This is a Schedule of Line Requirements and Q&A document for medical imaging equipment procurement across multiple VA medical facilities. The document details equipment requirements and site-specific information for various imaging systems including NM SPECT CT, NM PET CT, XR RF (X-ray fluoroscopy), XR CATH LAB (catheterization lab), RT LINAC (radiation therapy linear accelerator), XR CT (computed tomography), and XR RAD (general radiography) systems.

The document covers 22 separate equipment installations across 15 VA facilities in VISNs 2, 6, 8, 9, 16, 20, 21, and 22. Each installation includes specific technical requirements, site visit information, and Q&A responses regarding construction needs, facility modifications, and equipment specifications. Key details include power requirements, HVAC specifications, flooring requirements, lighting upgrades, and millwork modifications needed for each installation. Site visits are scheduled between December 10-20, 2024. The document provides extensive technical clarifications on equipment specifications like detector sizes, weights, and capabilities to ensure fair competition among vendors while meeting VA clinical requirements.

View the file

Other files

File Type Posted
Philips CT Big Bore Drawings_Orlando.zip ZIP file
Eureka VA HVAC Balance Report TB_San Francisco.zip ZIP file
Mechanical-2012-03-23_San Francisco.zip ZIP file
648B43011_Docs.zip ZIP file
663B43021_Docs.zip ZIP file
621 VAMC MOUNTAIN HOME DRAWINGS.zip ZIP file
SIM CT Orlando_Docs.zip ZIP file
Structural TI Plans_San Francisco.zip ZIP file
Electrical REV Plans_San Francisco.zip ZIP file
561B42017 - 626B44046 TS-CM.zip ZIP file
36A79725Q0001 0002.docx DOCX document
626B44047 - 675B47014 TS-CM.zip ZIP file
653 ROSEBURG OR.zip ZIP file
Amendment 0002 - Continuation Page.docx DOCX document
36A79725Q0001 0001.pdf PDF
Amendmnet 0001 Continuation Page.pdf PDF
NAC Turnkey Rubric - Oct 2024.pdf PDF
662B40006 - 675B47014.zip ZIP file
658B49004.zip ZIP file
Vendor Folders.zip ZIP file
653B43000.zip ZIP file
SEP 2024 Extended Install and Turnkey Consolidation - RFO.pdf PDF
VA Directive 6550 - New Appendix A - published Jun. 2023.docx DOCX document
626B44048 - 648B43011.zip ZIP file
Memorandum for Training.pdf PDF
SEP 2024 TKY - Schedule of Line Requirements.xlsx XLSX spreadsheet
621B40008 - 626B44047.zip ZIP file
NAC Extended Installation and Turnkey Rubric - Oct 2023.pdf PDF
658B49005.zip ZIP file
653B43002.zip ZIP file
561B42017 - 614B44017.zip ZIP file
36A79725Q0001_1.docx DOCX document
SEP 2024 TKY Consolidation Schedule.pdf PDF
Vendor Workup Spreadsheet - 36A79725Q0001.xlsx XLSX spreadsheet
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Line Items

HTME VISNStationEquip POTKY POEquipment TypeQTYSite Visit POCSite Visit DateSite Visit Time
VISN 2: VA Healthcare Network Upstate New York561 EAST ORANGE, NJ561B42017561B42020NM SPECT CT1esteban.rivera@va.gov12/11/2410am EST
VISN 16: South Central VA Health Care Network564 FAYETTEVILLE, AR564B40021564B40022NM SPECT CT1Ammar.Mohammed@va.gov12/16/2410am - 12pm CST
VISN 8: VA Sunshine Healthcare Network573 GAINESVILLE, FL573B45028573B45027NM PET CT1matthew.gustafson@va.gov12/11/248am EST
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B40016600B40017XR RF1younseon.han@va.gov12/10/2024 & 12/17/20249am - 10:30am PST
VISN 21: VA Sierra Pacific Network612 MATHER, CA612B49003612B49006XR RF1maia.gomez@va.gov12/10/242pm PST
VISN 21: VA Sierra Pacific Network612 STOCKTON, CA612B49004612B49005XR RF1Yvonna.Chan@va.gov12/10/2024 & 12/12/20248am - 3:30pm PST
VISN 9: VA Mid South Healthcare Network614 MEMPHIS, TN614B44015614B44016XR CATH LAB1Paul.Brown1@va.gov12/11/2410am CST
VISN 9: VA Mid South Healthcare Network614 MEMPHIS, TN614B44017614B44018RT LINAC1Paul.Brown1@va.gov12/18/2410am CST
VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B40008621B40009XR CT1terry.brlecic@va.gov12/20/2411am CST
VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B40010621B40011XR CT1terry.brlecic@va.gov12/20/2411am CST
VISN 9: VA Mid South Healthcare Network626 NASHVILLE, TN626B44046626B44049XR RAD1Tiffany.Cannon@va.gov Rebecca.Bulla@va.gov12/11/241pm CST
VISN 9: VA Mid South Healthcare Network626 NASHVILLE, TN626B44047626B44047XR RAD1Tiffany.Cannon@va.gov Rebecca.Bulla@va.gov12/11/241pm CST
VISN 9: VA Mid South Healthcare Network626 NASHVILLE, TN626B44048626B44051XR RAD1Tiffany.Cannon@va.gov Rebecca.Bulla@va.gov12/11/241pm CST
VISN 20: VA Northwest Network648 PORTLAND, OR648B43011648B43012XR CT1kelly.wachholz@va.gov12/10/242pm - 4pm PST
VISN 20: VA Northwest Network653 ROSEBURG, OR653B43000653B43001XR RAD1robert.hruza2@va.gov Justin.collins2@va.gov12/12/241pm - 2pm PST
VISN 20: VA Northwest Network653 ROSEBURG, OR653B43002653B43003XR RF1robert.hruza2@va.gov Justin.collins2@va.gov12/12/242pm - 3:30pm PST
VISN 6: VA Mid-Atlantic Health Care Network658 SALEM, VA658B49004658B49006XR CT1Andrew.Jackson@va.gov12/10/2410am EST
VISN 6: VA Mid-Atlantic Health Care Network658 SALEM, VA658B49005658B49007NM SPECT CT1Andrew.Jackson@va.gov12/10/2410am EST
VISN 21: VA Sierra Pacific Network662 SAN FRANCISCO, CA662B40006662B40007XR RAD1kenneth.green2@va.gov12/17/2024 & 12/19/20248am - 4:30pm PST
VISN 21: VA Sierra Pacific Network662 SAN FRANCISCO, CA662B40008662B40005XR RAD1julian.chajecki@va.gov12/17/2024 & 12/19/20248:30am - 4:30pm PST
VISN 20: VA Northwest Network663 SEATTLE, WA663B43020663B43021XR URO1pughtmbme@va.gov dori.mcclure@va.gov12/17/241pm - 2:30pm PST
VISN 8: VA Sunshine Healthcare Network675 ORLANDO, FL675B47014675B45016XR CT1Christine.motz@va.gov12/12/249am EST

