319 CTS 533 TRS Future Contract (PWS draft 30 Mar 21)_Redacted.pdf

PDF 642 KB Posted

Attached to
319 CTS and 533 TRS Space Power Training Federal contract opportunity
Solicitation number
Space_Power_Training_01
Issued by
Department of the Air Force Space Command

View the file

Other files for this federal contract opportunity

Other files attached to 319 CTS and 533 TRS Space Power Training, newest first.
File Type Posted
319 CTS OI 36-2203_2020 Final (20 Feb 20).pdf PDF
319 CTS CDG 24 Feb 21_Redacted.pdf PDF
Attachment_Space Power Training Past Performance Capability Matrix.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

319th COMBAT TRAINING SQUADRON (319 CTS)

AND

533rd TRAINING SQUADRON (533 TRS)

SPACEPOWER TRAINING

PETERSON AIR FORCE BASE, COLORADO

VANDENBERG AIR FORCE BASE, CALIFORNIA

30 March 2021

Table of Contents Contents

1. INTRODUCTION AND SCOPE

1.1. Introduction:

1.2. Scope:

2. GENERAL REQUIREMENTS

2.1. Management and Key Personnel:

2.2. Contractor Identification:

2.3. Quality Control:

2.4. Hours of Operation:

2.5. Place of Performance:

2.6. Security Requirements:

2.7. Required Certifications and Qualifications:

2.8. Meetings:

2.9. Contractor Travel:

2.10. Other Direct Costs (ODCs):

2.11. Product Ownership and Data Rights:

2.12. Phase-In / Phase-Out Periods:

2.13. Mission-Essential Services:

2.14. Contractor Manpower Reporting:

3. SPECIFIC REQUIREMENTS

3.1. 319 CTS Requirements

3.1.1. 319 CTS Courses

3.1.2. Basic Services:

3.1.3. Course Instruction:

3.1.4. Program Manager (PM):

3.1.5. Information Technology (IT) Support:

3.1.6. Information Assurance (IA) Support

3.1.7. SCIF Security Manager

3.1.8. Collateral Security Manager

3.1.9. Distance Learning .......................................................... Error! Bookmark not defined.

3.1.10. Website Support and Data Management

3.1.11. Modeling and Simulation

3.1.12. Instructional Systems Designer. .................................... Error! Bookmark not defined.

3.1.13. Registrar

3.1.14. Scheduler

3.1.15. Foreign Disclosure Reviewer ................................................................................. 3X

3.2. 533 TRS Requirements .................................................................................................. 4X

3.2.1. 533 TRS Courses .................................................................................................... 4X

3.2.2. Basic Services ......................................................................................................... 4X

3.2.3. Course Instruction ................................................................................................. 4X

3.2.4. Task Lead ............................................................................................................... 4X

3.2.5. Information Technology (IT) Support ................................................................. 4X

3.2.6. Distance Learning .................................................................................................. 4X

3.3. Training Workshop Hours ........................................................................................... 4X

4. GOVERNMENT FURNISHED PROPERTY AND SERVICES

4.1. Government Furnished Property and Equipment:

4.2. Government Furnished Facilities and Workspaces:

4.3. Government Furnished Services and Materials:

5. SERVICE SUMMARY

5.1. Overview:

5.2. Performance Objectives, PWS Paragraphs, and Thresholds:

5.3. Performance During Crisis

6. DELIVERABLES SCHEDULE

7. RECOMMENDED PERSONNEL QUALIFICATION MATRIX

8. MINIMUM PERSONNEL CLEARANCE REQUIREMENTS MATRIX

8.1. Instructor Services

8.2. Program Management

8.3. General Support Services

9. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

10. DEFINITIONS & ACRONYMS

11. ATTACHMENTS

1. INTRODUCTION AND SCOPE

1.1. Introduction:

1.1.1. General. This is a non-personal services contract to provide the 319 CTS and 533 TRS support services. The Government will not exercise any supervision or control over the Contractor employees performing the services herein. Such employees shall be accountable solely to the Contractor, who in turn is responsible to the Government, through Contracting Officer Representative (COR) oversight.

1.1.2. 319 CTS Mission. 319 CTS operates from the Moorman Space Education and Training Center (SETC) on Peterson Air Force Base in Colorado. The 319 CTS expands space system understanding by providing world-class, in-depth instruction of space systems, capabilities, requirements, acquisition, strategies and policies to support Joint military operations and U.S.

National Security. The mission of 319 CTS is to provide responsive training in support of tactical, operational, and strategic joint and coalition space operations. Annually, 319 CTS educates more than 2800 students from all branches of the United States military, other Government departments, and select allied nations.

