35821_K21545_AdvPlans_01.pdf
PDF 7 MB Posted
- Solicitation number
- S-63400-00008558
- Issued by
- Multnomah County, Oregon
About this file
This is an Invitation to Bid (ITB) issued by the Oregon Parks and Recreation Department (OPRD) for firewood deliveries to the Deschutes/Cottonwood Management Unit. The solicitation was released on October 30, 2023, with bids due by November 8, 2023, and an anticipated contract award date of November 10, 2023. The procurement seeks a two-year initial contract for delivering natural, seasoned firewood in standardized bundles, free of restricted species, with potential extensions up to six additional years. Contractors must be capable of standard deliveries within 5 business days and emergency deliveries within 2 business days, with a maximum of 6 emergency deliveries permitted annually. Bidders must be registered in the OregonBuys e-procurement system to participate.
Evaluation will be based on pricing, contractor experience, expertise, and overall responsibility, with potential preferences given to Oregon resident bidders and those offering recycled materials. Contractors must maintain comprehensive insurance coverage, including commercial general liability, automobile liability, and workers' compensation. Payment will be made based on actual quantities of firewood delivered on a performance-based compensation structure. Contractors will be compensated upon successful delivery and acceptance of goods. The procurement is specific to Multnomah County, Oregon, and all contractors must demonstrate compliance with federal, state, and local laws and regulations. No specific budget ranges are outlined, and no incumbent vendors are mentioned in the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB 10400 Firewood Deliveries for Deschutes MU.pdf | ||
| Attachment 3 - Sample Contract~2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
??V-???
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T
TO
C
HA
NG
E
R_K21545_ts_01.dgn :: Default 10/17/2023 10:28:49 AM hwye07x
LET'S ALL
WORK TOGETHER
TO MAKE THIS
JOB SAFE
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
(503) 232-1987).
The Oregon Utility Notification Center Is
The Center (Note: The Telephone Number For
You May Obtain Copies Of The Rules By Calling
Through OAR 952-001-0100.
Those Rules Are Set Forth In OAR 952-001-0001
By The Oregon Utility Notification Center.
Oregon Law Requires You To Follow Rules Adopted
ATTENTION:
Approving Authority:
Signature & date
Print name and title
Concurrence by ODOT Chief Engineer authority.
and approved by the ODOT Chief Engineer or their delegated
Exceptions to these standards, if any, have been submitted
These plans were developed using AASHTO design standards.
INDEX OF SHEETS
SHEET NO. DESCRIPTION
Title SheetA01
A02 Index Of Sheets Cont. & Std. Dwg. Nos.
P E
ADMINISTRATION
FEDERAL HIGHWAY
DIVISION
OREGON
PROJECT NUMBER
NO.
SHEET
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
A01A01S215(004)
Carol Cartwright-R2 Tech Center Manager
ST. HELENS
ASTORIA
TILLAMOOK
MCMINNVILLE
ALBANYNEWPORT
CORVALLIS
HOOD
RIVER
DALLES
THE
MADRAS
PRINEVILLE
BEND
COQUILLE
GRANTS
PASS
Ashland
BURNS
KLAMATH
FALLS
CONDON
MORO
PENDLETON
LA GRANDE
ENTERPRISE
VALE Ontario
PORTLAND
SALEM
MEDFORD
EUGENE
ROSEBURG
Athena
N. Powder
Unity Dayville
Sisters
Juntura
Frenchglen
Burns Jct.
McDermitt
Paisley
La Pine
Crescent
Biggs
Lexington
Hermiston Boardman
Ukiah
Arlington
Malin
Brookings
Coos Bay
Drain
Canyonvil le
Reedsport
Oakridge
Goshen Florence
Lincoln City
Waldport
Home Sweet
Detroit Antelope
Maupin
Forest Grove
Hebo
Cannon Beach
Seaside Rainier
Milton-Freewater
W
26 35 197
39519
3953197
Bonanza
Junction City
BAKER CITY
HEPPNER
Copperfield
Lake Silver
Junction CaveBEACH
GOLD
Orford Port
LAKEVIEW
CANYON
CITY
Day John
CITY
OREGON
HILLSBORO
DALLAS
Redmond
Val ley Jordan
Overall Length Of Project - 6.91 Miles
T. 15 & 16 S., R. 6 E., W.M.
F
O T
N E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
STATE OF OREGON
DEPARTMENT OF TRANSPORTATION
PLANS FOR PROPOSED PROJECT
STRUCTURES & PAVING
OR126: LINN COUNTY LINE -
OLD MCKENZIE HWY. SEC.
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
LANE COUNTY
APRIL 2024
E u g e n e
T o
S is t e r s
T o
Santiam Junction
To
LA
N E
LI
N
N
Belknap Springs
N O . 15
BELKNAP
NATIONAL
AIRPORT
BRIDGE
McKENZIE
SPRINGS RD.
BELKNAP
SPRINGS
HWY.
N O . 215
CLEA
R
LAKE -
M C
K E N Z
IE
H W
Y
M
CKE
NZ
IE
H W
Y
N O
D
EE
R
CR
EE
K
RD.
BEGINNING OF PROJECT
STA. "L" 10+00 (MP 12.90)
END OF PROJECT
STA. "L" 373+20 (MP 19.81)
R. 6 E.
R. 7 E.
T
S
T
S
C O
U N T Y
C O
U N T Y
R. 6 E.
R. 7 E.
WILLAMETTE
FOREST
McKenzi e
River
2 11
OREGON TRANSPORTATION COMMISSION
DIRECTOR OF TRANSPORTATION
COMMISSIONER
COMMISSIONER
COMMISSIONER
VICE CHAIR
CHAIR
Kristopher W. Strickler
Jeff Baker
Alicia Chapman
Sharon Smith
Lee Beyer
Julie Brown
CONTRACT LIMIT
STA. "L" 376+50 (MP 54.90)
R_K21545_ts_01.dgn :: Default 10/17/2023 10:28:49 AM hwye07x
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T
TO
C
HA
NG
E
ADMINISTRATION
FEDERAL HIGHWAY
DIVISION
OREGON
PROJECT NUMBER
NO.
SHEET
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
A02A02SEE SHEET A01
http://www.oregon.gov/ODOT/Engineering/Pages/Standards.aspx
Standard Drawings located on the web at:
T
N E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
Standard Dwg. Nos.
No R/W Map
SHEET NO. DESCRIPTION
Typical Sections
Details
INDEX OF SHEETS, CONT.
BA01
ROADWAY DETAILS
ROADWAY CONSTRUCTION
General Construction C01 Thru
C16 Incl.
PERMANENT PAVEMENT MARKINGS
Pavement Marking Details
- Slope RoundingRD150
- Roadway Cross Slopes Superelevated SectionsRD140
- Midwest Guardrail System TypesRD402
- Midwest Guardrail System Wood Post And BlockRD403
- Midwest Guardrail System Steel Post And BlockRD404
- Midwest Guardrail System (W-Beam)RD407
- Thrie Beam Guardrail TransitionRD410
- Midwest Guardrail System Standard Hardware (Nuts, Bolts, Washers And Misc.)RD416
- Midwest Guardrail System End SectionsRD417
- Midwest Guardrail System Grading For TerminalsRD419
- Midwest Guardrail System Non-Flared Energy-Absorbing TerminalRD420
- Midwest Guardrail System Typical Layouts At Bridge EndsRD442
- Wood Breakaway PostsRD451
- Midwest Guardrail System Type 3 (Nested W-Beam)RD482
- Transition Type "F" Concrete Rail to GuardrailBR203
- Thrie-Beam Rail and TransitionBR233
- Asphalt Concrete Pavement (ACP) DetailsRD610
- Surface Edge DetailsRD615
- Approaches And Non-Sidewalk DrivewaysRD715
- Poured Joint SealBR140
- Asphaltic Plug Joint SealBR157
- Bridge ID MarkerBR195
- 32" Concrete Barrier Type "F" Precast RD500
- Pavement Marking Standard Detail BlocksTM500
- Pavement Marking Standard Detail BlocksTM503
- Intersection Pavement Markings (Crosswalk, Stop Bar & Bike Lane Stencil)TM530
- Alignment Layout: GeneralTM560
- Alignment Layout: Left Turn Lane, Centerline & MediansTM561
- Traffic DelineatorsTM570
JA01 09474 # 09474-Plan & General Notes
DESCRIPTIONBDS DRAWING NO.SHEET NO. STRUCTURE NO.
BRIDGE
JB01 09846 #
JB02 09846 #
#JA02 09474 09474-Traffic Control Plan
JC01 09845 #
# 09845-Traffic Control PlanJC02 09845
09846-Traffic Control Plan
09846-Plan & General Notes
09845-Plan & General Notes
- Thrie Beam Rail Retrofit for Curb and Parapet Rail Connection DetailsBR273
- Tables, Abrupt Edge And PCMS DetailsTM800
QA03 Incl.
