34936 Preliminary Bid Tab.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- ITB - US97: MP 179. 97 - 183. 15 Wildlife Fence
- Solicitation number
- S-73000-00000076
- Issued by
- Jackson County, Oregon
About this file
This is a Preliminary Bid Tab from the Oregon Department of Transportation (ODOT) for the Roberts Mountain Riparian Planting project. The project involves comprehensive riparian restoration services including mobilization, erosion control, permanent seeding, soil testing, soil conditioning, tree and shrub planting, wetland plant installation, mulching, browse protection, and two years of plant establishment and maintenance. The bid tab reflects quantities for 3 acres of permanent seeding (Mix No. 2), 308 deciduous trees, 704 bare root shrubs, 1,300 plant cuttings, 1,320 wetland plant plugs, 1,012 browse protection units, and various materials including soil conditioner and compost mulch. Three contractors submitted bids for consideration: Andersons Erosion Control (LCB License 5095) with a total bid of $109,432.80, Erosion Control TBI (License 8096) with a total bid of $137,759.00, and Mountain Sky (License 8447) with a total bid of $349,656.50.
The bid pricing demonstrates significant variation among contractors, with Andersons Erosion Control submitting the lowest responsive bid at $109,432.80, followed by Erosion Control TBI at $137,759.00, and Mountain Sky at substantially higher pricing of $349,656.50. Unit pricing across the three bidders shows notable differences, particularly in Mobilization (ranging from $9,000 to $78,500), Deciduous Trees (ranging from $10.50 to $58.00 per unit), and Shrubs, Bare Root (ranging from $3.50 to $52.00 per unit), indicating varying cost structures and project approaches among the contractors. All bidders held valid Oregon Construction Contractors Board licenses, meeting the licensing requirements for state-funded public improvement contracts. The significant bid spread suggests differing interpretations of scope complexity or overhead allocation strategies among the competing contractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Standard Drawings.pdf | ||
| 00000076 Amendment 1.docx | DOCX document | |
| 34944 Prelim Bid Results.xlsx | XLSX spreadsheet | |
| Plans.pdf | ||
| 34944 Intent to Award.xlsx | XLSX spreadsheet | |
| Special Provisions.doc | DOC document | |
| Invitation to Bid~1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Preliminary Bid Results - Roberts Mountain Riparian Planting | |||||||||
| Contractor | Andersons Erosion Control | TBI | Mountain Sky | ||||||
| LCB License | 5095 | 8096 | 8447 | ||||||
| Bid Item | Description | ||||||||
| Unit | Quantity | Unit Price | Total Price | Unit Price | Total Price | Unit Price | Total Price | ||
| 1 | Mobilization | Lump Sum | 1 | $9,000.00 | $9,000 | $10,500.00 | $10,500 | $78,500.00 | $78,500 |
| 2 | Erosion Control | Lump Sum | 1 | $1,500.00 | $1,500 | $3,900.00 | $3,900 | $68,840.00 | $68,840 |
| 3 | Permanent Seeding, Mix No. 2 | Acre | 3 | $8,300.00 | $24,900 | $2,500.00 | $7,500 | $12,500.00 | $37,500 |
| 4 | Soil Testing | Each | 5 | $500.00 | $2,500 | $300.00 | $1,500 | $450.00 | $2,250 |
| 5 | Soil Conditioner | Cubic Yard | 43 | $130.00 | $5,590 | $295.00 | $12,685 | $150.00 | $6,450 |
| 6 | Deciduous Trees, #1 Container | Each | 308 | $10.50 | $3,234 | $52.00 | $16,016 | $58.00 | $17,864 |
| 7 | Shrubs, Bare Root | Each | 704 | $3.50 | $2,464 | $35.00 | $24,640 | $52.00 | $36,608 |
| 8 | Plant Cuttings, less than 1 inch | Each | 1300 | $7.00 | $9,100 | $5.52 | $7,176 | $19.50 | $25,350 |
| 9 | Wetland Plants, Plugs | Each | 1320 | $4.00 | $5,280 | $9.25 | $12,210 | $15.50 | $20,460 |
| 10 | Compost Mulch | Cubic Yard | 10 | $140.00 | $1,400 | $150.00 | $1,500 | $175.00 | $1,750 |
| 11 | Browse Protection | Each | 1012 | $5.40 | $5,465 | $11.00 | $11,132 | $19.50 | $19,734 |
| 12 | First Year Plant Establishment | Lump Sum | 1 | $20,000.00 | $20,000 | $18,000.00 | $18,000 | $21,851.00 | $21,851 |
| 13 | Second Year Plant Establishment | Lump Sum | 1 | $19,000.00 | $19,000 | $11,000.00 | $11,000 | $12,500.00 | $12,500 |
| TOTAL BID AMOUNT | $109,432.80 | $137,759.00 | $349,656.50 |
File details come from the government source that posted it. Updated .