This document contains the specifications for a Price Agreement issued by the Oregon Department of Transportation (ODOT) for crack seal work in Region 4. The Price Agreement covers various highway sections across multiple districts and maintenance sections within the region. Purchases will be made through Work Order Contracts, with the delivery location specified in each work order. The specification outlines the technical requirements, including compliance with the 2021 Oregon Standard Specifications for Construction, as well as general requirements for mobilization, traffic control, equipment and operators, samples/inspection, and removal of unacceptable and unauthorized work. The contract includes items for mobilization, flaggers, automated flagger assistance devices, and crack sealing, to be measured and paid per linear foot.
The related state and local contract opportunity is an Invitation to Bid (ITB) for the R4 Crack Seal Price Agreement, which covers the jurisdictions of Deschutes County and the City of Bend. The contract is being issued by the state of Oregon.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 35774 bidcover.docx | DOCX document | |
| Attachment G_Responsibility Inquiry~1.docx | DOCX document | |
| 35774 Invitation to Bid.docx | DOCX document | |
| 35774 Sample Agreement.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
This Price Agreement is for crack seal work in Region 4. Purchases under this PA will be made using Work Order Contracts.
Delivery Location: The delivery location will be specified in each work order issued under the Price Agreement.
The mobilization areas are defined by District and by Maintenance Section, the details on these locations are as follows:
| District 11, Lake of the Woods Section |
| Hwy 270/OR 140 West MP 16.04 – MP 57.23 |
| District 11, Klamath Falls Section |
| Hwy 270/OR 140 West MP 57.23 - MP 68.76 |
Hwy 4/US 97 MP 257.83 – MP 591.73 Hwy 20/OR 140 East MP -0.14 – MP 53.66 Hwy 21/OR 66 MP 43.86 – MP 59.05 Hwy 23/OR 70 MP 0.00 – MP 6.97 Hwy 50/OR 39 MP -2.24 – MP 27.10 Hwy 484/US 97 MP 4.97 – MP 5.10 Hwy 420 MP 1.33 – MP 5.65
| District 11, Chiloquin Section |
| Hwy 4/US 97 MP 227.77 – MP 257.83 |
Hwy 22/OR62 MP 83-63 – MP 103.95 Hwy 422 MP 0.00 – MP 5.29 Hwy 422Y1 MP 4.39 – MP 4.58
| District 11, Adel Section |
| Hwy 49/US 395 MP 0.00 – MP 65.28 |
| District 11, Lakeview Section |
| Hwy 19/US 395/OR 31 MP 120.57 – MP 157.73 |
Hwy 20/OR 140 East 53.66 – MP 96.37
| District 11, Alkali Lake Section |
| Hwy 49/US 395 MP 0.00 – MP 90.02 |
| District 11, Chemult Section |
| Hwy 4/US97 MP 194.80 – MP 227.77 |
Hwy429 /OR58 MP 70.00 – MP 86.45
| District 11, La Pine Section |
| Hwy 4 /US97 MP 155.50 – MP 194.80 |
Hwy 19/OR31 MP 0.00 – MP 18.28
| District 11, Silver Lake Section |
| Hwy 19/OR31 MP 18.28 –MP 120.57 |
| District 10, Bend Section |
| Hwy 7/US20 MP 0.00 – MP 18.01 |
Hwy4/US97 MP 112.83 – MP 155.50 Hwy 372 MP 4.63 – MP 21.98
| District 10, Brothers Section |
| Hwy 7/US20 MP 18.01 – MP 104.62 |
| District 10, Sisters Section |
| Hwy16/OR20 MP 88.19 – MP 100.36 |
Hwy17/US20 MP 0.00 – MP 18.59 Hwy15/OR126 MP 76.65 – MP 111.94
| District 10, Madras Section |
| Hwy4/US97 MP 68.66 – MP 112.83 |
Hwy360/US26 MP16.30 – MP 96.48 Hwy53/US26 MP 96.48 – MP 117.70 Hwy 293 MP 0.00 – MP 13.5 Hwy 361 MP 0.00 – MP 11.62
| District 10, Prineville Section |
| Hwy 360/US26 MP 16.30 – MP 26.28 |
Hwy 380/US26 MP 0.00 – MP 55.91 Hwy 14/OR27 MP1.9 – MP 23 Hwy 370 MP 0.00 – MP17.60 Hwy 41/US26 MP 0.22 – MP 34.70
| District 10, Mitchell Section |
| Hwy 41/US 26 MP 34.79 – MP 98.39 |
Hwy 390/ OR207 MP 0.00 – MP 24.32
| District 9, Moro Section |
| Hwy 291/OR 218 MP 0.00 – MP 23 |
Hwy 42/US 97 MP 0.00 – MP 69 Hwy 290/OR 216 MP 7 - MP 28 Hwy 300/OR 206 MP 0.00 – MP 15 Hwy 301/OR 206 MP 4.8 – MP 16
| District 9, Condon Section |
| Hwy 5/OR 19 MP 17.06 – MP 58.14 |
Hwy 291/OR 218 MP 23.1 – MP 43 Hwy 300/OR 206 MP 15 – MP 54.9
| District 9, Arlington Section |
| Hwy 2/I-84 MP 114.2 – MP 159.3 |
Hwy 5/OR 19 MP 0.00 – MP17.06 Hwy 52/OR 74 MP 0.00 – MP 8
| District 9, The Dalles Section |
| Hwy 2/I-84 MP 64.44 – MP 114.2 |
Hwy 4/OR197 MP 0.00 – MP 1 Hwy 292/OR30 MP 18. – 20.2
| District 9, Warm Springs Junction Section |
| Hwy 44/OR216 MP 0 .00 – 13 |
Hwy 53/OR26 MP 62 – 96.5
| District 9, Maupin Section |
| Hwy 4/OR197 MP 1 – 67 |
Hwy 290/OR216 MP 0.00 – 8 Hwy44/OR216 MP 13 – MP 26
1. SPECIFICATIONS
a. The apparent silence of the specification as to any detail or the apparent omission of the detailed description concerning any point, shall be regarded as meaning that Contractor shall meet the highest standards prevalent in the industry or business most closely involved in providing the Goods and Services to be provided under the Price Agreement. In addition to any special instructions included in the Work Order, Contractor shall comply with the following technical Specification in performance of each Work Order issued under the Price Agreement.
b. 2021 OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION: The 2021 Oregon Standard Specifications for Construction (Standard Specifications), incorporated herein by reference, including detailed technical specifications, apply to this work order. Some sections of the Technical Specifications are identified and modified below. Sections of the Technical Specifications not identified below remain applicable to the Work Order according to their original terms. Part 00100 of the standard specification (General conditions) is not applicable to this work order; however, if a technical specification references a section from Part 00100, the section applies to the Work Order for purposes of supporting and giving full effect to the technical specifications. The standard specifications are available online at: https://www.oregon.gov/ODOT/HWY/SPECS/pages/standard_specifications.aspx
2. GENERAL SPECIFICATIONS
a. Work performed and all Goods furnished are subject to inspection and testing by the Project Manager to determine if they conform to contractual requirements. Final acceptance will be given by the Project Manager upon satisfactory completion of work.
b. Contractor must complete all work at site prior to moving to another site.
c. MOBILIZATION: Contractor shall comply with Section 00210 of the Standard Specifications. Payment for Mobilization will be made at the lump sum amount for the item "Mobilization" per requested response - not by individual repair location.
d. TRAFFIC CONTROL: Contractor shall comply with Sections 00220, 00221, 00222, 00223 and 00224 of the Standard Specifications. For temporary closures of three days or less the most recent version of the "Oregon Temporary Traffic Control Handbook" may be used. This manual can be found at: https://www.oregon.gov/ODOT/HWY/TRAFFIC-ROADWAY/Pages/ottch.aspx
Contractor shall submit to the Project Manager a proposed Traffic Control Plan (TCP) and not start work on any stage of construction until the TCP has been reviewed and accepted and all Traffic Control Measures are in place and the TCP is operating satisfactorily.
With the exception of Flaggers, all materials, labor, and equipment for traffic control are incidental to the crack sealing work and no separate payment will be made for this work.
e. ENVIRONMENTAL PROTECTION: Contractor shall comply with Section 00290 of the Standard Specifications.
f. EQUIPMENT AND OPERATORS: Contractor shall furnish all equipment and operators required to perform the specified work and shall be responsible for the maintenance of said equipment and training of said operators.
g. SAMPLES/INSPECTION: The Project Manager reserves the right to take and test material samples and to reject any material not meeting the referenced specifications. It is agreed and understood that Contractor will replace all rejected material with material meeting the specifications at no additional cost to ODOT.
h. Removed materials will become the property of Contractor at the point of removal and must be disposed of in the manner specified in the Standard Specifications or a manner satisfactory to the Project Manager, whichever is applicable.
i. REMOVAL OF UNACCEPTABLE AND UNAUTHORIZED WORK: Contractor shall correct or remove work that does not meet the specifications, or unauthorized work, as directed by the Project Manager in writing. Contractor shall replace such work with work and materials conforming to the requirements of the Work Order. For the purposes of this subsection, "unauthorized work" includes without limitation the following:
· Work that extends beyond those limits established by the Work Order
· Work that is contrary to the Project Manager's instructions; and
· Work that is conducted without the Project Manager's written authorization.
ODOT will not pay the Contractor for unauthorized or unacceptable work. The Project Manager may issue a written order for the correction or removal of such work at Contractor's expense.
If, when ordered by the Project Manager, Contractor fails to correct or remove unacceptable or unauthorized work, the Project Manager may have the correction, or removal and replacement, done by others and deduct the entire cost from monies due or to become due the Contractor under the Work Order.
j. Contractor shall coordinate work with other State contract work so as not to interfere with their operation as identified by the Project Manager. Contractor shall also obtain from and pay for all applicable city, county, regional or other local, state or federal governmental entity, any required permits or noise variances for all work, including any nighttime work.
3. TECHNICAL SPECIFICATIONS:
The 2021 OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION are modified to make the listed provisions read as follows, with any non-referenced provision remaining unchanged:
00746.00 Scope:
Work on this contract consists of supplying all labor, equipment, material and machinery, for crack sealing designated by Engineer on State highway section. Crew size will be the contractor’s option, but the crew must be able to prepare and seal approximately 10,000 linear feet per 10-hour shift.
Measurement
00746.80 Measurement – The quantities of sealed cracks will be measured by length in linear feet.
Payment
00746.90 Payment – The accepted quantities of sealed cracks will be paid for at the Contract unit price, per linear foot as appropriate, for item “Crack Sealing”.
Payment will payment in full for furnishing and placing all materials, and for furnishing all equipment, labor, and incidentals necessary to complete the work as specified.
No separate or additional payment will be made for required cleaning and routing.
ITEM
| DESCRIPTION |
| UNIT |
| UNIT PRICE |
| 1-1 |
| Mobilization District 11, Lake of the Woods Section |
| Each |
| 1-2 |
| Mobilization District 11, Klamath Falls Section |
| Each |
| 1-3 |
| Mobilization District 11, Chiloquin Section |
| Each |
| 1-4 |
| Mobilization District 11, Adel Section |
| Each |
| 1-5 |
| Mobilization District 11, Lakeview Section |
| Each |
| 1-6 |
| Mobilization District 11, Alkali Lake Section |
| Each |
| 1-7 |
| Mobilization District 11, Chemult Section |
| Each |
| 1-8 |
| Mobilization District 11, La Pine Section |
| Each |
| 1-9 |
| Mobilization District 11, Silver Lake Section |
| Each |
| 1-10 |
| Mobilization District 10, Bend Section |
| Each |
| 1-11 |
| Mobilization District 10, Brothers Section |
| Each |
| 1-12 |
| Mobilization District 10, Sisters Section |
| Each |
| 1-13 |
| Mobilization District 10, Madras Section |
| Each |
| 1-14 |
| Mobilization District 10, Prineville Section |
| Each |
| 1-15 |
| Mobilization District 10, Mitchell Section |
| Each |
| 1-16 |
| Mobilization District 9, Moro Section |
| Each |
| 1-17 |
| Mobilization District 9, Condon Section |
| Each |
| 1-18 |
| Mobilization District 9, Arlington Section |
| Each |
| 1-19 |
| Mobilization District 9, The Dalles Section |
| Each |
| 1-20 |
| Mobilization District 9, Warm Springs Junction Section |
| Each |
| 1-21 |
| Mobilization District 9, Maupin Section |
| Each |
| 2 |
| Flaggers |
| Hour |
| 3 |
| Automated Flagger Assistance Device |
| Each |
| 4 |
| Crack Seal |
| Linear Foot |
SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC
Comply with Section 00220 of the Standard Specifications modified as follows:
00220.02(a) General Requirements - Add the following bulletpoint to the end of the bullet list:
· Accommodate all over-dimensional loads through the work zone. Do not hold or delay over-dimensional loads for more than 20 minutes.
00220.03(a) Over-Dimensional Vehicle Restrictions - Replace this subsection, except subsection number and title, with the following:
When the Project restricts the width, length, height, or weight of vehicles through a work zone or detours trucks around a work zone, fill out and submit a completed copy of the "Highway Restriction Notice - Size and/or Weight" form (Form No. 734-2357), available from the ODOT Oregon Trucking Online website (see 00110.05(e)), at least 35 Calendar Days before the restriction or detour takes effect.
00220.40(e)(1) Closed Lanes - Replace this subsection, except for the subsection number and title, with the following:
One Traffic Lane may be closed on the (Highway Name)_____ Highway (_Route No._) when allowed, shown, or directed during the following periods of time except as specified in 00220.40(e)(2):
· Single lane flagger-controlled closure is allowed Daily, Monday through Thursday, between 5:00 a.m. – 5:00 p.m., except no work is allowed from May 22nd through June 1st.
SECTION 00221 – COMMON PROVISIONS FOR WORK ZONE TRAFFIC CONTROL
Comply with Section 00221 of the Standard Specifications modified as follows:
00221.02 General Requirements - Add the following to end of this subsection:
Contractor shall perform the work zone traffic control according to Standard Drawings TM800, TM820, TM821, TM822, TM850 and TM854.
00221.90(b) Temporary Protection and Direction of Traffic ‑ Delete the bullet that reads “Moving temporary barrier to and from Contractor’s stockpile areas”.
Replace the bullet that begins "When the Schedule of Items does not include …" with the following bullet:
• Preparing and signing the daily “Traffic Control Inspection Report”, when a TCS is not included in the Schedule of Items or when a TCS is not onsite for a work shift.
SECTION 00222 – TEMPORARY TRAFFIC CONTROL SIGNS
Comply with Section 00222 of the Standard Specifications modified as follows:
00222.40(e) Temporary Sign Placement ‑ Add the following to the end of the bullet list:
Place a “WAIT FOR FLAGGER” (CR4-23) sign approximately 50 feet in advance of each flagger station, facing incoming pedestrian traffic. Install the sign on a conical marker or other temporary sign support, as shown or as directed. Do not allow the sign installation height or location to block the visibility of the flagger for incoming public traffic.
SECTION 00223 - WORK ZONE TRAFFIC CONTROL LABOR AND VEHICLES
Comply with Section 00223 of the Standard Specifications modified as follows:
00223.31(b) Traffic Control Inspection Without TCS ‑ Replace the bullet that begins “Prepares and signs a daily “Traffic Control Inspection Report”…” with the following bullet:
· Prepares and signs a “Traffic Control Inspection Report” (Form No. 734-2474) upon the initial installation of TCM and each working day when any modification, removal, or reinstallation of TCM are made, or as directed by the Engineer. Submit completed reports to the Engineer no later than the end of the next working day.