QA01 Thru
BB04 Incl.
BB01 Thru
TRAFFIC CONTROL
EB01 Thru
EB03 Incl.
EA01, EA02 Traffic Control Details
Traffic Control Detour Plan
EC01 Traffic Control Plan
- Temporary Pavement MarkingsTM810
- Temporary BarricadesTM820
- Temporary Sign SupportsTM821
- Temporary Sign SupportsTM822
- Temporary Concrete Barrier And Rumble Strip DetailsTM830
- Temporary Impact AttenuatorsTM831
- Temporary Impact AttenuatorsTM833
- Closure DetailsTM840
- 2-Lane, 2-Way RoadwaysTM850
- 2-Lane, 2-Way RoadwayTM854
- Bridge ConstructionTM870
R_K21545_ts_01.dgn :: Default 10/17/2023 10:28:50 AM hwye07x
Sl. as dir.Sl. as dir.
12'12'
Depth - 2.5"
Cold plane pvmt. removal
Ground line
"L"
"L"341+82 To "L"376+50 "L"340+01 To "L"341+82 (Str. no. 09474) "L"265+19 To "L"340+01 "L"264+40 To "L"265+19 (Str. no. 09846) "L"240+85 To "L"264+40 "L"238+85 To "L"240+85 "L"237+91 To "L"238+85 (Str. no. 09845) STA. "L" 10+00 To STA. "L"237+91
Width - var.
Extg. asph. conc. pvmt.
Nom. thkn. - 2.5"
" PG64-282
1Level 3, ACP wearing course
LS RS
Sl. as dir.
Comp. thkn. - var.
Aggr. shldr. matl.
(See dwg. no. RD615) Const. safety edge
Sl. as dir.
Ground line
(For bridge approach details not shown, see sht. BB01 and BB02)
4. For surfacing details of structures, see sht. A02.
3. For slope rounding, see dwg. no. RD150.
2. For standard superelevation, see dwg. no. RD140.
1. Side-slopes are shown as vert. to horiz.
NOTE:
RSSTATION TO STATION
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
"L"373+45
"L"373+00
"L"372+25
"L"341+82
"L"340+01
"L"339+22
"L"325+90
"L"323+71
"L"320+00
"L"317+93
"L"304+37
"L"303+40
"L"301+87
"L"265+19
"L"264+40
"L"239+94
"L" 238+85
"L" 237+91
"L" 234+16
"L" 231+15
"L" 229+30
"L" 136+68
"L" 136+37
"L" 133+04
"L" 132+65
"L" 112+65
"L" 112+27
"L" 111+54
"L" 111+08
"L" 10+00
"L"376+50
"L"373+45
"L"373+00
"L"372+25
"L"341+82
"L"340+01
"L"339+22
"L"325+90
"L"323+71
"L"320+00
"L"317+93
"L"304+37
"L"303+40
"L" 301+87
"L" 265+19
"L"264+40
"L" 239+94
"L" 238+85
"L" 237+91
"L" 234+16
"L" 231+15
"L" 229+30
"L" 136+68
"L" 136+37
"L" 133+04
"L" 132+65
"L" 112+65
"L" 112+27
"L" 111+54
"L" 111+08
5.5'
Var. 8' to 5.5'
Var. 3' to 8'
Var. 2' to 3'
Str. no. 09474
Var. 4' to 2.5'
Var. 2' to 4'
Var. 12' to 2'
12'
Var. 3' to 12'
3'
Var. 17' to 3'
Var. 3' to 17'
Var. 2' to 3'
Str. no. 09846
Var. 4' to 2.5'
Var. 3' to 4'
Str. no. 09845
Var. 13' to 3'
13'
Var. 4' to 13'
Var. 3' to 4'
Var. 7' to 3'
Var. 6' to 7'
Var. 3' to 7'
Var. 5' to 3'
Var. 13' to 5'
13'
Var. 3' to 13'
3'
TABLE "B"
STRUCTURAL DETAILS CHECKED
(See dwg. no. RD402) Midwest Guardrail System
Sl.
1:
2 m ax
Comp. thkn. - var.
Aggr. shldr. matl.
Ground line
LS
"L"341+82.1 To "L"343+63.4 "L"338+94.3 To "L"339+88.4 "L"265+04.5 To "L"266+85.2 "L"263+32.4 To "L"264+25.7 "L"238+68.5 To "L"240+25.2 STA. "L"236+84.8 To STA. "L"237+77.8
Midwest Guardrail System
Comp. thkn. - var.
Aggr. shldr. matl.
Ground line
RS
Sl. 1:2 max.
Const. safety edge
LSSTATION TO STATION
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
To
"L"369+50
"L"341+82
"L"340+01
"L"338+94
"L"325+70
"L"324+18
"L"319+38
"L"318+35
"L"265+19
"L"264+40
"L"241+70
"L"238+85
"L"237+91
"L" 235+50
"L" 231+50
"L" 228+95
"L" 132+45
"L" 131+78
"L" 131+35
"L" 130+20
"L" 17+44
"L" 15+25
"L" 11+15
"L" 10+12
"L" 10+00
"L"376+50
"L"369+50
"L"341+82
"L"340+01
"L"338+94
"L"325+70
"L"324+18
"L"319+38
"L"318+35
"L"265+19
"L"264+40
"L"241+70
"L"238+85
"L"237+91
"L"235+50
"L"231+50
"L"228+95
"L"132+45
"L" 131+78
"L" 131+35
"L" 130+20
"L" 17+44
"L" 15+25
"L" 11+15
"L" 10+12
4'
Var. 2' to 4'
Str. no. 09474
Var. 3' to 2'
Var. 2' to 4'
Var. 14' to 2'
14'
Var. 3' to 14'
3'
Str. no. 09846
Var. 4' to 3'
Var. 3' to 4'
Str. no. 09845
Var. 15' to 3'
15'
Var. 3' to 15'
3'
Var. 10' to 3'
10'
Var. 5' to 10'
Var. 3' to 5'
Var. 25' to 3'
25'
Var. 3' to 25'
3'
TABLE "A"
(For widths and stations not shown, see Table "A" and "B")
"L"341+92.4 To "L"342+86.1 "L"339+22 To "L"340+02.8 "L"265+34 To "L"266+27.2 "L"263+15.5 To "L"264+52.8 "L"239+00.1 To "L"239+94 STA. "L"236+25.3 To STA. "L"238+06.8
BA01
R_K21545_ty_01.dgn :: Default 10/17/2023 10:28:52 AM hwye07x
OREGON
RE
GI
STE
RED PROFESSIONALEN
GINEER
M
AY 10, 201
6C
ESAR J. LOPEZ
91,176
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T T
O C
HA
NG
E
Cesar Lopez
N/A
Jonathan Solano
Jeff Larson
TYPICAL SECTIONS
R_K21545_ty_01.dgn :: Default 10/17/2023 10:28:52 AM hwye07x
BOULDER CREEK STRUCTURE NO. 09845
Depth - 2.25"
Cold plane pvmt. removal
Nom. thkn. - 3"
" PG64-282
Level 3, ACP wearing course
Nom. thkn. - 3"
" PG64-282
Level 3, ACP wearing course
125'
Length - var.
Bridge
Bridge deck surfacing details
See bridge for
STRUCTURAL DETAILS CHECKED
(For bridge details, see sht. A02)
SCOTT CREEK STRUCTURE NO. 09846
Depth - 2.25" to 3"
Cold plane pvmt. removal
Nom. thkn. - 2.5"
" PG64-282
Level 3, ACP wearing course
Length - var.
Bridge
Bridge deck surfacing details
See bridge for
(For bridge details, see sht. A02)
Nom. thkn. - 2.5"
" PG64-282
Level 3, ACP wearing course
Depth - 2.25"
Cold plane pvmt. removal
125'
Nom. thkn. - 2.5"
" PG64-282
Level 3, ACP wearing course
75' Taper
Depth - 2.5"
Cold plane pvmt. removal
Nom. thkn. - 3"
" PG64-282
Level 3, ACP wearing course
Nom. thkn. - 3"
" PG64-282
Level 3, ACP wearing course
75' Taper
Depth - 2.25" to 3"
Cold plane pvmt. removal
75' Taper
Nom. thkn. - 3"
" PG64-282
Level 3, ACP wearing course
75' Taper
Nom. thkn. - 3"
" PG64-282
Level 3, ACP wearing course
Nom. thkn. - 2.5"
" PG64-282
Level 3, ACP wearing course
Depth - 3" to 2.25"
Cold plane pvmt. removal
Depth - 2.5"
Cold plane pvmt. removal
Depth - 2.5"
Cold plane pvmt. removal
Depth - 3" to 2.25"
Cold plane pvmt. removal
Depth - 2.5"
Cold plane pvmt. removal
" grade increase.4
Bridge deck to have
NOTE:
BB01
R_K21545_dt_01.dgn :: Default 10/17/2023 10:28:54 AM hwye07x
ST
ERE
D PROFESSIONALEN
A Y 10, 2
C
E
SAR J. LO
P
E Z
91,176
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T
TO
C
HA
NG
E
Cesar Lopez
N/A
Jonathan Solano
Jeff Larson
DETAILS
R_K21545_dt_01.dgn :: Default 10/17/2023 10:28:54 AM hwye07x
LOST CREEK STRUCTURE NO. 09474
Depth - 2.25"
Cold plane pvmt. removal
Nom. thkn. - 3"
" PG64-282
Level 3, ACP wearing course
Nom. thkn. - 2.5"
" PG64-282
Level 3, ACP wearing course
Length - var.