1.1.3. 533 TRS Mission. 533 TRS operates from Vandenberg AFB, CA. The 533 TRS provides initial skills training in space system understanding by providing world-class, in-depth instruction of space systems, capabilities, requirements, acquisition, threats, strategies and policies to support Joint military operations and U.S. National Security. The mission is to transform new personnel into joint minded space professionals possessing the values, skills, confidence, and character required to protect, defend, and deliver spacepower. Annually, the 533 TRS educates more than 400 students from all branches of the United States military.

1.1.4. Description of Services/Introduction.

1.1.4.1. 319 CTS requires specialized instructors and critical support personnel capable of successfully executing the 319 CTS mission. The Contractor shall provide all personnel, transportation, tools, materials, supervision, and other items and non- personal services (except for those items specified as Government furnished property and services) necessary to perform the tasks, as specified in this PWS.

1.1.4.2. 533 TRS requires specialized Subject Matter Experts (SME) courseware developers and instructors capable of successfully executing the 533 TRS mission. The Contractor shall provide all personnel, transportation, tools, materials, supervision, and other items and non-personal services (except for those items specified as Government furnished property and services) necessary to perform the tasks, as specified in this PWS.

1.1.5. Objectives. The overall objective of this PWS is to document the tasks required to support the missions of the 319 CTS and 533 TRS.

1.1.5.1. 319 CTS Objective: The 319 CTS objective is to successfully accomplish the mission identified in para 1.1.2 above and tasked assigned in the unit’s Mission Directive. The contractor shall support the 319 CTS objective by accomplishing the tasks identified in this PWS.

1.1.5.2. 533 TRS Objective: The 533 TRS objective is to successfully accomplish the mission identified in para 1.1.3 above and tasked assigned in the unit’s Mission Directive. The contractor shall support the 533 TRS objective by accomplishing the tasks identified in this PWS.

1.2. Scope:

1.2.1. Scope. To accomplish the objectives of this PWS, 319 CTS and 53 TRS require the

Contractor to accomplish specific tasks, including (but not limited to) courseware development in accordance with (IAW) established Instructional System Design (ISD) guidance and practices, unit level instructions/guidance, course instruction, Distance Learning (DL) support, web development/support, end-of-course After Action Reports, course registration, information technology (IT) and database services for 319 CTS and 533 TRS personnel (Government and Contractors), security support, and information assurance support. Courses occur year-round with a consistently high operational tempo. Details of the specific scope of efforts are summarized in subsequent paragraphs of this PWS.

1.2.2. Contractor Responsibilities. The Contractor shall furnish all necessary supplies, equipment, facilities, materials, and services required to perform work under this contract that are not listed under Section 4, Government Furnished Property and Services. The Contractor shall not retain any equipment purchased under this contract for any reason other than the performance of the requirements in this PWS.

1.2.3. Scope Determination. In the event a scope determination is required or a disagreement arises between Contractor and COR regarding contract scope, the issue shall be referred to the Contracting Officer (CO) who is the final authority for determining scope of the contract.

2. GENERAL REQUIREMENTS

2.1. Management and Key Personnel:

2.1.1. Program Manager (PM). The Contractor shall appoint a PM and alternate after contract award. The Contractor shall provide the name, telephone number (to include mobile telephone and pager, as applicable) and e-mail address of the PM and alternate to the COR and CO within one (1) business day of contract award. In the event of replacement of the PM, the Contractor shall notify the COR and CO, in writing, of such replacement at least 15 calendar days prior to a planned replacement and within 24 hours following an unplanned replacement.

2.1.1.1. PM Responsibilities. The Contractor PM shall coordinate with the COR to obtain and clarify contract requirements, and will be responsible for the daily control and supervision of the Contractor's employees. The PM shall have the authority to resolve problems, allocate resources, manage personnel, and monitor operation performance to ensure contract requirements are met. The effort shall be under the direction and coordination of a single PM that will be a central point of contact for the CO and COR for any issues. See PWS Section

3.4 for additional PM requirements.

2.1.2. 533 TRS Task Lead. The Contractor PM shall appoint one of the senior developer/instructors assigned to support the 533 TRS as the 533 TRS Task Lead to lead the contractor efforts at 533 TRS (Vandenberg AFB, CA). The 533 TRS task lead shall coordinate with the PM on the accomplishment of the contractor tasks supporting the 533 TRS mission.

