles Solution
1 LO NSP NSP
2005AF Hosted Lab Low Level Design
2005AG Hosted Lab Test Plan IAW PWS
1 LO NSP NSP
2005AH Hosted Lab Test Reports IAW PWS
1 LO NSP NSP
2005AJ Hosted Lab Status Reporting IAW
Due monthly as part of CLIN 2001AC.
2005AK Routing and Switching Architecture
1 LO NSP NSP
2005AL Routing and Switching Stability Audit
1 LO NSP NSP
2005AM Routing and Switching Network
4 EA NSP NSP
2005AN Routing and Switching Consulting not to exceed four hours in length per session on a topic requested by a VA
Technology Program Managers (TPM) via the COR to include remote lab access. These reports shall be due within 60 days of the topic being provided by VA.
1 LO NSP NSP
2005AP Unified Communications (UC)
2005AQ UC System Analysis Report IAW PWS
1 LO NSP NSP
2005AR UC Stability Audit Report IAW PWS
1 LO NSP NSP
2005AS UC Consulting Sessions IAW PWS not to exceed four hours in length per session on a topic requested by a VA
Technology Program Managers (TPM) via the COR to include remote lab access. These reports shall be due within 60 days of the topic being provided by VA.
2 EA NSP NSP
2005AT UC Infrastructure Strategy Roadmap exceed four hours in length per consulting session on a topic requested by the TPM to include remote lab access. These reports shall be due within 60 days of the topic being provided by VA.
2 EA NSP NSP
2005AU Data Center/Unified Computing
VA.
1 EA NSP NSP
2005AV Data Center/Unified Computing
VA.
5 EA NSP NSP
2005AW Data Center/Unified Computing
Consolidated Architecture Design
VA.
1 EA NSP NSP
2005AX Data Center/Unified Computing
VA.
1 EA NSP NSP
2005AY Data Center/Computing Infrastructure
VA.
1 EA NSP NSP
2005AZ Wireless LAN Architecture Design
VA.
1 EA NSP NSP
2005BA Wireless LAN Stability Audit Report
VA.
1 EA NSP NSP
2005BB Wireless LAN Network Infrastructure
VA.
4 EA NSP NSP
2005BC Enterprise Video Teleconferencing
Network (EVTN)
Due within 60 days of the topic/location being provided by the
VA.
2005BD EVTN Business Video Strategy
Roadmap Report IAW paragraph
VA
1 EA NSP NSP
2005BE Common Services Platform Collector /
Telepresence Management System quarterly.
1 EA NSP NSP
2005BF Cisco DNA Appliance Report
2005BG Monthly Knowledge Transfer Sessions personnel, within 72 hours of creation and approval of the material.
2005BH White Papers IAW paragraph 5.5.20.1 posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 EA NSP NSP
2005BJ Design Guides IAW paragraph 5.5.20.1 posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 LO NSP NSP
2005BK Case Studies IAW paragraph 5.5.20.1
Due as needed and submitted to the VA
COR, PPM, and TPM for internal posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
2005BL Support and Configuration Guides posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 LO NSP NSP
2005BM Troubleshooting Guides IAW posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 LO NSP NSP
2005BN Deployment Guides IAW paragraph posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 LO NSP NSP
2005BP Training Documents IAW paragraph posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 LO NSP NSP
2005BQ Cisco Learning Credits (CLCs)
5.125 CLCs provided with the install
base price on an as-needed basis not to exceed 13,125 CLCs throughout the performance of the base period. At the conclusion of the base period, the remaining balance of CLCs that are not
NTE
2,000 CLC packs shall be delivered within 10 business days of request.
2005BR Cisco Platinum Learning Library
200 EA NSP NSP
2005BS Annual Cisco Modeling Labs Licenses term period.
2 EA NSP NSP
2005BT Install Base Inventory Database Report
1 LO NSP NSP
2005BU Cisco Collaboration Flex Service
4 EA NSP NSP
2005BV CBCESA User Access Report IAW
2006 CBCESA Prime Report and the applicable Prime Report’s and
Subcontractor’s Report period end date and VA’s fiscal year end date
(September 30) or the end date of all performance under the contract
1 EA NSP NSP
2006AA CBCESA Service Organization Control
Due in accordance with the Schedule of
Deliverables to cover the dates between the applicable Prime Report’s and
Subcontractor’s Report period end date and VA’s fiscal year end date
(September 30) or the end date of all performance under the contract.
