325015_RFB_Badger_Prairie_Playground_Improvements_Project_Manual.pdf
PDF 3 MB Posted
- Solicitation number
- 325015
- Issued by
- Dane County, Wisconsin
About this file
The document is a Project Manual and Request for Bids (RFB No. 325015) issued by the Dane County Department of Administration Public Works Engineering Division for the Badger Prairie County Park Playground Improvements project located at 4654 Maple Grove Drive in the Town of Verona, Wisconsin. The project involves constructing playground improvements, with bids to be received electronically until 10:00 A.M. on Tuesday, May 13, 2025. A pre-bid site tour is scheduled for Tuesday, April 22, 2025, at 2:00 P.M., and bidders are strongly encouraged to attend. The RFB documents will be available after 2:00 P.M. on April 11, 2025, and can be obtained through the Dane County procurement portal.
The project includes an Emerging Small Business (ESB) goal of 10% participation, requiring bidders to make good faith efforts to award at least 10% of the work to ESBs. Bidders must submit an ESB Report to the Dane County Tamara D. Grigsby Office for Equity and Inclusion within ten business days of the bid due date. A bid guarantee of 5% of the maximum bid is required, and bidders must demonstrate experience completing similar projects. The award will be based on the lowest dollar amount submitted by a responsible bidder on the base bid, with the county reserving the right to reject any or all bids. Additional requirements include performance and payment bonds, and compliance with Wisconsin tax regulations and local government procurement guidelines.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION DOCUMENTS
PROJECT MANUAL
DANE COUNTY DEPARTMENT OF ADMINISTRATION
PUBLIC WORKS ENGINEERING DIVISION
1919 ALLIANT ENERGY CENTER WAY
MADISON, WISCONSIN 53713
RFB NO. 325015
REQUEST FOR BIDS NO. 325015
BADGER PRAIRIE COUNTY PARK
PLAYGROUND IMPROVEMENTS
4654 MAPLE GROVE DRIVE
TOWN OF VERONA, WISCONSIN
RFB No. 325015 Table of Contents rev. 09/23 00 01 10 - 1
SECTION 00 01 10
TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 01 - Project Manual Cover Page 00 01 10 - Table of Contents 00 21 13 - Instructions to Bidders 00 31 32 - Geotechnical Data - Subsurface Drilling and Sampling Information 00 52 96 - Sample Public Works Construction Contract 00 72 13 - General Conditions of Contract 00 73 00 - Supplementary Conditions
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 - General Requirements 01 23 00 - Alternates 01 45 16 - Testing Requirements 01 56 39 - Temporary Tree and Plant Protection 01 74 19 - Construction Waste Management, Disposal & Recycling
DIVISION 02 - EXISTING CONDITIONS
02 41 13 - Demolition
DIVISION 03 - CONCRETE
03 30 00 - Cast-In-Place Concrete 03 30 01 - Concrete Stoop Memo (Angus Young)
DIVISION 05 - METALS
05 50 00 - Metal Fabrications 05 52 13 - Pipe and Tube Railings
DIVISION 11 - EQUIPMENT
11 68 10 - Play Equipment Installation 11 68 10 - Play Equipment Installation - Instructions Appendix 11 68 15 - Nature Based Play Structures
DIVISION 31 - EARTHWORK
31 22 00 - Site Preparation and Earthwork 31 23 16.13 - Trenching 31 25 00 - Construction Site Erosion Control
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 23 - Crushed Aggregate Base Course 32 12 16 - Asphaltic Concrete Pavement 32 13 13 - Concrete Paving 32 13 16 - Decorative Concrete Paving 32 13 73 - Concrete Paving Joint Sealants 32 17 26 - Tactile Warning Surface 32 18 16 - Playground Protective Surfacing 32 33 00 - Site Furnishings 32 40 10 - Exterior Stone Features 32 91 13 - Soil Preparation 32 91 13.50 - Stormwater Bio-Infiltration 32 92 00 - Turf and Grasses 32 92 19 - Native Seeding 32 93 00 - Plants
RFB No. 325015 Table of Contents rev. 09/23 00 01 10 - 2
DIVISION 33 - UTILITIES
33 11 00 - Water Utilities 33 40 00 - Site Storm Sewer System
DRAWINGS
GENERAL SHEETS
G000 - COVER SHEET
G001 - GENERAL NOTES
G002 - SITE ORIENTATION PLAN
G003 - TREE PROTECTION PLAN
G004 - TREE PROTECTION DETAILS
G005 - BID ALTERNATES KEY PLAN
CIVIL SHEETS
C100 - EXISTING CONDITIONS
C200 - DEMOLITION PLAN
C300 - EROSION CONTROL PLAN
C400 - VEHICULAR PAVEMENT PLAN
C500 - GRADING PLAN
C600 - UTILITY PLAN
C700 - DETAILS
C701 - DETAILS 2
LANDSCAPE SHEETS
L001 - LANDSCAPE NOTES
L010 - HARDSCAPE SCHEDULES
L011 - HARDSCAPE SCHEDULES CONT.
L020 - LANDSCAPE SCHEDULES
L110 - SITE MATERIALS AND FURNISHINGS PLAN
L111 - SITE JOINTING PLAN
L120 - SITE SOILS PLAN
L130 - SITE PLANTING PLAN
L210 - SITE MATERIALS AND FURNISHING PLAN – PLAY AREA ENLARGMENTS
L220 - SITE EQUIPMENT PLAN - PLAY AREA ENLARGEMENTS
L230 - SITE PLANTING PLAN - PLAY AREA ENLARGEMENTS
L500 - SITE PAVING AND CURB DETAILS
L505 - DECORATIVE PAVING DETAILS
L510 - SITE STONE DETAILS
L520 - SITE STAIR AND HANDRAIL DETAILS
L530 - SITE ELEMENTS AND FURNISHING DETAILS
L540 - PLAY SURFACING AND PLACEMAKING DETAILS
L550 - HILLSIDE PLAY SURFACING AND PLAY ELEMENT DETAILS
L560 - HILLSIDE PLAY SURFACING AND PLAY ELEMENT DETAILS
L570 - SITE SIGNAGE DETAILS
L580 - PLANTING DETAILS
END OF SECTION
RFB No. 325015 Instructions to Bidders rev. 11/23 00 21 13 - 1
SECTION 00 21 13
INSTRUCTIONS TO BIDDERS
1. GENERAL
2. DRAWINGS AND SPECIFICATIONS
3. INTERPRETATION
4. BID GUARANTEE
5. WITHDRAWAL OF BIDS
6. CONTRACT FORM
7. CONTRACT INTERESTS BY COUNTY PUBLIC OFFICIALS
8. EMERGING SMALL BUSINESS PROVISIONS
9. METHOD OF AWARD - RESERVATIONS
10. SECURITY FOR PERFORMANCE AND PAYMENTS
11. TAXES
12. SUBMISSION OF BIDS
13. SUBCONTRACTOR LISTING
1. GENERAL
A. Before submitting Bid, bidder shall thoroughly examine all Construction Documents.
Successful Bidder shall be required to provide all the Work that is shown on Drawings, set forth in Specifications, or reasonably implied as necessary to complete Contract for this project.