2.1.3. Key Personnel. Key personnel include the following positions: the Contractor Program Manager (PM), 533 TRS Task Lead, Sensitive Compartmented Information Facility (SCIF) Security Manager, and 50% of the IT Support at 319 CTS. During the first 90 days of performance, the Contractor shall not substitute key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the CO within 15 calendar days after the occurrence of any of these events and provide the information required below. After the initial 90-day period, the Contractor shall submit the information required to the CO at least 15 calendar days before making any permanent substitutions. All key personnel changes impacting 319 CTS shall be reviewed by the COR, approved by the 319 CTS Commander, and notification provided by the CO within seven (7) calendar days. Any personnel change impacting the 533 TRS Task Lead shall be reviewed by the COR, approved by the 533 TRS Commander, and notification provided by the CO within seven (7) calendar days

2.1.4. Personal Services and Inherently Governmental Functions (IGFs). The Contractor shall ensure the Contractor's employees understand the prohibitions imposed on the US Government regarding personal services contracts and will report instances where the Government attempts to control or supervise the Contractor’s employees to the CO immediately. The Contractor shall train, organize, and control Contractor personnel and monitor support to ensure employees are not performing IGFs and shall report these types of actions to the CO immediately.

2.1.5. Supervision of Employees. The Contractor shall not allow Government employees to supervise Contractor employees or direct work outside the limits of this contract. Likewise, the Contractor shall not supervise or otherwise direct Government employees, nor shall the Contractor supervise or direct employees of other Contractors outside the Contractor’s own subcontracting/teaming arrangements. The Contractor shall ensure that all support provided to the Government is coordinated, approved, and directed by Contractor task leads and that their subordinate employees do not work directly or constructively for Government employees in an employee-like relationship that could result in personal services.

2.1.6. Organizational Conflict of Interest (OCI). Contractor and Subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the CO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the CO to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the CO and in the event the CO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the CO may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

2.2. Contractor Identification:

2.2.1. Identification of Contractor Employees. All contract personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

2.2.2. Identification Badges. Contractors shall wear company identification badges to easily distinguish themselves from Government employees (e.g. corporate identification badges, Government-issued identification that reflects Contractor status, etc.) These badges must be conspicuously displayed at all times when working with Government personnel. Identification badges must be displayed above the waist at all times to allow for easy identification as a Contractor employee or authorized sub-Contractor performing work for the Contractor. Badges shall be worn at all times when Contractor employees are co-located on a Government installation or when on temporary duty (TDY) working with other Government personnel.

Sub-Contractor employees’ identification badges shall identify their respective prime Contractor.

2.2.3. Identification when Communicating. Contractors shall, when conversing with

Government personnel during business meetings, over the telephone, or via electronic mail, identify themselves as Contractor personnel. Electronic mail signature blocks and business cards shall identify Contractor/company affiliation.

2.2.4. Identification of Workspace. When co-located in a space in a Government facility, such as offices, separate rooms, or cubicles, the work area must be clearly identified with Contractor-supplied signs, name plates or other identification, showing that these are work areas for Contractor or sub-Contractor personnel.

2.3. Quality Control:

2.3.1. Quality Control (QC). The Contractor shall develop and maintain an effective quality control program to ensure services are performed IAW this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services.

The quality control plan (QCP) shall be provided to the Government within 30-days after contract award for acceptance by the CO. After acceptance of the initial quality control plan by the CO, any changes to the QCP requires a comprehensive written QCP to be submitted to the CO within 5-working days of the change. The Contractor shall receive the CO’s acceptance in writing of any proposed change to the QCP within 30 calendar days after receipt of changed QCP. (CDRL A001)

2.3.2. Quality Assurance. The Government will periodically evaluate the Contractor’s performance by appointing a COR(s) to monitor performance to ensure services are received. The Government COR will evaluate the Contractor’s performance through intermittent on-site inspections of the Contractor's quality control program and receipt of complaints from base personnel. The Contractor’s performance shall be documented in the monthly Certificates of

Service. The Government may inspect each task as completed or increase the number of quality control inspections if deemed appropriate because of repeated failures discovered during quality control inspections or because of repeated customer complaints. Likewise, the Government may decrease the number of QC inspections if merited by performance. The Government will also investigate complaints received from various customers located on the installation. The Contractor shall be responsible for initially validating customer complaints.

However, the CO, with Government COR input, will make final determination of the validity of customer complaint(s) in cases of disagreement with Contractor.

2.3.3. Contracting Officer Representative (COR). The COR(s) will be identified by a separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: 1) assure that the Contractor performs the technical requirements of the contract, 2) perform inspections necessary in connection with contract performance, 3) maintain written and oral communications with the Contractor concerning technical aspects of the contract, 4) issue written interpretations of technical requirements, including Government drawings, designs, specifications, 5) monitor Contractor's performance and notifies both the CO and Contractor of any deficiencies, 6) coordinate availability of Government furnished property, and 7) provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in scope, price, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

2.3.3.1. COR and CO QC Roles. The COR(s) is (are) the authorized Government representative(s) who will perform assessments of the Contractor’s performance. The COR(s) will inform the CO when discrepancies occur and will request corrective action from the Contractor. The COR(s) will make a notation of the discrepancy, as well as the date and time the discrepancy was corrected, on their surveillance checklist. Any matter concerning a change to the scope, prices, terms or conditions of this contract shall be referred to the CO and not to the COR(s). The services to be performed by the Contractor during the period of this contract shall at all times and places be subject to review by the CO or authorized COR(s).