2007 ISO/IEC 27001 Certification IAW
TOTAL OPTION PERIOD TWO $
OPTION PERIOD 2 - OPTIONAL QUANTITIES COLLABORATION FLEX
This is an option for additional quantities in accordance with (IAW) FAR 52.217-7, Option for Increased Quantity
– Separately priced Line Item (MAR 1989). Work shall not commence until, and unless, a formal modification is
These optional quantities may be exercised as set forth in PWS Paragraph 5.5.21.6 up to the not to exceed (NTE) quantities stated below once at the beginning of the option period of performance. The period of performance shall commence upon exercise of Option Period 2 to reflect the service inventory as a result of the true-forward
Period of performance: October 1, 2021 through September 30, 2022
2008 Cisco Collaboration Flex Enterprise
Service – Knowledge Workers (KW)
NTE KW Quantity: 104,000 KWs
104,000
EA $ NTE$
2009 Cisco Collaboration Flex Enterprise
Service - Contact Center Concurrent
Agents: 1,000 Premium Concurrent
EA $ NTE$
2010 Cisco Collaboration Flex Enterprise
NTE Active Meeting Hosts: 2,000
TOTAL OPTION PERIOD 2 - OPTIONAL QUANTITIES $
TOTAL OPTION PERIOD 2 + OPTIONAL QUANTITIES $
OPTION PERIOD THREE
This 12-month option may be exercised in accordance with FAR 52.217-9, Option to Extend the Term of the
Contract (MAR 2000) Work shall not commence until, and unless, a formal modification is issued by the
Contracting Officer. If exercised, this option shall commence immediately after expiration of option period two.
Period of performance: October 1, 2022 through September 30, 2023
3001 Program Management in accordance
Lin Item Numbers (SLIN) shall be allocated to CLINs 3002 and 3004
12 MO NSP NSP
3001AA Contract Project Management Plan throughout the period of performance.
1 LO NSP NSP
3001AB Contractor Staff Support Roster weekly Joint Program Management
Office (JPMO) Meeting. 1 LO NSP NSP
3001AC Cisco Business Critical Enterprise
Service Agreement (CBCESA) be delivered the last day of the preceding month. 12 MO NSP NSP
3001AD CBCESA Service Level Agreement and updated periodically thereafter. 12 MO NSP NSP
3001AE CBCESA SLA Monitoring Report
Due monthly after first 30 business days of award and updated periodically thereafter
12 MO NSP NSP
3001AF Technical Kickoff Meeting Minutes
1 EA NSP NSP
3001AG Weekly Joint Program Management whichever comes first. 12 MO NSP NSP
3001AJ Bi-Annual PMR Minutes IAW meeting. 2 EA NSP NSP
3001AK Ad-Hoc/Tiger Team Meeting Minutes comes first. 1 LO NSP NSP
3002 Cisco Base Services (SmartNet Total
Care, Software Support Service, Business Critical Services) IAW PWS
Period 3.
Bands ($M)
Lot Price
500 - 600 $
600 - 700 $
700 - 800 $
800 - 900 $
900 - 1000 $
1000 - 1100 $
1100 - 1200 $
3002AA Mission Critical Device Listing IAW
COR and on a 6-month period.
1 LO NSP NSP
3003 Cisco Software Support Services
(SWSS) for Cisco Collaboration Edge
PoP: 12 months from exercise of option year.
allocated to CLIN 3002.
12 MO NSP NSP
3004 Cisco Collaboration Flex Enterprise conclusion of Option period 2 and after exercise of the option.
12 MO NSP NSP
3004AA Cisco Collaboration Flex Enterprise
Service – Knowledge Workers (KW)
3004AB Cisco Collaboration Flex Enterprise
Service - Contact Center Concurrent
3004AC Cisco Collaboration Flex Enterprise
12 MO $ $
3004AD Collaboration Flex Enterprise Service
1 LO NSP NSP
3005 Cisco Business Critical Services IAW
PoP: 12 months from date of option
SLINs shall be allocated to CLIN 3002.