B. Bidder shall visit site to become acquainted with adjacent areas, means of approach to site, conditions of actual site and facilities for delivering, storing, placing, and handling of materials and equipment.
C. Before award of Contract can be approved, Owner shall be satisfied that Bidder involved meets following requirements:
1. Has completed at least one (1) project of at least fifty percent (50%) of size or value of Division of work being bid and type of work completed is similar to that being bid. If greater magnitude of experience is deemed necessary, other than size or value of work, such requirements will be described in appropriate section of Specifications.
D. County’s Public Works Project Manager will make such investigations as are deemed necessary to determine ability of bidder to perform the Work, and bidder shall furnish to County’s Public Works Project Manager or designee all such information and data for this purpose as County’s Public Works Project Manager may request. Owner reserves right to reject Bid if evidence submitted by, or investigation of, bidder fails to satisfy Owner that bidder is responsible and qualified to carry out obligations of Contract and to complete the Work contemplated therein.
2. DRAWINGS AND SPECIFICATIONS
A. Drawings and Specifications that form part of this Contract, as stated in Article 1 of General
Conditions of Contact, are enumerated in Table of Contents of these Construction Documents.
rev. 11/23 00 21 13 - 2
B. Complete sets of Drawings and Specifications for all trades will be available to all Bidders, irrespective of category of work to be bid on, in order that all Bidders may be familiar with work of other trades as they affect their bid.
3. INTERPRETATION
A. No verbal explanation or instructions will be given in regard to meaning of Drawings or
Specifications before Bid Due Date. Bidders shall bring inadequacies, omissions or conflicts to Owner & Architect, Engineer or Consultant’s attention at least ten (10) calendar days before Bid Due Date. Prompt clarification will be available to all bidders by Addendum.
B. Failure to so request clarification or interpretation of Drawings and Specifications will not relieve successful Bidder of responsibility. Signing of Contract will be considered as implicitly denoting that Contractor has thorough understanding of scope of the Work and comprehension of Construction Documents.
C. Owner, Architect, Engineer, or Consultant will not be responsible for verbal instructions.
4. BID GUARANTEE
A. Bank certified check, cashier’s check or Bid Bond, payable to County in amount not less than five percent (5%) of maximum bid, shall accompany each Bid as guarantee that if Bid is accepted, Bidder will execute and return proposed Contract and Performance and Payment Bond within ten (10) business days after being notified of acceptance of Bid. Company issuing bonds must be licensed to do business in Wisconsin.
B. Any bid, which is not accompanied by bid guarantee, will be considered “No Bid” and will not be read at Bid Due Date.
C. If successful Bidder so delivers Contract, Certificate of Insurance, and Performance and Payment Bond, check will be returned to Bidder. In case Bidder fails to deliver such Contract, insurance, and bond, amount of bid guarantee will be forfeited to County as liquidated damages.
D. All checks tendered as bid guarantee, except those of three (3) lowest qualified, responsible bidders, will be returned to their makers within three (3) business days after Bid Due Date.
All such retained checks will be returned immediately upon signing of Contract and Performance and Payment Bond by successful Bidder.
5. WITHDRAWAL OF BIDS
A. Bids may only be withdrawn before Bid Due Date as authorized by Wis. Stat. s. 66.0901(5).
B. No Bid may be withdrawn for a period of ninety (90) calendar days after Bid Due Date.
6. CONTRACT FORM
A. Sample copy of contract that successful Bidder will be required to enter into is included in these Construction Documents and bidders are required to familiarize themselves with all conditions contained therein.
7. CONTRACT INTERESTS BY COUNTY PUBLIC OFFICIALS
rev. 11/23 00 21 13 - 3
A. In accordance with Wisconsin Statute 946.13, county official may not bid for or enter into any contract involving receipts or disbursements of more than $15,000.00 in a year, in which they have private pecuniary interest, direct or indirect if at same time they are authorized to take official action with respect to making of this Contract. Any contract entered into in violation of this Statute is void and County incurs no liability thereon. This subsection does not affect application and enforcement of Wisconsin Statute 946.13 by state prosecutors in criminal courts of this state.
8. EMERGING SMALL BUSINESS PROVISIONS
A. Emerging Small Business (ESB) Goal. The goal of this project is ten percent (10%) ESB participation. ESBs utilizations are shown as a percentage of the total Bid.
B. Emerging Small Business Involvement. Bidder shall make good faith effort to award minimum of ten percent (10%) of the Work to ESBs. Good faith effort means significant contact with ESBs for purposes of soliciting bids from them. Failure to make or demonstrate good faith efforts will be grounds for disqualification.
C. Emerging Small Business Report. Bidder shall submit ESB Report demonstrating good faith efforts to Dane County Tamara D. Grigsby Office for Equity and Inclusion within ten
(10) business days of Bid Due Date. ESB Report should be sent to Contract Compliance Specialist via email at oei@countyofdane.com or mailed to Dane County Tamara D. Grigsby Office for Equity and Inclusion, City-County Building, Room 356, 210 Martin Luther King, Jr. Blvd., Madison, WI 53703. Bidders who fail to submit ESB Report shall be deemed unresponsive.
D. Emerging Small Business Instructions & Forms. Bidders may locate ESB instructions and forms on Dane County Tamara D. Grigsby Office for Equity and Inclusion website:
equity.countyofdane.com/contract-compliance.
E. Emerging Small Business Questions. Questions concerning ESB provisions shall be directed to:
OEI@countyofdane.com or
Dane County Contract Compliance Specialist City-County Building, Room 356 210 Martin Luther King, Jr. Blvd.
Madison, WI 53703 608/283-1391
9. METHOD OF AWARD - RESERVATIONS
A. Following will be basis of award of Contract, providing cost does not exceed amount of funds then estimated by County as available to finance Contract(s):
1. Lowest dollar amount submitted by responsible bidder on Base Bid for all work comprising project, combined with such additive Owner accepted alternates.
2. Owner reserves right to reject all bids or any bid, to waive any informality in any bid, and to accept any bid that will best serve interests of County.
3. Unit Prices and Informational Bids will not be considered in establishing low bidder.
mailto:oei@countyofdane.com https://equity.countyofdane.com/contract-compliance mailto:OEI@countyofdane.com rev. 11/23 00 21 13 - 4
10. SECURITY FOR PERFORMANCE AND PAYMENTS
A. Simultaneous with delivery of signed Contract, Bidder shall be required to furnish
Performance and Payment Bond as specified in Article 29 of General Conditions of Contract, “Contract Security”. Surety Company shall be licensed to do business in Wisconsin.
Performance and Payment Bond must be dated same date or subsequent to date of Contract.
Performance and Payment Bond must emulate information in standard AIA Document A312 for Performance and Payment Bond.
B. Provide certified copy of power of attorney from Surety Company showing that agent who signs Bond has power of attorney to sign for Surety Company. Secretary or Assistant Secretary of company must sign this certification, not attorney-in-fact. Certification must bear same or later date as Bond. Power of Attorney must emulate model power of attorney information detailed in standard AIA Document A312 for Sample Performance and Payment Bond.
C. If Bidder is partnership or joint venture, State certified list, providing names of individuals constituting partnership or joint venture must be furnished. Contract itself may be signed by one partner of partnership, or one partner of each firm comprising joint venture, but Performance and Payment Bond must be signed by all partners.
D. If Bidder is corporation, it is necessary that current certified copy of resolution or other official act of directors of corporation be submitted showing that person who signs Contract is authorized to sign contracts for corporation. It is also necessary that corporate seal be affixed to resolution, contract, and performance and payment bond. If your corporation has no seal, it is required that above documents include statement or notation to effect that corporation has no seal.
11. TAXES
A. Wisconsin Statute 77.54 (9m) allows building materials that become part of local unit government facilities to be exempt from sales & use tax. Vendors & materials suppliers may not charge Bidders sales & use tax on these purchases. This does not include highways, streets or roads. Any other Sales, Consumer, Use & other similar taxes or fees required by law shall be included in Bid.
B. In accordance with Wisconsin Statute 71.80(16)(a),successful nonresident bidder, whether incorporated or not, and not otherwise regularly engaged in business in this state, shall file surety bond with State of Wisconsin Department of Revenue payable to Department of Revenue, to guarantee payment of income taxes, required unemployment compensation contributions, sales and use taxes and income taxes withheld from wages of employees, together with any penalties and interest thereon. Amount of bond shall be three percent (3%) of Contract or subcontract price on all contracts of $50,000 or more.
12. SUBMISSION OF BIDS
A. All Bids shall be submitted electronically through Dane County’s Procurement Portal via
OpenGov: procurement.opengov.com/portal/countyofdane.
B. Submit completed Bid Bond electronically with Bid.
C. No bids for any subdivision or any sub-classification of the Work, except as indicated, will be accepted. Any conditional Bid, amendment to Bid Pricing Table or appended item thereto, or inclusion of any correspondence, written or printed matter, or details of any nature other than https://procurement.opengov.com/portal/countyofdane rev. 11/23 00 21 13 - 5 that specifically called for, which would alter any essential provision of Construction Documents, or require consideration of unsolicited material or data in determining award of Contract, will disqualify Bid. Telecommunication alterations to Bid will not be accepted.
D. Bidders must submit single Bid for all the Work.
E. Bid amounts shall be inserted numerically in spaces provided on Bid Pricing Table in OpenGov submission.
F. Addenda issued after Bid Letting shall become part of Construction Documents. Bidders shall acknowledge receipt of such addenda in OpenGov submission. Bid may be rejected if receipt of any particular addendum applicable to award of Contract has not been acknowledged in OpenGov.
G. Faxed, hand-delivered or emailed Bids will not be accepted.
13. SUBCONTRACTOR LISTING
A. Bidders may be required to submit Section 00 43 36, Proposed Subcontractors Form listing all subcontractors for this project including committed prices for each subcontractor. See OpenGov “Bid Submission - Checklist” for requirements.
RFB No. 325015 Geotechnical Data rev. 01/22 00 31 32 - 1
SECTION 00 31 32
GEOTECHNICAL DATA
SUBSURFACE DRILLING AND SAMPLING INFORMATION
INVESTIGATION DATA
CGC, Inc. have made subsurface investigations and soil boring reports (8 pages) that are included following this page. The designers used this information in preparing their work; however, Bidders shall draw their own conclusions therefrom. Architect / Engineer or Owner assumes no responsibility for subsoil quality or conditions.
Notes
1. Borings were drilled by ADC on January 6, 2025.
2. Boring locations are approximate.
3. Base map was prepared by KL Engineering.
Legend
Denotes Soil Boring Location and Number
SOIL BORING LOCATION EXHIBIT
Proposed Stormwater Management
Badger Prairie County Park 4654 Maple Grove Dr, Verona, WI 53593
Job No.:
C24597
Date:
Jan 2025
CGC, Inc.
Graphic Scale:
Approx. 50 ft
N
B-1
B-2
B-3
1002-CPS-23
Page of 1
County
Parcel I.D.
Property Owner Property Location
Govt. Lot ¼ ¼ S T 6 N R 8 E
Property Owner's Mail Address Lot # Block# Subd. Name or CSM #
City Village X Town Nearest Road
Soil Moisture
Drainage area sq ft acres Date of soil borings:
USDA-NRCS WETS Value:
Test site suitable for (check all that apply): Site not suitable; X Morphological Evaluation Dry = 1;
Bioretention; Subsurface Disperal System; Double Ring Infiltrometer Normal = 2;
Reuse; Irrigation; Other Other: (specify) Wet = 3.
#OBS. Pit X Boring Ground surface elevation ft. Elevation of limiting factor ft.
Name (Please Print) Signature Credential Number
Address Date Evaluation Conducted Telephone Number 129 Milky Way, Madison, WI 53718
Tim F. Gassenheimer
(608) 288-4100January 10, 2025
B-1
Comments: Apparent groundwater was not encountered during or upon the completion of drilling.
(1)
Possible bedrock near 14.5 ft below grade.