2.4. Hours of Operation:

2.4.1. Normal Operating Hours/Business Hours. Normal operating hours are 7:30 am to 4:30 pm

Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. During preparation for courses and/or course execution, extended hours may be required. The Contractors shall log these hours as compensation hours and use these hours per their management directives. No overtime hours with associated additional pay are authorized.

In addition, the Contractor shall provide support and response to emergency incidences associated with security or loss of equipment. The 533 TRS may be required to conduct training on different shifts due to student throughput demands.

2.4.2. Recognized Holidays. The Contractor is not required to perform services on the following holidays:

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day

2.5. Place of Performance:

2.5.1. Place of Performance. The work to be performed under this contract shall be performed on-site. The primary location for contract performance supporting 319 CTS is the SETC, located in Peterson AFB, Colorado Springs, CO. The allotment of Government-provided Contractor on-site workspace at 319 CTS is not-to exceed 55 seats with 24/7 access.

The primary location for contract performance supporting 533 TRS is Vandenberg AFB, CA. The allotment of Government-provided Contractor on-site workspace at 533 TRS is not-to exceed eight (8) seats with 24/7 access. The Contractor PM may authorize tele- commuting for individuals, on a case-by-case basis and only after coordinating with 319 CTS and 533 TRS Operations Officers, as applicable.

2.5.2. Building Closures and Delays. Situations may arise where Government facilities may not be available for performance of requirements (i.e., closure due to weather, force protection conditions, etc.). Contractor employees will contact their supervisor for direction concerning late reporting or early release due to inclement weather. Delays or additional response due to exercises and contingencies are part of the environment and cannot be considered cause for an adjustment in price. Mission requirements may necessitate suspension or cancellation of operations for that period. All uncompleted work requirements will be rescheduled for accomplishment at a later date.

2.6. Security Requirements:

2.6.1. Security Clearances. All Contractor personnel performing security, IT, and instructional

(teaching) duties under this contract shall have a Top Secret/Special Compartmented Information (TS/SCI) security clearance at time of the contract start date and must maintain the level of security required for the life of the contract. All other Contractor personnel shall have as a minimum a Secret clearance. Higher-level security clearances for some of the Contractor employees are required. The courses requiring the higher-level security clearances are annotated in para 3.1.2 (Table 1) and para 3.2.2 (Table 3) of this PWS. The security requirements are IAW the contract DD254.

2.6.2. Physical Security. The Contractor shall be responsible for safeguarding all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.

2.6.3. Key/Badge Control. The Contractor shall establish and implement methods of making sure all keys/security badges issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include security badges. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the QCP.

Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/security badges to the CO. (CDRL A001)

2.6.3.1. Controlled Use of Keys. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the CO.

2.6.3.2. Lost Keys and Rekeying. In the event keys (other than master keys) are lost or duplicated, the Contractor shall, upon direction of the CO, re-key or replace the affected lock or locks;

however, the Government, at its option, may replace the affected lock or locks or perform re- keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

2.6.4. Lock Combinations. The Contractor shall establish and implement methods of ensuring that no lock combinations are revealed to unauthorized persons. For lock combination managed by the Contractor, the Contractor shall ensure lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. The contractor shall notify the COR and all Unit Security Managers before lock combination(s) are changed. These procedures shall be included in the Contractor’s QCP. (CDRL A001)

2.6.5. Physical Security. The Contractor shall comply with base Operations Plans and Instructions for Force Protection Condition procedures, Random Antiterrorism Measures, and local search and identification requirements. The Contractor shall adhere to security policies and safeguard all Government property provided for Contractor use. At the end of each work period, the Contractor shall secure all Government facilities, equipment, and materials.

2.6.6. Commander’s Authority. The Government may direct the Contractor in writing to remove any employee from the installation when retention of such employee endangers life, property or security, or where such employee violates laws or regulations. This action does not relieve the Contractor from total performance of the contract tasks specified herein.

2.6.7. Applicability of Security Requirements. The provisions outlined in this section apply to the prime Contractor and any subcontractors the prime Contractor may employ during the course of this contract. No Contractor personnel performing sensitive duties shall be allowed to commence work on this effort until his or her trustworthiness has been favorably adjudicated.