12 MO NSP NSP
3005AA Contractor/Network Consulting
Engineering (NCE) Support Team
1 LO NSP NSP
3005AB Solution Delivery (SD) and
Infrastructure Operations (IO)
1 LO NSP NSP
3005AC Change Management Strategy Report
3005AD Monthly Security
Vulnerability/Common Services
3005AE Hosted Lab Test Cycles Solution
Due within 10 business days of VA request.
3005AF Hosted Lab Low Level Design
1 LO NSP NSP
3005AG Hosted Lab Test Plan IAW PWS
1 LO NSP NSP
3005AH Hosted Lab Test Reports IAW PWS
1 LO NSP NSP
3005AJ Hosted Lab Status Reporting IAW
PWS paragraph 5.5.8.
Due monthly as part of CLIN 3001AC.
1 LO NSP NSP
3005AK Routing and Switching Architecture
1 LO NSP NSP
3005AL Routing and Switching Stability Audit
1 LO NSP NSP
3005AM Routing and Switching Network
4 EA NSP NSP
3005AN Routing and Switching Consulting not to exceed four hours in length per session on a topic requested by a VA
Technology Program Managers (TPM) via the COR to include remote lab access. These reports shall be due within 60 days of the topic being provided by VA.
3005AP Unified Communications (UC)
3005AQ UC System Analysis Report IAW PWS
1 LO NSP NSP
3005AR UC Stability Audit Report IAW PWS
1 LO NSP NSP
3005AS UC Consulting Sessions IAW PWS not to exceed four hours in length per session on a topic requested by a VA
Technology Program Managers (TPM) via the COR to include remote lab access. These reports shall be due within 60 days of the topic being provided by VA.
2 EA NSP NSP
3005AT UC Infrastructure Strategy Roadmap exceed four hours in length per consulting session on a topic requested by the TPM to include remote lab access. These reports shall be due within 60 days of the topic being provided by VA.
2 EA NSP NSP
3005AU Data Center/Unified Computing
3005AV Data Center/Unified Computing
VA.
5 EA NSP NSP
3005AW Data Center/Unified Computing
Consolidated Architecture Design
VA.
1 EA NSP NSP
3005AX Data Center/Unified Computing
VA.
1 EA NSP NSP
3005AY Data Center/Computing Infrastructure
VA.
1 EA NSP NSP
3005AZ Wireless LAN Architecture Design
VA.
1 EA NSP NSP
3005BA Wireless LAN Stability Audit Report
VA.
1 EA NSP NSP
3005BB Wireless LAN Network Infrastructure
4 EA NSP NSP
3005BC Enterprise Video Teleconferencing
Network (EVTN)
VA.
1 EA NSP NSP
3005BD EVTN Business Video Strategy
VA
1 EA NSP NSP
3005BE Common Services Platform Collector /
Telepresence Management System
Due within three business days of quarterly.
1 EA NSP NSP
3005BF Cisco DNA Appliance Report
3005BG Monthly Knowledge Transfer Sessions personnel, within 72 hours of creation and approval of the material.
1 EA NSP NSP
3005BH White Papers IAW paragraph 5.5.20.1 posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 LO NSP NSP
3005BJ Design Guides IAW paragraph 5.5.20.1 posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
3005BK Case Studies IAW paragraph 5.5.20.1 posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 LO NSP NSP
3005BL Support and Configuration Guides posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 LO NSP NSP
3005BM Troubleshooting Guides IAW posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 LO NSP NSP
3005BN Deployment Guides IAW paragraph posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 LO NSP NSP
3005BP Training Documents IAW paragraph posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 LO NSP NSP
3005BQ Cisco Learning Credits (CLCs)
5.125 CLCs provided with the install
base price on an as-needed basis not to
NTE
exceed 13,125 CLCs throughout the performance of the base period. At the conclusion of the base period, the remaining balance of CLCs that are not
2,000 CLC packs shall be delivered within 10 business days of request.