QA

VISNStationEquipment Requisition NumberTurnkey Requisition NumberEquipment QuestionsTurnkey QuestionsGOVT Equipment ResponseGOVT Turnkey Response
VISN 2: VA Healthcare Network Upstate New York561 EAST ORANGE, NJ561B42017Compliance Matrix # 92 - Does the end user intend to do CT calcium scoring with this system? Compliance Matrix # 54 - Please confirm the end user does NOT want below ground cables. Compliance Matrix #92 - Please confirm which cardiac software the end user wants, 4DM or Cedars or both (current system has both)#92 Yes #54 No, cables should be above ground as system may be moved in future #92 No, software requirement laid out in this line item. End user currently uses 4DM which would be preferred and access to Cedars could be added value
VISN 2: VA Healthcare Network Upstate New York561 EAST ORANGE, NJ561B42017Line 23 – please change this to 50cm as that is the standard CT FOV on most scanners.

Line 33 – what is meant by “low energy”? Is this different than the LEHR already included on line 29?

Line 39 – Let’s use this item for the “CZT” question. Let’s ask if this refers to CZT detectors and of they are required.#23 Technical specification updated #33 The low energy ultra high resolution collimater will be removed to avoid confusion. This could be added value #39 CZT cyrstal is not a requirement but could be added value
VISN 16: South Central VA Health Care Network564 FAYETTEVILLE, AR564B40021Benchmark mislabeled please correct NM SPECT confirmed per requirement overview Line 13Confirmed that this is a SPECT only requirement.
VISN 16: South Central VA Health Care Network564 FAYETTEVILLE, AR564B400211a. Maximum detector crystal dimensions [in] - Please clarify if 3/8 or 5/8 is preferred.

1k. Please clarify what is meant for a full system UPS, are you looking for a UPS that backs up the camera comparable to what you have today? If you’re looking for a different UPS solution than you have today, please provide specifics on what is needed?

2j. & 2k. Will you retain the MEGP and PH collimators from the NM630 being traded in if they can be re-used on the vendors system vs. buying new?

6i. Please clarify what is meant by “nonuniform attenuation” when referring to a SPECT only system?

Q: Do you have any plans to upgrade to diagnostic SPECT CT in the future?1.Please confirm what the new flooring requirement is based on the VA TIL (LVT, Sheet Vinyl, VCT?).
2.The VA said they recently conducted a structural evaluation of the slab that they could provide. We need this evaluation as well as confirmation on slab thickness.1a. 5/8 in. is preferred for maximum detector crystal dimensions.

1k. We are looking for a UPS that backs up the camera comparable to what we currently have.

2j. & 2k. We would be agreeable to using the old collimators provided that the old collimators would match the “life span” of the new camera system being installed - for purposes of service contract coverage, the old collimators would not have a shorter life span than the new camera system as a whole.

6i. Non-uniform attenuation in SPECT refers to the uneven absorption of radiation across different tissue densities within a patient's body, meaning that different parts of the body attenuate the signal from the radiotracer differently.

Q: We would like to have that option as a possibility. 1. The new flooring requirement based on the VA TIL is WSF (Chapter 252, FA2: Patient Area, Rm Cde NMGS1).

2. The existing slab is a 4-inch topping slab cast over a 5-inch wire-reinforced concrete slab on ground. A cable trough runs through the topping slab next to the existing scanner. If a new configuration of support feet on the gantry is used, the feet must maintain a minimum of 2-inches from the edge of the trough. The floor slab was found to be sufficient for equal to or greater than existing system size and weight.

VISN 16: South Central VA Health Care Network564 FAYETTEVILLE, AR564B40022Per site walk thru, please specify what new flooring requirement based on the VA TIL is requestedThe new flooring requirement based on the VA TIL is WSF (Chapter 252, FA2: Patient Area, Rm Cde NMGS1).
VISN 16: South Central VA Health Care Network564 FAYETTEVILLE, AR564B40022Per site walk, thru the VA recently conducted a structural evaluation of the slab thickness. Please provide this report.The existing slab is a 4-inch topping slab cast over a 5-inch wire-reinforced concrete slab on ground. A cable trough runs through the topping slab next to the existing scanner. If a new configuration of support feet on the gantry is used, the feet must maintain a minimum of 2-inches from the edge of the trough. The floor slab was found to be sufficient for equal to or greater than existing system size and weight.
VISN 16: South Central VA Health Care Network564 FAYETTEVILLE, AR564B40022Please provide a drawing of the current existing install and the floor cable lengthExisting install drawing not available further than the general room floorplan submitted through FORCE.
VISN 8: VA Sunshine Healthcare Network573 GAINESVILLE, FL573B45028Can the following information be provided in regards to the GE trade-in:
•Equipment Name
•# of CT slices
•Date of Manufacture
•Serial Number
•System Location (Basement, Ground Floor, Floor#)
•Crane Needed
•System in Good Working Condition
•CT Tube in working Condition.
•Last CT Tube Exchange
•Software level
•Chiller (No, Roof, Ground)
•Scan seconds on Gantry
•Scan seconds on CT Tube

• Cooling (Air, Water, Air/Water) "As mentioned in the technical specifications the trade-in is a Siemens Biograph 600 Name: Siemens Biograph Vision 600

