This is Addendum #2 to an Invitation to Bid issued by the City of Silverton for the Sheltering Silverton Tenant Improvements project (Project #22-1062). The addendum, issued on Friday, March 17, 2023, modifies the original ITB issued on Tuesday, February 28, 2023, and supplements Addendum #1. The ITB closing date and time remains unchanged at Tuesday, March 21, 2023, at 2:00 PM. The addendum clarifies material specifications and contractor responsibilities for the project's mechanical and utility work, addressing four substantive questions received from contractors regarding project requirements.

The addendum provides material clarification that affects project specifications and contractor scope: PVC is acceptable for drainage piping instead of cast iron, PEX piping is acceptable for water lines instead of copper, and the contractor is responsible for all remaining water service and fire sprinkler work from the meter to the point of connection, as city utility staff will no longer complete work on this project. Additionally, the bid bond requirement is clarified as 10 percent of the base bid amount only and does not need to cover additive bid items. All other terms, conditions, specifications, requirements, and deadlines from the original ITB and previous addenda remain unchanged.

View the file

Other files

File Type Posted
Bid Tally sheet~10.doc DOC document
Notice of Intent to Award~3.pdf PDF
Sample Contract.pdf PDF
Vollmer Oaks Pre-bid Meeting Roster.pdf PDF
Vollmer Oaks Map 2.0.pdf PDF
ITB for Vollmer Oaks Project.pdf PDF
Amendment 1 Vollmer Oaks Scope.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID

CITY OF SILVERTON

SHELTERING SILVERTON TENANT IMPROVEMENTS

Addendum #2

Project # 22-1062

Addendum #1 Issue Date: Friday March 10, 2023 Addendum #2 Issue Date: Friday March 17, 2023

ITB Issue Date: Tuesday February 28, 2023 ITB Closing Date and Time: Tuesday March 21, 2023 at 2:00 PM

ITB Closing Date and Time: No Change

Project # 22-1062

This Addendum is issued to the above referenced ITB and forms a part of the contract documents and modifies the original scope of work, specifications and drawings, requirements and deadlines. Except as changed by this Addendum, all terms, conditions, scope of work, plans, specification, requirements and deadlines in the original ITB and previous addenda remain unchanged.

PLEASE NOTE THE FOLLOWING MODIFICATIONSTO THE ABOVE

REFERENCED ITB:

Answers to questions received from contractors are below.

Question I can’t find a requirement for drainage piping material. Can I use PVC or do you want to see cast Iron? Answer: PVC is acceptable.

Question The plans call for copper piping for water. Is PEX piping acceptable?

Answer: Yes, PEX is acceptable.

Question Is the contractor responsible to run the fire sprinkler line off the meter to their point of connection or are the utility guys running that? Answer: City utility staff is not completing anymore work for this project. Contractor is responsible for all remaining water service and fire sprinkler work required to complete the project.

4 Question What is the 10% bid bond amount supposed to cover?

Answer: The bid bond should be 10% of your base bid amount. The bid bond amount does not need to cover the bid additive items.

End of Addendum #2