3005BR Cisco Platinum Learning Library
200 EA NSP NSP
3005BS Annual Cisco Modeling Labs Licenses term period.
2 EA NSP NSP
3005BT Install Base Inventory Database Report
1 LO NSP NSP
3005BU Cisco Collaboration Flex Service
4 EA NSP NSP
3005BV CBCESA User Access Report IAW
3006 CBCESA Prime Report and
Due in accordance with the Schedule of Deliverables to cover the dates between the applicable Prime Report’s and Subcontractor’s Report period end date and VA’s fiscal year end date
(September 30) or the end date of all performance under the contract
3006AA CBCESA Service Organization Control between the applicable Prime Report’s and Subcontractor’s Report period end date and VA’s fiscal year end date
(September 30) or the end date of all performance under the contract.
1 EA NSP NSP
3007 ISO/IEC 27001 Certification IAW
TOTAL OPTION PERIOD THREE $
OPTION PERIOD 3 - OPTIONAL QUANTITIES COLLABORATION FLEX
This is an option for additional quantities in accordance with (IAW) FAR 52.217-7, Option for Increased Quantity
– Separately priced Line Item (MAR 1989). Work shall not commence until, and unless, a formal modification is
These optional quantities may be exercised as set forth in PWS Paragraph 5.5.21.6 up to the not to exceed (NTE) quantities stated below once at the beginning of the option period of performance. The period of performance shall commence upon exercise of Option Period 3 to reflect the service inventory as a result of the true-forward
Period of performance: October 1, 2022 through September 30, 2023
3008 Cisco Collaboration Flex Enterprise
Service – Knowledge Workers (KW)
NTE KW Quantity: 156,000 KWs
156,000
EA $ NTE$
3009 Cisco Collaboration Flex Enterprise
Service - Contact Center Concurrent
Agents: 1,500 Premium Concurrent
3010 Cisco Collaboration Flex Enterprise
NTE Active Meeting Hosts: 3,000
EA $ NTE$
TOTAL OPTION PERIOD 3 - OPTIONAL QUANTITIES $
TOTAL OPTION PERIOD 3 + OPTIONAL QUANTITIES $
OPTION PERIOD FOUR
This 12-month option may be exercised in accordance with FAR 52.217-9, Option to Extend the Term of the
Contract (MAR 2000). Work shall not commence until, and unless, a formal modification is issued by the
Contracting Officer. If exercised, this option shall commence immediately after expiration of option period three..
Period of performance: October 1, 2023 through September 30, 2024
4001 Program Management in accordance
Lin Item Numbers (SLIN) shall be allocated to CLINs 4002 and 4004
12 MO NSP NSP
4001AA Contract Project Management Plan throughout the period of performance.
1 LO NSP NSP
4001AB Contractor Staff Support Roster weekly Joint Program Management
Office (JPMO) Meeting.
1 LO NSP NSP
4001AC Cisco Business Critical Enterprise
Service Agreement (CBCESA) be delivered the last day of the preceding month.
4001AD CBCESA Service Level Agreement and updated periodically thereafter.
12 MO NSP NSP
4001AE CBCESA SLA Monitoring Report
Due monthly after first 30 business days of award and updated periodically thereafter
12 MO NSP NSP
4001AF Technical Kickoff Meeting Minutes
1 EA NSP NSP
4001AG Weekly Joint Program Management whichever comes first.
12 MO NSP NSP
4001AJ Bi-Annual PMR Minutes IAW
2 EA NSP NSP
4001AK Ad-Hoc/Tiger Team Meeting Minutes comes first.
1 LO NSP NSP
4002 Cisco Base Services (SmartNet Total
Care, Software Support Service, Business Critical Services) IAW PWS
The annual Reconciliation/true-up
IAW PWS 5.5.21.5 will establish the
Period 4.
Bands ($M)
Lot Price
500 - 600 $
600 - 700 $
700 - 800 $
800 - 900 $
900 - 1000 $
1000 - 1100 $
1100 - 1200 $
4002AA Mission Critical Device Listing IAW
1 LO NSP NSP
4003 Cisco Software Support Services
(SWSS) for Cisco Collaboration Edge
PoP: 12 months from exercise of option year.
allocated to CLIN 4002.
