3454591_CDRL1_REPORT.pdf

PDF 139 KB Posted

Attached to
Repair Position Indicator Federal contract opportunity
Solicitation number
FA8117-22-R-0015
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

View the file

Other files for this federal contract opportunity

Other files attached to Repair Position Indicator, newest first.
File Type Posted
FA811722R0015.pdf PDF
3456207_ATTACH.pdf PDF
3454962_ATTACH.pdf PDF
3454981_ATTACH.pdf PDF
3454969_ATTACH.pdf PDF
3454991_ATTACH.pdf PDF
3454977_ATTACH.pdf PDF
3454986_ATTACH.pdf PDF
3456213_TRNSPDATA_REPORT.pdf PDF
3456212_PKGRQMT_REPORT.pdf PDF
3454958_ATTACH.pdf PDF
3454992_ATTACH.pdf PDF
3454963_ATTACH.pdf PDF
3456046_PWS.pdf PDF
CRSAW (-0609).pdf PDF
CRSAW (-2759).pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

KC-135 /Indicator, Position

E. CONTRACT / PR NO.

FD20302201063

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Teardown Deficiency Report

3. SUBTITLE

TDR

4. AUTHORITY

DI-PSSS-81534A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 23 MAR 2022DATE:

THIS CDRL WILL SERVE BASIC YEAR AND ALL OPTION YEARS

Changes to the office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

BLOCK 9: Distribution Statement D: Distribution authorized to the Department of Defense and US DOD Contractors only, Critical Technology. Other requests shall be referred to 848 SCMG/EN.

Control Warning Notice: Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751 Et Seq) or the Export Administration Act of 1979, Title 50, USC, App 240 I Et Seq, as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.

Destruction Notice for Unclassified Documents: destroyed by any method that will prevent disclosure of contents or reconstruction of the document.

Destruction Notice for Classified Documents: Follow the procedures in DOD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DOD 5220.0 I M, Information Security Program , Vol 3, Protection of Classified Information.

BLOCKS 10, 11, 12, and 13: To be negotiated upon government's request.

COORDINATORS:

422 SCMS/GUME

3001 Staff Drive, Annex 4, Suite 1AF1 92B Tinker AFB, OK 73145-3033 Attention : Jeremy P. Marshall

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAB

405-736-7976

H. DATE

24 MAR 2022

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Marshall, Jeremy P

422 SCMS / GUME 405-734-5839 / 884-5839

J. DATE

23-MAR-22

Page 1 of 10DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 28 Mar 2022

PREVIOUS EDITION MAY BE USED.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

KC-135 /Indicator, Position

E. CONTRACT / PR NO.

FD20302201063

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Counterfeit Prevention Plan (CPP)

3. SUBTITLE

CPP

4. AUTHORITY

DI-MISC-81832

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 23 MAR 2022DATE:

THIS CDRL WILL SERVE BASIC YEAR AND ALL OPTION YEARS

Block 9: Distribution Statement D: Distribution authorized to the Department of Defense and US DOD Contractors only, Critical Technology. Other requests shall be referred to 848 SCMG/EN.

Control Warning Notice: Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751 Et Seq) or the Export Administration Act of 1979, Title 50, USC, App 240 I Et Seq, as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.

Destruction Notice for Unclassified Documents: destroyed by any method that will prevent disclosure of contents or reconstruction of the document.

Destruction Notice for Classified Documents: Follow the procedures in DOD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DOD 5220.0 I M, Information Security Program , Vol 3, Protection of Classified Information.

The plan shall be delivered in electronic PDF format through the Wide Area Workflow (WAWF) system no later than 90 calendar days after contract award. (FA8117)

Contractor format acceptable unless otherwise defined by applicable Data Item Description (DID).

DID Requirements NOT Tailored

Delivery CANNOT Be Deferred

COORDINATORS:

422 SCMS/GUEA

3001 Staff Drive Tinker AFB, OK 73145

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAB

405-736-7976

H. DATE

24 MAR 2022

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Marshall, Jeremy P

422 SCMS / GUME 405-734-5839 / 884-5839

J. DATE

23-MAR-22

Page 2 of 10DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 28 Mar 2022

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

KC-135 /Indicator, Position

E. CONTRACT / PR NO.

FD20302201063

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Production Surge Plan

3. SUBTITLE

Capability Analysis Plan (CAP)

4. AUTHORITY

DI-MGMT-80969

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 23 MAR 2022DATE:

THIS CDRL WILL SERVE BASIC YEAR AND ALL OPTION YEARS

In the event that the DoD experiences an unplanned spike or sudden increase in demand, due to major theater warfare or a national emergency (also known as surge, reference DFARs 217.208-70 and DFARs 252.217.7001), and invokes surge: The Contractor is willing to work to meet and sustain this demand for quantity levels above and beyond normal peacetime requirements.

