3389 LCHD-ESS Section J - OCT2025.docx

DOCX document 19 KB Posted

Attached to
3389 LCHD-ESS Special Notice - Draft Specification
Solicitation number
Not on record
Issued by

About this file

This document is Section J of a solicitation, specifically listing contract and reference drawings for a marine vessel project by the U.S. Army Corps of Engineers. The attachments include technical drawings such as a Standard Paint Schedule (924-B406-01), Pipe Marking Guide (924-B601-01), and Communications Mark drawings, which will be provided electronically to the successful bidder. The section also outlines a detailed performance evaluation process for service and supply contracts, requiring contractor performance assessments at minimum annually, with provisions for interim evaluations, contractor comment periods, and potential appeals to the Contracting Officer.

The associated federal contract opportunity is a Special Notice for a draft specification of a marine vessel, likely a hopper dredge, with the USACE seeking industry feedback on complex technical requirements. Key areas of inquiry include ABS notation specifications, vessel speed capabilities (7 knot currents, 14 knot transit speeds), ship motion acceleration measurements, and berthing requirements. The solicitation explicitly requests input on design and construction challenges, potential competitive business considerations, and technical requirements that might impact traditional hopper dredge design, indicating an early-stage collaborative procurement approach.

View the file

Other files

File Type Posted
3389 LCHD-ESS Section E - OCT2025.docx DOCX document
3389 LCHD-ESS Section F - OCT2025.docx DOCX document
3389 LCHD-ESS Section G - OCT2025.docx DOCX document
3389 LCHD-ESS Section M - OCT2025.docx DOCX document
3389 LCHD-ESS Section D - OCT2025.docx DOCX document
3389 LCHD-ESS Section C - OCT2025.docx DOCX document
3389 LCHD-ESS Section H - OCT2025.docx DOCX document
3389 LCHD-ESS Section B - OCT2025.docx DOCX document
3389 Section I Intro - Draft Solicitation .docx DOCX document
3389 LCHD-ESS Section L - OCT2025.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION J - ATTACHMENTS

Section J – List of Documents Exhibits and Other Attachments

J01 CONTRACT DRAWINGS & DOCUMENTS

The following contract drawings and documents shall form a part of this solicitation. All drawings will be provided to the successful bidder in electronic file form.

Drawing Number Title

924-B406-01MDC STANDARD PAINT SCHEDULE
924-B601-01PIPE MARKING GUIDE

J02 REFERENCE DRAWINGS

The following reference drawings shall form a part of this solicitation. All drawings will be provided to the successful bidder in electronic file form.

Drawing Number Title

656-B460-01COMMUNICATIONS MARK
N/ADEFLECTOR DRAWING
N/ADEFLECTOR INSPECTION CHECKLIST

J03 NOT USED

J04 PERFORMANCE EVALUATION FOR SERVICE & SUPPLY CONTRACTS

In accordance with FAR 42.15, AFAR 42.15, and Army Acquisition Letter 98-1, this contract action is subject to the requirement for Contractor performance evaluation in the elements listed on the attached form.

At a minimum, the performance evaluation shall be completed within 45 days of completion of each year’s performance. Additional (Interim) evaluations may be prepared if any element listed is being performed unsatisfactorily.

The period of evaluation will begin on the date of acknowledgment of receipt of the Notice to Proceed and will run concurrent with the performance period of the contract.

The Contractor shall be provided thirty (30) days to submit comments, rebut statements, or provide additional information before the final performance evaluation is issued. This period may be shortened if an interim unsatisfactory evaluation is being contemplated and time does not allow for a full thirty (30) days.

The Contractor may appeal a final performance evaluation to the Commander of the Contracting Activity. The appeal must be made within thirty (30) days and must be a written request to the Contracting Officer stating the reasons why a further review of their performance evaluation is justified, and the circumstances which may be cause the Government to revise its performance rating. Interim evaluations are not subject to appeal.

File details come from the government source that posted it. Updated .