2.6.8. Common Access Cards (CACs) and Access ID Badges. Every Contractor employee shall obtain and possess a DoD CAC and an Access ID Badge as required. Contractor shall use the card IAW AFFARS 5352.242-9001. Upon favorable review and initiation of the Personnel Security Investigation (PSI) to establish the suitability of an employee for the job and the approval for temporary Automated Information System (AIS) access pending final adjudication of the PSI, the Contractor shall submit to a Contractor’s onsite System Manager request for the DoD CAC and ID Badge.

2.6.9. Return of Identification and Access Badges. The Contractor shall ensure employees who terminate their services shall immediately return any Government identification/access badges issued in support of this contract.

2.6.10. Privately Owned Vehicles. The Contractor shall comply with directives pertaining to operation of privately owned vehicles on AF Installations per policies established by the installation commanders.

2.7. Required Certifications and Qualifications:

2.7.1. Special Qualifications. The Contractor shall obtain appropriate certifications and provide documentation to the CO for each functional area at contract start date and maintain certifications throughout the life of the contract at Contractor's expense. The minimum certification and training requirements shall be maintained as an electronic record. Contractor personnel shall provide proof of release for certification(s) to the DoD via Defense Workforce Certification Application (DWCA). The Contractor shall update certifications prior to internal movement of personnel. The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the CO. Proposed substitutes must meet the minimum qualifications as specified by the associated position delineated in Request for Proposal (RFP) Attachment 5, Personnel Qualifications Matrix. Substitutes shall not begin work until approved in writing by the CO or Government COR. The CO shall notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. (CDRL A002)

2.7.2. Certification Requirement. The Contractor personnel supporting requirements listed in Section 3 of the PWS shall meet industry certification requirements as identified in this PWS.

2.7.3. Certification Updates. The Contractor shall update and maintain, at their expense, certifications IAW this PWS. The Government will notify the Contractor in writing when a new certification is required, and the Contractor shall have six months to obtain the new certifications for their employees.

2.7.4. Information Assurance (IA) Certification. The Contractor shall have a current Information

Assurance Technical or Information Assurance Manager level certification IAW DoD 8140.01- M, Information Assurance Workforce Improvement Program, at contract start date and maintain certifications throughout life of the contract at Contractor's expense.

2.7.5. Clearance Requirements – SCIF Security Contractor. The security Contractor

(applicable to 319 CTS support only) shall possess and maintain, at a minimum, a TS/SCI eligible clearance.[redacted] . If required by the Government, the SCIF security Contractor shall take and pass a counter-intelligence polygraph. [redacted] .

2.8. Meetings:

2.8.1. Post Award Conference. The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office IAW Federal Acquisition Regulation (FAR) Subpart 42.5.

2.8.2. Periodic Progress Meetings. The CO, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the CO will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

2.9. Contractor Travel:

2.9.1. Contractor Travel. Contractor will be required to travel in support of 319 CTS and 533 TRS during the performance of this contract. The travel on this contract is in the Other Direct Cost (ODC) CLIN for Government-directed travel outside the local commuting area. Any location within the local travel area at which the Contractor may be required to perform duties required in the PWS shall be an alternate duty location. The Contractor is authorized to ship training aids to these locations in support of this PWS. Contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. All travel requires Government approval/authorization and notification to the COR prior to travel before any travel costs can be expended. Contractor employees shall be current in their knowledge to support their respective unit (319 CTS or 533 TRS).

2.9.2. Instructor Training/Seminars. The Contractor shall provide opportunities for the 319 CTS and 533 TRS Contractor instructors to attend courses, seminars, conferences, etc. to maintain their currency in their technical area of expertise. The ODC budget shall include funding annually (base and options) to support the Contractor instructor’s attendance at courses, seminars, conferences, etc. to maintain their currency in the technical material of 319 CTS and 533 TRS courses. All Contractor participation in courses, seminars, conferences, etc. will be approved by the Government prior to each event and before any ODC funds are expended on it. (CDRL A003)

2.9.3. Travel Approval. The Contractor shall obtain written travel approval requirements

(including plans, agenda, itinerary, or dates) from the COR, a minimum of five (5) business days prior to travel commencing. Travel requests shall include approximate travel dates, expected duration, origin and destination, purpose, estimated costs and number/names of personnel traveling.

2.9.4. Travel Reimbursement. Contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Federal Travel Regulation (JFTR) and the limitation of funds specified in this contract. Travel reimbursement shall be IAW FAR 31.205-46, on a cost- reimbursable basis.