SP-011900004
062/0608-142-8690-1
NW NW 14
Verona 4654 Maple Grove Dr
Dane County
210 Martin Luther King Jr Blvd Rm 114
Madison WI 53703-3342
Redox Description Qu.
Sz. Cont. Color
Hydraulic Application Test Method
Dane
Horizon
Division of Industry Services
Madison, Wisconsin 53701
SOIL AND SITE EVALUATION - STORM
Attachment 2:
In accordance with SPS 382.365, 385, Wis. Adm. Code, and WDNR Standard 1002
1012.0 <997
1msbk mfi mvfr ml mvfr
P.O. Box 2658
Dominant Color
Munsell
Attach a complete site plan on paper not less than 8 ½ x 11 inches in size. Plan must include, but not limited to: vertical and horizontal reference point (BM), direction and percent of slope, scale or dimensions, north arrow, and BM referenced to nearest road
Reviewed by:
Date:
Structure Gr.
Sz. Sh.
Consistence Boundary
% Rock
Frags.
% Fines
(P200)
Please print all information
Personal information you provide may be used for secondary purposes [Privacy Law, s. 15.04(1)(m)]
City State Zip Code Phone Number
Texture
Hydraulic
App Rate
Inches/Hr
<5
<10
40-50
10YR 5/4
10YR 5/4
10YR 6/4
10YR 6/4
none none none none
Topsoil [not sampled]
SiCL
L
VGRS
GRSL
(1)
0.04
0.24
3.60
0.50
2msbk
1msbk
0sg
Approx.
Depth in.
0-9
9-36
36-66
66-96
96-180
SBD-10793 (R 7/17)
WDNR - September 2017
1002-CPS-23
Page of 1
County
Parcel I.D.
Property Owner Property Location
Govt. Lot ¼ ¼ S T 6 N R 8 E
Property Owner's Mail Address Lot # Block# Subd. Name or CSM #
City Village X Town Nearest Road
Soil Moisture
Drainage area sq ft acres Date of soil borings:
USDA-NRCS WETS Value:
Test site suitable for (check all that apply): Site not suitable; X Morphological Evaluation Dry = 1;
Bioretention; Subsurface Disperal System; Double Ring Infiltrometer Normal = 2;
Reuse; Irrigation; Other Other: (specify) Wet = 3.
#OBS. Pit X Boring Ground surface elevation ft. Elevation of limiting factor ft.
#OBS. Pit X Boring Ground surface elevation ft. Elevation of limiting factor ft.
Name (Please Print) Signature Credential Number
Address Date Evaluation Conducted Telephone Number
In accordance with SPS 382.365, 385, Wis. Adm. Code, and WDNR Standard 1002
Attach a complete site plan on paper not less than 8 ½ x 11 inches in size. Plan must include, but not limited to: vertical and horizontal reference point (BM), direction and percent of slope, scale or dimensions, north arrow, and BM referenced to nearest road
Dane
062/0608-142-8001-4
Division of Industry Services
Attachment 2:
P.O. Box 2658
Madison, Wisconsin 53701
SOIL AND SITE EVALUATION - STORM
210 Martin Luther King Jr Blvd Rm 114
City State Zip Code Phone Number
Please print all information Reviewed by:
Personal information you provide may be used for secondary purposes [Privacy Law, s. 15.04(1)(m)] Date:
Dane County
NE NW 14
Hydraulic Application Test Method
B-2
998.0 <983
Madison WI 53703-3342 Verona Maple Grove Dr
Consistence Boundary % Rock
Frags.
% Fines
(P200)
Hydraulic
App Rate
Inches/Hr
1 0-2 Topsoil [not sampled]
Horizon Approx.
Depth in.
Dominant Color
Munsell
Redox Description Qu.
Sz. Cont. Color Texture
Structure Gr.
Sz. Sh.
0m mvfi <5 0.032 2-36 10YR 5/3 none CL
4 66-180 10YR 6/4 none GRSL
3 36-66 10YR 4/3 none SCL
1msbk mvfr 15-25 0.50 mfi <5 0.112msbk
Comments: Apparent groundwater was not encountered during or upon the completion of drilling.
Tim F. Gassenheimer
SP-011900004
129 Milky Way, Madison, WI 53718 January 10, 2025 (608) 288-4100
B-3
990.0 <975
Horizon Approx.
Depth in.
Dominant Color
Munsell
Redox Description Qu.
Sz. Cont. Color Texture
Structure Gr.
Sz. Sh.
Consistence Boundary
% Rock
Frags.
0sg ml <10 3.60
% Fines
(P200)
Hydraulic
App Rate
Inches/Hr
1 0-4 Topsoil [not sampled]
2 4-18 10YR 7/3 none S
Comments: Apparent groundwater was not encountered during or upon the completion of drilling.
(1)
Possible bedrock near 13.5 ft below grade.
1msbk mvfr 19 30 0.503 18-180
10YR 6/4,
7.5YR 5/6
none GRSL
(1)
SBD-10793 (R 7/17)
WDNR - September 2017
9± in. TOPSOIL
Stiff, Brown Lean CLAY, Trace to Little Sand (CL) USDA: 10YR 5/4 Silty Clay Loam
Loose, Brown Silty Fine SAND, Trace Gravel (SM) USDA: 10YR 5/4 Loam
Dense, Light Brown Gravelly Fine to Coarse SAND, Trace to Little Silt (SP/SP-SM) USDA: 10YR 6/4 Very Gravelly Sand
Medium Dense, Light Brown Fine to Medium SAND, Some Silt and Gravel, Scattered Cobbles/Boulders (SM) USDA: 10YR 6/4 Gravelly Sandy Loam
Composite P200 (Samples 4 and 5) = 32.2%
Possible Cobble/Boulder or Bedrock near 14.5 ft End of Boring at 15 ft
Borehole Backfilled with Bentonite Chips
M
M/W
M
M
M
M/W
(1.75-2.0)
CJ
(ft)
Driller
Rec W
End
ADC
Y LL
Location
While Drilling Upon Completion of Drilling
2921 Perry Street, Madison, WI 53713
VISUAL CLASSIFICATION
Job No.
Geoprobe
7822DT
SOIL PROPERTIES
NW
2.25" HSA; Autohammer
(qa)
SAMPLE
soil types and the transition may be gradual.
Chief
Boring No.
LOG OF TEST BORING
(in.)