• # of CT slices 64: PET Gantry: 8 ring

• Date of Manufacture: 2020 (Installed Sept. 25, 2020)

• Serial Number: (21) 11061

• System Location (Basement, Ground Floor, Floor#): BASEMENT

• Crane Needed: NO

• System in Good Working Condition: YES

• CT Tube in working Condition: YES

• Last CT Tube Exchange: N/A

• Software level: VG80C

• Chiller (No, Roof, Ground): No

• Scan seconds on Gantry: 353,465

• Scan seconds on CT Tube: 481,342

• Cooling (Air, Water, Air/Water): water" VISN 8: VA Sunshine Healthcare Network 573 GAINESVILLE, FL 573B45028 1i. Maximum time of flight resolution [ps] - Q: Please clarify if you meant 300ps vs. “30pc"

2f. UPS – maintains full functionality of the system for a minimum of 15 minutes during a power outage – Q: If the intention if for a FULL UPS please indicate siting requirements and location where the UPS should be installed. Additionally, please consider changing requirement to 7 minutes to allow for UPS standards.

Q: If the selected vendor will not require a chiller, does the VA intend to keep the existing chiller in place on the roof or will there be a requirement for the selected to remove it as part of their turnkey solution?Flooring:
1.Replace the flooring in the Scanner and Closet rooms (A019-1 and A019A-1), or patch where the existing system was removed?
2.Are we replacing the flooring in the shared control room (A017-1) (we will do in evenings or one weekend)?
3.If so, do you want heat welded seamless sheet vinyl flooring, VCT, or LVT?
4.4” or 6” rubber or vinyl base or flash cove?

Walls:

1. Paint all existing walls or only where walls were patched?

Ceilings:

1. If the new imaging system doesn’t require modifying the ceiling, do you want any or all the ceiling grid and/or panels replaced?

Millwork:

1. Do you want any or all millwork replaced in the Control or the Exam rooms (upper/base cabinets, counter tops, etc.)?

Lighting:

1. Do you need any additional lighting than what currently exists?

Power:

1. Can you provide feeder size feeding the existing breaker in the Exam room. Can you also provide details for panel 1ANHD1-20 22 24?

HVAC:

1.Can you please provide a recent T&B (test and balance) report?
2.We understand the site is in the middle of an HVAC upgrade. Does this upgrade include the AC supplying A019? If so, please provide specifics of the air handling unit (size, manufacturer, and model)?

Lead Shielding:

1. There was a discussion of adding additional leading to the equipment room back corner behind the electrical panels because of interference with the adjacent Hot Lab. What thickness of lead and how much of the corner needs lead?

Asbuilt Information:

1. Can you provide asbuilt drawings (structural, electrical, and mechanical) of this space? 1i. Maximum time of flight resolution [ps] - Q: Please clarify if you meant 300ps vs. “30pc" 300ps

2f. UPS – maintains full functionality of the system for a minimum of 15 minutes during a power outage – Q: If the intention if for a FULL UPS please indicate siting requirements and location where the UPS should be installed. Additionally, please consider changing requirement to 7 minutes to allow for UPS standards. Service does not have space for full back up power , so requirement was changed to: UPS – maintains full functionality of the workstation for a minimum of 10 minutes during a power outage

Q: If the selected vendor will not require a chiller, does the VA intend to keep the existing chiller in place on the roof or will there be a requirement for the selected to remove it as part of their turnkey solution? Facility will keep existing chiller. 1. Replace all flooring in scanner and closet room

2. Replace flooring in shared control room during weekend or after hours.

3. Provide heat welded sheet vinyl flooring

4. 6" rubber base to match existing

5. Two coat of paint on all walls. Patch or repair any damage as needed prior to painting.

6. Replace only damaged ceiling grid and tiles.

7. Millwork - No millwork needed

8. Lighting - No lighting needed

9. Feeder Size - It is fed by a 200A breaker.

10. Test and Balance - This information is not available yet as the unit has not been installed.

11. HVAC Specs for new AHU included as separate document

VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B400161. All existing lighting to remainNo, upgrade. Possible to retrofit LED with existing diffusers.
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B400162. Is the existing HVAC adequate for the new system and all HVAC registers to remainClarification needed. VA HVAC Shop can provide specifications for current system. Vendor would have to determine if system meets requirments or not.
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B400163. All existing cabinets and counter tops to remainNo, upgrade
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B400164. Existing flooring to remainNo, upgrade. Note, the existing floor drain. Should be included in upgrade.
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B400165. Are we repainting the entire room (walls and ceilings)Yes, repainitning walls and ceiling
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B400166. Project work hoursNormal workhours. Planning of any shutdowns or impacts to Using Service may require work outside of normal business hours.
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B400167. Existing med gas boom to remainYes. It is desired to be changed but isnt covered in this project.
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B400168. Existing view boxes to remainYes, upgrade with new glass. Additionally flooring, paint and cabinet/counters included.
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B400169. All existing portable cabinets to remainYes, they will be removed from the work area during construction.
VISN 22: VA Desert Pacific Healthcare Network600 LONG BEACH, CA600B4001610. Existing main entry door to remainNo, upgrade main entry and rear door. Match with existing doors in the service.
VISN 21: VA Sierra Pacific Network612 MATHER, CA612B490031ac) Please update max detector weight to 9lbs to maximize competition

1ad) Please update detector distributed load capcity to 450lbs to maximize competition or note if a weight bearing cap may be included to exceed posted spec 1aa, 1ba, 1ca and 2e) Please confirm the requirement for 3 detectors 2c) Please reduce max kVp range to 125 kVp to maximize competitionour

Construction Questions:

1) Should we include acrovyn wall protection up to 54” above finished floor around the perimeter of the scan room?

2) Should we replace existing casework with new (8) lineal feet of upper cabinets and (8) lineal feet of base cabinets with solid surface countertop in the scan room?

3) Should we replace existing countertop with new (8) lineal feet of solid surface countertop in control room?

4) Should we replace existing handwash sink and faucet with new sink and faucet (if we replace the casework, then we would replace the sink and faucet).