2.9.5. Travel Expense Reports. The Contractor shall submit travel expense reports within ten (10) business days from Contractor's employees return date from travel. Travel expense reports must include a summary section of all reimbursable travel costs incurred and receipts for all reimbursable travel costs over $75. All trips shall be in accordance with the Joint Travel Regulations.

2.9.6. Trip Reports (CDRL A009). For all trips the Contractor shall provide a trip report within ten

(10) business days of the return date from travel. Extensions may be granted by the COR on a case by case basis. As a minimum, trip reports will include the objectives and outcomes of the trip. Trip reports do not have a specific format and may range from an email to a formal presentation depending on the type of trip. Travel details as part of course execution shall be documented in course After Action Reports (IAW paragraphs 1.2.1 and 3.1.3.9), and an additional Trip Report is not required.

2.10. Other Direct Costs (ODCs):

2.10.1. Other Direct Costs (ODC). ODC includes travel for support of 319 CTS mobile courses identified in para 3.1.2, Table 1. ODC includes travel for maintaining 319 CTS and 533 TRS Contractor instructor proficiency (outlined in paragraphs 2.9.1 and 2.9.2). For 319 CTS, additional ODC include textbooks (hardcover or electronic), software and software licenses, tech refresh, DL and Learning Management System (LMS) software and licenses, reproduction, shipping expenses associated with training activities and visits to Contractor facilities, and if applicable, the purchase of DL/LMS support (typically purchased on a per-student basis). The Contractor is authorized to purchase reimbursable items costing less than $5,000 for open market buys, or up to $25,000 for General Service Administration (GSA) items, using the following procedures in para 2.10.3 below. (CDRL A003)

2.10.2. ODC for Training Software Support. The Contractor shall program ODC funds for the training software identified in the following paragraphs.

2.10.2.1. SEW Training Software. The contractor shall purchase sustainment of the virtualized Space Electronic Warfare (EW) training software. If funding is available, the contractor shall purchase the development of additional capabilities, as directed by 319 CTS. This effort is not currently funded and no work should be accomplished until funding is established for this effort.

2.10.2.2. SBM Training Software. The contractor shall purchase sustainment of the virtualized Space Battle Management (SBM) training software. If funding is available, the contractor shall purchase the development of additional capabilities, as directed by 319 CTS. This effort is not currently funded and no work should be accomplished until funding is established for this effort.

2.10.2.3. OW Software. The contractor shall purchase sustainment of the virtualized Orbital

Warfare training software (Palski tool). If funding is available, the contractor shall purchase the development of additional capabilities, as directed by 319 CTS. This effort is not currently funded and no work should be accomplished until funding is established for this effort

2.10.3. Procedures. All reimbursable open market purchases below $5,000 must be approved by the

COR. For items exceeding $5,000, the Contractor shall obtain COR recommendation, and CO approval prior to purchase. In addition, the Contractor shall provide at least three quotes before going to the lowest acceptable offer that meets the Government need. The Contractor shall not break up purchases to meet this threshold.

2.10.4. Itemized List. Contractor shall provide a monthly itemized listing of purchased items to the COR via the ODC Funds Status Report (OFSR) so they can be added to GFP. (CDRL A003)

2.11. Product Ownership and Data Rights:

2.11.1. Data Rights. The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the CO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

2.11.2. Retention of Material. The Contractor shall not retain classified or unclassified material generated or received under this contract after the contract ends without approval of the appropriate office of primary responsibility. The Contractor shall not use any materials pertaining to this contract for business development or any other vendor strategic purposes.

However, the Contractor is authorized to include summary performance information in proposals to be submitted to the Government to satisfy past performance information requirements.

2.11.3. Product Ownership. All reports produced by the Contractor in the performance of this contract are property of the Government. These items shall be turned-in to the Government by the end of the Period of Performance (PoP).

2.12. Phase-In / Phase-Out Periods:

2.12.1. Phase-In / Phase-Out Period. To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have personnel on board, during the phase-in and phase-out periods. During the phase-in period, the Contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date. (CDRL A004)

2.12.2. 319 CTS Phase-In. During the phase-in period, the Contractor shall perform a complete assessment of the 319 CTS IT environment to gain understanding, contractual responsibilities, state of services and IT infrastructure, current transition work flow/processes and volumes (e.g. incidents/requests), project(s) status, and organization relationships of employees. The Contractor shall provide a transition plan two business days after contract award to the COR and CO that addresses all actions necessary to ensure a seamless transition. Transition Activities required, but not limited to:

• Coordinate the transition schedule with the incumbent and identify schedule conflicts

• Obtaining all system and network diagrams and ensuring accuracy with incumbent

Contractor, identify any missing information to perform a successful technical/application management transition

• IT equipment custodian asset accountability and transfer of accounts to new custodians

• Transfer of safe combinations

• Transfer of service accounts and administrative passwords

• Communications Security (COMSEC) account inventory and transfers

• Provide listing of security badging requirements by individual

• Determine and validate backlog of service request and incidents

• Determine and validate service pipeline and projects

2.12.3. 533 TRS Phase In. During the phase-in period, the Contractor shall perform an assessment of the 533 TRS IT environment and initial skills training environment. The Contractor shall provide a transition plan two business days after contract award to the COR and CO that addresses all actions necessary to ensure a seamless transition.