1/6/25
NW
11.9'
P
(608) 288-4100, FAX (608) 288-7887
N Depth
No.
qu
Start
T
TFG
Depth to Cave in
Proposed Stormwater Management C24597
E
Drill Method
PL
The stratification lines represent the
BULogger
4654 Maple Grove Dr, Verona, WI 53593
(tsf)
Moist
Badger Prairie County Park
Editor
1/6/25
Depth to Water Time After Drilling Rig and Remarks
Sheet of approximate boundary between
Project
WATER LEVEL OBSERVATIONS
Surface Elevation (ft)
1 1
LI
GENERAL NOTES
1012±
2± in. TOPSOIL Very Stiff, Brown Lean CLAY, Little Sand, Trace Gravel (CL; Possible Fill) USDA: 10YR 5/3 Clay Loam
Loose, Brown Clayey Fine to Medium SAND, Trace Gravel, Scattered Roots/Organic Matter (SC) USDA: 10YR 4/3 Sandy Clay Loam
Medium Dense, Light Brown Fine to Medium SAND, Some Silt and Gravel, Scattered Cobbles/Boulders (SM) USDA: 10YR 6/4 Gravelly Sandy Loam
End of Boring at 15 ft
Borehole Backfilled with Bentonite Chips
M
M
M
M
M
M
(2.5-2.75)
CJ
(ft)
Driller
Rec W
End
ADC
Y LL
Location
While Drilling Upon Completion of Drilling
2921 Perry Street, Madison, WI 53713
VISUAL CLASSIFICATION
Job No.
Geoprobe
7822DT
SOIL PROPERTIES
NW
2.25" HSA; Autohammer
(qa)
SAMPLE
soil types and the transition may be gradual.
Chief
Boring No.
LOG OF TEST BORING
(in.)
1/6/25
NW
12.2'
P
(608) 288-4100, FAX (608) 288-7887
N Depth
No.
qu
Start
T
TFG
Depth to Cave in
Proposed Stormwater Management C24597
E
Drill Method
PL
The stratification lines represent the
BULogger
4654 Maple Grove Dr, Verona, WI 53593
(tsf)
Moist
Badger Prairie County Park
Editor
1/6/25
Depth to Water Time After Drilling Rig and Remarks
Sheet of approximate boundary between
Project
WATER LEVEL OBSERVATIONS
Surface Elevation (ft)
1 1
LI
998±
4± in. TOPSOIL Medium Dense, Tan Fine to Medium SAND, Trace Silt and Gravel (SP; Possible Fill) USDA: 10YR 7/3 Sand Medium Dense to Dense, Light Brown Fine to Medium SAND, Some Silt and Gravel, Scattered Cobbles/Boulders (SM) USDA: 10YR 6/4 to 7.5YR 5/6 Gravelly Sandy Loam
Composite P200 (Samples 2 and 3) = 29.7%
Possible Cobble/Boulder or Bedrock near 13.5 ft
End of Boring at 15 ft
Borehole Backfilled with Bentonite Chips
M
M
M
M
M
M
CJ
(ft)
Driller
Rec W
End
ADC
Y LL
Location
While Drilling Upon Completion of Drilling
2921 Perry Street, Madison, WI 53713
VISUAL CLASSIFICATION
Job No.
Geoprobe
7822DT
SOIL PROPERTIES
NW
2.25" HSA; Autohammer
(qa)
SAMPLE
soil types and the transition may be gradual.
Chief
Boring No.
LOG OF TEST BORING
(in.)
1/6/25
NW
10.9'
P
(608) 288-4100, FAX (608) 288-7887
N Depth
No.
qu
Start
T
TFG
Depth to Cave in
Proposed Stormwater Management C24597
E
Drill Method
PL
The stratification lines represent the
BULogger
4654 Maple Grove Dr, Verona, WI 53593
(tsf)
Moist
Badger Prairie County Park
Editor
1/6/25
Depth to Water Time After Drilling Rig and Remarks
Sheet of approximate boundary between
Project
WATER LEVEL OBSERVATIONS
Surface Elevation (ft)
1 1
LI
990±
Bid No. 325015 Public Works Construction Contract rev. 11/2024 00 52 96 - 1
COUNTY OF DANE
PUBLIC WORKS CONSTRUCTION CONTRACT
Contract No. Bid No. 325015
Authority: 2025 RES -
THIS CONTRACT, made and entered into as of the date by which authorized representatives of both parties have affixed their signatures, by and between the County of Dane (hereafter referred to as “COUNTY”) and (hereafter, “CONTRACTOR”), and
W I T N E S S E T H :
WHEREAS, COUNTY, whose address is c/o Public Works Director, 1919 Alliant Energy Center Way, Madison, WI 53713, desires to have CONTRACTOR provide Badger Prairie County Park Playground Improvements, including Alternate Bids (if applicable) (“the Project”);
and
WHEREAS, CONTRACTOR, whose address is is able and willing to construct the Project, in accordance with the Construction Documents;
NOW, THEREFORE, in consideration of the above premises and the mutual covenants of the parties hereinafter set forth, the receipt and sufficiency of which is acknowledged by each party for itself, COUNTY and CONTRACTOR do agree as follows:
1. CONTRACTOR agrees to construct, for the price of $_____________ the Project and at the CONTRACTOR’S own proper cost and expense to furnish all materials, supplies, machinery, equipment, tools, superintendence labor, insurance, and other accessories and services necessary to complete the Project in accordance with the conditions and prices stated in the [Bid, Quote], General Conditions of Contract, any and all Addenda, the drawings which include all maps, plats, plans, and other drawings and printed or written explanatory matter thereof, and the specifications therefore as prepared by Damon Farber Landscape Architects (hereinafter referred to as “the Architect / Engineer”), and as enumerated in the Project Manual Table of Contents, all of which are made a part hereof and collectively evidence and constitute the Contract.
2. The term of this Contract shall commence when fully executed by the parties. The CONTRACTOR shall commence the Work by ________________. The Work’s substantial completion date shall be ________________. Failure to meet commence work or substantial completion dates on the Work as set forth herein is grounds for termination of the Contract and other remedies as set forth in the General Conditions of Contract incorporated herein.
3. COUNTY agrees to pay the CONTRACTOR in current funds for the performance of the Contract subject to additions and deductions, as provided in the General Conditions of Contract, and to make payments on account thereof as provided in Article entitled, “Payments to Contractor” of the General Conditions of Contract.
rev. 11/2024 00 52 96 - 2
4. During the term of this Contract, CONTRACTOR agrees to take affirmative action to ensure equal employment opportunities. The CONTRACTOR agrees in accordance with Wisconsin Statute 111.321 and Chapter 19 of the Dane County Code of Ordinances not to discriminate on the basis of age, race, ethnicity, religion, color, gender, disability, marital status, sexual orientation, national origin, cultural differences, ancestry, physical appearance, arrest record or conviction record, military participation or membership in the national guard, state defense force or any other reserve component of the military forces of the United States, or political beliefs.