Bridge
Bridge deck surfacing details
See bridge for
(For bridge details, see sht. A02)
75' Taper
Nom. thkn. - 2.5"
" PG64-282
Level 3, ACP wearing course
Depth - 12.75"
Exc: 245 cu. yd.
200'
Nom. thkn. - 2.5"
" PG64-282
Level 3, ACP wearing course
1st lift - 3"
2nd lift - 2" Nom. thkn. - 5"
" PG64-282
Level 3, ACP base course
Nom. comp. thkn. - 6"
Aggregate base
STRUCTURAL DETAILS CHECKED
(Locate as directed)
Extg. pvmt. Nom. thkn. - 2"
" PG64-28 2
Level 3, ACP wearing course
Nom. thkn. - 4"
" PG64-282
Level 3, ACP base course
6" ASPH. CONC. PVMT. REPAIR
Depth - 6"
Cold plane pvmt. removal
"L"229+12
"L"186+88
"L"176+32
"L"156+78
"L"125+63
"L"109+79
"L"109+79
"L" 89+20
"L" 68+08
"L" 22+67
STARTING STATION
TABLE
WIDTH (Ft.)
17.05
16.25
16.05
15.68
15.09
14.79
14.79
14.40
14.00
13.14
STARTING MP
17.22
16.34
16.12
15.73
15.11
14.89
14.86
14.43
14.09
13.16
ENDING MP
"L"238+10
"L"191+63
"L"180+02
"L"159+42
L"126+69
"L"115+07
"L"113+49
"L" 90+78
"L" 72+83
"L" 23+73
ENDING STATION
Westbound
Westbound
Westbound
Westbound
Eastbound
Westbound
Eastbound
Westbound
Westbound
Westbound
DIRECTION
Full Lane
RWT
LWT
Full Lane
LWT
Full Lane
Full Lane
RWT
LWT
LWT
LOCATION
4. Field verify locations with engineer.
3. RWT: Right wheel track
2. LWT: Left wheel track
1. Full Lane: Skip stripe to fog line.
NOTE:
Depth - 2.5"
Cold plane pvmt. removal
Nom. thkn. - 3"
" PG64-282
Level 3, ACP wearing course
75' Taper
Nom. thkn. - 2.5"
" PG64-282
Level 3, ACP wearing course
Depth - 2.5" to 1.75"
Cold plane pvmt. removal
Depth - 2.5"
Cold plane pvmt. removal
125'
Depth - 2.25" to 3"
Cold plane pvmt. removal
" grade increase.4
Bridge deck to have
NOTE:
BB02
R_K21545_dt_01.dgn :: Default 10/17/2023 10:28:54 AM hwye07x
ST
ERE
Y 10, 2
C
E
SAR J. LO
P
E Z
91,176
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T
TO
C
HA
NG
E
Cesar Lopez
N/A
Jonathan Solano
Jeff Larson
R_K21545_dt_01.dgn :: Default 10/17/2023 10:28:54 AM hwye07x
3. Shop fabricate all radius rail to dimensions shown.
2. Place radius identification plate (For details, see drg. no. RD416 and RD417).
1. For transition details, see appropriate Bridge Standard Drawings.
GENERAL NOTES FOR ALL DETAILS:
with bridge rail type
Post placement will vary
Type 1 modified anchor
Transition (As reqd.)
Bridge rail (Typ.)
3'-1½"
87.5'
Type 2A guardrail
PLAN
12'-6" min.
Type 3 guardrail
(See general note 5) w/Type 1 modified anchor
Type B end piece a p p r o a c h r o a d
D ri v e w a y o r
(Typ.)
6'-3"
Face of rail
Sta. "L"263+15.4, 29.1 Lt.
F a c e o f r a il
S ta
L
.5
, 1
.4 L t.
liardraug e p y T
'52 - noitces s ui dar
.t f
BB03
R_K21545_dt_01.dgn :: Default 10/17/2023 10:28:55 AM hwye07xR_K21545_dt_01.dgn :: Default 10/17/2023 10:28:55 AM hwye07x
ST
ERE
Y 10, 2
C
E
SAR J. LO
P
E Z
91,176
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T
TO
C
HA
NG
E
Cesar Lopez
N/A
Jonathan Solano
Jeff Larson
R_K21545_dt_01.dgn :: Default 10/17/2023 10:28:55 AM hwye07x
L"
L"
CLEAR LAKE - BELKNAP SPRINGS HWY. (OR126)
.5
.5
12'12'
12'12' 12'
14'
15' 15' 1'
4' (Sh ldr.
9'
3' Sh ld r.
.5
2'
4'
4'
4'
' 4
4'
Paving limit
Paving limit
Sta. "L" 369+50
Sta. "L" 373+14.4, 215.5' Lt.
Sta. "L" 376+50
M c
K E
N Z
IE
H
W Y . (O
R
McKENZIE HWY.
(OR126)
Approximate area: 2,235 sq. yd.
Dense, Lime-Treated, ACP Wearing Course shown thus:"2
2.5" Level 3, 2.5" Cold Plane Pvmt. Removal shown thus:
BB04
R_K21545_dt_01.dgn :: Default 10/17/2023 10:28:55 AM hwye07x
ST
ERE
Y 10, 2
C
E
SAR J. LO
P
E Z
91,176
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T
TO
C
HA
NG
E
Cesar Lopez
N/A
Jonathan Solano
Jeff Larson
R_K21545_dt_01.dgn :: Default 10/17/2023 10:28:55 AM hwye07x
Sec. 24, T. 15 S., R. 6 E., W.M.
STA. "L" 10+00 (MP 12.90)
BEGINNING OF PROJECT
(See dwg. nos. RD610 & RD715)
Const. appr.1
CONSTRUCTION NOTES
" LINEL"
" LINEL"
C01
R_K21545_pl_01.dgn :: Default 10/17/2023 10:28:56 AM hwye07x
A s p h . c o n c
.4
19.8'
CLEAR LAKE - BELKNAP SPRINGS HWY. (OR126)
CLEAR LAKE - BELKNAP SPRINGS HWY.(OR126)
' 1
L"
L"
S07°39'00"E
P .S
.2
P .S .C
.2
L" P .S
.2
L"
S = 02°16'51"
200.00' Spiral
L"
L"
Sp�200.00' Sp� - 200.00' 1,357.54' - Ts� 1,357.54'Ts�
53°10'29"TΔ
C.R.02°16'51"
"L"
STE
6C
ESAR J. LOPEZ
91,176
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T T
O C
HA
NG
E
Cesar Lopez
N/A
Jonathan Solano
Jeff Larson
GENERAL CONSTRUCTION
Sec. 24, T. 15 S., R. 6 E., W.M.
Const. appr.1
CONSTRUCTION NOTES
" LINEL"
" LINEL"
C02
R_K21545_pl_01.dgn :: Default 10/17/2023 10:28:57 AM hwye07x
.4 A s p h . c o n c
12.3'
CLEAR LAKE - BE
LKNAPSPRINGS HWY.(OR126)
CLEAR LAKE - BELKNAP SPRINGS HWY. (OR126)
Linear Annotation.Line Direction
L"
L"
P .C
.5
L" P .C
.5
L"
P .T
.5
S = 02°16'51"
200.00' Spiral
S45°31'29"W
P
.0
ST
ERE
Y 10, 2
C
E
SAR J. LO
P
E Z
91,176
RENEWS: 12-31-2024
S45°31'29"W
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T
TO
C
HA
NG
E
Cesar Lopez
N/A
Jonathan Solano
Sec. 23 & 24, T. 15 S., R. 6 E., W.M.