Transition Activities required, but not limited to:

• Coordinate the transition schedule with the incumbent and identify schedule conflicts

• Transfer of service accounts and administrative passwords

• Provide listing of security badging requirements by individual

2.12.4. Phase-out. To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have personnel on board, during the phase-out period. Anticipated to begin 30 days prior to contract conclusion, the Contractor shall collaborate with the future gaining Contractor to provide the items, services, and transfer of IT assets and accounts required for transition.

2.13. Mission-Essential Services:

2.13.1. Services During Crisis. The contractor shall prepare for the continuation of essential DoD services during crisis IAW Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.237-7023 for the PWS paragraphs referenced in para 2.13.2 below. “Mission-essential functions” means those organizational activities that must be performed under all circumstances to achieve DoD component missions or responsibilities, as determined by the appropriate functional commander or civilian equivalent. Failure to perform or sustain these functions would significantly affect DoD’s ability to provide vital services or exercise authority, direction, and control. During crisis situations the Contractor shall be responsible to perform those services identified as essential contractor services during crisis situations (as directed by the Contracting Officer), in accordance with its Mission-Essential Contractor Services Plan. On occasion, services may be required to support an activation, or exercise of contingency plans outside normal duty hours. IAW DFARS 252.237-7023, the Contractor shall develop a Mission-Essential Contractor Services Plan and furnish a copy to the Contracting Officer as part of their technical proposal submission. Any price changes resulting from this crisis will be negotiated in accordance with DFARS clause 252.237-7023, Continuation of Essential Contractor Services, paragraph (f), Changes.

2.13.2. Mission-Essential Efforts. The following efforts are identified as Mission-Essential:

Paragraph 3.1.1.1, Space Power Discipline Orbital Warfare 100 Course

Paragraph 3.1.1.2, Space Power Discipline Space Electronic Warfare 100 Course Paragraph 3.1.1.3 Space Power Discipline Space Battle Management 100 Course

Paragraph 3.1.1.4, Director of Space Forces Course Paragraph 3.1.1.7, Space Warfighter Preparation Course Paragraph 3.1.1.8, Weapons School Preparation Course

Paragraph 3.1.1.9, SWIFTU Course Paragraph 3.1.5, Information Technology Paragraph 3.1.7, SCIF Security Paragraph 3.1.11, Mod/Sim support of the courses identified in this paragraph Paragraph 3.2.1.1, Enlisted Undergraduate Space Training (EUST) Paragraph 3.2.1.2, Officer Undergraduate Space Training (OUST)

2.14. Contractor Manpower Reporting

The Contractor shall report ALL Contractor labor hours (including Subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The Contractor is required to completely fill-in all required data fields using the following web address: http://www.ecmra.mil/ Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the CMRA help desk at: http://www.ecmra.mil. The COR will verify the accuracy of the information in ECMRA.

3. SPECIFIC REQUIREMENTS

3.1. 319 CTS Requirements

3.1.1. 319 CTS Courses. The following courses are scheduled to be taught by 319 CTS IAW the Master Course Schedule. The number of days listed for each course are the estimated number of training days and may vary by a few days when taught on this contract.

3.1.1.1. In-Residence Courses

3.1.1.1.1. Space Power Discipline Orbital Warfare 100 (SPD-OW-100) Course. The SPD- OW-100 course will prepare space professionals to operate spacecraft and command crews to accomplish combat, training and other missions. Students will learn how to maintain spacecraft health and safety during contested operations and ensure mission accomplishment.

The course will provide a foundation in planning, building, executing and assessing orbital engagement maneuvers to defeat terrestrial-based and space-based attacks against spacecraft.