Such equal opportunity shall include, but not be limited to, the following: employment, upgrading, demotion, transfer, recruitment, advertising, layoff, termination, training, rates of pay, and any other form of compensation. CONTRACTOR agrees to post in conspicuous places, available to all employees and applicants for employment, notices setting forth the provisions of this paragraph.
5. CONTRACTOR shall file an Affirmative Action Plan with the Dane County Contract Compliance Specialist in accord with Chapter 19 of the Dane County Code of Ordinances.
CONTRACTOR must file such plan within fifteen (15) business days of the effective date of this Contract. During the term of this Contract CONTRACTOR shall also provide copies of all announcements of employment opportunities to COUNTY’S Office of Equity & Inclusion, and shall report annually the number of persons, by race, ethnicity, gender, and disability status, which apply for employment and, similarly classified, the number hired and number rejected.
6. During the term of this Contract, all solicitations for employment placed on CONTRACTOR’S behalf shall include a statement to the effect that CONTRACTOR is an “Equal Opportunity Employer”.
7. CONTRACTOR agrees to furnish all information and reports required by COUNTY’S Contract Compliance Specialist as the same relate to affirmative action and nondiscrimination, which may include any books, records, or accounts deemed appropriate to determine compliance with Chapter 19, Dane County Code of Ordinances, and the provisions of this Contract.
8. The intent of this Contract is to be a Contract solely between the parties hereto and for their benefit only. Do not construe any part of this Contract to add to, supplement, amend, abridge or repeal existing rights, benefits or privileges of any third party or parties including, but not limited to, employees of the parties.
9. The entire agreement of the parties is contained herein and this Contract supersedes any and all oral agreements and negotiations between the parties relating to the subject matter hereof. The parties expressly agree that the express terms of this Contract shall not be amended in any fashion except in writing, executed by both parties.
10. CONTRACTOR must be qualified as a Best Value Contractor or have proven their exemption with Dane County Public Works Engineering Division before Bid Due Date / Time.
All contractors and subcontractors must be qualified as a Best Value Contractor or have proven their exemption to perform any work under this Contract.
11. This Contract, and any amendment or addendum relating to it, may be executed and transmitted to any other party by legible facsimile reproduction or by scanned legible electronic PDF copy, and utilized in all respects as, an original, wet-inked manually executed document.
Further, this Contract and any amendment or addendum thereto, may be stored and reproduced by each party electronically, photographically, by photocopy or other similar process, and each party may at its option destroy any original document so reproduced. All parties hereto stipulate that any such legible reproduction shall be admissible in evidence as the original itself in any judicial, arbitration or administrative proceeding whether or not the original is in existence and whether or rev. 11/2024 00 52 96 - 3 not each party made such reproduction in the regular course of business. This term does not apply to the service of notices under this Contract.
IN WITNESS WHEREOF, COUNTY and CONTRACTOR, by their respective authorized agents, have caused this Contract and its Schedules to be executed, effective as of the date by which all parties hereto have affixed their respective signatures, as indicated below.
FOR CONTRACTOR:
Signature Date
Printed or Typed Name and Title
Signature Date
Printed or Typed Name and Title
NOTE: If CONTRACTOR is a corporation, Secretary should attest. In accordance with IRS Regulations, unincorporated entities are required to provide either their Social Security or Employer Number in order to receive payment for services rendered.
This Contract is not valid or effectual for any purpose until approved by the appropriate authority designated below, and no work is authorized until the CONTRACTOR has been given notice to proceed by COUNTY’S Public Works Director.
FOR COUNTY:
Melissa Agard, County Executive Date
Scott McDonell, County Clerk Date
Bid No. 325015 General Conditions of Contract rev. 02/24 00 72 13 - 1
SECTION 00 72 12
GENERAL CONDITIONS OF CONTRACT
1. CONSTRUCTION DOCUMENTS
2. DEFINITIONS
3. ADDITIONAL INSTRUCTIONS AND DRAWINGS
4. SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
5. CUTTING AND PATCHING
6. CLEANING UP
7. USE OF SITE
8. MATERIALS AND WORKMANSHIP
9. CONTRACTOR’S TITLE TO MATERIALS
10. “OR EQUAL” CLAUSE
11. PATENTS AND ROYALTIES
12. SURVEYS, PERMITS, REGULATIONS AND TAXES
13. CONTRACTOR’S OBLIGATIONS AND SUPERINTENDENCE
14. WEATHER CONDITIONS
15. PROTECTION OF WORK AND PROPERTY
16. INSPECTION AND TESTING OF MATERIALS
17. REPORTS, RECORDS AND DATA
18. CHANGES IN THE WORK
19. EXTRAS
20. TIME FOR COMPLETION
21. CORRECTION OF WORK
22. SUBSURFACE CONDITIONS FOUND DIFFERENT
23. RIGHT OF DEPARTMENT TO TERMINATE CONTRACT
24. CONSTRUCTION SCHEDULE AND PERIODIC ESTIMATES
25. PAYMENTS TO CONTRACTOR
26. WITHHOLDING OF PAYMENTS
27. ACCEPTANCE OF FINAL PAYMENT AS RELEASE
28. PAYMENTS BY CONTRACTOR
29. CONTRACT SECURITY
30. ASSIGNMENTS
31. MUTUAL RESPONSIBILITY OF CONTRACTORS
32. SEPARATE CONTRACTS
33. SUBCONTRACTS
34. PUBLIC WORKS PROJECT MANAGER’S AUTHORITY
35. CONSULTANT’S AUTHORITY
36. STATED ALLOWANCES
37. ESTIMATES OF QUANTITIES
38. LANDS AND RIGHTS-OF-WAY
39. GENERAL GUARANTEE
40. CONFLICTING CONDITIONS
41. NOTICE AND SERVICE THEREOF
42. PROTECTION OF LIVES AND HEALTH
43. AFFIRMATIVE ACTION PROVISION AND MINORITY / WOMEN /
DISADVANTAGED BUSINESS ENTERPRISES
44. COMPLIANCE WITH FAIR LABOR STANDARDS
456. USE AND OCCUPANCY PRIOR TO ACCEPTANCE
46. CLAIMS
47. ANTITRUST AGREEMENT
48. INSURANCE
49. WISCONSIN LAW CONTROLLING
rev. 02/24 00 72 13 - 2
1. CONSTRUCTION DOCUMENTS
A. Construction Documents, listed in Table of Contents of this Specification volume shall form part of this Contract and provisions of Construction Documents shall be as binding upon parties as if they were fully set forth in Contract itself.
