SEP 2023 - HTME with includes Turnkey Schedule w QA - Updated 2-22-24.xlsx
XLSX spreadsheet 69 KB Posted
- Attached to
- 6525--SEP 2023 Consolidation - HTME with Extended Installation Services (includes Turnkey Services)
- Solicitation number
- 36A79724Q0003
About this file
This document outlines a federal contract opportunity for medical equipment turnkey services and high-technology medical equipment. The solicitation is issued by the Department of Veterans Affairs National Acquisition Center to consolidate requirements across VISNs for equipment installations and upgrades. Services include project management, site assessments, equipment installation and integration, facility modifications, training, and warranty support. Offerors are advised to carefully review technical specifications and respond to questions to ensure all requirements are met.
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Line Items
| HTME VISN | Station | Equip PO | TKY PO | Equipment Type | QTY | Site Visit POC | Site Visit Date | Site Visit Time | HTME VISN |
| VISN 5: VA Capitol Health Care Network | 512 BALTIMORE, MD | 512B30913 | 512B31021 | XR CT | 1 | Christopher.Chester@va.gov Oladapo.Lajubutu@va.gov | 1/10/24 | 9 AM ET | VISN 5: VA Capitol Health Care Network |
| VISN 8: VA Sunshine Healthcare Network | 516 BAY PINES, FL | 516B30019 | 516B30025 | XR CATH LAB | 1 | nelson.gonzalez@va.gov | 1/9/24 | 8am EST | VISN 8: VA Sunshine Healthcare Network |
| VISN 16: South Central VA Health Care Network | 520 PENSACOLA, FL | 520B30018 | 520B30020 | CT | 1 | Logan.Bazo@va.gov; Ranjita.shrestha@va.gov | 1/11/24 | 12pm - 430pm | VISN 16: South Central VA Health Care Network |
| VISN 1: VA New England Healthcare System | 523 WEST ROXBURY, MA | 523B31047 | 523B32018 | XR RAD | 1 | Robert.Christie@va.gov | 1/11/24 | 11am - 12pm | VISN 1: VA New England Healthcare System |
| VISN 1: VA New England Healthcare System | 523 WEST ROXBURY, MA | 523B31048 | 523B32019 | XR RF | 1 | Robert.Christie@va.gov | 1/11/24 | 10am - 11am | VISN 1: VA New England Healthcare System |
| VISN 1: VA New England Healthcare System | 523 JAMAICA PLAIN, MA | 523B31049 | 523B32020 | XR RF | 1 | Guillermo.Socorro@va.gov | 1/11/24 | 1:30pm - 2:30pm | VISN 1: VA New England Healthcare System |
| VISN 12: VA Great Lakes Health Care System | 537 JESSE BROWN, IL | 537B38031 | 537B38034 | XR CATH LAB EP | 1 | sarah.pabilic@va.gov, kelsey.koenig@va.gov, deena.elboghdady@va.gov | 1/16/2024 1/17/2024 (Alternate) | 4:00pm – 6:00pm 4:00pm – 6:00pm (Alternate) | VISN 12: VA Great Lakes Health Care System |
| VISN 12: VA Great Lakes Health Care System | 537 JESSE BROWN, IL | 537B38032 | 537B38036 | RF HYBRID OR | 1 | Megan.Gron@va.gov gregory.cohen@va.gov Akram.Jabeer@va.gov | 1/11/2024 1/18/2024 (Alternate) | 4:00pm – 6:00pm 4:00pm – 6:00pm (Alternate) | VISN 12: VA Great Lakes Health Care System |
| VISN 12: VA Great Lakes Health Care System | 537 JESSE BROWN, IL | 537B38037 | 537B38035 | XR CATH LAB C | 1 | francisco.contreras@va.gov, kelsey.koenig@va.gov, deena.elboghdady@va.gov | 1/16/2024 1/17/2024 (Alternate) | 4:00pm – 6:00pm 4:00pm – 6:00pm (Alternate) | VISN 12: VA Great Lakes Health Care System |
| VISN 10: VA Healthcare System of Ohio | 538 CHILLICOTHE, OH | 538B30003 | 538B30006 | NM NUC | 1 | joe.williams@va.gov | 1/10/24 | 10AM EST | VISN 10: VA Healthcare System of Ohio |
| VISN 10: VA Healthcare System of Ohio | 538 CHILLICOTHE, OH | 538B30004 | 538B30005 | NM NUC | 1 | joe.williams@va.gov | 1/10/24 | 10AM EST | VISN 10: VA Healthcare System of Ohio |
| VISN 10: VA Healthcare System of Ohio | 541 CLEVELAND, OH | 541B30027 | 541B30031 | XR CT | 1 | daniel.hudak@va.gov | 1/4/24 | 10am EST | VISN 10: VA Healthcare System of Ohio |
| VISN 10: VA Healthcare System of Ohio | 541 CLEVELAND, OH | 541B30028 | 541B30036 | NM NUC | 1 | daniel.hudak@va.gov | 1/4/24 | 10am EST | VISN 10: VA Healthcare System of Ohio |
| VISN 8: VA Sunshine Healthcare Network | 548 WEST PALM BEACH, FL | 548B30022 | 548B30045 | XR MRI | 1 | robert.kittelson@va.gov | 1/9/24 | 1pm EST | VISN 8: VA Sunshine Healthcare Network |
| VISN 8: VA Sunshine Healthcare Network | 548 WEST PALM BEACH, FL | 548B30023 | 548B30044 | XR MRI | 1 | robert.kittelson@va.gov | 1/9/24 | 1pm EST | VISN 8: VA Sunshine Healthcare Network |
| VISN 8: VA Sunshine Healthcare Network | 548 WEST PALM BEACH, FL | 548B30025 | 548B30047 | XR CT | 1 | robert.kittelson@va.gov | 1/10/24 | 1pm EST | VISN 8: VA Sunshine Healthcare Network |
| VISN 8: VA Sunshine Healthcare Network | 548 WEST PALM BEACH, FL | 548B30027 | 548B30048 | XR CT | 1 | robert.kittelson@va.gov | 1/10/24 | 1pm EST | VISN 8: VA Sunshine Healthcare Network |
| VISN 8: VA Sunshine Healthcare Network | 548 WEST PALM BEACH, FL | 548B30029 | 548B30046 | XR CT | 1 | robert.kittelson@va.gov | 1/10/24 | 1pm EST | VISN 8: VA Sunshine Healthcare Network |
| VISN 10: VA Healthcare System of Ohio | 552 Dayton, OH | 552B30015 | 552B30016 | NM SPECT CT | 1 | christopher.ahn@va.gov | 1/5/2024 (two offerings) | 8am -12pm EST 12pm - 430pm EST (Alternate) | VISN 10: VA Healthcare System of Ohio |
| VISN 19: VA Rocky Mountain Network | 554 AURORA, CO | 554B33006 | 554B33031 | XR CT | 1 | katie.haley@va.gov; haley.seubert@va.gov | 1/11/24 | 9am MT | VISN 19: VA Rocky Mountain Network |
| VISN 12: VA Great Lakes Health Care System | 578 HINES, IL | 578B38013 | 578B38014 | XR RF | 1 | Bashir.Hajissa@va.gov | 1/9/2024 1/16/2024 (Alternate) | 7:30-am – 9:30am 7:30-am – 9:30am (Alternate) | VISN 12: VA Great Lakes Health Care System |
| VISN 12: VA Great Lakes Health Care System | 578 HINES, IL | 578B38015 | 578B38016 | XR CATH LAB C | 1 | Melat.Tesfaye@va.gov | 1/22/24 | 1:00p – 3:00p | VISN 12: VA Great Lakes Health Care System |
| VISN 16: South Central VA Health Care Network | 580 HOUSTON, TX | 580B30022 | 580B30033 | XR RAD | 1 | Yaseen.Golzarian@va.gov; Conrad.Lewis2@va.gov | 1/16/24 | 9am | VISN 16: South Central VA Health Care Network |
| VISN 5: VA Capitol Health Care Network | 581 HUNTINGTON, WV | 581B31009 | 581B31010 | XR RAD | 1 | gregory.fosson@va.gov | 1/8/24 | 10 AM ET | VISN 5: VA Capitol Health Care Network |
| VISN 10: VA Healthcare System of Ohio | 583 INDIANAPOLIS, IN | 583B30023 | 583B30028 | XR CATH LAB IR | 1 | Gregory.Apers@va.gov | 1/9/24 | 1:30 PM EST | VISN 10: VA Healthcare System of Ohio |
| VISN 16: South Central VA Health Care Network | 629 NEW ORLEANS, LA | 629B30001 | 629B30004 | XR RAD | 1 | Gavin.Bordelon@va.gov | 1/17/24 | 8am | VISN 16: South Central VA Health Care Network |
| VISN 16: South Central VA Health Care Network | 629 NEW ORLEANS, LA | 629B30002 | 629B30003 | XR RAD | 1 | Gavin.Bordelon@va.gov | 1/17/24 | 8am | VISN 16: South Central VA Health Care Network |
| VISN 6: VA Mid-Atlantic Health Care Network | 637 ASHEVILLE, NC | 637B39005 | 637B39014 | XR CATH LAB IR | 1 | sydney.lyda1@va.gov | 1/9/24 | 9am | VISN 6: VA Mid-Atlantic Health Care Network |
| VISN 6: VA Mid-Atlantic Health Care Network | 637 ASHEVILLE, NC | 637B39006 | 637B39015 | XR CATH LAB IR | 1 | sydney.lyda1@va.gov | 1/11/24 | 2pm | VISN 6: VA Mid-Atlantic Health Care Network |
| VISN 6: VA Mid-Atlantic Health Care Network | 637 ASHEVILLE, NC | 637B39007 | 637B39013 | XR RAD | 1 | sydney.lyda1@va.gov | 1/4/2024 1/5/2024 (Alternate) | 8am EST (Alternate) 8am EST (Alternate) | VISN 6: VA Mid-Atlantic Health Care Network |
| VISN 6: VA Mid-Atlantic Health Care Network | 637 ASHEVILLE, NC | 637B39008 | 637B39012 | XR RAD | 1 | sydney.lyda1@va.gov | 1/4/2024 1/5/2024 (Alternate) | 10am EST 10am EST | VISN 6: VA Mid-Atlantic Health Care Network |
| VISN 6: VA Mid-Atlantic Health Care Network | 637 ASHEVILLE, NC | 637B39009 | 637B39011 | XR RAD | 1 | sydney.lyda1@va.gov | 1/4/2024 1/5/2024 (Alternate) | 12pm EST 12pm EST | VISN 6: VA Mid-Atlantic Health Care Network |
| VISN 20: VA Northwest Network | 663 SEATTLE, WA | 663B32852 | 663B32854 | XR RAD | 1 | Cameron.Larks2@va.gov Justin.Collins2@va.gov | 1/12/24 | 8AM – 10AM PST | VISN 20: VA Northwest Network |
| VISN 8: VA Sunshine Healthcare Network | 672 SAN JUAN, PR | 672FC3007 | 672B3T012 | RT LINAC | 1 | Hiram.Lopez@va.gov | 1/16/24, 1/22/24 | 8am - 430pm AST | VISN 8: VA Sunshine Healthcare Network |
| VISN 8: VA Sunshine Healthcare Network | 672 SAN JUAN, PR | 672FC3012 | 672B3T014 | XR CT | 1 | Hiram.Lopez@va.gov | 1/16/24, 1/22/24 | 8sm - 430pm AST | VISN 8: VA Sunshine Healthcare Network |
| VISN 8: VA Sunshine Healthcare Network | 673 TAMPA, FL | 673B30059 | 673B30064 | RT LINAC | 1 | vinh.bui@va.gov | 1/4/2024 1/9/2024 (Alternate) | 9:00am 9:00am (Alternate) | VISN 8: VA Sunshine Healthcare Network |
| VISN 5: VA Capitol Health Care Network | 688 WASHINGTON, DC | 688B30033 | 688B30036 | XR RAD | 1 | jerry.greene@va.gov | 1/9/24 | 1 PM ET | VISN 5: VA Capitol Health Care Network |
| VISN 5: VA Capitol Health Care Network | 688 WASHINGTON DC | 688B30034 | 688B30037 | XR CT | 1 | elhadji.faye@va.gov | 1/9/24 | 1 PM ET | VISN 5: VA Capitol Health Care Network |
| VISN 1: VA New England Healthcare System | 689 WEST HAVEN, CT | 689B31027 | 689B32001 | XR RAD | 1 | cornelius.finnegan@va.gov | 1/9/24 | 8am – 1pm | VISN 1: VA New England Healthcare System |
| VISN 1: VA New England Healthcare System | 689 WEST HAVEN, CT | 689B31028 | 689B32002 | NM SPECT | 1 | leon.qubick@va.gov | 1/8/24 | 8am – 12pm | VISN 1: VA New England Healthcare System |
| VISN 12: VA Great Lakes Health Care System | 695 GREEN BAY, WI | 695B38027 | 695B38033 | XR CT | 1 | Joseph.Junemann@va.gov | 1/17/2024 1/18/2024 (Alternate) | 10:00am – 12:00pm 10:00am – 12:00pm (Alternate) | VISN 12: VA Great Lakes Health Care System |
QA
| Sort | VISN # | VISN | Station | Equipment Requisition Number | Turnkey Requisition Number | Equipment Questions | Turnkey Questions | GOVT Equipment Response | GOVT Turnkey Response |
| VA NAC HTME | VA NAC HTME | Can you please provide a fillable version of the VA Directive 6550 _ New Appendix A _ published Jun. 2023 | Added a fillable word document. | ||||||
| VA NAC HTME | VA NAC HTME | Should Optional items be included on the Vendor Workup? If so, should it show a zero $ value? | Only provide the items that are on the quote. If additional optional options are available and selected, then they can be added and accounted for later. | ||||||
| VA NAC HTME | VA NAC HTME | Can additional spaces be provided for Trade-in information on the vendor workup, there are occassionally more than 4 trade-ins for a PO requirement | We can work on adding a few more line items for trade ins in the future consolidations. | ||||||
| VA NAC HTME | VA NAC HTME | Will updated Instructions to Offerors be provided to include information on whether there should be a separate equipment and turnkey quote provided, naming convention for the turnkey quote and what PO# is referenced, as well as additional instructions on the vendor workup that includes a turnkey tab? | |||||||
| We are always working on updating and making things more efficient. We will be looking into the RFO Instructions and seeing ways to improve it and implement things to help. As of not submitting the turnkey SOW/quote in one separate document will be fine, but make sure that the labeling is for the equipment PO. These are sorted and pulled, so they need to all be labeled the same. At the end of the file name make the equipment quote EQ Quote and the turnkey quote TKY Quote. | |||||||||
| VA NAC HTME | VA NAC HTME | Could examples of what the turnkey quote/sow/sov should look like be provided? | Turnkey SOW/Quotes should be done as they have been in the past, however, have them in a separate file and make sure that the labeling is for the equipment PO. At the end of the file name make the equipment quote EQ Quote and the turnkey quote TKY Quote. | ||||||