12 MO NSP NSP
4004 Cisco Collaboration Flex Enterprise conclusion of Option period 3 and after exercise of the option.
12 MO NSP NSP
4004AA Cisco Collaboration Flex Enterprise
Service – Knowledge Workers (KW)
4004AB Cisco Collaboration Flex Enterprise
Service - Contact Center Concurrent
Agents
12 MO $ $
4004AC Cisco Collaboration Flex Enterprise
12 MO $ $
4004AD Collaboration Flex Enterprise Service
1 LO NSP NSP
4005 Cisco Business Critical Services IAW
PWS Paragraphs 5.5 and its subtasks.
PoP: 12 months from date of option
SLINs shall be allocated to CLIN 4002.
12 MO NSP NSP
4005AA Contractor/Network Consulting
Engineering (NCE) Support Team
1 LO NSP NSP
4005AB Solution Delivery (SD) and
Infrastructure Operations (IO)
1 LO NSP NSP
4005AC Change Management Strategy Report
4005AD Monthly Security
Vulnerability/Common Services
Due monthly throughout the PoP.
4005AE Hosted Lab Test Cycles Solution
1 LO NSP NSP
4005AF Hosted Lab Low Level Design
1 LO NSP NSP
4005AG Hosted Lab Test Plan IAW PWS
1 LO NSP NSP
4005AH Hosted Lab Test Reports IAW PWS
1 LO NSP NSP
4005AJ Hosted Lab Status Reporting IAW
Due monthly as part of CLIN 4001AC.
4005AK Routing and Switching Architecture
1 LO NSP NSP
4005AL Routing and Switching Stability Audit
1 LO NSP NSP
4005AM Routing and Switching Network
4 EA NSP NSP
4005AN Routing and Switching Consulting
The Contractor shall deliver up to three strategy consulting sessions annually not to exceed four hours in length per session on a topic requested by a VA
Technology Program Managers (TPM) via the COR to include remote lab access. These reports shall be due within 60 days of the topic being provided by VA.
4005AP Unified Communications (UC)
4005AQ UC System Analysis Report IAW PWS
1 LO NSP NSP
4005AR UC Stability Audit Report IAW PWS
1 LO NSP NSP
4005AS UC Consulting Sessions IAW PWS not to exceed four hours in length per session on a topic requested by a VA
Technology Program Managers (TPM) via the COR to include remote lab access. These reports shall be due within 60 days of the topic being provided by VA.
2 EA NSP NSP
4005AT UC Infrastructure Strategy Roadmap exceed four hours in length per consulting session on a topic requested by the TPM to include remote lab access. These reports shall be due within 60 days of the topic being
4005AU Data Center/Unified Computing
VA.
1 EA NSP NSP
4005AV Data Center/Unified Computing
VA.
5 EA NSP NSP
4005AW Data Center/Unified Computing
Consolidated Architecture Design
VA.
1 EA NSP NSP
4005AX Data Center/Unified Computing
VA.
1 EA NSP NSP
4005AY Data Center/Computing Infrastructure
VA.
1 EA NSP NSP
4005AZ Wireless LAN Architecture Design
VA.
1 EA NSP NSP
4005BA Wireless LAN Stability Audit Report
4005BB Wireless LAN Network Infrastructure
VA.
4 EA NSP NSP
4005BC Enterprise Video Teleconferencing
Network (EVTN)
VA.
1 EA NSP NSP
4005BD EVTN Business Video Strategy
VA
1 EA NSP NSP
4005BE Common Services Platform Collector /
Telepresence Management System
Due within three business days of quarterly.
1 EA NSP NSP
4005BF Cisco DNA Appliance Report
4005BG Monthly Knowledge Transfer Sessions personnel, within 72 hours of creation and approval of the material.
4005BH White Papers IAW paragraph 5.5.20.1 within 72 hours of creation and approval of the material.
4005BJ Design Guides IAW paragraph 5.5.20.1 posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 EA NSP NSP
4005BK Case Studies IAW paragraph 5.5.20.1 posting and viewing by VA personnel, within 72 hours of creation and approval of the material.
1 EA NSP NSP
4005BL Support and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.