B. These shall also be considered as part of Construction Documents: Addenda, including additions and modifications incorporated in such addenda before execution of Contract;
requests for information; construction bulletins; change orders; and written interpretations by
Architect / Engineer or Public Works Project Manager that are made after execution of
Contract.
C. Construction Documents are complementary, and what is required by one shall be as binding as if required by all. Intent of Construction Documents is to include all labor, materials and equipment necessary for proper execution of the Work.
2. DEFINITIONS
A. These terms as used in this Contract are respectively defined as follows:
1. All uses of term “County” in Construction Documents shall mean Dane County.
2. All uses of term “Department” in Construction Documents shall mean Department of
Administration - Public Works Engineering Division, which is a unit of Dane County government. Department is County agency overseeing Contract with Contractor.
3. Public Works Project Manager is appointed by and responsible to Department. Public
Works Project Manager has authority to act on behalf of Department and will sign change orders, payment requests and other administrative matters related to projects.
4. Public Works Project Manager is responsible for supervision, administration and management of field operations involved in construction phase of this Work.
5. Term “Work” includes all labor, equipment and materials necessary to produce project required by Construction Documents.
6. Term “Substantial Completion” is date when project or specified area of project is certified by Architect / Engineer that construction is sufficiently completed, in accordance with Construction Documents, and as modified by any subsequent changes agreed to by parties, so that County may occupy project or specified area of project for use for which it was intended subject to permit approval for occupancy.
7. Term “Bid” includes all information submitted electronically by bidder in Dane County
Procurement Portal.
8. Contractor is person, firm, or corporation with whom County makes Contract. Though multiple contracts may be involved, Construction Documents treat them throughout as if each were of singular number.
3. ADDITIONAL INSTRUCTIONS AND DRAWINGS
A. Contractor may be furnished additional instructions and detail drawings as necessary to carry out the Work included in Contract. Additional drawings and instructions thus supplied to
Contractor will coordinate with Construction Documents and will be so prepared that they can be reasonably interpreted as part thereof. Contractor shall carry out the Work in accordance with additional detail drawings and instructions.
rev. 02/24 00 72 13 - 3
4. SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
A. All Submittals:
1. Contractor shall maintain updated Submittal Log containing status of all Shop Drawings, Product Data or Samples submissions minimally including comments & dates submitted
& approved.
2. Revise and resubmit submittals as required; identify all changes made since previous submittal.
3. Submittal form to identify Project, Contractor, Subcontractor or supplier and pertinent
Construction Documents references.
4. Apply Contractor's stamp, signed or initialed, certifying that review, verification of
Products required, field dimensions, adjacent construction work, and coordination of information is in accordance with requirements of the Work and Construction
Documents.
5. Identify variations from Construction Documents and Product or system limitations that may be detrimental to successful performance of completing the Work.
6. Unless otherwise specified, Contractor shall submit electronic copies of all Shop
Drawings & Product Data for each submission.
7. Contractor shall not commence any work requiring Shop Drawing, Product Data or
Sample submission until Architect / Engineer has approved submission. All such work shall be in accordance with approved Shop Drawings, Product Data and Samples.
8. By stamping and submitting Shop Drawings, Product Data and Samples, Contractor thereby represents that they have or will determine and verify all field measurements, field construction criteria, materials, catalog numbers, and similar data and that they have checked and coordinated each Shop Drawing, Product Data and Sample with requirements of the Work and of Construction Documents. Architect / Engineer shall return without examination, Shop Drawings, Product Data and Samples not so noted.
9. Section 00 73 00 - Supplementary Conditions details any additional, submittal-specific requirements beyond those in this sub-section.
B. Shop Drawings Submittals:
1. Contractor shall review Shop Drawings and place their dated stamp thereon to evidence their review and approval and shall submit with reasonable promptness and in orderly sequence to cause no delay in the Work or in work of any other contractor. At time of submission, Contractor shall inform Architect / Engineer in writing of any deviation in
Shop Drawings or Samples from requirements of Construction Documents.
2. Architect / Engineer will review and approve or reject Shop Drawings with reasonable promptness to cause no delay. Architect / Engineer’s approval shall not relieve
Contractor from responsibility for errors or omissions in Shop Drawings.
3. Contractor shall keep on site of the Work, approved or conformed copy of Shop
Drawings and shall at all times give Department access thereto.
4. All Shop Drawings from any one Contractor should be numbered consecutively and on cover sheet shall bear name and location of project, name of Contractor, date of submittal and date of each correction or revision and associated Specification section and page number.
C. Product Data Submittals:
1. Contractor shall submit, on an on-going basis and as directed, Product Data such as brochures that shall contain catalog cuts and specifications of all furnished mechanical and electrical equipment. After Architect / Engineer’s final approval, keep one (1) copy at job site by Contractor for reference purposes.
2. Mark each copy to identify applicable products, models, options, and other data.
Supplement manufacturer's standard data to provide information unique to this Project.
rev. 02/24 00 72 13 - 4
3. Submit manufacturers' printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, in quantities specified for Product Data.
4. Submit manufacturers' certificate for review, in quantities specified for Product Data.
Indicate material or Product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.
D. Samples Submittals:
1. Samples shall consist of physical examples furnished by Contractor in sufficient size and quantity to illustrate materials, equipment or workmanship, and to establish standards to compare the Work.
a) Submit Samples to Architect / Engineer & Public Works Project Manager. Submit
Samples in sufficient quantity (minimum of one (1)) to permit Architect / Engineer to make all necessary tests and of adequate size showing quality, type, color range, finish, and texture. Label each Sample stating material, type, color, thickness, size, project name, and Contractor’s name.
b) Submit transmittal letter requesting approval, and prepay transportation charges to
Architect / Engineer’s office on samples forwarded.
c) Materials installed shall match approved Samples.
5. CUTTING AND PATCHING
A. Contractor shall be responsible for all cutting, fitting or patching required to make its parts fit together properly in the Work.
B. Contractor shall not damage or endanger portion of the Work or fully or partially completed construction of County or separate contractors by cutting, patching or otherwise altering such construction, or by excavation. Contractor shall not cut or otherwise alter such construction by County or separate contractor except with written consent of County and of such separate contractor; such consent shall not be unreasonably withheld. Contractor shall not withhold unreasonably from County or separate contractor, Contractor’s consent to cutting or otherwise altering the Work.
6. CLEANING UP
A. Contractor shall keep premises and surrounding area free from accumulation of waste materials or rubbish caused by operations under Contract. Contractor shall remove from and about the Work waste materials, rubbish, Contractor’s tools, construction equipment, machinery, and surplus materials at completion of the Work. Contractor shall maintain streets and sidewalks around the Work site in clean condition. Contractor shall remove all spillage and prevent tracking of spillage arising from performance of the Work, into, out of, and within the Work site. Contractor shall establish regular maintenance program of sweeping, vacuuming and / or hosing to minimize accumulation of dirt and dust upon such areas.
B. If Contractor fails to clean up as directed in Construction Documents, County may do so and shall charge Contractor cost thereof.
C. Contractor shall be responsible for broken windows and glass, and at completion of the Work shall replace such damaged or broken windows and glass. After replacing damaged or broken windows and glass, Contractor shall remove all labels, wash and polish both sides of all windows and glass.
rev. 02/24 00 72 13 - 5
D. In addition to general cleaning (sweeping, vacuuming and / or hosing, as is appropriate to work surface), Contractor shall perform following final cleaning for all trades at completion of the Work:
1. Remove temporary protections;
2. Remove marks, stains, fingerprints and other soil or dirt from painted, decorated and finished woodwork and wall surfaces;
3. Remove spots, plaster, soil and paint from ceramic tile, marble and other finished materials, and wash or wipe clean;
4. Clean fixtures, cabinet work and equipment, removing stains, paint, dirt and dust, and leave same in undamaged, new condition;
5. Clean aluminum in accordance with recommendations of manufacturer; and
6. Clean resilient floors thoroughly with well-rinsed mop containing only enough moisture to clean off any surface dirt or dust and buff dry by machine to bring surfaces to sheen.
7. USE OF SITE
A. Contractor shall provide County and Architect / Engineer access to the Work under all circumstances.
B. Contractor shall confine operations at site to areas permitted by County, law, ordinance, permits and Construction Documents and shall not unreasonably encumber site with materials or equipment. Contractor shall assure free, convenient, unencumbered, direct and safe access to all properties adjacent to the Work for County, its employees, invitees and guests.
8. MATERIALS AND WORKMANSHIP
A. Contractor shall perform all work and furnish all supplies and materials, machinery, equipment, facilities and means, necessary to complete the Work required by this Contract, within time specified, in accordance with provisions of Construction Documents.
B. All equipment and materials incorporated in the Work covered by this Contract are to be new;
use recycled and / or recovered materials to extent that such use is technically and economically feasible. Recovered materials are products recovered from solid waste in form identical to original form for use that is same as, or similar to original use. Recycled materials are products manufactured from solid waste.
C. If requested, Contractor shall furnish satisfactory evidence as to kind and quality of construction materials proposed or used. Contractor shall furnish to Architect / Engineer, for approval, manufacturer name and model, performance capacities and other pertinent information of machinery, mechanical, electrical or other types of equipment, which
Contractor plans to install.
D. If not otherwise provided, materials and labor called for in this Contract shall be provided and performed in accordance with established practice and standards recognized by Architects, Engineers, Department, and construction industry.
E. Reference to “Standard” specifications of any association or manufacturer, or codes of
County authorities, intends most recent printed edition or catalog in effect on date that corresponds with date of Construction Documents.
F. Whenever reference is made in Specifications that work shall be “performed”, “applied”, in accordance with “manufacturer’s directions or instructions”, Contractor to whom those rev. 02/24 00 72 13 - 6 instructions are directed shall furnish three (3) printed copies of such instructions to Architect
/ Engineer before execution of the Work.
9. CONTRACTOR’S TITLE TO MATERIALS
A. Contractor or any subcontractor shall not purchase materials or supplies for the Work subject to any chattel mortgage or under conditional sale contract or other agreement by which seller retains interest. Contractor warrants that all materials and supplies used in the Work are free from all liens, claims or encumbrances and Contractor has good title to them.
10. “OR EQUAL” CLAUSE
A. Whenever equipment or materials are identified on Drawings or in Specifications by reference to manufacturer’s or vendor’s name, trade name, catalog number, and other identifying information, it is intended to establish standards; and any equipment or material of other manufacturers and vendors which will perform adequately duties imposed by general design will be considered equally accepted provided equipment or material so proposed is, in opinion of Architect / Engineer, of equal substance and function. Architect / Engineer and
Department shall provide written approval before Contractor may purchase or install it.
B. Equipment or materials of manufacturers, other than those named, may be used only upon following conditions:
1. That, in opinion of Architect / Engineer and Department, proposed material or equipment item is fully equal or superior (in design, materials, construction, workmanship, performance, finish, etc.) to named item. No compromise in quality level, however small, is acceptable.
2. That, in substituting materials or equipment, Contractor assumes responsibility for any changes in system or for modifications required in adjacent or related work to accommodate such substitution despite Architect / Engineer’s and Department’s approval, and all costs growing out of approval of “or equal” items shall be responsibility of Contractor. No extra costs resulting from such approval shall become responsibility of
Department, Architect / Engineer or any other separate Contractor.
3. It shall be understood that use of materials or equipment other than those specified, or approved equal by Architect / Engineer and Department, shall constitute violation of
Contract, and that Architect / Engineer and Department shall have right to require removal of such materials or equipment and their replacement with specified materials or equipment at Contractor’s expense.
4. Product and manufacturer named first in Specifications or on information shown on
Drawings is basis of selection of manufactured items and equipment, particularly mechanical equipment. In using other than first named products or manufacturers, including those specified as additionally approved or acceptable, Contractor assumes responsibility for any changes in system and for modifications in any work required to accommodate them. Architect / Engineer’s approval of such additionally acceptable products or manufacturers, either in Specifications or in Addendum, does not relieve
Contractor from obligation to coordinate such optional products with other Contractors, whose work may be affected by them, and to pay all additional costs resulting from their inclusion into the Work. Contractor’s liability shall include payment of Architect /
Engineer’s fees for any additional services made necessary by or directly connected to such product changes.
This is the start of the file's text. The full file is on GovTribe.