| VA NAC HTME | VA NAC HTME | Would it be possible for the VA NAC to provide feedback on the first Turnkey Consolidation submission, so that Vendors know what was done correctly or needs to be worked on? Specifically in regards to the turnkey SOW, turnkey quote | We are still working through May 2023's Consolidation which was the first one. With that one and this one going on, we will work on any improvements that are needed to be changed or what works well and will pass the information along in the future with industry. | ||||||
| VA NAC HTME | VA NAC HTME | Setion7.1.3 references the SOW CSI format template provided with the RFO, can you please provide the template or an example? | Turnkey SOW/Quotes should be done as they have been in the past. The SOW CSI will be looked to add in upcoming TKY consolidations. | ||||||
| VA NAC HTME | VA NAC HTME | Can you please advise and provide an example of how the "Completed Schedule" should be done for the Turnkey Consolidation? Should we add 3 columns to the schedule? One for equip quote total, one for turnkey quote total and one for combined total value? | The vendor workup spreadsheet has everything broken down for euipment and for turnkey. Just fill it in and it will fill out everything accordingly. | ||||||
| VA NAC HTME | VA NAC HTME | Should Schedule of Values and Statement of Work be combined into one file to create the Turnkey quote? | Yes, make this one document, SOW and then Quote. Make sure it is labeled using the equipment PO and not turnkey. At the end of the file name make the equipment quote EQ Quote and the turnkey quote TKY Quote. | ||||||
| ERROR:#N/A | ERROR:#N/A | 523B31047 | 1. Please provide a specification including location, type, manufacturer, etc. for Seamless flooring, Casework and Countertops, Lighting, Acoustical Ceilings Grid and Tile | Yes finishes need replacement - |
New flooring - sheet welded flooring in all suite rooms (Scan, Control & Equipment) with 6" integral cove base. Mohawk Medella Main Floor/Base Color: 717 Cotton Accent Color (Under Machine): 649 Blue Sage New ceiling grid - Armstrong Prelude XL Suspension Grid & Ultima High NRC Tiles New HVAC Diffusers and grills - match existing or provide an acceptable equivalent New lights - 2x2 Lithonia Lighting Fixture (2BLT2 33L ADP EZ1 LP835 BAA) Paint - apply paint in three (3) coats; prime, body, and finish.
General Wall & Door Frame Color: Benjamin Moore OC-131 White Down Accent Wall Color(s): Benjamin Moore 480 Lily Pad Interior designer will pick the accent wall.
New Casework:Midmark Casework Synthesis - New casework to match existing layout Exterior: Flax Interior: Pebble Grey Solid Surface Countertop: Corian Linen with integral backsplash.
Vendor to compliy with all Infection Control Measures of Medical Center.
| ERROR:#N/A | ERROR:#N/A | 523B31047 | 523B32018 | 1. | Regarding this obligation, please provide any preferences including location, type and manufacturer for the following: | ||
| • | Seamless flooring | ||||||
| • | Casework and Countertops. | ||||||
| • | Lighting | ||||||
| • | Acoustical Ceilings Grid and Tile | ||||||
| 2. | Please provide the location of the main electrical distribution panel feeding the room. | ||||||
| 3. | Sufficeint information not available from site walk. Please provide structural, electrical, and HVAC as-built drawings. | Yes finishes need replacement - |
New flooring - sheet welded flooring in all suite rooms (Scan, Control & Equipment) with 6" integral cove base. Mohawk Medella Main Floor/Base Color: 717 Cotton Accent Color (Under Machine): 649 Blue Sage New ceiling grid - Armstrong Prelude XL Suspension Grid & Ultima High NRC Tiles New HVAC Diffusers and grills - match existing or provide an acceptable equivalent New lights - 2x2 Lithonia Lighting Fixture (2BLT2 33L ADP EZ1 LP835 BAA) Paint - apply paint in three (3) coats; prime, body, and finish.
General Wall & Door Frame Color: Benjamin Moore OC-131 White Down Accent Wall Color(s): Benjamin Moore 480 Lily Pad Interior designer will pick the accent wall.
New Casework:Midmark Casework Synthesis - New casework to match existing layout Exterior: Flax Interior: Pebble Grey Solid Surface Countertop: Corian Linen with integral backsplash.
Electrical Panel - The Disconnect is in the room. That panel is fed from panel HDPX in room GC-101. Drawings - Attached, Labeled as ED X-Ray Vendor to compliy with all Infection Control Measures of Medical Center.
| ERROR:#N/A | ERROR:#N/A | 523B31047 | 2. Provide the location of the main electrical distribution panel. | Electrical Panel - The Disconnect is in the room. That panel is fed from panel HDPX in room GC-101. |
| ERROR:#N/A | ERROR:#N/A | 523B31047 | 3. Provide structural, electrical, and HVAC as-built drawings. | Drawings - Attached, Filenames begin with "523B31047_ 523B32018_X-Ray" |
| ERROR:#N/A | ERROR:#N/A | 523B31047 | Are we Changing the ceiling in the room? |
If the new imaging system doesn’t require modifying the ceiling, do you want any or all the ceiling grid and/or panels replaced?
Do you want existing lighting to be replaced with new LED lighting?
Do you need any additional lighting than what currently exists?
Existing flooring replaced?
Exam and Control room or just Exam room? If so, do you want?
Heat welded seamless sheet vinyl or LVT?
4” or 6” rubber base or flash cove If source panel for lineside feeder was not identified during walkthrough, can you please provide location, distance, name of panel, etc.?
Are we figuring for a countertop along the right wall as you enter the room where the 2 desk workstations are?
Are we replacing the cabinets and the unit where the sink currently is?
Can you please provide a recent T&B (test and balance) report?
If the proposed imaging system does not require additional AC, do you need HVAC unit(s) replaced due to age or not functioning?
Are we replacing the cabinets and the unit where the sink currently is?
Are we figuring for a countertop along the right wall as you enter the room where the 2 desk workstations are?
Is there any shielding upgrades and requirements?
Will there be in work in the restroom?