Block 9: Approved for Unlimited Public and Foreign Distribution. Other requests shall be referred to 422 SCMS/GUEA.

Block 10, 11, 12, 13: The Capability Analysis Plan (CAP) shall be prepared IAW DI-MGMT-80969 and shall be submitted 30 days after the contract award.

This Plan shall include a delivery schedule showing the maximum sustainable rate of delivery for items in this contract.

This delivery schedule shall provide acceleration by month up to the maximum sustainable rate of delivery achievable within the Contractor's existing facilities, equipment, and subcontracting structure. This Plan will address the surge capacity possible at no increase to the contract prices as well as the surge capacity possible at an additional cost. Based on this Plan, a mutually agreed to increase the quantity of supplies or services called for under this contract by no more than x % percent; and the accelerate the rate of delivery may be established for this contract, at a price or cost established after contract award or to be established by negotiation.

COORDINATORS:

422 SCMS/GUME

3001 Staff Drive, Annex 4, Suite 1AG192B Tinker AFB, OK 73145-3033 Attention: Jeremy Marshall jeremy.marshall.5@us.af.mil

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAB

405-736-7976

H. DATE

24 MAR 2022

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Marshall, Jeremy P

422 SCMS / GUME 405-734-5839 / 884-5839

J. DATE

23-MAR-22

Page 3 of 10DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 28 Mar 2022

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

KC-135 /Indicator, Position

E. CONTRACT / PR NO.

FD20302201063

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Engineering Change Proposal (ECP)

3. SUBTITLE

N/A

4. AUTHORITY

DI-SESS-80639E

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

422 SCMS/GUEA

7. DD 250 REQ

DD

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

ASREQ

11. AS OF DATE

As Required

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 23 APR 2020DATE:

THIS CDRL WILL SERVE BASIC YEAR AND ALL OPTION YEARS

Blk 4: Contractor format or as 9102 format or equivalent is acceptable. The contract, CDRL number, document name, date of submission and document number shall appear on the first page of deliverable.

Blk 7: All inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports.

Blk 8: Government written notice of approval/disapproval is 30 days after receipt of contractor's report.

Blk 9: DISTRIBUTION STATEMENT B. Distribution authorized to U.S. Government agencies proprietary information (3 April 2020). Other requests for this document shall be referred to 848 SCMG/EN, Tinker Air Force Base, Oklahoma.

Control Warning Notice: WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

Destruction notice for unclassified/limited documents: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

The above Distribution Statement, Warning, Destruction Notice shall be displayed or affixed to the data in a conspicuous position.

Blk 13: To be determined

COORDINATORS:

422 SCMS/GUEA

3001 Staff Drive, Annex 4 Tinker Air Force Base, Oklahoma 73145

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAB

405-736-7976

H. DATE

24 MAR 2022

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Marshall, Jeremy P

422 SCMS / GUME 405-734-5839 / 884-5839

J. DATE

23-MAR-22

Page 4 of 10DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 28 Mar 2022

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

KC-135 /Indicator, Position

E. CONTRACT / PR NO.

FD20302201063

F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Commercial Asset Visibility (CAV) Reporting

3. SUBTITLE

CFM End Item Reporting

4. AUTHORITY

DI-MGMT-81838

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

See Block 16

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

DD

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

Seee Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 23 MAR 2022DATE:

THIS CDRL WILL SERVE BASIC YEAR AND ALL OPTION YEARS

NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

1. Block 5: Contract Reference: PWS and CAV AF Reporting Requirements Document.

2. Block 4: All reporting shall be submitted in the English Language.

3. Blocks 10, 11, 12, 13:

a. Date of first submission shall be within 24 hours following a supply or maintenance transaction, after the contract award date.

b. Contractor reporting requirements to CAV AF shall be submitted daily and/or within 24 hours of a supply or maintenance action occurrence IAW the CAV AF Reporting Requirements Document.

c. Data shall be current within 24 hours of the last End Item maintenance occurrence.

4. Blocks 7, 8, 14:

a. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF website or CICA XML.

b. The contractor shall submit a DD Form 250 (Material Inspection and Receiving Report) electronically via the Internet to iRAPT (WAWF) website address: https://wawf.eb.mil, using DODAAC FA8251. MARK FOR: Address in block 14A.

c. A Letter of Transmittal shall be submitted in the month the delivery order is completed, covering all reports transmitted for that order. Submit the Letter to the following email address: jeremy.marshall.5@us.af.mil

COORDINATORS:

See Block 16 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAB

405-736-7976

H. DATE

24 MAR 2022

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Marshall, Jeremy P

422 SCMS / GUME 405-734-5839 / 884-5839

J. DATE

23-MAR-22

Page 5 of 10DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 28 Mar 2022

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

KC-135 /Indicator, Position

E. CONTRACT / PR NO.

FD20302201063

F. CONTRACTOR

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

Government Property Inventory Report

3. SUBTITLE

Government Property Inventory Report

4. AUTHORITY

DI-MGMT-80441D

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS Paragraph 4.3.4

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

ANNLY

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 04 JAN 2021DATE:

THIS CDRL WILL SERVE BASIC YEAR AND ALL OPTION YEARS

BLK 4: The data item description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

See Data Item Description at http://quicksearch.dla.mil/ for content requirements and most current version.

BLK 7: Enter the applicable code as listed in DOD 5010.12-M, Chapter 3. (Enter LT for Letter of Transmittal if not separately priced or DD if separately priced). WAWF E-DD FORM 250 shall be required for separately priced data. E- DD FORM 250 shall be submitted to FA8524 Program Manager (PM/ and Production Management Specialist PMS EMAIL ADDRESS) for acceptance.

Block 8: Approval (written) is not required. However, the data item will be reviewed and accepted/rejected, based on its conforming to the requirements of the DID, and within the review time specified in Block 16, items 10-13.

BLK 9: "A" Approved for Public Release; distribution is unlimited.

Block 10-13: The annual physical inventory report shall be provided within seven (7) calendar days of the end of each option/ordering period for the contract. The data is representative of the Contractor's Internal Property Control System and shall be current as of the last day of the option/ordering reporting period. If requested outside of an annual cadence, the data shall be current as of the date requested.

BLK 14: EMAIL electronic Annual Physical Inventory Report to the Production Management Specialist (PMS) and Program Manager (PM). Points of Contact will be provided to the Contractor at Contract Award. Submit digital copy in Microsoft Office Excel format for all reports.

COORDINATORS:

422 SCMS/GUME

3001 Staff Drive, Annex 4, Suite 1AG192B Tinker AFB, OK 73145-3033 Email:

jeremy.marshall.5@us.af.mil ATTN: Jeremy Marshall

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAB

405-736-7976

H. DATE

24 MAR 2022

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Marshall, Jeremy P

422 SCMS / GUME 405-734-5839 / 884-5839

J. DATE

23-MAR-22

Page 6 of 10DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 28 Mar 2022

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

KC-135 /Indicator, Position

E. CONTRACT / PR NO.

FD20302201063

F. CONTRACTOR

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

Technical Order Improvement Report and Reply

3. SUBTITLE

AFTO Form 22

4. AUTHORITY

DI-TMSS-80229D

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

11. AS OF DATE

As Required

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

As Required

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 23 MAR 2022DATE:

THIS CDRL WILL SERVE BASIC YEAR AND ALL OPTION YEARS

Changes to the office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

This report shall be submitted IAW TO 00-5-1 using AFTO 22 for Air Force TOs. The contractor shall report when an error or improvement changes the meaning of the instructions or information contained in the technical directives where it may prevent mission performance. Also, this report shall be used by the contractor to indicate omissions of pertinent overhaul procedures in TOs or desired changes to TO date.

Block 9: Distribution Statement D: Distribution authorized to the Department of Defense and US DOD Contractors only, critical technology. Other requests shall be referred to 848 SCMG/EN.

Control Warning Notice: Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751 Et Seq) or the Export Administration Act of 1979, Title 50, USC, App 240 I Et Seq, as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.

Destruction Notice for Unclassified Documents: destroyed by any method that will prevent disclosure of contents or reconstruction of the document.

Destruction Notice for Classified Documents: Follow the procedures in DOD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DOD 5220.0 I M, Information Security Program , Vol 3, Protection of Classified Information.

COORDINATORS:

422 SCMS/GUME

3001 Staff Drive, Annex 4, Suite 1AF1 92B Tinker AFB, OK 73145-3033 Attention : Jeremy P. Marshall

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAB

405-736-7976

H. DATE

24 MAR 2022

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Marshall, Jeremy P

422 SCMS / GUME 405-734-5839 / 884-5839

J. DATE

23-MAR-22

Page 7 of 10DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 28 Mar 2022

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

KC-135 /Indicator, Position

E. CONTRACT / PR NO.

FD20302201063

F. CONTRACTOR

1. DATA ITEM NO.

A008

2. TITLE OF DATA ITEM

Item Unique Identification (IUID) Marking Plan

3. SUBTITLE

N/A

4. AUTHORITY

DI-MGMT-81803A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

ASREQ

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 23 MAR 2022DATE:

NSN : 6610-00-242-0609

Part Number : EA308-1

THIS CDRL WILL SERVE BASIC YEARS AND ALL OPTION YEARS.

Blk 4: Contractor format or AS 9102 format or equivalent is acceptable. The complete contract number, CDRL number, Document Name, Date of Submission and Document Number shall appear on the first page of deliverable.

Blk 8: Government written notice of approval/disapproval is due 30 days after receipt of contractor's report.

Blk 9: Per DoDI 5230.24. Refer other requests for this document to 422 SCMS/GUEA, Tinker AFB, OK 73145. (11 November 2020)

Blk 11, 12, and 13: Submit NLT 30 Days after contract award.

Documents comments/approval will be provided within 30 day after receipt. The contractor shall resubmit within 15 days after receipt of Government comments.

Blk 14a.

422 SCMS/GUME

3001 Staff Drive, Annex 4, Suite #1AG1 92B Tinker Air Force Base, Oklahoma 73145-3033 Attention : Jeremy P. Marshall Commercial phone number: (405) 734-5839 Email: Jeremy.Marshall.5@us.af.mil

CONTRACTOR FORMAT ACCEPTABLE

DID REQUIREMENTS NOT TAILORED

DELIVERY CANNOT BE DEFERRED

COORDINATORS:

422 SCMS/GUME

3001 Staff Drive, Annex 4, Suite #1AG1 92B Tinker Air Force Base, Oklahoma 73145-3033 Attention : Jeremy P. Marshall

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAB

405-736-7976

H. DATE

24 MAR 2022

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Marshall, Jeremy P

422 SCMS / GUME 405-734-5839 / 884-5839

J. DATE

23-MAR-22

Page 8 of 10DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 28 Mar 2022

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

KC-135 /Indicator, Position

E. CONTRACT / PR NO.

FD20302201063

F. CONTRACTOR

1. DATA ITEM NO.

A009

2. TITLE OF DATA ITEM

Contract Depot Maintenance (CDM) Monthly Production Report

3. SUBTITLE

CDM Production Monthly Status Report

4. AUTHORITY

DI-PSSS-81995A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

422 SCMS/GUME

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

MTHLY

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 23 MAR 2022DATE:

THIS CDRL WILL SERVE BASIC YEAR AND ALL OPTION YEARS

NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

1. Block 4:

a. All reporting shall be submitted in the English Language.

b. The Contractor's CAV AF Reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks, etc. for each repair.

c. The Contractor shall report by contract delivery order on all applicable categories, totals and on-hand balances, providing TABLE I (DI-PSSS-81995A) for EACH repair location, including subcontractor facilities, for the contracts maintenance occurrence actions during the reporting period.

d. The Contractor shall report on production, providing TABLE I (DI-PSSS-81995A) for EACH repair location, including subcontractor facilities, for which the contractor produced assets during the reporting period.

2. Blocks 10, 11, 12, 13:

a. The reports shall be provided monthly within 5 (five) business days of the previous month's last calendar date.

b. Reports shall continue to be submitted by the contractor unless the requirement is terminated by the assigned Contracting Officer at the request of the Program Manager (PM) and the Production Management Specialist (PMS).

c. The Final Report submitted following the final reporting period on the contract shall be annotated "Final Report".

3. Block 9:

a. DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only, critical technology. Other requests for this document shall be referred to 848 SCMG/EN, Tinker Air Force Base, Oklahoma. (7 January 2022)

b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:

EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App.

2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.

c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

4. Block 7, 14: Submit the CDM Production Monthly Status Reports to the following email address:

jeremy.marshall.5@us.af.mi

See Block 16 0 1 0

0 1 015. TOTAL

Page 9 of 10DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 28 Mar 2022

COORDINATORS:

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAB

405-736-7976

H. DATE

24 MAR 2022

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Marshall, Jeremy P

422 SCMS / GUME 405-734-5839 / 884-5839

J. DATE

23-MAR-22

Page 10 of 10DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 28 Mar 2022

File details come from the government source that posted it. Updated .