5) Should we replace existing incandescent/ fluorescent lights with new dimmable LED lights?1) Updated to 9lbs. 2) Added weight bearing cap language to the requirement: Weight bearing cap may be included to meet requirement. 3) Yes, 3 detectors are required, 1 fixed table detector and 2 wireless detectors. 4) Range reduced to 40-125 kVP.1) Yes include Acrovyn wall protection up to 54” above finish floor around the perimeter of the scan and control room. 2) Furnish labor and material to install (8) lineal feet of base cabinets and (8) lineal feet of upper cabinets in procedure room. Base cabinets to include (8) lineal feet of solid surface countertop. Procedure room countertop to include cutout for new ADA compliant handwash sink. Furnish labor and material to install (8) lineal feet of solid surface countertops in control room. Furnish labor and material to install 4” backsplash at all new countertops. 3) Furnish labor and material to install (8) lineal feet of base cabinets and (8) lineal feet of upper cabinets in procedure room. Base cabinets to include (8) lineal feet of solid surface countertop. Procedure room countertop to include cutout for new ADA compliant handwash sink. Furnish labor and material to install (8) lineal feet of solid surface countertops in control room. Furnish labor and material to install 4” backsplash at all new countertops. 4) Yes – replace existing handwash sink and faucet with new sink and new battery-operated motion sensor faucet. 5) Furnish labor and material to install (10) dimmable LED can lights throughout the project area and (1) 2x4 dimmable LED control room light. Remove existing wall scone lighting from area.
VISN 21: VA Sierra Pacific Network612 MATHER, CA612B490031)Would you please provide us with As-Built Drawings?Record drawings of this room (as-builts) are not available.
VISN 21: VA Sierra Pacific Network612 MATHER, CA612B49003Flooring:
1.Replace the flooring in the Exam room or patch where the existing system is located?
2.Replace the flooring in the shared control room?
3.If so, do you want heat welded seamless sheet vinyl flooring, VCT, or LVT?
4.4” or 6” rubber or vinyl base or flash cove.

Walls:

1. Paint all existing walls in the Exam and Control or just the Exam room?

Ceilings:

1. If the new imaging system doesn’t require modifying the ceiling, do you want any or all the ceiling grid and/or panels replaced?

Doors:

1. Should we include any work to existing doors, repairing or replacing?

Millwork:

1.Do you want any or all millwork replaced in the Control or the Exam rooms (upper/base cabinets, counter tops, etc.)?
2.Should we include any additional millwork in either the Exam room or Control room?

Lighting:

1. Should we include replacing all existing lights with new LED lights with dimmers or without dimmers?

Power:

1. Can you provide power details (amperage of breaker in source panel, feeder size, ground size, and length to power source) of the existing feeder?

HVAC:

1.Can you provide a recent T&B (test and balance) report?
2.Should we include replacing the existing wall hung split unit in Room 1?
3.Are new HVAC units required to be on house chilled water? If so, where is the connection point?

Asbuilt Information:

1.Can you provide asbuilt drawings (structural, electrical, and mechanical) of this space?Flooring: 1) Yes – furnish all labor and material to install new Mannington BioSpec MD sheet vinyl flooring. 2) Yes – furnish all labor and material to install new Mannington BioSpec MD sheet vinyl flooring. 3) Heat welded seamless sheet vinyl flooring with 6” integral rolled coved base. 4) Heat welded seamless sheet vinyl flooring with 6” integral rolled coved base in exam and control room. Wall: 1) All walls, door/window frames, and gutter will receive (1) coat of primer and (2) coats of finish paint. Ceilings: 1) Furnish all labor and material to install new 2’x2’ suspended ceiling grid with lay in ceiling tiles. New ceiling tiles to match building standard approved by the VA. Doors: 1) Replace existing lead door and include SS 3’ kick plates on both sides of the door. Millwork: 1) Furnish labor and material to install (8) lineal feet of base cabinets and (8) lineal feet of upper cabinets in procedure room. Base cabinets to include (8) lineal feet of solid surface countertop. Procedure room countertop to include cutout for new ADA compliant handwash sink. Furnish labor and material to install (8) lineal feet of solid surface countertops in control room. Furnish labor and material to install 4” backsplash at all new countertops. 2) Furnish labor and material to install (8) lineal feet of base cabinets and (8) lineal feet of upper cabinets in procedure room. Base cabinets to include (8) lineal feet of solid surface countertop. Procedure room countertop to include cutout for new ADA compliant handwash sink. Furnish labor and material to install (8) lineal feet of solid surface countertops in control room. Furnish labor and material to install 4” backsplash at all new countertops. Lighting: 1) Furnish labor and material to install (10) dimmable LED can lights throughout the project area and (1) 2x4 dimmable LED control room light. Remove existing wall scone lighting from area. Power: 1) Contractor shall field verify all existing power and electrical as-built conditions. Existing 30 amp and 100 amp - 480v breakers currently service the room. The Vendor and Contractor are still responsible to provide all new breakers, all new feeders, and all power requirements to their specified unit. Existing xray warning lights and emergency power off disconnects are required to be replaced. HVAC: 1) Existing T&B report is not available. Contractor shall perform a pre-construction and post construction T&B report to ensure they match existing conditions and meet existing requirements of the new radiology selected unit. 2) No split unit exists in this room. 3) Existing HVAC system to remain and be reused for new equipment. As-built Information: 1) Record drawings of this room (as-builts) are not available.
VISN 21: VA Sierra Pacific Network612 STOCKTON, CA612B490041ac) Please update max detector weight to 9lbs to maximize competition

1ad) Please update detector distributed load capcity to 450lbs to maximize competition or note if a weight bearing cap may be included to exceed posted spec 1aa, 1ba, 1ca and 2e) Please confirm the requirement for 3 detectors 2c) Please reduce max kVp range to 125 kVp to maximize competitionour

Construction Questions:

1) Should we include acrovyn wall protection up to 54” above finished floor around the perimeter of the scan room?

2) Should we include (6) lineal feet of upper cabinets and (6) lineal feet of base cabinets with solid surface countertop in the scan room? 1ac) Changed to 9lbs 1ad) Adding "weight bearing cap may be included to meet requirement" 1aa, 1ba, 1ca, 2e) Correct, 3 detectors: a fixed table detector, a wall detector, and a wireless detector.

