36C10B18Q3124-006.xlsx
XLSX spreadsheet 300 KB Posted
- Attached to
- TAC-18-52800 - API Platform and Development
- Solicitation number
- 36C10B18Q3124
About this file
36C10B18Q3124 Attachment 005 - VA API Development and Operations_Price Evaluation Spreadsheet.xlsx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C10B18C2763-000.docx | DOCX document | |
| 36C10B18C2756-000.docx | DOCX document | |
| 36C10B18Q3124-0001002.pdf | ||
| 36C10B18Q3124-0001001.pdf | ||
| 36C10B18Q3124-0001000.docx | DOCX document | |
| 36C10B18Q3124-001.pdf | ||
| 36C10B18Q3124-004.pdf | ||
| 36C10B18Q3124-000.docx | DOCX document | |
| 36C10B18Q3124-005.pdf | ||
| 36C10B18Q3124-003.xlsx | XLSX spreadsheet | |
| 36C10B18Q3124-002.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions Instructions Tab
Evaluated Price Summary Tab Instructions -
(1) Offeror shall make no inputs in the Total Evaluated Price Table. The Total Evaluated Price Table automatically calculates the total evaluated price. (2) Offeror shall complete the Socio-Economic Status Price Table identifying the Total SDVOSB Percentage.
T&M and Labor Hour Rate Table Tab Instructions -
(1) In red shaded cell in row 2 the Offeror shall enter the name of the Prime Offeror.
(2) Each labor category specified by the Government must be addressed (i.e., no un-addressed labor categories). (3) For each labor category specified by the Government the Offeror shall enter a hourly fully loaded labor rate (no more than two decimal places) for the Base Period (all red shaded cells). If the loaded labor rate is entered with more than two decimal places, cells are formatted to be flagged and will be color shaded. Ensure all loaded labor rate cells are corrected so no color shading is remaining before submitting the proposal.
(4) The proposed fully loaded labor rates will be incorporated into any resultant contract, as binding, Not To Exceed (NTE) ceiling loaded labor rates. The proposed fully loaded labor rates will be used for the prime and all subcontractors/team members in performance of this contract.
T&M Labor Tab Instructions -
(1) Offeror shall make no inputs in this tab. T&M Labor tab automatically calculates the total Not-To-Exceed T&M labor price.
T&M Material & Handling Tab Instructions -
(1) The Offeror shall complete the Material/Software Table entering the item description/part number, quantity, and unit price. (2) In the red shaded cell, Offeror shall either enter a Material Fixed Handling percentage (whole number and two decimal places; i.e. 5.35%) or 0.00% (if Offeror proposes no Material Fixed Handling costs). If Material Handling percentage is entered with more than two decimal places, cells are formatted to be flagged and will be color shaded. Ensure the Material Handling percentage cell is corrected so no color shading is remaining before submitting the proposal. If not included in the proposal, Material Fixed Handling will not be added during contract performance. (3) The proposed Material Fixed Handling rate will be incorporated into any resultant contract, as a binding, Not To Exceed (NTE) ceiling rate. (4) Calculation of the Total Evaluated Price for the T&M Material & Material Fixed Handling will be done automatically based on the proposed Material/Software price and the Material Fixed Handling rate entered by the Offeror.
Labor Hour Labor Tab Instructions -
(1) Offeror shall make no inputs in this tab. Labor Hour Labor tab automatically calculates the total Not-To-Exceed Labor Hour price.
FFP Priced CLINs Tab Instructions -
(1) The Offeror shall enter unit prices (in red shaded cells) for the Firm Fixed Price CLINs. Unit prices shall be entered with no more than two decimal places. If unit prices are entered with more than two decimal places, cells are formatted to be flagged and will be color shaded. Ensure all unit price cells are corrected so no color shading is remaining before submitting the proposal. For CLIN 0002 the Offeror shall also enter the quantity of sprints it can accomplish in a 12-month period. The quantity entered shall have zero decimal places (shall be in whole numbers). If CLIN 0002 quantity is entered with more than zero decimal places, the cell is formatted to be flagged and will be color shaded. Ensure the CLIN 0002 quantity cell is corrected so no color shading is remaining before submitting the proposal.