3.1.1.1.2. Space Power Discipline Space Electronic Warfare 100 (SPD-SEW-100) Course.

The SWF SEW is a 15-day course that will prepare space professionals to operate electronic attack, electronic protection, electronic warfare support systems and payloads, and perform link management. Students will learn how to defeat threats to space effects by protecting critical electromagnetic spectrum (EMS) links. The course will provide a foundation in negating (e.g.

disrupt, deny, degrade, destroy and deceive) adversary access to space effects through the EMS and the students will gain an understanding in integrating SEW into theater non-kinetic operations.

http://www.ecmra.mil/ http://www.ecmra.mil/

3.1.1.1.3. Space Power Discipline Space Battle Management 100 (SPD-SBM-100) Course. The SWF SBM is a 15-day course focused on mission planning considerations and battle management for missile warning, missile defense, and space protection missions. This course will focus on how to employ sensors, data links, and communication systems to prioritize tactical and operational effects for the joint force, and ensure communication flow for battle space situation awareness and networking. A graduate of SBM will be able to plan, execute, supervise, coordinate, or direct dynamic battle management of fires, force accountability, force package development and real- time targeting.

3.1.1.1.4. Director of Space Forces Course (DIRSPACEFOR or DS4). The DIRSPACEFOR or DS4 course is a 5-day TS//SCI// REL ACGU course designed to provide USSF and coalition selected senior leaders training to serve as the senior space advisor to the COMAFFOR/Joint Forces Air Component Commander (JFACC). This course emphasizes Air Operations Center (AOC) operations, the role the DIRSPACEFOR plays in integrating space into theater operations, as well as advising the JFACC on the Space Coordinating Authority role.

3.1.1.1.5. Space Power Discipline Orbital Warfare 200 Rendezvous Proximity Operations (SPD-OW-200-RPO). The SPD-OW-200-RPO course is a 15-day course which provides advanced Orbital Warfare (OW) training and will develop space professionals who can comprehend characteristics of satellite orbits, analyze orbital motions and create innovative tactics, techniques and procedures (TTPs) by applying the principles of orbital mechanics to effectively plan and execute orbital RPO. The target audience is experienced OW operators and is recommended for those moving to training, evaluation, or tactics development positions.

3.1.1.1.6. Space Power Discipline Space Battle Management 200 Overhead Persistent Infrared (SPD-SBM-200-OPIR) The SPD-SBM-200-OPIR Course provides an in-depth look at the OPIR mission areas of missile warning, missile defense, battle awareness, technical intelligence, and civilian applications. It provides an environment for operators to begin development of TTPs that enhance delivery of OPIR data to warfighters during normal operations and in a contested space environment. The target audience is experienced OPIR operators and is recommended for those moving to training, evaluation, or tactics development positions. The first two offerings of this course shall be 10 training days in length.

Subsequent offerings shall be 15 training days in length.

3.1.1.1.7. Space Warfighter Preparation Course (SWPC). SWPC is a 15-day course designed to prepare space professionals to effectively augment theater AOCs during both exercises and real-world operations. This course provides both academic instruction and hands-on equipment training needed to prepare graduates to integrate air and space power in support of theater commanders.

3.1.1.1.8. Weapons School Preparation Course (WSPC). WSPC is a 15-day course that prepares USSF officer candidates for the USAF Weapons Instructor Course (WIC) and USSF enlisted candidates for the USAF Advanced Integration Course (AIC). The WSPC highlights the capabilities, limitations, vulnerabilities, applications and employment of space and Combat Air Forces systems supporting the warfighter.

3.1.1.1.9. Space Warfighter Intelligence Formal Training Unit (SWIFTU). The SWIFTU course is a 20-day Initial Qualification Training (IQT) course for intelligence professionals with assignments supporting US Space Force operations. SWIFTU prepares certified intelligence professionals for duties involving space operations. The course provides students a broad-based understanding of the fundamental principles of space operations including: an overview of space as an operational domain, orbital mechanics, Annex 3-14 Counterspace Operations, and the capabilities and limitations of current US space systems and adversary systems. The first 40 hours of this course unclassified and taken on-line using the 319 CTS learning management system (LMS). All SWIFTU students are required to complete the on-line portion of the course prior to attending the 3-week in-residence portion of the course.

3.1.1.1.10. Space Flag Preparation Course (SFPC). SFPC is required by Headquarters United States Space Force (HQ USSF) S3/6T to train United States Space Force (USSF), National Reconnaissance Office (NRO), and Coalition personnel participating in SPACE FLAG exercises. SFPC prepares Joint and Coalition warfighters for participation in USSF SPACE FLAG exercises and provides a broad, common knowledge in fundamentals of orbital engagement, mission planning, package integration, and mission command and control

3.1.1.1.11. Advanced Curriculum Design Course (ACDC). ACDC provides advanced education and training for all new cadre (military, civilian, and contractor) selected as 319 CTS instructors. This course focuses on specific duties of a schoolhouse instructor; policies, processes, courseware design, and procedures within the schoolhouse; and how the schoolhouse supports space operations.

3.1.1.1.12. Basic Instructor Skills Course (BISC).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .