32701-13423_Trail_Bridge_Kits_Specifications.pdf
PDF 128 KB Posted
- Attached to
- Statewide Trail Bridge Frame Kits
- Solicitation number
- Event 32701-13423
- Issued by
- Hamilton County, Tennessee
About this file
This document is a Request for Bids (RFB) for Statewide Trail Bridge Frame Kits, Event # 32701-13423, issued by the Tennessee State Parks. The RFB seeks to establish a contract to furnish 24 aluminum trail bridge frame kits, 3 aluminum trail stairway frame kits, and 3 aluminum landing frame kits, with delivery to nine separate state park locations across Tennessee. The kits must be delivered between contract award and September 10, 2024, and the dimensions and weight specifications are provided. No additional work is permitted without pre-approval, and all brands and materials must be pre-approved prior to submission of the bid. The RFB includes a detailed table specifying the quantity, length, width, and Rolling Barge model number (or pre-approved equal) for each location.
The RFB states that decking is not included in the contract, but the frame kits must be designed to accommodate 2-inch thick wood or composite decking. All components must be manufactured with 6061 T6 Aluminum, with a live load capacity of a minimum of 9,000 lbs. Welded connections are not permitted, and each frame kit must ship on pallets using standard freight. The vendor must provide engineering reports regarding the design and manufacturing of the bridges.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Statewide_Trail_Bridge_Frame_Kits.pdf | ||
| 32701-13423_Trail_Bridge_Kits_T_C.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statewide Trail Bridge Frame Kits, Event # 32701-13423 Page 1 of 3
Statewide Trail Bridge Frame Kits
Event # 32701-13423
Tennessee State Parks
This request for bids is for a contract to furnish 24 aluminum trail bridge frame kits, 3 aluminum trail stairway frame kits, and 3 aluminum landing frame kits, with delivery to nine separate locations as indicated herein.
General Conditions
1) All kits shall be delivered between contract award and September 10, 2024, unless an exception is granted by the Facilities Management Project Manager.
2) Only the Facilities Management Office can approve any alterations, modifications, or substitutions to the written scope, specifications, or requirements of the project. No additional work shall be authorized unless pre-approved by the Facilities Management Office.
3) All brands and materials must be pre-approved prior to submission of the bid. Rolling Boat, Inc./ Rolling Barge is pre-approved, and their model numbers are supplied for reference.
4) The dimensions specified on page 2 shall represent the minimum acceptable length and width.
General Scope of Work
1) The vendor shall provide twenty-four (24) aluminum trail bridge frame kits, three (3) aluminum stairway frame kits, and three (3) aluminum stair landing frame kits.
Dimensions of each frame kit along with its capacity are listed below.
2) Decking is not included within this contract; however, the frame kits shall be designed to accommodate 2-inch thick wood or composite decking.
3) All kits shall be designed such that the use of a footer or abutment is not required.
4) Since the bridge locations have very remote access, no individual part of the kit shall exceed 30 lbs. in weight nor 100 inches in length. The bridge shall not exceed 2,700 lbs. total weight when fully assembled.
5) All components shall be manufactured with 6061 T6 Aluminum. The frame kits shall be designed with a live load capacity of a minimum of 9,000 lbs.
6) All bridge components shall rely solely on bolted connections. Welded connections are not permitted.
7) Each frame kit shall ship on pallets using standard freight.
8) All bridges shall include engineering reports regarding design and manufacturing.
9) Delivery of the kits shall be made per the table below.
Statewide Trail Bridge Frame Kits, Event # 32701-13423 Page 2 of 3
State Park and
Delivery Address
Length
(FT)
Width
(FT)
Rolling Barge
Model # or Pre-
Approved Equal
Qty
(EA)
North Chickamauga Creek
Gorge State Park c/o State Forestry Office
1327 Montlake Road
Soddy Daisy, TN 37379
20 4 HD4-0420 1
50 4 HD4-0452 1
Cumberland Trail State Park
270 Glyph Parkway
Pikeville, TN 37367
60 4 SD4-0460 1
50 4 HD4-0452 4
40 4 HD4-0440 2
Bledsoe Creek State Park
400 Zieglers Fort Road
Gallatin, TN 37066
24 6 HD6-0628 1
48 6 SD6-0648 1
40 6 HD6-0640 1
Big Hill Pond State Park
1435 John Howell Road
Pocahontas, TN 38061
32 4 HD4-0432 1
Paris Landing State Park
16055 Highway 79N
Buchanan, TN 38222
35 6 HD6-0636 1
45 6 HD6-0648 1
David Crockett Birthplace State
Park
1245 Davy Crockett Park Road
Limestone, TN 37681
40 4 HD4-0440 1
Long Hunter State Park
2910 Hobson Pike
Hermitage, TN 37076
12 8 VB-0812 1
18 6 HD6-0620 1
24 6 HD6-0624 1
48 6 SD6-0648 1
17 4 HD4-0420 1
25 4 HD4-0428 1
Pickett State Park
4605 Pickett Park Highway
Jamestown, TN 38556
40 4 HD4-0440 1
32 4 Stairs HDS-0432 2
8 4 Stairs HDS-0408 1
4 4 Landing -0404 3
Frozen Head State Park
964 Flat Fork Road
Wartburg, TN 37887
72 4 SD4-0472 1
Statewide Trail Bridge Frame Kits, Event # 32701-13423 Page 3 of 3
Additional Conditions
1) Workmanship is to be warrantied for not less than one year from date of final inspection.
Materials shall be warrantied as per manufacturer’s warranty.
2) Unless otherwise indicated, all materials, equipment, and supplies shall be new and in good condition, UL listed when applicable, and all work accomplished in a manner acceptable to
Facilities Management.
3) Invoice for payment shall be submitted to: Debbie Quist, East Tennessee Regional Office, 160
State Circle, Rocky Top, TN 37769, (865) 606-0785, Deborah.G.Smith@tn.gov
4) Facilities Management Regional Contact for this project is:
Project Manager: Tim Stewart, (615) 517-0598, Tim.Stewart@tn.gov
Nothing Follows mailto:Deborah.G.Smith@tn.gov mailto:Tim.Stewart@tn.gov
File details come from the government source that posted it. Updated .