Evaluated Price Summary
| Evaluated Price Summary Tab | |
| Total Evaluated Price Table | |
| Category | Base Period |
| Total Evaluated T&M Labor - Not To Exceed (NTE) Optional Task | $ - 0 |
| Total Evaluated T&M Material and Material Handling - NTE Optional Task | $ - 0 |
| Total Evaluated T&M Labor, Material, and Material Handling - NTE Optional Task | $ - 0 |
Total Evaluated Labor Hour - NTE Optional Task $ - 0
Total Evaluated Firm Fixed Price $ - 0
Total Evaluated Price (T&M, Labor Hour, and Firm Fixed Price) $ - 0
| Socio-Economic Status Price Table | |||||
| Company | Company Socio-Economic Status | DUNS | CAGE | Amount | Percentage of Total Price |
Total SDVOSB Percentage
T&M and Labor Hour Rate Table
| T&M and Labor Hour Rate Table Tab PROPOSED FULLY LOADED LABOR RATES | ||
| Prime Offeror Name | ||
| Base Period | ||
| PWS 5.4.3 T&M Labor Category | Site | Fully Loaded Hourly Labor Rate |
| Project Analyst | Off-Site (Contractor Site) |
| Base Period | ||
| PWS 5.3 - 5.4.2 Labor Hour Labor Category | Site | Fully Loaded Hourly Labor Rate |
| Developer, Senior | Off-Site (Contractor Site) | |
| Technical Lead | Off-Site (Contractor Site) | |
| Product Manager | Off-Site (Contractor Site) | |
| Business Analyst | Off-Site (Contractor Site) | |
| Senior UX Designer | Off-Site (Contractor Site) |
T&M Labor
| T&M Labor Tab | |||||
| CLIN 0007 | |||||
| Prime Offeror Name | Base Period | Base Period | Base Period | ||
| PWS Task | Labor Category | Site | Labor Hours |
(For Evaluation
| Purposes Only) | Loaded Hourly Labor Rate | Total Labor | ||||
| 5.4.3 | Project Analyst | Off-Site (Contractor Site) | 480 | $ - 0 | $ - 0 |
&D page &P If Used for Source Selection Information See FAR 2.101 and 3.104
T&M Material and Handling
| T&M Material & Material Handling Tab | ||
| CLIN 0007 - WBS 5.4.3 | Base Period | |
| Material - Not To Exceed (NTE) | $ - 0 | |
| Material Fixed Handling Percent and Amount - NTE | $ - 0 | |
| Material & Material Fixed Handling Amount - NTE | $ - 0 |
| Material/Software Table | Base Period | Base Period | Base Period |
| Item Description/Part Number | Quantity | Unit Price | Extended Price |
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 |
Labor Hour Labor
| Labor Hour Labor Tab | |||||
| CLIN 0006 | |||||
| Prime Offeror Name | Base Period | Base Period | Base Period | ||
| PWS Task | Labor Category | Site | Labor Hours |
(For Evaluation
| Purposes Only) | Loaded Hourly Labor Rate | Total Labor | ||||
| 5.3 - 5.4.2 | Developer, Senior | Off-Site (Contractor Site) | 3,920 | $ - 0 | Need Rate | |
| Technical Lead | Off-Site (Contractor Site) | 1,960 | $ - 0 | Need Rate | ||
| Product Manager | Off-Site (Contractor Site) | 3,920 | $ - 0 | Need Rate | ||
| Business Analyst | Off-Site (Contractor Site) | 1,960 | $ - 0 | Need Rate | ||
| Senior UX Designer | Off-Site (Contractor Site) | 640 | $ - 0 | Need Rate | ||
| Total Labor | 12,400 | $ - 0 |
&D page &P If Used for Source Selection Information See FAR 2.101 and 3.104
FFP Priced CLINs
| FFP Priced CLINs Tab | |||||
| LINE ITEM | DELIVERABLE DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL EVALUATED PRICE |
| Base Period FFP : | |||||
| 0001 | Project Management IAW PWS 5.1. The price of CLIN 0001 shall be included in and allocated to CLIN 0002 and CLIN 0003. | 12 | MO | NSP | NSP |
| 0002 | VA API Development - Not To Exceed (NTE) IAW PWS 5.2.1. The Quoter shall propose the unit price per sprint and complete the quantity of sprints it can accomplish in a 12-month period for the total price proposed for CLIN 0002. | EA | $ - 0 | ||
| 0003 | API Operations IAW PWS 5.2.2 | 12 | MO | $ - 0 | |
| 0004 | Contractor Staff Roster IAW PWS 6.2.2. The price of CLIN 0004 shall be allocated to CLIN 0002 and CLIN 0003. | 1 | LO | NSP | NSP |
| 0005 | Final Section 508 Compliance Test Results IAW PWS A3.4. The price of CLIN 0005 shall be allocated to CLIN 0002 and CLIN 0003. | 1 | EA | NSP | NSP |
| Total Evaluated Firm Fixed Price | $ - 0 |
File details come from the government source that posted it.