341 MW_IG Storage Structure SOW.pdf
PDF 215 KB Posted
- Attached to
- IG Storage Shed Federal contract opportunity
- Solicitation number
- FA462623Q0042
About this file
This specification sheet outlines requirements for a prefabricated storage structure to be delivered to Malmstrom Air Force Base in Montana. The contractor shall deliver one 14'x18'x7' A-frame tall wall shed with a metal lockable roll-up door, lockable steel entry door, metal siding and roof, aluminum ramp, and floor capable of supporting a 2,000lb utility vehicle. Delivery must occur within 60 days of award and is required to be scheduled at least 48 hours in advance. The contractor must adhere to all base security protocols and be responsible for transporting the structure to its designated location on site.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| COMBO_Storage_shed.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATION SHEET
Malmstrom AFB, MT
PREFABRICATED STORAGE STRUCTURE
14 Aug 2023
PART I - General Contract Requirements
1. General Requirements
1.1. The 341 MW/IG requires (1) 14’x18’x7’ Storage structure for safe keeping of utility vehicle and equipment utilized during Higher Headquarters / Wing level exercises.
1.2. The Contractor shall deliver and place structure on prepared concrete pad behind
Building 300 (7410 Flightline Drive) on Malmstrom Air Force Base (MAFB), Montana
59402. The materials shall conform to the specifications provided in Part II.
1.3. All material is to be delivered to MAFB. Specific drop-off location on site will be coordinated with the 341 MW/IG point of contact (POC).
1.4. All increases, decreases, or modifications to the requirements specified in this document must be directed by the Contracting Officer (CO).
2. Delivery Periods. The delivery of structure will occur during standard business hours on
Monday through Friday between 7AM and 4PM. The Government will provide notice to the Contractor for a material call no later than 48 hours prior to the anticipated delivery; the Government reserves the right to delay the delivery with 24 hours advance notice.
2.1. The delivery/installation of this storage shed shall be completed no later than 60 days after receipt of award.
2.2. The Contractor shall be responsible for transporting the material to the designated delivery location. The Government will make every effort to provide the Contractor the maximum amount of notice possible.
2.3. Notification of date and time of delivery must be made as early as possible for all materials. A minimum of 48 hours prior to the delivery date, the supplier will contact the 341 MW/IG POC to coordinate delivery, date/time, and specific location.
2.4. In the event of adverse weather events prohibiting safe delivery of materials, the 341
MW/IG POC will contact the supplier to coordinate rescheduling of delivery within the following 48 hours.
3. Military Installation Requirements
3.1. All mud, dirt, debris, foreign objects, trash, or spills caused by the contractor (including
Sub-Contractors and contractors) on a street or parking lot, used as access to the delivery location or staging area shall be cleaned off the same day or as soon as practicable or requested by the CO.
3.2. The Contractor shall immediately report to the CO to discuss any issues or incidents which may indicate potential imminent risk to Government personnel or the environment. Following the notification, the Contractor shall be available to the CO for instructions regarding remediation of the release. Contractor should be aware of “you spill, you dig” policies, which means if you are the cause of the spill then you are responsible for the cleanup. To report a release or spill, contact the CO immediately.
3.3. The Contractor shall follow existing security procedures and instructions applicable to
MAFB. The Contractor is required to provide any and all materials as required by security personnel. The Contractor is responsible for providing required documents in a timely manner to maintain the submitted work schedule. Delays caused by documents not being submitted early enough are the responsibility of the Contractor.
3.4. The contractor shall adhere strictly to existing security procedures and instructions applicable to accessing MAFB. Contractor personnel attempting to access MAFB shall hold a current, valid identification (ID) and/or limited to material description, quantity, and source. The U.S Government shall not be liable for delays resulting from pass coordination/approval. Contractor shall allot time into its schedule for obtaining base access.
4. Emergency Situations. Installation access may be restricted at any time. Restricted access is reserved for emergency actions, exercises, or increased installation security.
5. Contractor Responsibility.
5.1. The Contractor is responsible for the wellbeing of their workers. The Government will not be responsible for supplying food or water to the Contractor’s workers. The
Contractor should bring enough food and water for his/her workers to last the entire delivery period.
5.2. The Contractor shall provide the name and phone number of a supervisor that can make decisions for the Contractor and who is responsible for the performance of the work.
The supervisor shall be designated in writing when the contract is awarded, and must always be available during work hours. The supervisor shall read, write, and speak fluent English. Additionally, the supervisor shall have sufficient technical knowledge with regard to the requirements prescribed in this document. The identified Government representative shall have the right to request a replacement for any individual not deemed acceptable to the Government at any time.
END OF SECTION
PART II – Material Specifications
1. General
1.1. The Contractor shall deliver (1) 14x18x7 A-Frame Tall Wall Prefabricated Shed.
2. Shed Specifications: The Prefabricated shed must (at a minimum) comply with the following salient characteristics (see Attachment 1):
2.1. Wood framed structure shall measure 14’ in length, 18’ in width, and shall measure 7’ in height at top of exterior wall (see Attachment 1).
2.2. There must be an 8’x 7” metal lockable roll-up door centered on the front of structure with a 3’ lockable steel entry door (left hand swing) located on one side.
2.3. The floor must be constructed with heavy duty material, capable of supporting at minimum a 2,000lb utility vehicle. Must be able to support weight of utility vehicle entering/exiting and storage.
2.4. Must have 72” gable transom window on front of structure and 72” transom window on back of structure (see Attachment 1).
2.5. The roof needs to be metal (Brown in color).
2.6. Exterior of structure shall be metal siding (light tan in color) with matching metal corner trim.
2.7. A 23” x 48” aluminum ramp is required for ease of access through roll-up door.
Attachment 1.
18’ 14’
18’
14’
7’
7’