2c) Changed to 125 kVp

VISN 21: VA Sierra Pacific Network612 STOCKTON, CA612B490041)Would you please provide us with As-Built Drawings?Asbuilts are not available at this time
VISN 21: VA Sierra Pacific Network612 STOCKTON, CA612B4900422. Please clarify if two wireless detectors are needed.

Please change the wireless detector specification to 14x17

92. please change minimum table width to 31"

105.Please change minimum in-room monitor size to 23". 117.Please move virtual grid software to the value-add section to allow full and fair competitionFlooring:
1.Replace the flooring in the Exam room or patch where the existing system is located?
2.Replace the flooring in the shared control room?
3.If so, do you want heat welded seamless sheet vinyl flooring, VCT, or LVT?
4.4” or 6” rubber or vinyl base or flash cove.

Walls:

1. Paint all existing walls in the Exam and Control or just the Exam room?

Ceilings:

1. If the new imaging system doesn’t require modifying the ceiling, do you want any or all the ceiling grid and/or panels replaced?

Doors:

1. Should we include any work to existing doors, repairing or replacing?

Millwork:

1.Do you want any or all millwork replaced in the Control or the Exam rooms (upper/base cabinets, counter tops, etc.)?
2.Should we include any additional millwork in either the Exam room or Control room?

Lighting:

1. Should we include replacing all existing lights with new LED lights with dimmers or without dimmers?

Power:

1. Can you provide power details (amperage of breaker in source panel, feeder size, ground size, and length to power source) of the existing feeder?

HVAC:

1.Can you provide a recent T&B (test and balance) report?
2.Should we include replacing the existing wall hung split unit in Room 1?
3.Are new HVAC units required to be on house chilled water? If so, where is the connection point?

Asbuilt Information:

1. Can you provide asbuilt drawings (structural, electrical, and mechanical) of this space? 22. QTY 1 wireless detectors are requested in addition to the table detector and the wall detector. Wireless detector dimensions will remain 17x17 as many vendors are able to meet the 17x17 requirement.

92. Changed table width to 31"

105. Changed minimum in-room monitor size to 23"

117. Virtual grid software will remain as a software requirement as many vendors are able to meet the requirement. Flooring:

1. Vendor shall patch and restore any of the welded seamless vinyl flooring required for new imaging unit or damaged during construction.

2. Control room flooring to remain as is.

3,4. Heat welded seamless sheet vinyl flooring with 6” integral rolled coved base. Match existing conditions and replace any damaged or removed flooring for unit.

Walls:

1. Paint all walls, ceiling needs, and soffits in exam room.

Ceilings:

1. Existing ceiling to remain – any modifications required for new units shall be provided by the vendor.

Doors:

1. Existing doors and windows to remain as is.

Millwork:

1,2. Include (12) lineal feet of upper cabinets and (12) lineal feet of base cabinets with solid surface countertop in the exam room. Include (4) lineal feet of additional solid surface countertop space for the control room wing walls.

Lighting:

1. Existing lighting to remain as is. Any modifications or relocation of existing lighting shall be the responsibility of the vendor.

Power:

1. Contractor shall field verify all existing power and electrical as-built conditions. Existing 480v 50-amp breaker services the area.

The Vendor and Contractor are still responsible to provide all new breakers, all new feeders, and all power requirements to their specified unit.

HVAC:

1.Initial existing construction T&B report is not available. Contractor shall perform a pre-construction and post construction T&B report to ensure they match existing conditions and meet existing requirements of the new radiology selected unit.

2.There is no existing split unit in Stockton RF room 3.Existing HVAC system to remain and be reused for new equipment.

Asbuilt Information:

1.Record drawings of this room (as-builts) are not available.

VISN 9: VA Mid South Healthcare Network614 MEMPHIS, TN614B44015Line 52 Please change Full Capacity UPS to minimum 7 minutes to allow for greater competition.Minimum of 20 minutes is required to meet specifications
VISN 9: VA Mid South Healthcare Network614 MEMPHIS, TN614B44015Line 42 Clarify if these dimensions are for the system "only" or the maximum room size and should it be in Feet not inchesThis was changed to clarify that it is for maximum procedure room dimensions in ft.
VISN 9: VA Mid South Healthcare Network614 MEMPHIS, TN614B44015i. UPS – a Full UPS that maintains a full 20 minutes will require specific siting space, is there a designated space for this? Will you consider a smaller UPS that allows for 10 minutes of backup?

66.g. Please change to include Boston IVUS as an option for IVUS compatibility.

58.o. Please change to side to side or head to foot to allow for fair competition.Flooring:
1.Replace the flooring in the Exam room or patch where the existing system is located?
2.Replace the flooring in the shared control room?
3.If so, do you want heat welded seamless sheet vinyl flooring, VCT, or LVT?
4.4” or 6” rubber or vinyl base or flash cove?

Walls:

1. Paint all existing walls in the Exam and Control or just the Exam room?

Ceilings:

1. If the new imaging system doesn’t require modifying the ceiling, do you want any or all the ceiling grid and/or panels replaced?

Doors:

1. Should we include any work to existing doors, repairing or replacing?

Millwork:

1.Do you want any or all millwork replaced in the Control or the Exam rooms (upper/base cabinets, counter tops, etc.)?
2.Should we include any additional millwork in either the Exam room or Control room?

Lighting:

1. Should we include replacing existing lights with new LED lights with dimmers or without dimmers?

Power:

1. Can you provide power details (amperage of breaker in source panel, feeder size, ground size, and length to power source) of the existing feeder?

HVAC:

1.Can you provide a recent T&B (test and balance) report?
2.If the proposed imaging system does not require additional AC, do you need HVAC unit(s) replaced due to age or not functioning?

As-built Information:

1. Can you provide as-built drawings (structural, electrical, and mechanical) of this space? i. No, this will need to stay at 20 minutes as this is the desired capacity for the facility.

66.g. No, this will need to be compatible with the Philips Instrasight version 1.1.0.1. This is a requirement.