S45°31'29"W
" LINEL"
" LINEL"
" LINEL"
C03
R_K21545_pl_01.dgn :: Default 10/17/2023 10:28:58 AM hwye07x
CLEAR LAKE - BELKNAPSPRINGS HWY.(OR126)
CLEAR LAKE - BELKNAP SPRINGS HWY. (OR126)
' 1
L"
L"
Sp�200.00' Sp� - 200.00' 615.26' - Ts� 615.26'Ts�
15°21'48"TΔ
C.R.01°30'00"
"L"
P
.0
.S
.0
L" P .S
.0
L"
P .C
.2
L"
P .C
.2
L"
P
.2
L"
S = 01°30'00" 200.00' Spiral
S = 01°30'00" 200.00' Spiral
S60°53'17"W
P
.7
.S
.7
L" P .S
.7
L"
P
.2
S = 01°30'00" 200.00' Spiral
S = 06°15'00" 250.00' Spiral
STE
6C
ESAR J. LOPEZ
91,176
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T T
O C
HA
NG
E
Cesar Lopez
N/A
Jonathan Solano
Sec. 23 & 26, T. 15 S., R. 6 E., W.M.
Const. street connection1
CONSTRUCTION NOTES
" LINEL"
" LINEL"
C04
R_K21545_pl_01.dgn :: Default 10/17/2023 10:28:58 AM hwye07x
.3 A s p h . c o n c
42.1'
CLEAR LAKE - BELKNAPSPRINGSHWY.(OR126)
CLEAR LAKE - BELKNAP SPRINGS HWY. (OR126)
D E E
R C
R E E
K R
D
L"
L"
L"
Sp�100.00' Sp� - 250.00' 756.30' - Ts� 828.15'Ts�
63°07'31"TΔ
C.L.05°00'00"
"L"
P.S.
.7
L"
P.S.C
.7
L"
.7
L"
P
.S.
.2
L"
P
.S.
.2
L"
P.T
.2
L"
S = 06°15'00" 250.00' Spiral
S = 02°30'00" 100.00' Spiral
L"
S02°14'14"E
P .C
.2
L" P .C
.2
L"
P
.2
.6
S = 02°30'00" 100.00' Spiral
STE
6C
ESAR J. LOPEZ
91,176
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T T
O C
HA
NG
E
Cesar Lopez
N/A
Jonathan Solano
Sec. 26, T. 15 S., R. 6 E., W.M.
S02 °14'
14"E
CONSTRUCTION NOTES
Const. street connection
" LINEL"
" LINEL"
C05
R_K21545_pl_01.dgn :: Default 10/17/2023 10:28:59 AM hwye07x
A s p h . c o n c
.3
21'
CLEAR LAKE - BELKNAP SPRINGSHWY.(OR126)
B O
U L
D E R C
R E E
K R
D
CLEAR LAKE - BELKNAP SPRINGS HWY. (OR126)
' 1
L"
L"
Sp�100.00' Sp� - 300.00' 606.80' - Ts� 700.74'Ts�
37°21'13"TΔ
C.R.03°30'00"
"L"
P
.6
L" P .S
.6
L" P .S
.6
L"
P .C
.8
L"
P .C
.8
L"
P
.8
L"
S = 05°15'00" 300.00' Spiral
S = 01°45'00" 100.00' Spiral
L"
S35°06'58"W
P
.9
.C
.8
L" P .C
.8
L"
P
.8
S = 01°45'00" 100.00' Spiral
S = 08°03'41" 350.00' Spiral
S = 08°03'41" 350.00' Spiral
STE
6C
ESAR J. LOPEZ
91,176
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T T
O C
HA
NG
E
Cesar Lopez
N/A
Jonathan Solano
Sec. 26, T. 15 S., R. 6 E., W.M.
S06 °56'
08" E
" LINEL"
" LINEL"
C06
R_K21545_pl_01.dgn :: Default 10/17/2023 10:28:59 AM hwye07x
CLEAR LAKE - BELKNAPSPRINGSHWY.(OR126)
CLEAR LAKE - BELKNAP SPRINGS HWY. (OR126)
L"
L"
L"
Sp�300.00' Sp� - 350.00' 630.80' - Ts� 652.93'Ts�
42°03'07"TΔ
C.L.04°36'24"
"L"
P .S
.9
L"
P .S
.9
L"
P .C
.8
L" P .C
.8
L"
P
.8
L"
S = 06°54'35" 300.00' Spiral
S = 08°03'41" 350.00' Spiral
L" 1
L"
S06°56'08"E
S13°51'1 1"E
Sp�200.00' Sp� - 200.00' 273.18' - Ts� 273.18'Ts�
06°55'03"TΔ
C.L.02°00'00"
"L"
P
.0
.S
.0
L" P .S
.0
L"
P .C
.8
L" P .C
.8
L"
P
.8
L"
P
.0
L"
P .S
.0
L" P .S
.0
L"
S = 02°00'00" 200.00' Spiral
S = 02°00'00" 200.00' Spiral
S = 00°22'22" 50.00' Spiral
STE
6C
ESAR J. LOPEZ
91,176
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T T
O C
HA
NG
E
Cesar Lopez
N/A
Jonathan Solano
Sec. 35, T. 15 S., R. 6 E., W.M.
" LINEL"
" LINEL"
C07
R_K21545_pl_01.dgn :: Default 10/17/2023 10:29:00 AM hwye07x
CLEAR LAKE - BELKNAP SPRINGS HWY. (OR126)
CLEAR LAKE - BELKNAPSPRINGSHWY. (OR126)
L"
L"
S07°43'38"E
Sp�50.00' Sp� - 50.00' 230.64' - Ts� 230.64'Ts�
06°07'33"TΔ
C.R.01°29'27"
"L"
P
.0
.S
.0
L" P .S
.0
L"
P .S
.0
L" P .S
.0
L"
P .C
.9
L" P .C
.9
L"
P
.9
S = 00°22'22" 50.00' Spiral
S = 06°15'00" 250.00' Spiral
L"
L"
L"
Sp�250.00' Sp� - 250.00' 631.70' - Ts� 631.70'Ts�
47°37'41"TΔ
C.L.05°00'00"
"L"
.0
L"
.0
L"
P .C
.6
L" P .C
.6
L"
P
.6
L"
S = 06°15'00" 250.00' Spiral
S55°2 1'19"
E
STE
6C
ESAR J. LOPEZ
91,176
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T T
O C
HA
NG
E
Cesar Lopez
N/A
Jonathan Solano
Sec. 35 & 36, T. 15 S., R. 6 E., W.M.
S55°2 1'19"E
" LINEL"
" LINEL"
C08
R_K21545_pl_01.dgn :: Default 10/17/2023 10:29:01 AM hwye07x
CLEAR LAKE - BELKNAP SPRINGS HWY. (OR126)
' 1
CLEAR LAKE - BELKNAP SPRINGSHWY.(OR126)
'1
S55°21'19"E
L"
L"
L"
S34°12'31"E
Sp�100.00' Sp� - 250.00' 315.85' - Ts� 382.45'Ts�
21°08'48"TΔ
C.R.04°05'25"
"L"
P
.7
L"
P .S
.7
L" P .S
.7
L"
P .C
.7
L"
P .C
.7
L"
P
.7
L"
P
.5
L"
S = 05°06'47" 250.00' Spiral
S = 02°02'43" 100.00' Spiral
STE
6C
ESAR J. LOPEZ
91,176
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T T
O C
HA
NG
E
Cesar Lopez
N/A
Jonathan Solano
Sec. 2 & 36, T. 16 S., R. 6 E., W.M.
" LINEL"
C09
R_K21545_pl_01.dgn :: Default 10/17/2023 10:29:01 AM hwye07x
CLEAR LAKE - BELKNAP SPRINGS HWY. (OR126)
CLEAR LAKE - BELKNAPSPRINGS HWY.(OR126)
L"
L"
L"
S26°32'21"E
488.00'T
07°40'10"Δ C.R.00°47'13"
"L"
P
.5
L"
P
.0
L"
L"
L"
Sp�0.00' Sp� - 0.00' 310.64' - Ts� 310.64'Ts�
21°23'56"TΔ
C.L.03°29'06"
"L"
P
.2
L"
P .S
.2
L"
P .S
.2
L"
P
.2
L"
S = 00°00'00" 0.00' Spiral
S = 00°00'00" 0.00' Spiral
S26°32'21"E S47°56 '16"E
STE
6C
ESAR J. LOPEZ
91,176
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T T
O C
HA
NG
E
Cesar Lopez
N/A
Jonathan Solano
Sec. 1 & 2, T. 16 S., R. 6 E., W.M.
RD420, RD442, RD451, RD482 & BR203)
RD407, RD410, RD416, RD417, RD419,
(See dwg. nos. RD402, RD403, RD404, Const. guardrail to bridge transition
Test level 3
Const. guardrail terminal, non-flared
W=2', E=0
Const. Midwest Guardrail System- 12.5' (Type 3)
Const. Midwest Guardrail System- 12.5' (Type 2A)
Remove extg. guardrail - 85.4'
Sta. "L"236+84.8 to Sta. "L"237+77.8, Lt.
CONSTRUCTION NOTES
Const. guardrail to bridge transition
Test level 3
Const. guardrail terminal, non-flared
W=1', E=0
Const. Midwest Guardrail System - 12.5' (Type 3)
Const. Midwest Guardrail System - 87.5' (Type 2A)
Remove extg. guardrail - 72'
Sta. "L"238+68.5 to Sta. "L"240+25.2, Lt.3
(For sht. nos., see sht. A02, Bridge)
Structure no. 098452
Const. appr.5
Const. guardrail to bridge transition
Test level 3
Const. guardrail terminal, non-flared
W=2', E=0
Const. Midwest Guardrail System- 12.5' (Type 3)
Const. Midwest Guardrail System- 100' (Type 2A)
Remove extg. guardrail - 72.3'
Sta. "L"236+25.3 to Sta. "L"238+06.8, Rt.6
Const. guardrail to bridge transition
Test level 3
Const. guardrail terminal, non-flared
W=1', E=0
Const. Midwest Guardrail System- 12.5' (Type 3)
Const. Midwest Guardrail System- 12.5' (Type 2A)
Remove extg. guardrail - 72.4'
Sta. "L"239+00.1 to Sta. "L"239+94.0, Rt.7
STRUCTURAL DETAILS CHECKED
4 Const. street connection
" LINEL"
" LINEL"
" LINEL"
All guardrail to be weatherized.
NOTE:
C10
R_K21545_pl_01.dgn :: Default 10/17/2023 10:29:02 AM hwye07x
A s p h . c o n c
.4
.1 A s p h . c o n c
24.1'
71.1'
CLEAR LAKE - BELKNAP SPRINGS HWY. (OR126)
CLEA
R LAKE - B
ELKNAP SPRIN
GS HWY.(OR126)
S C
O T
T C
R E E
K R
D
L" 2
L"
S47°56'16"E S51°29'27"E
134.45'T
03°33'11"Δ C.L.01°19'18"
"L"
P
.0
.8
L"
P
.7
L"
P .S
.7
L" P .S
.7
L"
S = 03°03'14" 150.00' Spiral
L"
L"
L"
224.50'T 18°07'47"Δ
C.R.04°04'18" "L"
P
.7
L"
P .S
.7
L"
P .S
.7
L"
P .C
.9
L" P .C
.9
L"
P .S
.9
L"
S = 03°03'14" 150.00' Spiral
S = 06°06'28" 300.00' Spiral
STE
6C
ESAR J. LOPEZ
91,176
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T T
O C
HA
NG
E
Cesar Lopez
N/A
Jonathan Solano
Sec. 1, T. 16 S., R. 6 E., W.M.
S11°33'03"W
Const. appr.1
CONSTRUCTION NOTES
" LINEL"
" LINEL"
C11
R_K21545_pl_01.dgn :: Default 10/17/2023 10:29:02 AM hwye07x
.7 A s p h . c o n c
58.6
CLEAR LAKE - BELKNAP SPRINGS HWY.(OR126)
CLEAR LAKE - BELKNAP SPRINGS HWY. (OR126)
L" 2
L"
519.59'T
32°31'58"Δ C.R.03°13'03"
"L"
P .C
.0
L" P .C
.0
L"
P
.0
L"
S = 03°13'03" 200.00' Spiral
S11°33'03"W
STE
6C
ESAR J. LOPEZ
91,176
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T T
O C
HA
NG
E
Cesar Lopez
N/A
Jonathan Solano
Sec. 11 & 12, T. 16 S., R. 6 E., W.M.
S11 °41'4
0"W
Const. guardrail to bridge transition
Test level 3
Const. guardrail terminal, non-flared
W=1', E=0
Const. Midwest Guardrail System- 12.5' (Type 3)
Const. Midwest Guardrail System- 12.5' (Type 2A)
Remove extg. guardrail - 84.9'
Sta. "L"263+32.4 to Sta. "L"264+25.7, Lt.
CONSTRUCTION NOTES
Const. guardrail to bridge transition
Test level 3
Const. guardrail terminal, non-flared
W=2', E=0
Const. Midwest Guardrail System- 12.5' (Type 3)
Const. Midwest Guardrail System- 100' (Type 2A)
Remove extg. guardrail - 84.6'
Sta. "L"265+04.5 to Sta. "L"266+85.2, Lt.3
(For sht. nos., see sht. A02, Bridge)
Structure no. 098462
(For details, see sht. BB03)
Const. guardrail to bridge transition
Inst. end piece (Type B)
Const. anchor - 2 (Type 1 mod.)
Const. Midwest Guardrail System- 12.5' (Type 3)
Const. Midwest Guardrail System- 112.5' (Type 2A)
Remove extg. guardrail - 72.6'
Sta. "L"263+15.5 to Sta. "L"264+52.8, Rt.4
Const. guardrail to bridge transition
Test level 3
Const. guardrail terminal, non-flared
W=1', E=0
Const. Midwest Guardrail System- 12.5' (Type 3)
Const. Midwest Guardrail System- 12.5' (Type 2A)
Remove extg. guardrail - 85.1'
Sta. "L"265+34.0 to Sta. "L"266+27.2, Rt.5
" 2
.4
P .I.
L"
" 2
.2
P .I.
L"
STRUCTURAL DETAILS CHECKED
" LINEL"
" LINEL"
All guardrail to be weatherized.
NOTE:
1 2 3
4 5
C12
R_K21545_pl_01.dgn :: Default 10/17/2023 10:29:03 AM hwye07x
CLEAR LAKE - BELKNAP SPRINGS HWY. (OR126)
CLEARLAKE - BELKNAP SPRINGSHWY.(OR126)
L"
S11°36'44"W S11°41'40"W
P
.2
L"
S11°33'03"W
L"
L"
L"
P
.2
L"
P .S
.2
L" P .S
.2
L"
S = 06°28'45"
400.00' Spiral
Sp�400.00' Sp� - 400.00' 1,243.05' - Ts� 1,243.05'Ts�
60°57'30"TΔ
C.R.03°14'23"
"L"
STE
6C
ESAR J. LOPEZ
91,176
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T T
O C
HA
NG
E
Cesar Lopez
N/A
Jonathan Solano
Sec. 11, T. 16 S., R. 6 E., W.M.
" LINEL"
C13
R_K21545_pl_01.dgn :: Default 10/17/2023 10:29:04 AM hwye07x
CLEAR LAKE - BE
LKNAP SPRINGSHWY.(OR126)
CLEAR LAKE - BELKNAPSPRINGSHWY.(OR126)1
L"
L"
L"
S72°39'10"W
Sp�400.00' Sp� - 400.00' 1,243.05' - Ts� 1,243.05'Ts�
60°57'30"TΔ
C.R.03°14'23"
"L"
P
.9
L"
P .C
.9
L" P .C
.9
L"
P
.9
L"
S = 06°28'45" 400.00' Spiral
L " 3
L"
S72°39'10"W S72°36'22"W
113.22'T 00°19'28"Δ
C.L.00°08'36" "L"
248.36'T 04°57'51"Δ
C.L.01°00'00" "L"
P
.9
L"
P
.4
L"
P
.6
L"
P
.0
L"
P
.9
L"
S67°38'31"W
STE
6C
ESAR J. LOPEZ
91,176
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T T
O C
HA
NG
E
Cesar Lopez
N/A
Jonathan Solano
Sec. 11, T. 16 S., R. 6 E., W.M. CONSTRUCTION NOTES
Const. street connection - 22
Const. appr.1
" LINEL"
" LINEL"
C14
R_K21545_pl_01.dgn :: Default 10/17/2023 10:29:04 AM hwye07x
A s p h . c o n c
.6
A s p h . c o n c
.8
.6 A s p h . c o n c
34.9'
75'
29.3'
CLEAR LAKE - BELKNAP SPRINGS HWY. (OR126)
CLEARLAKE - BELKNAP SPRINGSHWY.(OR126)1
B E L
K N
A P S
P R
IN
G S R
D
B E L
K N
A P S
P R
IN
G S R
D
S67°38'31"W
P
.7
S = 02°03'17"
200.00' Spiral
L"
L"
L"
S86°01'53"W
Sp�200.00' Sp� - 200.00' 551.48' - Ts� 551.48'Ts�
18°23'22"TΔ
C.R.02°03'17"
"L"
P
.7
L"
P .S
.7
L" P .S
.7
L"
P .C
.7
L" P .C
.7
L"
P
.7
L"
S = 02°03'17" 200.00' Spiral S = 02°03'17"
200.00' Spiral
STE
6C
ESAR J. LOPEZ
91,176
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T T
O C
HA
NG
E
Cesar Lopez
N/A
Jonathan Solano
Sec. 10 & 11, T. 16 S., R. 6 E., W.M.
(See dwg. no. BR233)
Const. guardrail to bridge transition
Test level 3
Const. guardrail terminal, non-flared
W=2', E=0
Const. Midwest Guardrail System- 12.5' (Type 3)
Const. Midwest Guardrail System- 12.5' (Type 2A)
Remove extg. guardrail - 72.1'
Sta. "L"341+92.4 to Sta. "L"342+86.1, Rt.
CONSTRUCTION NOTES
Const. guardrail to bridge transition
Test level 3
Const. guardrail terminal, non-flared
W=1', E=0
Const. Midwest Guardrail System- 12.5' (Type 3)
Remove extg. guardrail - 69.9'
Sta. "L"339+22 to Sta. "L"340+02.8, Rt.4
(For sht. nos., see sht. A02, Bridge)
Structure no. 094742
Const. guardrail to bridge transition
Test level 3
Const. guardrail terminal, non-flared
W=2', E=0
Const. Midwest Guardrail System- 12.5' (Type 3)
Const. Midwest Guardrail System- 100' (Type 2A)
Remove extg. guardrail - 69.7'
Sta. "L"341+82.1 to Sta. "L"343+63.4, Lt.3
Const. guardrail to bridge transition
Test level 3
Const. guardrail terminal, non-flared
W=2', E=0
Const. Midwest Guardrail System- 12.5' (Type 3)
Const. Midwest Guardrail System- 12.5' (Type 2A)
Remove extg. guardrail - 70.4'
Sta. "L"338+94.3 to Sta. "L"339+88.4, Lt.
STRUCTURAL DETAILS CHECKED
" LINEL"
" LINEL"
All guardrail to be weatherized.
NOTE:
C15
R_K21545_pl_01.dgn :: Default 10/17/2023 10:29:05 AM hwye07x
CLEARLAKE - BELKNAPSPRINGSHWY.(OR126)
CLEAR LAKE - BELKNAP SPRINGS HWY. (OR126)
L"
L"
L"
L"
S86°01'53"W
Sp�200.00' Sp� - 200.00' 563.30' - Ts� 563.30'Ts�
18°46'23"TΔ
C.L.02°02'41"
"L"
P
.3
L"
P .S
.3
L" P .S
.3
L"
P .C
.5
L" P .C
.5
L"
P
.5
L"
S = 02°02'41" 200.00' Spiral
S = 02°02'41" 200.00' Spiral
S67°15 '29"W
S67°15'29"WS67°15'29"W
STE
6C
ESAR J. LOPEZ
91,176
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T T
O C
HA
NG
E
Cesar Lopez
N/A
Jonathan Solano
Sec. 10, T. 16 S., R. 6 E., W.M.
STA. "L" 376+50 (MP 54.90)
CONTRACT LIMIT
S67°15'29"W
" LINEL"
" LINEL"
CONSTRUCTION NOTES
details not shown, see sht. BB04)
(For intersection asph. conc. paving
Const. street connection1
STA. "L" 373+20 (MP 19.81)
END OF PROJECT
Paving limit
C16
R_K21545_pl_01.dgn :: Default 10/17/2023 10:29:06 AM hwye07x
Paving Limit
CLEAR LAKE - BELKNAP SPRINGS HWY. (OR126)
' 1
CLEARLAKE - BELKNAP SPRINGSHWY.(OR126)
M C
K E
N Z
IE
H
W Y . (O
R
MCKENZIE HWY.(OR126)
.0
S67°15'29"W
L"
L"
Sp�200.00' Sp� - 200.00' 732.48' - Ts� 732.48'Ts�
24°53'42"TΔ
C.R.02°00'00"
"L"
P
.0
.S
.0
L" P .S
.0
L"
S = 02°00'00" 200.00' Spiral
STE
6C
ESAR J. LOPEZ
91,176
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OITATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T T
O C
HA
NG
E
Cesar Lopez
N/A
Jonathan Solano
ST
ERE
N
V. 13, 2
C H
R
IS
T
INA L. L
A F
L E
U R
87,105
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T
TO
C
HA
NG
E
Jakob Eibel, PE
Christy LaFleur, PE
Jason Rice
Jason Rice
TRAFFIC CONTROL DETAILS
STOP
PREPARED
BE
TO
STOP
PREPARED
BE
TO
AHEAD
WORK
ROAD
AHEAD
WORK
ROAD
100'± la g g e r
A B
A/2
C W
W
C
C/2
C
W
Activity Area
Temporary Pedestrian Accessibility Route (TPAR)
Rumble Strip Cluster
C
C/2
B
B/2
A 100'±
50'-100'
Taper
"B"
Buffer
F la g g e r
C W
W
W
"B"
Buffer
50'-100'
Taper
Rumble Strip Cluster
NOTE:
ONE LANE CLOSURE
2-LANE, 2-WAY ROADWAY
SECTION A-A
Construction
Under
Traffic
2-Way
1-Lane
TPAR at each rumble strip cluster for additional warning.
As directed, "BUMP" signs (W8-1) may be placed temporary rumble strips. Use black material only.
DO NOT use white or other colored material for
Install rumble strips as shown.
RUMBLE STRIP NOTES:
NOTE:
on 10' spacing for flagger station delineation.
Use a minimum of 3 tubular markers in shoulder taper
F la g g e r
20'
10'
28" Tubular Marker
FLAGGER STATION DELINEATION
GENERAL NOTES FOR ALL DETAILS:
TM800 for max. spacing.
See TCD Spacing Table on
28" Tubular Markers
UNDER TRAFFIC
UNDER CONSTRUCTION
AHEAD
STRIPS
RUMBLE
48x24
CG20-2
ROAD WORK
END
CG20-2, 48x24
ROAD WORK
END
C
A
A
A/2 B/2
Rumble Strip Cluster*
Rumble Strip Cluster* advanced flagger.
When using Advanced Flaggers, use rumble strip clusters ahead of the than or equal to 4' wide, provide a minimum of 4' of width for the TPAR.
Flaggers, other TCM, or as directed. When the existing shoulder is greater
Coordinate and control pedestrians movements through the TPAR using before each Flagger.
Include CR4-23 signs mounted on Type II Barricade located approx. 50' the Activity Area, as shown or as directed.
the Tubular Marker spacing along centerline may be increased to 200' within
When using pilot cars with flaggers to control traffic during paving operations, closed and bikes are expected.
the closure when a bike lane is closed, or when the shoulder is
Install a "BICYCLES ON ROADWAY" (CW11-1) sign in advance of
CONTROL DEVICES (TCD) SPACING TABLE" on Drg. No. TM800.
To determine sign spacing A, B, and C, use "TRAFFIC use the "MINIMUM LENGTHS TABLE" shown on Drg. No. TM800.
To determine Taper Length ("L") and Buffer Length ("B"), Install temporary striping as required.
conjunction with the "BE PREPARED TO STOP" (W3-4) sign.
The "FLAGGER" (CW23-2) symbol sign shall be used only in
To be accompanied by Drg. Nos. TM821 on roads with AADTs under 4000.
* Rumble Strip Cluster is optionalAHEAD
STRIPS
RUMBLE
C u st o m
C u st o m
EA01
ACCOMPANIED BY DWGS.:
TM840, TM850, TM854, TM870
TM822, TM830, TM831, TM833,
TM800, TM810, TM820, TM821,
TZ_K21545_tc_01.dgn :: Daytime Flagging 10/17/2023 10:29:08 AM hwye07x
ST
ERE
V. 13, 2
C H
R
IS
T
INA L. L
A F
L E
U R
87,105
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T
TO
C
HA
NG
E
Jakob Eibel, PE
Christy LaFleur, PE
Jason Rice
Jason Rice
TRAFFIC CONTROL DETAILS
A A A A
A A
AHEAD
STRIPS
RUMBLE
17.3" 30.2" 17.3"
" 19.4"
6"D
4"
6"D
4"
6"D
19.4" strips will be located from.)
sign or device the rumble
(Designer - Specify which or as directed.
approaching condition
Warning sign used for (See details above)
Rumble Strip Cluster strips will be located from.)
sign or device the rumble
(Designer - Specify which or as directed.
approaching condition
Warning sign used for
(black, non-reflectorized) or Conditional Use List
Portable Rumble Strip from QPL specifications manufacturer recommended
Optional 4th Strip. Follow of Traffic Direction
W - S X = portable transverse rumble strips.
Do not include motorcycle gap with
Z
( W ) Lane Width
X
Traffic of
Direction
(three strips)
YX
(four strips) Y
12"
Milled rumble strip milled transverse rumble strips.
Motorcycle gap not necessary for
W = Width of travel lane in feet
W - 10 X =
( W ) Lane Width
(eleven grooves) 15'
10'
X
X
Traffic of
Direction spacing recommended
Z = Manufacturer
N = Number of Strips
Y = N*Z length in feet (10'-11')
S = Portable rumble strip
W = Width of travel lane in feet
", nom.4 124"
Pavement surface
(black, non-reflectorized)
Thermoplastic Type A
4"
4"
", nom.4 1(black, non-reflective) removeable tape overlapping, temporary, 3 strips of
(See Tape Overlap Detail below) removeable tape may be used.
For shorter durations, overlapped for 14 days or more.
used where strips are needed
Thermoplastic strips should be as shown.
consider providing a 2 foot gap motorcyclists can be expected, Where a significant number of
W = Width of travel lane in feet
W - 10
X =
X
( W ) Lane Width
2'
4'
4'
Traffic of
Direction
(six strips) 10'X
SECTION A-A SECTION A-A
RUMBLE STRIP CLUSTER
(For use on pavement surfaces)
PORTABLE TRANSVERSE RUMBLE STRIPSMILLED TRANSVERSE RUMBLE STRIPS
(For use on base course *)
RUMBLE STRIP CLUSTER
TAPE OVERLAP DETAILSECTION A-A
RUMBLE STRIP CLUSTER
RAISED TRANSVERSE RUMBLE STRIPS
(For use on wearing courses)
RUMBLE STRIP LOCATION
B
BC
C
(S) Length Strip
Pavement surface into existing surfacing.
strips may be milled pavement overlay, rumble
When project includes than 4,000 when AADT less
2nd Strip Optional
(See details above)
Rumble Strip Cluster
"4 16"±
"8 1"±2 each rumble strip cluster for additional warning.
As directed, "BUMP" signs (W8-1) may be placed at in each thru lane.
Multilane roadways shall have rumble strips clusters
Pavement surface temporary rumble strips. Use black material only.
DO NOT use white or other colored material for
See ODOT Traffic Manual for further information.
Traffic-Roadway Engineer approval is required for all other installations.
rumble strips during intermediate-term work, including night work. State daylight work. Region Traffic Engineer approval is required for portable transverse
Approval is not required for portable transverse rumble strips during short-term
GENERAL NOTES:
EA02
TZ_K21545_tc_01.dgn :: Daytime Flagging 10/17/2023 10:29:08 AM hwye07x
5 17
5 10
45 50 55
60 65
85 90
95 10
25 30 35 40 45 50 55
80 85
0 5
0 5
101520
ST
ERE
V. 13, 2
C H
R
IS
T
INA L. L
A F
L E
U R
87,105
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T
TO
C
HA
NG
E
Jakob Eibel, PE
Christy LaFleur, PE
Jason Rice
Jason Rice
TRAFFIC CONTROL DETOUR PLAN
PHASE 1
STAGE 1
TRAFFIC CONTROL PLAN
(Locate As Directed)
(Suggested Message)
OR126
WORK
BRIDGE
DELAYS
EXPECT
PORTABLE CHANGEABLE MESSAGE SIGN
(Suggested Message)
VARIABLE MESSAGE SIGN
PCMS
Temporary sign
LEGEND
VMS
C W 211'
WIDTH
MAX
(Suggested Message)
NIGHTS
CLOSED
OR126
DAYS
MAX 11'
OR126
VARIABLE MESSAGE SIGN
CLOSED NIGHTS
EAST OF BELKNAP
OR126
5.45"22.1"5.45"
2'-9"
4.5" 6"D 4.5"
BORDER
R=1.5"
TH=1.25"
IN=0.75"
4.9" 35.2" 4.9"
3'-9"
4.5" 6"D 4.5"
BORDER
R=1.5"
TH=1.25"
IN=0.75"
5.3" 55.5" 5.3"
5'-6"
5"
12"
6"
8"B
8"
8"B
6"
8"B
5"
BORDER
R=1.5"
TH=1"
A
B
C
2 3 4 5
A
A
B
C
EB01
TZ_K21545_tc_01.dgn :: 1in to 10mi 10/17/2023 10:29:10 AM hwye07x
ST
ERE
V. 13, 2
C H
R
IS
T
INA L. L
A F
L E
U R
87,105
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T
TO
C
HA
NG
E
Jakob Eibel, PE
Christy LaFleur, PE
Jason Rice
Jason Rice
TRAFFIC CONTROL DETOUR PLAN
PHASE 2
STAGE 1
TRAFFIC CONTROL DETOUR PLAN
CLOSED JULXX-XX
EAST OF BELKNAP
OR126
(Suggested Message)
VARIABLE MESSAGE SIGN
(Locate As Directed)
(Suggested Message)
47 MILES
CLOSED
OR126
TO I5
RETURN
TRUCKS
PORTABLE CHANGEABLE MESSAGE SIGN
(Locate As Directed)
(Suggested Message)
45 MILES
CLOSED
OR126
AROUND
TURN
TRUCKS
PORTABLE CHANGEABLE MESSAGE SIGN
(Locate As Directed)
(Suggested Message)
MP 55
CLOSED
OR126
OR58
USE
TRUCKS
PORTABLE CHANGEABLE MESSAGE SIGN
(Locate As Directed)
(Suggested Message)
CLOSED
WEST
OR126
ROUTE
ALT
USE
PORTABLE CHANGEABLE MESSAGE SIGN
(Locate As Directed)
(Suggested Message)
JULXX-XX
CLOSED
OR126
ROUTE
ALT
USE
PORTABLE CHANGEABLE MESSAGE SIGN
(Locate As Directed)
(Suggested Message)
45 MILES
CLOSED
OR126
ROUTE
ALT
USE
PORTABLE CHANGEABLE MESSAGE SIGN
6.65" 46.7" 6.65"
5'-0"
4" 6"C 3.38" 5"C 3.38" 4"C 4.25"
BORDER
R=1.88"
TH=0.75"
IN=0.5"
4.6" 38.8" 4.6"
4'-0"
5" 6"C 4" 6"D 4" 6"D 5"
BORDER
R=2.25"
TH=0.88"
IN=0.63"
15.5" 33.8" 15.5"
16.9"
7"D 4.75" 7"D
5.25"
7"C
16.9"
BORDER
R=3"
TH=1.25"
IN=0.75"
4.35"30.3"4.35"
3'-3"
5"
8"D
5"
BORDER
R=1.5"
TH=1.25"
IN=0.75"
(Suggested Message)
8 MILES
CLOSED
OR126
AROUND
TURN
TRUCKS
VARIABLE MESSAGE SIGN
R11-2
48x30
K
D I
F
G
H
E
J
EB02
5 17
5 10
45 50 55
60 65
85 90
95 10
25 30 35 40 45 50 55
80 85
0 5
0 5
101520
ST
ERE
V. 13, 2
C H
R
IS
T
INA L. L
A F
L E
U R
87,105
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T
TO
C
HA
NG
E
Jakob Eibel, PE
Christy LaFleur, PE
Jason Rice
Jason Rice
TRAFFIC CONTROL DETOUR PLAN
PHASE 2
STAGE 1
TRAFFIC CONTROL DETOUR PLAN
PCMS
Temporary sign
LEGEND
VMS
Sign on Barricade
K
F
F
D
I
J
E
G
G
10 H
EB03
ST
ERE
V. 13, 2
C H
R
IS
T
INA L. L
A F
L E
U R
87,105
RENEWS: 12-31-2024
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T
TO
C
HA
NG
E
Jakob Eibel, PE
Christy LaFleur, PE
Jason Rice
Jason Rice
TRAFFIC CONTROL PLAN
on 20' max. spacing
28" Tubular Markers
UNDER TRAFFIC
UNDER CONSTRUCTION
(AFAD)
Automated Flagging Assistance Device
PHASE 1
STAGE 1
TRAFFIC CONTROL PLAN
(reflectorized)
Temp. conc. barrier
DAYTIME FLAGGING, TYP.
on bridge on 10' max. spacing
Temp. Plastic Drums
NOTE:
construction bridge cross sections during
See sheet JB02 & JC02 for
500'
250'
500' 500' 500' 500' 100'±
100'± 500' 500' 500' 500' 500'
250'
C W
(All stages)
36x48
R4-1
(All stages)
W
(All stages)
W
W 1 (All stages)
36x48
R4-1
C W
W
ROAD WORK
END
center stripe
Temp. double yellow
BRIDGE
ONE LANE
(All stages)
STOP
PREPARED
BE
TO
48x48
W
W
PASS
NOT
DO
AHEAD
WORK
BRIDGE
(All stages)
ROAD WORK
ENDcenter stripe
Temp. double yellow
100'
Taper
100' Min.
Flare
100' Min.
Flare
100'
Taper
Temp. impact attenuators
STOP
PREPARED
BE
TO BRIDGE
ONE LANE
PASS
NOT
DO
AHEAD
WORK
BRIDGE
100'
Taper
100' Min.
Flare
100' Min.
Flare
100'
Taper
(reflectorized)
Temp. conc. barrier
Temp. impact attenuators
(All stages)
48x24
CG20-2A
(All stages)
48x24
CG20-2A
Stage I
Stage II
HERE ON
RED
STOP
24x36
R10-6
HERE ON
RED
STOP
24x36
R10-6
AHEAD
SIGNAL
W a
AHEAD
SIGNAL
W a from AFAD (All stages)
"STOP" line 10 feet back
Temp. 12 inch white from AFAD (All stages)
"STOP" line 10 feet back
Temp. 12 inch white
EC01
TZ_K21545_tc_01.dgn :: Daytime Flagging 10/17/2023 10:29:10 AM hwye07x
L"
P .C
.5
L" P .C
.5
L"
L"
OF TRANSPORTATION
OREGON DEPARTMENT
Checker:Drafter:
Designer:
SHEET NO.
STRUCTURE NO.
BDS DWG NO.
CALC. BOOK
COUNTY Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
HWY:
M.P.:
DATE
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T
TO
C
HA
NG
E
Matthew A. Stucker
Micheal D. Jacobson
Mark E. Lusby
Rhonda L. Freeman
SCALE WARNING
DRAWING IS NOT TO SCALE
MEASURE ONE INCH, THEN
IF THIS SCALE LINE DOES NOT
LANE
19.20
04/2024
09474
00000
ST
ERE
JU
LY 25, 1
M
A
RK E. LUSB
Y
14,990
RENEWS: 12-31-2024
LOST_CREEK_BRIDGE
McKe nzie Hwy. O
R21
Sp ri n g s
R d
S.
B el k n ap
Lost Creek
SPRINGS
BELKNAP
Old McKenzie Hwy.
WORK ITEMS
GENERAL NOTES
M in
NOTE:
f in is h d e c k
7 c o n c r e te d e c k p a r e n t
Deck texture after placing nosing. (gutter to gutter)
" x 45° chamfer, typ. each side 4
" to 16
Grind
Poured joint seal. Use non-sag sealant in curbs.
Bond breaker backer rod
LOCATION MAP
LAT. 44.187551 LONG. 122.0621
SEC. 10, T. 16S., R06E., W.M.
L a n e L a n e
R o a d w a y
182'-0" Out to Out along � Roadway, Prestressed Concrete Girders
S T
A
B e n t
B e n t
B e n t
B e n t
S T
A
B e n t
(Typ.)
JOINT DETAILS AT BENTS 1 & 5
� Roadway
PLAN
Scale: 1" = 20'
Phone Number 503-362-0457
(Agency Dispatch Center)
Route (RTE)
Highway No. (HWY)
Milepoint (MP)
Bridge No. (BR)
Structure Name
(See BR195)
BRIDGE IDENTIFICATION MARKER TABLE
OR 126
19.20
09474
Hwy 215 Lost Creek Bridge, Roadway Typical Sections Roadway approach, see 7"6" texture No deck m in
JOINT DETAILS AT BENTS 2, 3 & 4
Elastomeric concrete nosing (gutter to gutter)
HESC inlay Prepare and construct
Adjust Rail Transitions. (See BR273 and Grading Plans)
(See Bridge ID Marker Table, this sht., JD01 and BR195) Remove and replace Bridge Identification Markers.
1½” deep x ½” wide, fill with hot applied joint sealant.
Install poured joint seal. (See BR140)
Construct Elastomeric Concrete Nosing.
Remove existing edge steel armor.
2" nominal, with sawcut texturing, see Section 00540.50(c) Construct High Early Strength Concrete Overlay (HESC), (Hydrodemo), 0.50 inch. All spans.
Partial Depth Concrete Deck Removal (Micromill), 1.0 inch.
Partial Depth Concrete Deck Removal 1/4" nominal depth all spans.
Remove Multi-Layer Polymer Concrete Overlay (MPCO), HESC Structural Overlay 1.5" min. - 2.5" max.
1.5"), See note. (Total deck removal of parent deck using hydrodemolition equipment.
" depth 2 1using micromilling equipment. Remove additional
Remove existing MPCO and 1" depth of parent deck concrete
Existing reinforcement prior to fabrication or ordering materials.
considered approximate. Field verify dimensions in the 'For Information' drawings and are shown are based upon information shown Dimensions and geometry of the existing features
Design Deviation RX-XXX for XXXXXXXX
Provide HESC4500-3/4" for structural overlay.
as modified by the following:
the Bridge Design Category `Bridge Retrofit', of the “Oregon Bridge Design Manual”, in Design Specifications” and April 2023 edition with the 9th edition of the “AASHTO LRFD Bridge Work on Bridge 09474 is designed in accordance for Construction 2024”.
according to the “Oregon Standard Specifications Provide all materials and perform all work
7 6
1 2
4 3 4 3 4 3 4
JA01
Accompanied by drawings:
Sheets JB01, JC01, JD01, Std. Dwg. Nos. BR140, BR157, GENERAL NOTES
09474 - PLAN &
STRUCTURAL CONCRETE OVERLAY DETAIL
HESC Structural Overlay
Partial Deck Removal reinforcement prior to micro-milling.
Field verify location of existing
BR_K21545_gen_01.dgn :: JA01 10/17/2023 10:29:12 AM hwye07x
10" 7"
Poured joint seal hot applied joint " wide, fill with 2
1" deep X 2
1" @ 52° F
To Springfield
To Linn County
(T yp
L o st C re e k steel edge armor Cut and remove existing
Top of existing concrete deck
(See BR140) Elastometric concrete nosing.
McKENZIE HIGHWAY (OR 126)
Scale: No scale
"=1'-0"4 3 Scale:
SHEET NO.
STRUCTURE NO.
BDS DWG NO.
CALC. BOOK
COUNTY Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
HWY:
M.P.:
DATE
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T
TO
C
HA
NG
E
For accompanied by drawings, see sht. J01
Matthew A. Stucker
Micheal D. Jacobson
Mark E. Lusby
Rhonda L. Freeman
SCALE WARNING
DRAWING IS NOT TO SCALE
MEASURE ONE INCH, THEN
IF THIS SCALE LINE DOES NOT
LANE
04/2024
09474
ST
ERE
M
A
RK E. LUSB
Y
14,990
RENEWS: 12-31-2024
LOST_CREEK_BRIDGE
Abandoned drain
" of existing deck and PC Overlay2
Remove 1 2" HESC inlay
Prepare and construct
Existing Bridge Rail
Install joints.
Construct elastomeric concrete nosing.
Construct structural concrete overlay;
Remove steel edge armor;
Selective concrete deck removal;
and structural concrete overlay construction.
Close structure for selective concrete deck removal
STAGE 1:
JA02
TRAFFIC CONTROL PLAN09474 -
19.20
BR_K21545_gen_01.dgn :: JA02 10/17/2023 10:29:13 AM hwye07x
1'-2" 12'-0" 12'-0"1'-2"
26'-0" with 2.5" HESC overlay)
5" existing concrete deck thickness . (67.5"
To Linn County 13'-0"
To Springfield 13'-0"
North South
Under Construction - Closed to Traffic
� Roadway
� Roadway
TYPICAL SECTION
EXISTING
STAGE 1
Scale: No scale
Scale: 1" = 20'
SouthNorth
� Roadway
Scale: No scale
SHEET NO.
STRUCTURE NO.
BDS DWG NO.
CALC. BOOK
COUNTY Reviewer:
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
ANE COUNTYL
CLEAR LAKE - BELKNAP SPRINGS HIGHWAY
OLD MCKENZIE HWY. SEC.
OR126: LINN COUNTY LINE -
HWY:
M.P.:
DATE
F O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
AD
VA
NC
E C
OP
Y
SU
BJ
EC
T
TO
C
HA
NG
E
For accompanied by drawings, see sht. J01
Matthew A. Stucker
Micheal D. Jacobson
Mark E. Lusby
Rhonda L. Freeman
SCALE WARNING
DRAWING IS NOT TO SCALE
MEASURE ONE INCH, THEN
IF THIS SCALE LINE DOES NOT
LANE
17.76
04/2024
09846
ST
ERE
M
A
RK E. LUSB
Y
14,990
RENEWS: 12-31-2024
SCOTT_CREEK_BRIDGE
7"
11'-0"10'-0" 10'-0"11'-0"
M c K e n z ie H w y
O R
D S c o tt R d
Bo ul de r C re ek
N F 2
N F
Sc ot t C re ek
WORK ITEMS GENERAL NOTES
NOTE:
12'-6" 55'-0" 12'-5" f in is h d e c k
7 c o n c…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .