This Statement of Work (SOW) outlines requirements for converting the existing wet-pipe fire sprinkler system to an antifreeze system at the Medgar and Myrlie Evers Home National Monument in Jackson, MS. The contractor must furnish all labor, materials, tools, equipment, and supervision to complete the conversion, which includes flushing the existing system, replacing the backflow preventer with a Reduced Pressure Detector Assembly (RPDA), installing a new expansion tank, and providing UL-listed noncombustible antifreeze solution.

The work must be completed within 30 calendar days of Notice to Proceed, with operations limited to weekdays between 8:00 AM and 4:00 PM. Design and layout must be prepared by a NICET Level III/IV Sprinkler Technician or licensed Fire Protection Engineer. The contractor is responsible for all permits, site visits for verification, and submitting required documentation including qualifications, equipment locations, data sheets, and operations manuals. The project is being managed by the Department of the Interior National Park Service Southeast Region, with all work complying with NFPA 13 (2022 edition) standards and local Water Authority requirements.

View the file

Other files

File Type Posted
2024_Hinds_County_Wage_Determination.pdf PDF
Sol_140P5225Q0003.pdf PDF
121815_Maps__Plans__and_Photographs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NATIONAL PARK SERVICE

Region IR2

Medgar and Myrlie Evers Home National Monument

Project Name:

Medgar and Myrlie Evers Home Fire Sprinkler Wet System to Antifreeze Conversion

Medgar and Myrlie Evers Home National Monument Jackson, MS 39213 Statement of Work

TABLE OF CONTENTS

I. SCOPE / BACKGROUND

II. PROJECT REQUIREMENTS

III. PHOTOGRAPHS / EXISTING CONDITIONS

IV. BIDDERS TO VISIT SITE

V. RESPONSIBILITY FOR EMPLOYEES

VI. DELIVERABLE

VII. CONTRACT PERFORMANCE PERIOD

VIII. WORKING HOUR RESTRICTIONS

IX. PAYMENT

I. SCOPE:

The contractor shall furnish all labor, materials, tools, equipment, and supervision necessary to convert the existing wet-pipe fire sprinkler system to an antifreeze system servicing the Medgar and Myrlie Evers Home located at 2332 Margaret Walker Alexander Drive, Jackson, MS 39213. This project will be completed under a single prime contract. Design, layout, installation, and testing shall be in accordance with 2022 edition NFPA 13, Standard for the Installation of Sprinkler Systems and NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-based Fire Protection Systems.

BACKGROUND: The Medgar and Myrlie Evers Home National Monument sits at 2332 Margaret Walker Alexander Street (formerly Guynes Street) in Jackson, Mississippi. It is significant at the local, state, and national level for its association with Medgar Wiley Evers and Myrlie Beasley Evers, who made major contributions to advancing the goals of the civil rights movement. It is also significant as the site of Medgar Evers’s assassination on June 12, 1963. A white supremacist shot and killed Medgar Evers in the carport of his home. His was the first murder of a nationally significant civil rights leader. The assassination focused national attention on the necessity for civil rights legislation and forced Myrlie Evers into a more prominent, national role for the NAACP where she continued to promote issues of racial equality and social justice.

II. PROJECT REQUIREMENTS:

· This project will require the flushing of the existing system, replacement of the existing DCDA (Double Check Detector Assembly / backflow preventer) with a required RPDA (Reduced Pressure Detector Assembly), the provision and installation of a new expansion tank, and replacement / provision of an acceptable UL listed noncombustible antifreeze solution. All work shall comply with the requirements of the local Water Authority. Design / layout of new work shall be prepared and signed by a NICET Level III or Level IV Sprinkler Technician, or by a Registered Professional Engineer licensed in the field of Fire Protection Engineering.

· After project award, the contractor shall complete a site visit to field verify all conditions and requirements of this contract.

· If applicable, all permitting requirements and associated costs are the responsibility of the contractor. All requirements to follow and complete the permit through construction and permit closeout is the responsibility of the contractor.

· Prepare and submit submittals required by this Statement of Work. All submittal approvals are required before commencement of work. At a minimum, the following approvals are required prior to start of work:

a) Qualifications for designer and installer

b) Proposed location for new expansion tank

c) Manufacturer’s Data Sheets

d) Operations and Maintenance manuals that include step-by-step procedures for system start-up, operation, shutdown, routine maintenance and testing.

· Contractor shall have limited use of site for construction operations. Do not disturb portions of project site beyond areas in which the work is indicated. Confine parking to locations identified by NPS.

· Site cleanup.

III. PHOTOGRAPHS / EXISTING CONDITIONS:

Medgar and Myrlie Evers Home

Riser located in Bedroom 2 Closet

IV. BIDDERS TO VISIT SITE: All bidders are expected to visit the site of the work and to inform themselves as to all existing conditions. Failure to do so in no way relieves the successful bidder from the necessity of furnishing all equipment and materials and performing all work required for the completion of the contract in conformity with all specifications.

No allowance will be made for the failure of the bidder correctly to estimate the difficulties attending the execution of the work.

V. RESPONSIBILITY FOR EMPLOYEES: The contractor shall be responsible for the safety of his employees and for any injury or damage done to or by them from any source or cause. He shall save and hold the United States free from all claims for damages to all persons and (or) property arising from the execution of the work covered by this SOW.

The contractor shall make good at his own expense all damage to any property of the United States, arising from his operations under these specifications, or from the fault or neglect of any of his employees.

VI. DELIVERABLE: The deliverable for this project is the satisfactorily completion for all required work under this contract. All equipment, tools, surplus materials, and rubbish shall be removed upon completion of work.

VII. CONTRACT PERFORMANCE PERIOD: 30 calendar days from Notice to Proceed.

VIII. WORKING HOUR RESTRICTIONS: Contractor shall conduct his operations in conformance with rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by Park Superintendent. All work and deliveries shall be limited to the weekday hours of 8:00 am to 4:00 pm Monday through Friday, unless otherwise approved by the Contracting Officer or COR. No work shall occur on National Park Service holidays or weekends without prior approval.

No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.

IX. PAYMENT: Payments will be processed upon completion of project and need to be submitted to and processed via the electronic invoicing system. Information can be found at www.ipp.gov.

07550 -10 image1.png image2.png image3.png image4.png image5.png