58.o. No, this system must move side to side for clinical reasons. It cannot only move from head to foot. Side to side is a requirement. Flooring:

1. Flooring in exam room shall be replaced.

2. Flooring in control room shall be replaced.

3. Flooring shall be welded seamless vinyl flooring.

4. Covebase shall be 6" integrated vinyl Walls:

1. All walls shall be painted Ceilings:

1. All ceiling grid annd panels shall be replaced as part of base bid.

Doors:

1. Existing doors shall be stained or painted.

Millwork:

1. Millwork shall be replaced with approved equal.

2. No additional millwork is needed.

Lighting:

1. New lighting with dimmers shall be included.

Power:

1. Circuits are fed from panels GRL40 & GRL48, in Building 1 Ground Floor.

HVAC:1. T&B report to be provided by Engineering.

2. Supply/Return diffusers shall be all new. New HVAC equipment is needed ONLY if required by new imaging equipment.

As-built Information:

1. SEE ATTACHED DOCUMENTS

VISN 9: VA Mid South Healthcare Network614 MEMPHIS, TN614B44017614B44018RFI: Site Observations:
1.There is a water leak above the Main Circuit Breaker Panel at the north end of the Control Room. Currently, the panel has plastic above it to keep water off the electrical panel. This issue needs to be repaired prior to construction.
2.An additional site visit is needed to review the area in the Rig Path that requires shoring. Can you please provide structural drawings for the rigging route? When could we schedule the next site visit to review the shoring?
3.The following items were discussed to be included in the SOW:

a. Sixteen linear feet of plastic laminate millwork in the maze for storage of TrueBeam-related accessories. For example, electron cone storage.

b. Replace 7.5 linear feet of plastic laminate cabinets to match the cabinets on the sagittal wall. See attached photo.

c. Reuse the countertop in the Control Room or provide new? If new, we will provide solid surface if requested.

d. Leave or replace vinyl tile flooring? We would leave and patch the flooring to be cut out at the rear of the existing base frame for chilled water piping rework. If we replace it, we will use sheet vinyl flooring (only patching an area behind the accelerator stand).

e. We intent to spot prime and paint the Vault and Control Rooms.

4. If Vision RT will be installed by others, will we be responsible for preparing the room to receive the Vision RT equipment? Cabling, posts, cameras, and any related equipment will be installed by Vision RT? RFI: Site Observations:

1. Acknowledged

2. Structural drawings have been provided as an attachment. Please schedule follow up site visit with COr at your earliest convenience.

3. The following items were discussed to be included in the SOW:

a. Concur

b. Concur

c. Provide new solid surface

d. Flooring shall be replaced.

e. Vault and Control Rooms shall be fully painted.

4. Vision RT will be installed by vendor, if applicable.

VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B40008621B40009H) Respectfully request facility drawings, as builts, of the architectural, structural, electrical and mechanical for those two CT rooms.PDF of original structural drawings and current architectural provided. Current electrical and mechanical are not available.
VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B40008621B40009H) Respectfully request drawings for rooms immediately above and below each CT room in question.Curent architectural of 1st and 3rd floor provided.
VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B4000821.a Please change acquired to reconstructed due to weight requirements.

22.b. Please change aperture from 72 cm to 75 cm due to clinical purposes requested.

41.j. Confirm if you require a full UPS or will you accept a partial UPS to power on the console.

29.i. Please change maximum System Dimension to 25.6 in x 93.3 in.

Advanced Applications CT Cardiac. Based on your request for clinical needs for CCTA and TAVR, please add Automated Motion Correction for Coronaries, Valve Motion, Great Vessels, and Heart Chambers

61.5. Mobile Trailer Requirements - Please remove section from matrix – does not apply.

46.3 Will you accept a server solution for your post processing applications for remote reading/post processing?Flooring:
1.Replace the flooring in the Exam room or patch where the existing system is located?
2.Replace the flooring in the shared control room?
3.If so, do you want heat welded seamless sheet vinyl flooring, VCT, or LVT?
4.4” or 6” rubber or vinyl base or flash cove.

Walls:

1. Paint all existing walls in the Exam and Control or just the Exam room?

Ceilings:

1. If the new imaging system doesn’t require modifying the ceiling, do you want any or all the ceiling grid and/or panels replaced?

Doors:

1. Should we include any work to existing doors, repairing or replacing?

Millwork:

1.Do you want any or all millwork replaced in the Control or the Exam rooms (upper/base cabinets, counter tops, etc.)?
2.Should we include any additional millwork in either the Exam room or Control room?

Lighting:

1. Should we include replacing all existing lights with new LED lights with dimmers or without dimmers?

Power:

1. Can you provide power details (amperage of breaker in source panel, feeder size, ground size, and length to power source) of the existing feeder?

HVAC:

1.Can you provide a recent T&B (test and balance) report?
2.Should we include replacing the existing wall hung split unit in Room 1?
3.Are new HVAC units required to be on house chilled water? If so, where is the connection point?

Asbuilt Information:

1. Can you provide asbuilt drawings (structural, electrical, and mechanical) of this space? 21.a Please change acquired to reconstructed due to weight requirements. Changed to minimum 64 slice w/128 slice reconstruction capability 22.b. Please change aperture from 72 cm to 75 cm due to clinical purposes requested. 72 cm is the correct minimum 41.j. Confirm if you require a full UPS or will you accept a partial UPS to power on the console. Partial UPS is required 29.i. Please change maximum System Dimension to 25.6 in x 93.3 in. Changed to 94 x 42 Advanced Applications CT Cardiac. Based on your request for clinical needs for CCTA and TAVR, please add Automated Motion Correction for Coronaries, Valve Motion, Great Vessels, and Heart Chambers - added with Motion Correction

61.5. Mobile Trailer Requirements - Please remove section from matrix – does not apply. This is not applicable

46.3 Will you accept a server solution for your post processing applications for remote reading/post processing? Server solution is acceptable however must meet VA requirements Flooring:

1. Yes

2. Yes

3. Welded sheet vinyl

4. 6" Vinyl base Walls

1. All walls both rooms Ceilings

1. If the new system does not require ceiling modification, replace the tile only.

Doors:

1. Repairs as needed. No replacements.

Millwork

1. Replace upper and lower cabinets & counter tops in the exam rooms.

2. Replace existing furniture in the control room with millwork.

Lighting:

1. Yes, with dimmers Power:

1.

HVAC:

1. T&B report is unavailable.

2. Demo the split unit, patch and repair the wall finish.

3. Current architectural layout and original structural drawings are provided. Current electrical and mechanical are not available.

VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B400081. Are finishes in the shared control between 5 & 6 included?1. Yes
VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B400082. Are we painting each room?2. yes
VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B400083. Are new overhead lights included, LEDs?3. Yes
VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B400084. Dimmers?4. Yes
VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B400085. New flooring in the entire room and control, or just specific to the equipment?5. Yes, see answer above.
VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B400086. Any new cabinets/millwork?6. Yes, see answer above.
VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B400087. Any work involving HVAC controls, removing or replacing?7. Yes, see answer above.
VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B400088. Any work involving doors, repair or replace?8. Yes, see answer above.
VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B40010621B40011H) Respectfully request facility drawings, as builts, of the architectural, structural, electrical and mechanical for those two CT rooms.H) Yes, see answer above.
VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B40010621B40011H) Respectfully request drawings for rooms immediately above and below each CT room in question.H) Yes, see answer above.
VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B4001021.a Please change acquired to reconstructed due to weight requirements.

22.b. Please change aperture from 72 cm to 75 cm due to clinical purposes requested.

41.j. Confirm if you require a full UPS or will you accept a partial UPS to power on the console.

29.i. Please change maximum System Dimension to 25.6 in x 93.3 in.

Advanced Applications CT Cardiac. Based on your request for clinical needs for CCTA and TAVR, please add Automated Motion Correction for Coronaries, Valve Motion, Great Vessels, and Heart Chambers

61.5. Mobile Trailer Requirements - Please remove section from matrix – does not apply.

46.3 Will you accept a server solution for your post processing applications for remote reading/post processing?Flooring:
1.Replace the flooring in the Exam room or patch where the existing system is located?
2.Replace the flooring in the shared control room?
3.If so, do you want heat welded seamless sheet vinyl flooring, VCT, or LVT?
4.4” or 6” rubber or vinyl base or flash cove.

Walls:

1. Paint all existing walls in the Exam and Control or just the Exam room?

Ceilings:

1. If the new imaging system doesn’t require modifying the ceiling, do you want any or all the ceiling grid and/or panels replaced?

Doors:

1. Should we include any work to existing doors, repairing or replacing?

Millwork:

1.Do you want any or all millwork replaced in the Control or the Exam rooms (upper/base cabinets, counter tops, etc.)?
2.Should we include any additional millwork in either the Exam room or Control room?

Lighting:

1. Should we include replacing all existing lights with new LED lights with dimmers or without dimmers?

Power:

1. Can you provide power details (amperage of breaker in source panel, feeder size, ground size, and length to power source) of the existing feeder?

HVAC:

1.Can you provide a recent T&B (test and balance) report?
2.Should we include replacing the existing wall hung split unit in Room 1?
3.Are new HVAC units required to be on house chilled water? If so, where is the connection point?

Asbuilt Information:

1. Can you provide asbuilt drawings (structural, electrical, and mechanical) of this space? 21.a Please change acquired to reconstructed due to weight requirements. Changed to minimum 64 slice w/128 slice reconstruction capability 22.b. Please change aperture from 72 cm to 75 cm due to clinical purposes requested. 72 cm is the correct minimum 41.j. Confirm if you require a full UPS or will you accept a partial UPS to power on the console.Partial UPS is required 29.i. Please change maximum System Dimension to 25.6 in x 93.3 in.Changed to 94 x 42 Advanced Applications CT Cardiac. Based on your request for clinical needs for CCTA and TAVR, please add Automated Motion Correction for Coronaries, Valve Motion, Great Vessels, and Heart Chambers added with Motion Correction

61.5. Mobile Trailer Requirements - Please remove section from matrix – does not apply. This is not applicable

46.3 Will you accept a server solution for your post processing applications for remote reading/post processing? Server solution is acceptable however must meet VA requirements Flooring:

1. Replace

2. Yes

3. Welded sheet vinyl

4. 6" Vinyl base Walls

1. All walls both rooms Ceilings

1. If the new system does not require ceiling modification, replace the tile only.

Doors:

1. Repairs as needed. No replacements.

Millwork

1. Replace upper and lower cabinets & counter tops in the exam rooms.

2. Replace existing furniture in the control room with millwork.

Lighting:

1. Yes, with dimmers Power:

1. 480v, 200a, 4/0, Approx. 200 feet

HVAC:

1. T&B report is unavailable.

2. Demo the split unit, patch and repair the wall finish.

3. Current architectural layout and original structural drawings are provided. Current electrical and mechanical are not available.

VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B400101. Are finishes in the shared control between 5 & 6 included?1. Yes, see answer above.
VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B400102. Are we painting each room?2. Yes, see answer above.
VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B400103. Are new overhead lights included, LEDs?3. Yes, see answer above.
VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B400104. Dimmers?4. Yes, see answer above.
VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B400105. New flooring in the entire room and control, or just specific to the equipment?5. Yes, see answer above.
VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B400106. Any new cabinets/millwork?6. Yes, see answer above.
VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B400107. Any work involving HVAC controls, removing or replacing?7. Yes, see answer above.
VISN 9: VA Mid South Healthcare Network621 MTN HOME, TN621B400108. Any work involving doors, repair or replace?8. Yes, see answer above.
VISN 9: VA Mid South Healthcare Network626 NASHVILLE, TN626B44046For additional detectors required, would a 14x17 detector be acceptable?No, 17 X17 is needed
VISN 9: VA Mid South Healthcare Network626 NASHVILLE, TN626B44046For table detector required, would a fixed detector be acceptable?No, removeable detector is needed
VISN 9: VA Mid South Healthcare Network626 NASHVILLE, TN626B440461a) Please update max detector weight to 9lbs to maximize competition

1b) Please update max detector weight to 9lbs to maximize competition 1c) Please update max detector weight to 9lbs to maximize competition 1abc) Please confirm the total quantity of detectors is four (4) 2e) Please update table elevation range to 520mm to 850cm

Construction Questions:

1) Are finishes in the shared control between 5 & 6 included?

2) Are we painting each room?

3) Are new overhead lights included, LEDs?

4) Are dimable wall switches included in scope?

5) Is new flooring in the entire room and control, or just specific to the equipment?

6) Any new cabinets/millwork?

7) Any work involving HVAC controls, removing or replacing?

8) Any work involving doors, repair or replace?

1a) Please update max detector weight to 9lbs to maximize competition- concur 1b) Please update max detector weight to 9lbs to maximize competition- concur 1c) Please update max detector weight to 9lbs to maximize competition- concur 1abc) Please confirm the total quantity of detectors is four (4)-please change to 3- 1 fixed, 2 non-fixed 2e) Please update table elevation range to 520mm to 850mm- existing minimum range specification is 535mm - 850mm, 520mm expands the range which is allowed under existing specification.

1. Finishes between 5 & 6 to be included with the bid.

2. Paint each room.

3. Include new LED lights.

4. Include dimmable switches.

5. Include new flooring.

6. No new cabinet (review with department).

7. New VAV box, thermostate, and controls required.

8. The doors into D-62/D-60 need new door hold opener and door closer combination hardware.

VISN 9: VA Mid South Healthcare Network626 NASHVILLE, TN626B44046626B440491a) b. Minimum wall detector size is listed as a 14x17. Should this be a 17x17 in. for the Upright Bucky?yes, please change to 17x17 in. for the upright Bucky
VISN 9: VA Mid South Healthcare Network626 NASHVILLE, TN626B44046626B440491a) c. Respectfully request that the maximum wireless wall detector weight, with battery installed [lbs] weigh 4.8lbs for the 14x17 or 5.7lbs for the 17x17 in.Concur
VISN 9: VA Mid South Healthcare Network626 NASHVILLE, TN626B44046626B440491b) b. Confirming that the minimum Table detector size 17x17 in. and not 14x17 in.Confirmed, requesting 17 x 17
VISN 9: VA Mid South Healthcare Network626 NASHVILLE, TN626B44046626B440491b) c. Respectfully request that the maximum wireless wall detector weight, with battery installed [lbs] weigh 4.8lbs for the 14x17 or 5.7lbs for the 17x17 in.Concur
VISN 9: VA Mid South Healthcare Network626 NASHVILLE, TN626B44046626B440491c) c. Respectfully request that the 17 x 17 in. detector weight be increased from 4.5lbs to 5.7lbs to allow for fair and open competition.Concur
VISN 9: VA Mid South Healthcare Network626 NASHVILLE, TN626B44046626B440492d). Respectfully request that the Minimum Table Top dimensions listed as 2400 x 800 mm be changed to a minimum of 2350 x 800 mm.Concur
VISN 9: VA Mid South Healthcare Network626 NASHVILLE, TN626B44046626B440492e). Respectfully request that the Minimum Table Elevation be changed from 500 mm (20 in.) to 535 mm (21 in.) to allow for fair and open competition.Concur
VISN 9: VA Mid South Healthcare Network626 NASHVILLE, TN626B44046626B440492f). Respectfully request that the minimum Table weight capacity be changed from 350kg (770lbs) to 2965g (650lbs) to allow for open and fair competition.Concur
VISN 9: VA Mid South Healthcare Network626 NASHVILLE, TN626B44046626B440494a). Respectfully request that the minimum monitor size be changed from 21in to 19in to allow for fair and open competition.Concur
VISN 9: VA Mid South Healthcare Network626 NASHVILLE, TN626B4404624.c. Change to 7 lbs. maximum

28.c. Change to 8.4 lbs. maximum 32.c. Change to 8.4 lbs. maximum

3. Additional Specifications - Please clarify if stitching is needed for leg length and scoliosis series (wallstand and table?)

Please confirm if camera applications for positioning and technique assistance are desired for clinical support? I.e., Live streaming camera and artificial intelligence camera applications for common department errors and inefficiencies.Flooring:
1.Replace the flooring in the Exam room or patch where the existing system is located?
2.Replace the flooring in the shared control room?
3.If so, do you want heat welded seamless sheet vinyl flooring, VCT, or LVT?
4.4” or 6” rubber or vinyl base or flash cove?

Walls:

1.Paint all existing walls in the Exam and Control or just the Exam room?
2.Should we include painting the shared control room between 5 & 6?

Ceilings:

1. If the new imaging system doesn’t require modifying the ceiling, do you want any or all the ceiling grid and/or panels replaced?

Doors:

1. Should we include any work to existing doors, repairing or replacing?

Millwork:

1.Do you want any or all millwork replaced in the Control or the Exam rooms (upper/base cabinets, counter tops, etc.)?
2.Should we include any additional millwork in either the Exam room or Control room?

Lighting:

1. Should we include replacing existing lights with new LED lights with dimmers or without dimmers?

Power:

1. Can you provide power details (amperage of breaker in source panel, feeder size, ground size, and length to power source) of the existing feeder?

HVAC:

1.Can you provide a recent T&B (test and balance) report?
2.If the proposed imaging system does not require additional AC, do you need HVAC unit(s) replaced due to age or not functioning?

Asbuilt Information:

1. Can you provide asbuilt drawings (structural, electrical, and mechanical) of this space? 24.c. Change to 7 lbs. maximum- concur 28.c. Change to 8.4 lbs. maximum-concur 32.c. Change to 8.4 lbs. maximum- concur

3. Additional Specifications - Please clarify if stitching is needed for leg length and scoliosis series (wallstand and table?) Not needed in this room Please confirm if camera applications for positioning and technique assistance are desired for clinical support? Confirmed, positioning camera is desired. 1. Replace flooring.

2. Yes, replace control room flooring as well.

3. Welded seamless sheet vinyl.

4. Integrated base.

5. Paint all rooms.

6. Replace ceiliing tile only (TBD).

7. No work to the doors.

8. No millwork replacement.

9. Add new dimmable LED lights.

10. The AE will need to detail this information during the design phase.

VISN 9: VA Mid South Healthcare Network626 NASHVILLE, TN626B440461. Are finishes in the shared control between 5 & 6 included?Yes
VISN 9: VA Mid South Healthcare Network626 NASHVILLE, TN626B440462. Are we painting each room?Yes

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .