35586 Plans.pdf

PDF 620 KB Posted

Attached to
ITB - Gap Quarry Chip Rock Production
Solicitation number
S-73000-00005923
Issued by
Harney County, Oregon

About this file

The document provided contains plans and specifications for the Gap (M.P. 87) Quarry Chip Rock Production project in Harney County, Oregon. The project is being conducted by the Oregon Department of Transportation (ODOT) for the Central Oregon Highway (US20 / Central Oregon Hwy No. 007) at Mile Post 87.16. The plans detail the excavation and processing area for the production of 3/8" chip rock scalpings, including the location of existing stockpiles, proposed stockpiles, air track drill holes, and core hole locations. The project boundary, excavation area, and safety berm specifications are also included.

The related state and local contract opportunity is an Invitation to Bid (ITB) for the Gap Quarry Chip Rock Production project, involving the jurisdictions of Deschutes County and the City of Bend. No additional details are provided regarding pricing terms, set asides, incumbents, funding requirements, or other salient information.

View the file

Other files

File Type Posted
35586 Sample Contract.docx DOCX document
35586 Site Narrative.pdf PDF
35886 Specifications.docx DOCX document
DOR-032-23 Collections Training RFQ - Final.doc DOC document
35586 Bid Cover Sheet.docx DOCX document
35586 Invitation to Bid.docx DOCX document
35586 Preliminary Bid Tabs.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Reject Fines

3/8" Chip Rock

Scalpings

Stockpiles

Existing

Processing Area

Stockpile &

Stockpile

Existing

86 M iles

Bend

O D

O T C o n tr o l

B o u n d a r y

ODOT Control Boundary

ODOT Control Boundary

= No Work Area

No Work Area

S E C

N E

S W

S E C

N E

S E

SEC. 334

1 NE4

1NE

SEC. 334

1 NE4

1SE

43 M iles

BURNS

= Fence

= Excavation Area

= Project Boundary

LEGEND

FEET

150300 300

= Gate

SITE PLAN LAYOUT

Detail for Site Plan

See Sheet "GE02"

= Safety Berm

= Existing Access Road/Edge of Gravel

= Proposed Bench Access Road air track drill hole locations.

3. See Sheet "GE02" for approximate core hole and

2. 5' Contour interval.

Vertical Datum (1988).

1. Elevations are based on North American

GENERAL NOTES

= Proposed Material Stockpile

= Existing Material Stockpile

No Work Area

No Work Area

O D

O T C o n tr o l B o u n d a r y

O D

O T C o n tr o l

B o u n d a r y

ODOT Control Boundary

US20 / CENTRAL O

REGO

N HW

Y NO

. 007

MGL_2018_GapQuarry_GE01_12-2022.dgn :: ROW 2/2/2023 4:29:24 PM hwye44a 1"=300' Scale: Rotation: 0°

Scott D. Billings

N/A

Micah G. Lederer

Micah G. Lederer

GE01

OF TRANSPORTATION

OREGON DEPARTMENT

Checker:Drafter:

Designer:

SHEET NO.

STRUCTURE NO.

BDS DWG NO.

CALC. BOOK

COUNTY Reviewer:

AVAILABLE UPON REQUEST

FINAL ELECTRONIC DOCUMENT

HARNEY COUNTY, OREGON

CENTRAL OREGON HIGHWAY

ODOT R4 DISTRICT 10 MAINTENANCE

GAP (M.P. 87) QUARRY CHIP ROCK PRODUCTION

HWY:

M.P.:

HWY:

M.P.:

DATE

F O

T N

E

MTRAPED

N

O G

E R

O

N

OI

T

ATROPS

N A

R T

Sec. 33, T. 23 S., R. 24 E. W.M. 2 1N

CENTRAL OREGON HWY. 007, US 20 M.P. 87.16

SOURCE # OR-13-061-5 DOGAMI # 13-0003

GAP (M.P. 87) QUARRY

PROSPECTIVE MATERIAL SOURCE

C RETIIFED

OREGON

E N

GINEERING GEOLO

G

STI

E2726

EXPIRES: 10-01-2023

MICAH G. LEDERER

No Work Area

Processing Area

A B

= No Work Area

A

= Excavation Area

= Project Boundary

LEGEND

FEET

3060 60

No Work Area

No Work Area

SITE PLAN DETAIL

Processing Area

To Stockpile &

To Processing Area

= Safety Berm

= Proposed Bench Access Road

AT18-03

AT18-04

AT18-02

AT18-05

AT18-06

AT18-17

AT18-13

AT18-01

AT18-15

AT18-16

AT18-14

= Air Track Drill Hole Location

= Core Hole Location

3. 2' Contour interval.

approximate and have not been surveyed.

2. Core hole and air track drill hole locations are

Datum (1988).

1. Elevations are based on North American Vertical

GENERAL NOTES

O versize

Existing

= Existing Material Stockpile

TH-3-96

TH-4-96

TH-5-96

MGL_2018_GapQuarry_GE02_v2_12-27-2022.dgn :: ROW 2/1/2023 3:55:04 PM hwye44a 1"=60' Scale: Rotation: 0°

Scott D. Billings

N/A

Micah G. Lederer

Micah G. Lederer

GE02

B

TH-2-96

Sec. 33, T. 23 S., R. 24 E. W.M. 2 1N

CENTRAL OREGON HWY. 007, US 20 M.P. 87.16

SOURCE # OR-13-061-5 DOGAMI # 13-0003

GAP (M.P. 87) QUARRY

PROSPECTIVE MATERIAL SOURCE

C RETIIFED

OREGON

E N

GINEERING GEOLO

G

STI

E2726

EXPIRES: 10-01-2023

MICAH G. LEDERER

OF TRANSPORTATION

OREGON DEPARTMENT

Checker:Drafter:

Designer:

SHEET NO.

STRUCTURE NO.

BDS DWG NO.

CALC. BOOK

COUNTY Reviewer:

AVAILABLE UPON REQUEST

FINAL ELECTRONIC DOCUMENT

HARNEY COUNTY, OREGON

CENTRAL OREGON HIGHWAY

ODOT R4 DISTRICT 10 MAINTENANCE

GAP (M.P. 87) QUARRY CHIP ROCK PRODUCTION

HWY:

M.P.:

DATE

F O

T N

E

MTRAPED

N

O G

E R

O

N

OI

T

ATROPS

N A

R T

46804680

0 40 80 200 240120 160

SECTION B-B

VERT. SCALE: 1":40'

HORIZ. SCALE: 1":40'

SECTION A-A

VERT. SCALE: 1":40'

HORIZ. SCALE: 1":40'

CROSS SECTIONS

10'

SAFETY BERM DETAIL

NO SCALE

V :1

H

1V:

2H

Excavation Area

Excavation Area

Proposed Safety Berm

V :1

H

V :1

H

V :1

H

V :1

H

Proposed Safety Berm (see detail this sheet)

Proposed Safety Berm (see detail this sheet)

Proposed Safety Berm (see detail this sheet)

Proposed Safety Berm (see detail this sheet)

Original Ground

Finish Ground

Finish Ground

Original Ground

47004700

400 44036080 1200 40 160 280 320200 240

Project BoundaryNo Work Area

Loose shot material

Access Road (approx.)

Proposed Bench

Loose shot material

MGL_2018_GapQuarry_GE03_12-28-2022.dgn :: ROW 2/1/2023 4:00:01 PM hwye44a 1"=40' Scale: Rotation: 0°

GE03

Scott D. Billings

N/A

Micah G. Lederer

Micah G. Lederer

OF TRANSPORTATION

OREGON DEPARTMENT

Checker:Drafter:

Designer:

SHEET NO.

STRUCTURE NO.

BDS DWG NO.

CALC. BOOK

COUNTY Reviewer:

AVAILABLE UPON REQUEST

FINAL ELECTRONIC DOCUMENT

HARNEY COUNTY, OREGON

CENTRAL OREGON HIGHWAY

ODOT R4 DISTRICT 10 MAINTENANCE

GAP (M.P. 87) QUARRY CHIP ROCK PRODUCTION

HWY:

M.P.:

DATE

F O

T N

E

MTRAPED

N

O G

E R

O

N

OI

T

ATROPS

N A

R

TC RETIIFED

OREGON

E N

GINEERING GEOLO

G

STI

E2726

EXPIRES: 10-01-2023

MICAH G. LEDERER

Sec. 33, T. 23 S., R. 24 E. W.M. 2 1N

CENTRAL OREGON HWY. 007, US 20 M.P. 87.16

SOURCE # OR-13-061-5 DOGAMI # 13-0003

GAP (M.P. 87) QUARRY

PROSPECTIVE MATERIAL SOURCE

2023-02-07T12:46:29-0800
LEDERER Micah G
2023-02-07T12:46:33-0800
LEDERER Micah G
2023-02-07T12:46:38-0800
LEDERER Micah G

File details come from the government source that posted it. Updated .