Will the control area wall remain or replaced Yes finishes need replacement - New flooring - sheet welded flooring in all suite rooms (Scan, Control & Equipment) with 6" integral cove base. Mohawk Medella Main Floor/Base Color: 717 Cotton Accent Color (Under Machine): 649 Blue Sage New ceiling grid - Armstrong Prelude XL Suspension Grid & Ultima High NRC Tiles New HVAC Diffusers and grills - match existing or provide an acceptable equivalent New lights - 2x2 Lithonia Lighting Fixture (2BLT2 33L ADP EZ1 LP835 BAA) Paint - apply paint in three (3) coats; prime, body, and finish.
General Wall & Door Frame Color: Benjamin Moore OC-131 White Down Accent Wall Color(s): Benjamin Moore 480 Lily Pad Interior designer will pick the accent wall.
New Casework:Midmark Casework Synthesis - New casework to match existing layout Exterior: Flax Interior: Pebble Grey Solid Surface Countertop: Corian Linen with integral backsplash.
Restroom - Replace all fixtures. Currently the toilet is out of compliance. It will need to be brought up tostandards Control Area wall - Replace Are we replacing the cabinets and the unit where the sink currently is? Yes Are we figuring for a countertop along the right wall as you enter the room where the 2 desk workstations are? Yes Electrical Panel - The Disconnect is in the room. That panel is fed from panel HDPX in room GC-101. HVAC Syatem - Vendor to complete initial TAB report to determine existing conditions on current cooling capability. Vendor to review and determine if additional cooling is needed for their respective proposed systems. Existing equipment is Philips Digital Diagnost, no T&B report available.
New countertop area to include new lead lined window to match existing layout. Countertop to be solid surface Corian Linen Current walls are lead lined to meeting existing system requirements.
If new system to be installed requires higher rating, the contractor will need to address the lead lined walls accordingly. VA will complete a physicist report at the end to ensure compliance.
Current door is lead lined to meeting existing system requirements. If new system to be installed requires higher rating, the contractor will need to address the lead lined door accordingly. VA will complete a physicist report at the end to ensure compliance.
Plan to have demolition off hours in order to avoid any noise, vibration issues for other scan room.
Vendor to compliy with all Infection Control Measures of Medical Center.
| ERROR:#N/A | ERROR:#N/A | 523B31047 | 523B32018 | West Rox Technical Spec (523B31047) | |||
| 1) | Would the facility like to add a 2nd detector to the requirements? The description states this is an upright room; if the intention is for chest only exams, should the table and associated accessories be removed? | ||||||
| 2) | No detail on generator is specified; would an 80kw generator be acceptable? | ||||||
| 3) | Would the facility consider assigning Added Value requirements for items such as extended warranty? | General Construction Question: |
1) Exam room flooring - would facility prefer seamless vinyl or VCT?
2) Would the facility prefer new countertops? If yes, what material?
3) Paint - would the facility like this included in SOW?
4) Are Architectural and Engineering Drawings required for this project?
1) The intent is an upright room for chest only exams. Table and accessories should not be included. Removed 2e Table holder for wireless detector from the Tech spec
2) Added Minimum generator output power of 80 [kW] to the Tech Spec
3) Additional year(s) of warranty is already included in the Tech Spec under Added Value Yes finishes need replacement - New flooring - sheet welded flooring in all suite rooms (Scan, Control & Equipment) with 6" integral cove base. Mohawk Medella Main Floor/Base Color: 717 Cotton Accent Color (Under Machine): 649 Blue Sage New ceiling grid - Armstrong Prelude XL Suspension Grid & Ultima High NRC Tiles New HVAC Diffusers and grills - match existing or provide an acceptable equivalent New lights - 2x2 Lithonia Lighting Fixture (2BLT2 33L ADP EZ1 LP835 BAA) Paint - apply paint in three (3) coats; prime, body, and finish.
General Wall & Door Frame Color: Benjamin Moore OC-131 White Down Accent Wall Color(s): Benjamin Moore 480 Lily Pad Interior designer will pick the accent wall.
New Casework:Midmark Casework Synthesis - New casework to match existing layout Exterior: Flax Interior: Pebble Grey Solid Surface Countertop: Corian Linen with integral backsplash.
A&E not required - submittals on materials to be reviewed by COR. As-builts of layout to be provided by vendor at completion of project, if applicable.
Vendor to comply with all Infection Control Measures of Medical Center.
| ERROR:#N/A | ERROR:#N/A | 523B31047 | 523B32018 | Would you please send us the CAD drawings? | All additional drawings available have been added. Most of these drawings are too large to add which causes several issues in posting these. That is why we provide the drawings that we can. | ||
| ERROR:#N/A | ERROR:#N/A | 523B31047 | The project overview references a table, but the Technical Requirements only list a Wall Detector. Are you looking for an Upright Stand only or do we need to include a mobile table with motorized height adjustment to be included in the configuration? | The intent is an upright stand room only for chest only exams. Table and accessories should not be included. Removed "table" from the Requirement Overview section of the Tech Spec. Removed 2e Table holder for wireless detector from the Tech Spec | |||
| ERROR:#N/A | ERROR:#N/A | 523B31048 | 1. Please provide a specification including location, type, manufacturer, etc. for Seamless flooring, Casework and Countertops, Lighting, Acoustical Ceilings Grid and Tile | Yes finishes need replacement - |
New flooring - sheet welded flooring in all suite rooms (Scan, Control & Equipment) with 6" integral cove base. Mohawk Medella Main Floor/Base Color: 717 Cotton Accent Color (Under Machine): 549 Slate New ceiling grid - Armstrong Prelude XL Suspension Grid & Ultima High NRC Tiles New HVAC Diffusers and grills - match existing or provide an acceptable equivalent New lights - 2x2 Lithonia Lighting Fixture (2BLT2 33L ADP EZ1 LP835 BAA) Paint - apply paint in three (3) coats; prime, body, and finish: Sherwin Williams & Benjamin Moore General Wall & Door Frame Color: Benjamin Moore OC-131 White Down Accent Wall Color(s): Sherwin Williams SW6220 Interesting Aqua Interior designer will pick the accent wall.
New Casework:Midmark Casework Synthesis - New casework to match existing layout Exterior: Flax Interior: Pebble Grey Solid Surface Countertop: Corian Linen with integral backsplash.
Vendor to compliy with all Infection Control Measures of Medical Center.
| ERROR:#N/A | ERROR:#N/A | 523B31048 | 523B32019 | 1. | Regarding this obligation, please provide any preferences including location, type and manufacturer for the following: | ||
| • | Seamless flooring | ||||||
| • | Casework and Countertops. | ||||||
| • | Lighting | ||||||
| • | Acoustical Ceilings Grid and Tile | ||||||
| 2. | Please provide the location of the main electrical distribution panel feeding the room. | ||||||
| 3. | Sufficeint information not available from site walk. Please provide structural, electrical, and HVAC as-built drawings. | Yes finishes need replacement - |
New flooring - sheet welded flooring in all suite rooms (Scan, Control & Equipment) with 6" integral cove base. Mohawk Medella Main Floor/Base Color: 717 Cotton Accent Color (Under Machine): 549 Slate New ceiling grid - Armstrong Prelude XL Suspension Grid & Ultima High NRC Tiles New HVAC Diffusers and grills - match existing or provide an acceptable equivalent New lights - 2x2 Lithonia Lighting Fixture (2BLT2 33L ADP EZ1 LP835 BAA) Paint - apply paint in three (3) coats; prime, body, and finish.
Sherwin Williams & Benjamin Moore General Wall & Door Frame Color: Benjamin Moore OC-131 White Down Accent Wall Color(s): Sherwin Williams SW6220 Interesting Aqua Interior designer will pick the accent wall.
New Casework:Midmark Casework Synthesis - New casework to match existing layout Exterior: Flax Interior: Pebble Grey Solid Surface Countertop: Corian Linen with integral backsplash.
Electrical Panel - The Disconnect is in the room. That panel is fed from panel DX Circut # 5 which located at the end of the hallway C1-2 by room 1B-109.which is the same hallway as room 1B117 is on..
Plan to have demolition off hours in order to avoid any noise, vibration issues for other scan room.
Vendor to compliy with all Infection Control Measures of Medical Center.
| ERROR:#N/A | ERROR:#N/A | 523B31048 | 2. Provide the location of the main electrical distribution panel. | Electrical Panel - The Disconnect is in the room. That panel is fed from panel HDPX in room GC-101. |
| ERROR:#N/A | ERROR:#N/A | 523B31048 | 3. Provide structural, electrical, and HVAC as-built drawings. | PDF Drawings - Attached, File Name starts with "523B31048_523B32019_RF X-Ray" |
| ERROR:#N/A | ERROR:#N/A | 523B31048 | Are we Changing the ceiling in the room? |
If the new imaging system doesn’t require modifying the ceiling, do you want any or all the ceiling grid and/or panels replaced?
Do you want existing lighting to be replaced with new LED lighting?
Do you need any additional lighting than what currently exists?
Existing flooring replaced?
Exam and Control room or just Exam room? If so, do you want?
Heat welded seamless sheet vinyl or LVT?
4” or 6” rubber base or flash cove If source panel for lineside feeder was not identified during walkthrough, can you please provide location, distance, name of panel, etc.?
Are we figuring for a countertop along the right wall as you enter the room where the 2 desk workstations are?
Are we replacing the cabinets and the unit where the sink currently is?
Can you please provide a recent T&B (test and balance) report?
If the proposed imaging system does not require additional AC, do you need HVAC unit(s) replaced due to age or not functioning?
Are we replacing the cabinets and the unit where the sink currently is?
Are we figuring for a countertop along the right wall as you enter the room where the 2 desk workstations are?
Is there any shielding upgrades and requirements? Yes finishes need replacement - New flooring - sheet welded flooring in all suite rooms (Scan, Control & Equipment) with 6" integral cove base. Mohawk Medella Main Floor/Base Color: 717 Cotton Accent Color (Under Machine): 549 Slate New ceiling grid - Armstrong Prelude XL Suspension Grid & Ultima High NRC Tiles New HVAC Diffusers and grills - match existing or provide an acceptable equivalent New lights - 2x2 Lithonia Lighting Fixture (2BLT2 33L ADP EZ1 LP835 BAA) Paint - apply paint in three (3) coats; prime, body, and finish. :
Sherwin Williams & Benjamin Moore General Wall & Door Frame Color: Benjamin Moore OC-131 White Down Accent Wall Color(s): Sherwin Williams SW6220 Interesting Aqua Interior designer will pick the accent wall.
New Casework:Midmark Casework Synthesis - New casework to match existing layout Exterior: Flax Interior: Pebble Grey Solid Surface Countertop: Corian Linen with integral backsplash.
Are we replacing the cabinets and the unit where the sink currently is? Yes Are we figuring for a countertop along the right wall as you enter the room where the 2 desk workstations are? Yes Current walls are lead lined to meeting existing system requirements. If new system to be installed requires higher rating, the contractor will need to address the lead lined walls accordingly. VA will complete a physicist report at the end to ensure compliance.
Electrical Panel - The Disconnect is in the room. That panel is fed from panel DX Circut # 5 which located at the end of the hallway C1-2 by room 1B-109.which is the same hallway as room 1B117 is on.. HVAC System - Vendor to review and determine if additional cooling is needed for their respective proposed systems.Vendor to complete initial TAB report to determine existing conditions on current cooling capability. Existing equipment is Philips Digital Diagnost, no T&B reports available.
Current door is lead lined to meeting existing system requirements. If new system to be installed requires higher rating, the contractor will need to address the lead lined door accordingly. VA will complete a physicist report at the end to ensure compliance.
Plan to have demolition off hours in order to avoid any noise, vibration issues for other scan room.
Vendor to compliy with all Infection Control Measures of Medical Center.
| ERROR:#N/A | ERROR:#N/A | 523B31048 | 523B32019 | 1) | Would the facility like to add a 2nd detector to the requirements? | |||
| 2) | The overall requirement seems to favor a traditional pullover tower style room – would the facility consider a remote style R&F solution? | General Construction Question: |
1) Exam room flooring - would facility prefer seamless vinyl or VCT?
2) Would the facility prefer new countertops? If yes, what material?
3) Paint - would the facility like this included in SOW?
| 4) Are Architectural and Engineering Drawings required for this project? | 1) Two wireless detectors are required - one each for the wall and the table. Tech Spec updated to clarify this. |
| 2) No, a traditional pullover tower style is required. | Yes finishes need replacement - |
New flooring - sheet welded flooring in all suite rooms (Scan, Control & Equipment) with 6" integral cove base. Mohawk Medella Main Floor/Base Color: 717 Cotton Accent Color (Under Machine): 549 Slate New ceiling grid - Armstrong Prelude XL Suspension Grid & Ultima High NRC Tiles New HVAC Diffusers and grills - match existing or provide an acceptable equivalent New lights - 2x2 Lithonia Lighting Fixture (2BLT2 33L ADP EZ1 LP835 BAA) Paint - apply paint in three (3) coats; prime, body, and finish. :
Sherwin Williams & Benjamin Moore General Wall & Door Frame Color: Benjamin Moore OC-131 White Down Accent Wall Color(s): Sherwin Williams SW6220 Interesting Aqua Interior designer will pick the accent wall.
New Casework:Midmark Casework Synthesis - New casework to match existing layout Exterior: Flax Interior: Pebble Grey Solid Surface Countertop: Corian Linen with integral backsplash.
Plan to have demolition off hours in order to avoid any noise, vibration issues for other scan room.
Vendor to compliy with all Infection Control Measures of Medical Center.
| ERROR:#N/A | ERROR:#N/A | 523B31048 | Will you accept a Remote RF Room. Our system gives clinican the ability to work in the room or in the technologist control room. | |||
| Q1 - 3j. Proposing remote RF room. Respectfully request a roll-away shielding device be acceptable for removing lead shielding when not needed? Q2 - 3.o. The Remote system offers protocol-based movement, but respectfully request that the Tube Crane offers auto-tracking, but protocol movement is not required. 5a. Respectfully request changing the minimum patient table load capacity to 584lbs from 600lbs. | Q3. Is Room GA-113, Bldg 3, built on a cement slab or is there a floor beneath it? If it is open, is it full height or a crawl space? | No, a Traditional pullover tower styleis is required. |
Q1-3j. Roll-away shielding device not acceptable for removing lead shielding when not needed.
Q2 - 3.o Automatic tube crane, protocol-based movement is required.
| 5a. Minimum patient table load capacity changed to 580lbs in Tech Spec | Slab | ||||||
| ERROR:#N/A | ERROR:#N/A | 523B31048 | 523B32019 | Would you please send us the CAD drawings? | All additional drawings available have been added. Most of these drawings are too large to add which causes several issues in posting these. That is why we provide the drawings that we can. | ||
| ERROR:#N/A | ERROR:#N/A | 523B31049 | 1. Please provide a specification including location, type, manufacturer, etc. for Seamless flooring, Casework and Countertops, Lighting, Acoustical Ceilings Grid and Tile | 1. | |||
| • | Seamless Flooring – 540SF / 60SY Mohawk Group; Juniperus II 6Ft06In – C2059/ Copper Mine 358 |
Healthy Environments Heterogeneous Resilient Sheet
| • | Casework and Countertops – Casework; Wilsonart Plastic Laminate Casework with locks & Corian countertop |
| • | Lighting – Replace lighting with LED fixtures to replace all existing lighting fixtures. |
| • | Acoustical Ceiling Grid and Tile – Grid; Armstrong Prelude XL 15/16” or Suprafine 9/16” |
Tile; Armstrong Health Zone/Ultima 1935
| ERROR:#N/A | ERROR:#N/A | 523B31049 | 523B32020 | 1. | Regarding this obligation, please provide any preferences including location, type and manufacturer for the following: | ||
| • | Seamless flooring | ||||||
| • | Casework and Countertops. | ||||||
| • | Lighting | ||||||
| • | Acoustical Ceilings Grid and Tile | ||||||
| 2. | Please provide the location of the main electrical distribution panel feeding the room. | ||||||
| 3. | Sufficeint information not available from site walk. Please provide structural, electrical, and HVAC as-built drawings. |
1.
• Seamless Flooring – 540SF / 60SY Mohawk Group; Juniperus II 6Ft06In – C2059/ Copper Mine 358 Healthy Environments Heterogeneous Resilient Sheet
| • | Casework and Countertops – Casework; Wilsonart Plastic Laminate Casework with locks & Corian countertop |
| • | Lighting – Replace lighting with LED fixtures to replace all existing lighting fixtures. |
| • | Acoustical Ceiling Grid and Tile – Grid; Armstrong Prelude XL 15/16” or Suprafine 9/16” |
Tile; Armstrong Health Zone/Ultima 1935
2. On hallway outside room about 85 feet away
3. Official government drawings will only be provided after award.
| ERROR:#N/A | ERROR:#N/A | 523B31049 | 2. Provide the location of the main electrical distribution panel. | 2. On hallway outside room about 85 feet away, provide new 70-amp disco, New 277/480 3ph circuit breaker panel for all new equipment. All new conduits and wires. |
| ERROR:#N/A | ERROR:#N/A | 523B31049 | 3. Provide structural, electrical, and HVAC as-built drawings. | 3. Official government drawings will only be provided after award. |
| ERROR:#N/A | ERROR:#N/A | 523B31049 | Are we Changing the ceiling in the room? |
If the new imaging system doesn’t require modifying the ceiling, do you want any or all the ceiling grid and/or panels replaced?
Do you want existing lighting to be replaced with new LED lighting?
Do you need any additional lighting than what currently exists?
Existing flooring replaced?
Exam and Control room or just Exam room? If so, do you want?
Heat welded seamless sheet vinyl or LVT?
4” or 6” rubber base or flash cove If source panel for lineside feeder was not identified during walkthrough, can you please provide location, distance, name of panel, etc.?
Are we figuring for a countertop along the right wall as you enter the room where the 2 desk workstations are?
Are we replacing the cabinets and the unit where the sink currently is?
Can you please provide a recent T&B (test and balance) report?
If the proposed imaging system does not require additional AC, do you need HVAC unit(s) replaced due to age or not functioning?
Are we replacing the cabinets and the unit where the sink currently is?
Are we figuring for a countertop along the right wall as you enter the room where the 2 desk workstations are?
Is there any shielding upgrades and requirements?
| a. | Yes, New ceiling tiles and Hoyer Lift |
| b. | Yes, all ceiling system to be replace. All new Acoustical Ceiling Grid and Tile – Grid; Armstrong Prelude XL 15/16” or Suprafine 9/16” Tile; Armstrong Health Zone/Ultima 1935 |
| c. | Yes, Replace all lighting fixtures with LED fixtures. |
| d. | All needed lighting fixtures must be accounted to the necessities of the new equipment and usage of the room. |
| e. | Yes, Seamless Flooring – 540SF / 60SY Mohawk Group; Juniperus II 6Ft06In – C2059/ Copper Mine 358 Healthy Environments Heterogeneous Resilient Sheet. 550 sqft approx. |
| f. | X-Ray Exam room, X-Ray changing room, and X-Ray Control Room, with Heat welded seamless sheet vinyl, account for 550 sqft approx. |
| g. | 6” rubber base in all areas of new flooring, (X-Ray Exam room, X-Ray changing room, and X-Ray Control Room). |
i. Yes, casework and countertops – Casework; Wilsonart Plastic Laminate Casework with locks & Corian countertop, account for 24’ of linear cabinetry including lockable base, wall units with adjustable shelves, drawers, sinks, faucets, plumbing connections and incline security panel for plumbing, final colors TBD by VA.
j. Yes, casework and countertops – Casework; Wilsonart Plastic Laminate Casework with locks & Corian countertop, account for 24’ of linear cabinetry including lockable base, wall units with adjustable shelves, drawers, sinks, faucets, plumbing connections and incline security panel for plumbing, final colors TBD by VA.
k. No recent T&B available, new test and balance report to be produced and provided, to ensure optimal performance of equipment.
l. Vendor to complete initial TAB report to determine existing conditions on current cooling capability. Vendor to review and determine if additional cooling is needed for their respective proposed systems. Existing Rad/Fluoro equipment is Philips EASYDIAGNOST ELEVA. No T&B report available. Existing HVAC unit model Trane BCHC036G2D0A3N04J00000B01, 3 ph, 460 Volts, blower motor 1.8 FLA 1HPmax RPM 1800.
m.Current walls are lead lined to meeting existing system requirements. If new system to be installed requires higher rating, the contractor will need to address the lead lined walls accordingly. VA will complete a physicist report at the end to ensure compliance.
Current door is lead lined to meeting existing system requirements. If new system to be installed requires higher rating, the contractor will need to address the lead lined door accordingly. VA will complete a physicist report at the end to ensure compliance.
ERROR:#N/A ERROR:#N/A 523B31049 523B32020 Technical Specs
| 1) | 1b) Please change to a fixed detector to maximize competition | |
| 2) | The overall requirement seems to favor a traditional pullover tower style room – would the facility consider a remote style R&F solution? | General Construction Question: |
1) Exam room flooring - would facility prefer seamless vinyl or VCT?
2) Would the facility prefer new countertops? If yes, what material?
3) Paint - would the facility like this included in SOW?
| 4) Are Architectural and Engineering Drawings required for this project? | 1) | 1b) No, two wireless detectors are required - one each for the wall and the table. Tech Spec updated to clarify this. |
| 2) No, a traditional pullover tower style is required. | 1) Seamless vinyl flooring |
2) Yes, new countertops in Solid Surface
3) Yes, include paint in SOW
4) Architectural and Engineering Drawings are required
| ERROR:#N/A | ERROR:#N/A | 523B31049 | 523B32020 | Would you please send us the CAD drawings? | All additional drawings available have been added. Most of these drawings are too large to add which causes several issues in posting these. That is why we provide the drawings that we can. | ||||
| ERROR:#N/A | ERROR:#N/A | 689B31027 | 1. Please provide a specification including location, type, manufacturer, etc. for Seamless flooring, Casework and Countertops, Lighting, Acoustical Ceilings Grid and Tile | • | Rooms will need an uplift to include updated flooring, ceilings, lighting, casework, etc. but must stay within allocated turnkey budget. | ||||
| • | Please refer to Imaging Service Design Guide from TIL for any and all construction and design questions if below information is not sufficient for bid. | ||||||||
| • | Any requested drawings or reports can’t be provided per NAC-HTME | ||||||||
| • | Location of main electrical distribution panel feeding the room | ||||||||
| o | ED X-ray Room | ||||||||
| RM 1187 (60 AMP Breaker) | |||||||||
| • | Drawings | ||||||||
| o | Please provide A/E drawings for equipment layout, electrical, casework, lighting, plumbing, etc. | ||||||||
| • | Seamless Flooring | ||||||||
| o | RSF (Rubber Resilient Sheet) | ||||||||
| Noraplan | |||||||||
| Series: Sentica | |||||||||
| Color: (Match adjacent room) | |||||||||
| Base: Integral Cove | |||||||||
| Welding: TBD | |||||||||
| • | Casework and Countertops | ||||||||
| o | Midmark Synthesis Casework | ||||||||
| o | Handle: Edge | ||||||||
| o | Style: Transcend | ||||||||
| o | Countertop: Corian – Linen | ||||||||
| o | Laminate: TBD | ||||||||
| • | Lighting | ||||||||
| o | Please refer to Imaging Services Design Guide and Lighting Design Manuel section 4.2.5 for lighting design consideration | ||||||||
| o | Prefer LED Lighting | ||||||||
| • | Acoustical Ceilings, Grid, and Tile | ||||||||
| o | Armstrong | ||||||||
| o | Series: Ultima Health Zone High NRC | ||||||||
| o | Models: 1445 (24x24) / 1448 (24x48) (Square Lay-in) | ||||||||
| o | Coordination: Armstrong Prelude XL 15/16” – White | ||||||||
| o | Need to include site prep for ceiling lift install by third party | ||||||||
| • | HVAC | ||||||||
| o | T&B report will be provided post-award | ||||||||
| o | HVAC work related to equipment functionality | ||||||||
| • | Painting | ||||||||
| o | Colors to match adjacent rooms | ||||||||
| o | Interior Paint Color Palette will be provided | ||||||||
| ERROR:#N/A | ERROR:#N/A | 689B31027 | 689B32001 | 1. | Regarding this obligation, please provide any preferences including location, type and manufacturer for the following: | ||||
| • | Seamless flooring | ||||||||
| • | Casework and Countertops. | ||||||||
| • | Lighting | ||||||||
| • | Acoustical Ceilings Grid and Tile | ||||||||
| 2. | Please provide the location of the main electrical distribution panel feeding the room. | ||||||||
| 3. | Sufficeint information not available from site walk. Please provide structural, electrical, and HVAC as-built drawings. | • | Rooms will need an uplift to include updated flooring, ceilings, lighting, casework, etc. but must stay within allocated turnkey budget. | ||||||
| • | Please refer to Imaging Service Design Guide from TIL for any and all construction and design questions if below information is not sufficient for bid. | ||||||||
| • | Any requested drawings or reports can’t be provided per NAC-HTME | ||||||||
| • | Location of main electrical distribution panel feeding the room | ||||||||
| o | ED X-ray Room | ||||||||
| RM 1187 (60 AMP Breaker) | |||||||||
| • | Drawings | ||||||||
| o | Please provide A/E drawings for equipment layout, electrical, casework, lighting, plumbing, etc. | ||||||||
| • | Seamless Flooring | ||||||||
| o | RSF (Rubber Resilient Sheet) | ||||||||
| Noraplan | |||||||||
| Series: Sentica | |||||||||
| Color: (Match adjacent room) | |||||||||
| Base: Integral Cove | |||||||||
| Welding: TBD | |||||||||
| • | Casework and Countertops | ||||||||
| o | Midmark Synthesis Casework | ||||||||
| o | Handle: Edge | ||||||||
| o | Style: Transcend | ||||||||
| o | Countertop: Corian – Linen | ||||||||
| o | Laminate: TBD | ||||||||
| • | Lighting | ||||||||
| o | Please refer to Imaging Services Design Guide and Lighting Design Manuel section 4.2.5 for lighting design consideration | ||||||||
| o | Prefer LED Lighting | ||||||||
| • | Acoustical Ceilings, Grid, and Tile | ||||||||
| o | Armstrong | ||||||||
| o | Series: Ultima Health Zone High NRC | ||||||||
| o | Models: 1445 (24x24) / 1448 (24x48) (Square Lay-in) | ||||||||
| o | Coordination: Armstrong Prelude XL 15/16” – White | ||||||||
| o | Need to include site prep for ceiling lift install by third party | ||||||||
| • | HVAC | ||||||||
| o | T&B report will be provided post-award | ||||||||
| o | HVAC work related to equipment functionality | ||||||||
| • | Painting | ||||||||
| o | Colors to match adjacent rooms | ||||||||
| o | Interior Paint Color Palette will be provided | ||||||||
| ERROR:#N/A | ERROR:#N/A | 689B31027 | 2. Provide the location of the main electrical distribution panel. | ||||||
| • | Location of main electrical distribution panel feeding the room | ||||||||
| o | ED X-ray Room | ||||||||
| RM 1187 (60 AMP Breaker) |
| ERROR:#N/A | ERROR:#N/A | 689B31027 | 3. Provide structural, electrical, and HVAC as-built drawings. | All additional drawings available have been added. Most of these drawings are too large to add which causes several issues in posting these. That is why we provide the drawings that we can. |
| ERROR:#N/A | ERROR:#N/A | 689B31027 | Are we Changing the ceiling in the room? |
If the new imaging system doesn’t require modifying the ceiling, do you want any or all the ceiling grid and/or panels replaced?
Do you want existing lighting to be replaced with new LED lighting?
Do you need any additional lighting than what currently exists?
Existing flooring replaced?
Exam and Control room or just Exam room? If so, do you want?
Heat welded seamless sheet vinyl or LVT?
4” or 6” rubber base or flash cove If source panel for lineside feeder was not identified during walkthrough, can you please provide location, distance, name of panel, etc.?
Are we figuring for a countertop along the right wall as you enter the room where the 2 desk workstations are?
Are we replacing the cabinets and the unit where the sink currently is?
Can you please provide a recent T&B (test and balance) report?
| If the proposed imaging system does not require additional AC, do you need HVAC unit(s) replaced due to age or not functioning? | • | Rooms will need an uplift to include updated flooring, ceilings, lighting, casework, etc. but must stay within allocated turnkey budget. | |||||
| • | Please refer to Imaging Service Design Guide from TIL for any and all construction and design questions if below information is not sufficient for bid. | ||||||
| • | Any requested drawings or reports can’t be provided per NAC-HTME | ||||||
| • | Location of main electrical distribution panel feeding the room | ||||||
| o | ED X-ray Room | ||||||
| RM 1187 (60 AMP Breaker) | |||||||
| • | Drawings | ||||||
| o | Please provide A/E drawings for equipment layout, electrical, casework, lighting, plumbing, etc. | ||||||
| • | Seamless Flooring | ||||||
| o | RSF (Rubber Resilient Sheet) | ||||||
| Noraplan | |||||||
| Series: Sentica | |||||||
| Color: (Match adjacent room) | |||||||
| Base: Integral Cove | |||||||
| Welding: TBD | |||||||
| • | Casework and Countertops | ||||||
| o | Midmark Synthesis Casework | ||||||
| o | Handle: Edge | ||||||
| o | Style: Transcend | ||||||
| o | Countertop: Corian – Linen | ||||||
| o | Laminate: TBD | ||||||
| • | Lighting | ||||||
| o | Please refer to Imaging Services Design Guide and Lighting Design Manuel section 4.2.5 for lighting design consideration | ||||||
| o | Prefer LED Lighting | ||||||
| • | Acoustical Ceilings, Grid, and Tile | ||||||
| o | Armstrong | ||||||
| o | Series: Ultima Health Zone High NRC | ||||||
| o | Models: 1445 (24x24) / 1448 (24x48) (Square Lay-in) | ||||||
| o | Coordination: Armstrong Prelude XL 15/16” – White | ||||||
| o | Need to include site prep for ceiling lift install by third party | ||||||
| • | HVAC | ||||||
| o | T&B report will be provided post-award | ||||||
| o | HVAC work related to equipment functionality | ||||||
| • | Painting | ||||||
| o | Colors to match adjacent rooms | ||||||
| o | Interior Paint Color Palette will be provided | ||||||
| ERROR:#N/A | ERROR:#N/A | 689B31027 | 689B32001 | Technical Spec: | |||
| 1) | 1a-c) Please confirm qty4 DR detectors are required per posted Technical Specs (qty2 14”x17” and qty2 17”x17”). If it is determined that detector configurations will differ from technical specs, please ensure that Technical Specs reflect this update as well | ||||||
| 2) | 2) Will an 80 kW Generator be acceptable? | General Construction Question: |
1) Exam room flooring - would facility prefer seamless vinyl or VCT?
2) Would the facility prefer new countertops? If yes, what material?
3) Paint - would the facility like this included in SOW?
| 4) Are Architectural and Engineering Drawings required for this project? | 1. | Yes, we request four (4) detectors; one for the table, one for the wall, and two additional backup detectors. 14x17 (2ct); 17x17 (1ct); 10x12 (1ct) | ||||||||
| 2. | Yes, an 80 kW exceeds our expectations. 60 kW was requested as a minimum requirement to meet. | • | Rooms will need an uplift to include updated flooring, ceilings, lighting, casework, etc. but must stay within allocated turnkey budget. | |||||||
| • | Please refer to Imaging Service Design Guide from TIL for any and all construction and design questions if below information is not sufficient for bid. | |||||||||
| • | Any requested drawings or reports can’t be provided per NAC-HTME | |||||||||
| • | Location of main electrical distribution panel feeding the room | |||||||||
| o | ED X-ray Room | |||||||||
| RM 1187 (60 AMP Breaker) | ||||||||||
| • | Drawings | |||||||||
| o | Please provide A/E drawings for equipment layout, electrical, casework, lighting, plumbing, etc. | |||||||||
| • | Seamless Flooring | |||||||||
| o | RSF (Rubber Resilient Sheet) | |||||||||
| Noraplan | ||||||||||
| Series: Sentica | ||||||||||
| Color: (Match adjacent room) | ||||||||||
| Base: Integral Cove | ||||||||||
| Welding: TBD | ||||||||||
| • | Casework and Countertops | |||||||||
| o | Midmark Synthesis Casework | |||||||||
| o | Handle: Edge | |||||||||
| o | Style: Transcend | |||||||||
| o | Countertop: Corian – Linen | |||||||||
| o | Laminate: TBD | |||||||||
| • | Lighting | |||||||||
| o | Please refer to Imaging Services Design Guide and Lighting Design Manuel section 4.2.5 for lighting design consideration | |||||||||
| o | Prefer LED Lighting | |||||||||
| • | Acoustical Ceilings, Grid, and Tile | |||||||||
| o | Armstrong | |||||||||
| o | Series: Ultima Health Zone High NRC | |||||||||
| o | Models: 1445 (24x24) / 1448 (24x48) (Square Lay-in) | |||||||||
| o | Coordination: Armstrong Prelude XL 15/16” – White | |||||||||
| o | Need to include site prep for ceiling lift install by third party | |||||||||
| • | HVAC | |||||||||
| o | T&B report will be provided post-award | |||||||||
| o | HVAC work related to equipment functionality | |||||||||
| • | Painting | |||||||||
| o | Colors to match adjacent rooms | |||||||||
| o | Interior Paint Color Palette will be provided | |||||||||
| ERROR:#N/A | ERROR:#N/A | 689B31027 | 689B32001 | Would you please send us the CAD drawings? | All additional drawings available have been added. Most of these drawings are too large to add which causes several issues in posting these. That is why we provide the drawings that we can. | |||||
| ERROR:#N/A | ERROR:#N/A | 689B31028 | 689B32002 | 1. | Regarding this obligation, please provide any preferences including location, type and manufacturer for the following: | |||||
| • | Seamless flooring | |||||||||
| • | Casework and Countertops. | |||||||||
| • | Lighting | |||||||||
| • | Acoustical Ceilings Grid and Tile | |||||||||
| 2. | Please provide the location of the main electrical distribution panel feeding the room. | |||||||||
| 3. | Sufficeint information not available from site walk. If possible, please provide structural, electrical, and HVAC as-built drawings. | • | Rooms will need an uplift to include updated flooring, ceilings, lighting, casework, etc. but must stay within allocated turnkey budget. | |||||||
| • | Please refer to Imaging Service Design Guide from TIL for any and all construction and design questions if below information is not sufficient for bid. | |||||||||
| • | Any requested drawings or reports can’t be provided per NAC-HTME | |||||||||
| • | Location of main electrical distribution panel feeding the room | |||||||||
| o | Philips Forte | |||||||||
| Fed from NL-MDP in G291B | ||||||||||
| • | Drawings | |||||||||
| o | Please provide A/E drawings for equipment layout, electrical, casework, lighting, plumbing, etc. | |||||||||
| • | Seamless Flooring | |||||||||
| o | RSF (Rubber Resilient Sheet) | |||||||||
| Noraplan | ||||||||||
| Series: Sentica | ||||||||||
| Color: (Match adjacent room) | ||||||||||
| Base: Integral Cove | ||||||||||
| Welding: TBD |
This is the start of the file's text. The full file is on GovTribe.