October 2026 Asphalt Price Adjustment - October 2026
| Group | Description | Award # | Contract No. |
| 31503 | Bituminous Concrete Asphalt Mixtures | | |
(2026 VPP NYSDOT Specific Projects) (Federal & State Funds) 23433 PC70965 - PC70986 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2026 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23434 PC70990 - PC70997
| | Bituminous materials price adjustment(s) EFFECTIVE on: | | | | October 1, 2026 | ERROR:#REF! | | | | | |
| | Award(s) using February 1, 2026 base index of | | | | $638.000 | per ton. | | Year: | 2026 | | |
| | In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s), | | | | | | | Month: | October | Posted Price | 2026 |
| | the following price adjustments have been calculated. | | | | | | | | | Month | $/ton |
| | MONTHLY PG 64S-22 BINDER ADJUSTMENT: | | The October 2026 Average is | | | $803.000 | per ton | Asphalt Price Adjustment | | January | - |
| | (F.O.B. Terminal Price for unmodified PG 64S-22 binder without anti-stripping agent) | | | | | | | Base Average = | $638.000 | February | - |
| | The February 1, 2026 Base Average FOB Terminal Price for Asphalt Cement was | | | | $638.000 | per ton. | | New Average = | $803.000 | March | - |
| | Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to more | | | | | | | | | April | 730 |
| | than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price. | | | | | | | | | May | 777 |
| | All Asphalt Price Adjustments will be computed to three decimal places. | | | | | | | | | June | 793 |
| | Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by using | | | | | | | | | July | 797 |
| | the price adjustments listed below: | | | | | | | | | August | 799 |
| | Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page. | | | | | | | | | September | 794 |
| | CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | | | | October | 803 |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | | | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | November | | | | | |
| | 702.0700 | Asphalt Filler (18-60) | 100.00 | 0.20 | 100.20 | $0.704 | ERROR:#VALUE! | | | December | |
| | 702.3001 | RS-1 | 55.00 | 1.70 | 56.70 | $0.398 | ERROR:#VALUE! | | | Month | 2027 |
| | 702.3002 | RS-1h | 55.00 | 1.70 | 56.70 | $0.398 | $0.000 | | | | $/ton |
| | 702.3101 | RS-2 | 63.00 | 2.70 | 65.70 | $0.461 | $0.000 | | | January | |
| | 702.3102 | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.461 | $0.000 | | | February | |
| | 702.3201 | MS-2 | 65.00 | 8.20 | 73.20 | $0.514 | $0.000 | | | March | |
| | 702.3301 | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.514 | $0.000 | | | April | |
| | 702.3401 | HFMS-2h | 65.00 | 2.70 | 67.70 | $0.475 | ERROR:#REF! | | | May | |
| | 702.3402 | HFMS-2s | 65.00 | 8.20 | 73.20 | $0.514 | ERROR:#REF! | | | June | |
| | 702.3501 | SS-1 | 57.00 | 0.20 | 57.20 | $0.402 | ERROR:#REF! | | | July | |
| | 702.3501 | | | | | | | | | | |
| (Cold Recycling only) | SS-1 | 65.00 | 0.20 | 65.20 | $0.458 | ERROR:#REF! | | | | August | | |
| | 702.3601 | SS-1h | 57.00 | 0.20 | 57.20 | $0.402 | ERROR:#REF! | | | September | |
| | 702.3601 | | | | | | | | | | |
| (Cold Recycling only) | SS-1h | 65.00 | 0.20 | 65.20 | $0.458 | ERROR:#REF! | | | | October | | |
| | 702.3101P | RS-2 | 63.00 | 2.70 | 65.70 | $0.461 | ERROR:#REF! | | | November | |
| | 702.3102P | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.461 | ERROR:#REF! | | | December | |
| | 702.3301P | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.514 | ERROR:#REF! | | | | |
| | 702.4001 | CRS-1 | 60.00 | 2.70 | 62.70 | $0.440 | ERROR:#REF! | | | | |
| | 702.4002 | CRS-1h | 60.00 | 2.70 | 62.70 | $0.440 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2 | 65.00 | 2.70 | 67.70 | $0.475 | ERROR:#REF! | | | | |
| | 702.4201 | CMS-2 | 65.00 | 10.20 | 75.20 | $0.528 | ERROR:#REF! | | | | |
| | 702.4301 | CMS-2h | 65.00 | 10.20 | 75.20 | $0.528 | ERROR:#REF! | | | | |
| | 702.4401 | CSS-1 | 57.00 | 0.20 | 57.20 | $0.402 | ERROR:#REF! | | | | |
| | 702.4401 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1 | 65.00 | 0.20 | 65.20 | $0.458 | ERROR:#REF! | | | | | | |
| | 702.4501 | CSS-1h | 57.00 | 0.20 | 57.20 | $0.402 | ERROR:#REF! | | | | |
| | 702.4501 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1h | 65.00 | 0.20 | 65.20 | $0.458 | ERROR:#REF! | | | | | | |
| | 702.4601 | CQS-1h | 62.00 | 0.20 | 62.20 | $0.437 | ERROR:#REF! | | | | |
| | 702.4001P | CRS-1p | 60.00 | 2.70 | 62.70 | $0.440 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2p | 65.00 | 2.70 | 67.70 | $0.475 | ERROR:#REF! | | | | |
| | 702.4601P | CQS-1p | 62.00 | 0.20 | 62.20 | $0.437 | ERROR:#REF! | | | | |
| | HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / POUND | | | | | | | |
| | 417.0101 | Recycling Agent | 65.00 | 1.00 | 66.00 | $0.054 | ERROR:#REF! |
| | JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / LANE MILE | | | | | | | |
| | ASTM D6690 Type II | - | 56.00 | 0.20 | 56.20 | $39.460 | ERROR:#REF! |
| | Mastic Materials | - | 40.00 | 0.20 | 40.20 | $28.226 | ERROR:#REF! |
| | MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 413.02010118 | Microsurfacing, Type II, F1 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.02020118 | Microsurfacing, Type II, F2 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.02030118 | Microsurfacing, Type II, F3 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.03010118 | Microsurfacing, Type III, F1 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.03020118 | Microsurfacing, Type III, F2 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.03030118 | Microsurfacing, Type III, F3 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.04030118 | Microsurfacing, Type III Rut Filling | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 414.03030118 | Quick-set Slurry, Type II | 13.50 | 0.20 | 13.70 | $2.603 | ERROR:#REF! |
| | 414.04030118 | Quick-set Slurry, Type III | 12.00 | 0.20 | 12.20 | $2.318 | ERROR:#REF! |
| | PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 415.0X0F0218 | Paver Placed ST - Conventional | 6.50 | 1.00 | 7.50 | $12.375 | ERROR:#REF! |
| | 415.1X0F0218 | Paver Placed ST - Modified | 6.50 | 1.00 | 7.50 | $12.375 | ERROR:#REF! |
| | ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 404.017901 | True & Leveling F9, Asphalt, 70 Series | **** | 1 | **** | **** | ERROR:#REF! |
| | 404.018901 | True & Leveling F9, Asphalt, 80 Series | **** | 1 | **** | **** | ERROR:#REF! |
| | 404.058901 | Shim Course F9, Asphalt | 8.25 | 1 | 9.25 | $15.263 | ERROR:#REF! |
| | 404.068X01 | 6.3 F1/F2/F3 Top Course Asphalt, 80 Series | 6.70 | 1 | 7.70 | $12.705 | ERROR:#REF! |
| | 404.09XX01 | 9.5 Top Course Asphalt | 6.20 | 1 | 7.20 | $11.880 | ERROR:#REF! |
| | 404.12XX01 | 12.5 Top Course Asphalt | 5.50 | 1 | 6.50 | $10.725 | ERROR:#REF! |
| | 404.19XX01 | 19 F9 Binder Course Asphalt, 80 Series | 4.90 | 1 | 5.90 | $9.735 | ERROR:#REF! |
| | *** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used | | | | | | |
| | TACK COAT (Per Gallon): | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | |
| | 407.0102 | Diluted Tack Coat | 40.00 | 0.20 | 40.20 | $0.282 |
| | 407.0103 | Straight Tack Coat | 55.00 | 0.20 | 55.20 | $0.388 |
| | 407.01040009 | Non - Tracking Tack Coat | 50.00 | 0.20 | 50.20 | $0.352 |
| FORMULAS & EXAMPLE |
| ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS |
Unit prices per gallon will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per gallon) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $3.000 + ($0.703531914893617) = | $3.704 | |
| Total Material Price After Adjustment: | | $3.704 | per gallon |
| FORMULAS & EXAMPLE |
| JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing) |
Unit prices per Lane Mile will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per Lane Mile) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $1,500.000 + ($39.4595744680851) = | $1,539.460 | |
| Total Material Price After Adjustment: | | $1,539.460 | per Lane Mile |
| FORMULAS & EXAMPLE |
| ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP) |
Unit prices per ton will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per ton) | New Monthly Average | |
| F.O.B. Terminal Price | - | Base Average F.O.B. |
| Terminal Price | | ) X Total Allowable Petroleum % |
| Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $200.000 + ($15.2625) = | $215.263 | |
| Total Material Price After Adjustment: | | $215.263 | per ton |
https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot September 2026 Asphalt Price Adjustment - September 2026
| Group | Description | Award # | Contract No. |
| 31503 | Bituminous Concrete Asphalt Mixtures | | |
(2026 VPP NYSDOT Specific Projects) (Federal & State Funds) 23433 PC70965 - PC70986 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2026 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23434 PC70990 - PC70997
| | Bituminous materials price adjustment(s) EFFECTIVE on: | | | | September 1, 2026 | ERROR:#REF! | | | | | |
| | Award(s) using February 1, 2026 base index of | | | | $638.000 | per ton. | | Year: | 2026 | | |
| | In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s), | | | | | | | Month: | September | Posted Price | 2026 |
| | the following price adjustments have been calculated. | | | | | | | | | Month | $/ton |
| | MONTHLY PG 64S-22 BINDER ADJUSTMENT: | | The September 2026 Average is | | | $794.000 | per ton | Asphalt Price Adjustment | | January | - |
| | (F.O.B. Terminal Price for unmodified PG 64S-22 binder without anti-stripping agent) | | | | | | | Base Average = | $638.000 | February | - |
| | The February 1, 2026 Base Average FOB Terminal Price for Asphalt Cement was | | | | $638.000 | per ton. | | New Average = | $794.000 | March | - |
| | Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to more | | | | | | | | | April | 730 |
| | than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price. | | | | | | | | | May | 777 |
| | All Asphalt Price Adjustments will be computed to three decimal places. | | | | | | | | | June | 793 |
| | Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by using | | | | | | | | | July | 797 |
| | the price adjustments listed below: | | | | | | | | | August | 799 |
| | Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page. | | | | | | | | | September | 794 |
| | CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | | | | October | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | | | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | November | | | | | |
| | 702.0700 | Asphalt Filler (18-60) | 100.00 | 0.20 | 100.20 | $0.665 | ERROR:#VALUE! | | | December | |
| | 702.3001 | RS-1 | 55.00 | 1.70 | 56.70 | $0.376 | ERROR:#VALUE! | | | Month | 2027 |
| | 702.3002 | RS-1h | 55.00 | 1.70 | 56.70 | $0.376 | $0.000 | | | | $/ton |
| | 702.3101 | RS-2 | 63.00 | 2.70 | 65.70 | $0.436 | $0.000 | | | January | |
| | 702.3102 | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.436 | $0.000 | | | February | |
| | 702.3201 | MS-2 | 65.00 | 8.20 | 73.20 | $0.486 | $0.000 | | | March | |
| | 702.3301 | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.486 | $0.000 | | | April | |
| | 702.3401 | HFMS-2h | 65.00 | 2.70 | 67.70 | $0.449 | ERROR:#REF! | | | May | |
| | 702.3402 | HFMS-2s | 65.00 | 8.20 | 73.20 | $0.486 | ERROR:#REF! | | | June | |
| | 702.3501 | SS-1 | 57.00 | 0.20 | 57.20 | $0.380 | ERROR:#REF! | | | July | |
| | 702.3501 | | | | | | | | | | |
| (Cold Recycling only) | SS-1 | 65.00 | 0.20 | 65.20 | $0.433 | ERROR:#REF! | | | | August | | |
| | 702.3601 | SS-1h | 57.00 | 0.20 | 57.20 | $0.380 | ERROR:#REF! | | | September | |
| | 702.3601 | | | | | | | | | | |
| (Cold Recycling only) | SS-1h | 65.00 | 0.20 | 65.20 | $0.433 | ERROR:#REF! | | | | October | | |
| | 702.3101P | RS-2 | 63.00 | 2.70 | 65.70 | $0.436 | ERROR:#REF! | | | November | |
| | 702.3102P | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.436 | ERROR:#REF! | | | December | |
| | 702.3301P | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.486 | ERROR:#REF! | | | | |
| | 702.4001 | CRS-1 | 60.00 | 2.70 | 62.70 | $0.416 | ERROR:#REF! | | | | |
| | 702.4002 | CRS-1h | 60.00 | 2.70 | 62.70 | $0.416 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2 | 65.00 | 2.70 | 67.70 | $0.449 | ERROR:#REF! | | | | |
| | 702.4201 | CMS-2 | 65.00 | 10.20 | 75.20 | $0.499 | ERROR:#REF! | | | | |
| | 702.4301 | CMS-2h | 65.00 | 10.20 | 75.20 | $0.499 | ERROR:#REF! | | | | |
| | 702.4401 | CSS-1 | 57.00 | 0.20 | 57.20 | $0.380 | ERROR:#REF! | | | | |
| | 702.4401 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1 | 65.00 | 0.20 | 65.20 | $0.433 | ERROR:#REF! | | | | | | |
| | 702.4501 | CSS-1h | 57.00 | 0.20 | 57.20 | $0.380 | ERROR:#REF! | | | | |
| | 702.4501 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1h | 65.00 | 0.20 | 65.20 | $0.433 | ERROR:#REF! | | | | | | |
| | 702.4601 | CQS-1h | 62.00 | 0.20 | 62.20 | $0.413 | ERROR:#REF! | | | | |
| | 702.4001P | CRS-1p | 60.00 | 2.70 | 62.70 | $0.416 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2p | 65.00 | 2.70 | 67.70 | $0.449 | ERROR:#REF! | | | | |
| | 702.4601P | CQS-1p | 62.00 | 0.20 | 62.20 | $0.413 | ERROR:#REF! | | | | |
| | HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / POUND | | | | | | | |
| | 417.0101 | Recycling Agent | 65.00 | 1.00 | 66.00 | $0.051 | ERROR:#REF! |
| | JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / LANE MILE | | | | | | | |
| | ASTM D6690 Type II | - | 56.00 | 0.20 | 56.20 | $37.307 | ERROR:#REF! |
| | Mastic Materials | - | 40.00 | 0.20 | 40.20 | $26.686 | ERROR:#REF! |
| | MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 413.02010118 | Microsurfacing, Type II, F1 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.02020118 | Microsurfacing, Type II, F2 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.02030118 | Microsurfacing, Type II, F3 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.03010118 | Microsurfacing, Type III, F1 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.03020118 | Microsurfacing, Type III, F2 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.03030118 | Microsurfacing, Type III, F3 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.04030118 | Microsurfacing, Type III Rut Filling | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 414.03030118 | Quick-set Slurry, Type II | 13.50 | 0.20 | 13.70 | $2.603 | ERROR:#REF! |
| | 414.04030118 | Quick-set Slurry, Type III | 12.00 | 0.20 | 12.20 | $2.318 | ERROR:#REF! |
| | PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 415.0X0F0218 | Paver Placed ST - Conventional | 6.50 | 1.00 | 7.50 | $11.700 | ERROR:#REF! |
| | 415.1X0F0218 | Paver Placed ST - Modified | 6.50 | 1.00 | 7.50 | $11.700 | ERROR:#REF! |
| | ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 404.017901 | True & Leveling F9, Asphalt, 70 Series | **** | 1 | **** | **** | ERROR:#REF! |
| | 404.018901 | True & Leveling F9, Asphalt, 80 Series | **** | 1 | **** | **** | ERROR:#REF! |
| | 404.058901 | Shim Course F9, Asphalt | 8.25 | 1 | 9.25 | $14.430 | ERROR:#REF! |
| | 404.068X01 | 6.3 F1/F2/F3 Top Course Asphalt, 80 Series | 6.70 | 1 | 7.70 | $12.012 | ERROR:#REF! |
| | 404.09XX01 | 9.5 Top Course Asphalt | 6.20 | 1 | 7.20 | $11.232 | ERROR:#REF! |
| | 404.12XX01 | 12.5 Top Course Asphalt | 5.50 | 1 | 6.50 | $10.140 | ERROR:#REF! |
| | 404.19XX01 | 19 F9 Binder Course Asphalt, 80 Series | 4.90 | 1 | 5.90 | $9.204 | ERROR:#REF! |
| | *** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used | | | | | | |
| | TACK COAT (Per Gallon): | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | |
| | 407.0102 | Diluted Tack Coat | 40.00 | 0.20 | 40.20 | $0.267 |
| | 407.0103 | Straight Tack Coat | 55.00 | 0.20 | 55.20 | $0.366 |
| | 407.01040009 | Non - Tracking Tack Coat | 50.00 | 0.20 | 50.20 | $0.333 |
| FORMULAS & EXAMPLE |
| ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS |
Unit prices per gallon will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per gallon) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $3.000 + ($0.665157446808511) = | $3.665 | |
| Total Material Price After Adjustment: | | $3.665 | per gallon |
| FORMULAS & EXAMPLE |
| JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing) |
Unit prices per Lane Mile will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per Lane Mile) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $1,500.000 + ($37.3072340425532) = | $1,537.307 | |
| Total Material Price After Adjustment: | | $1,537.307 | per Lane Mile |
| FORMULAS & EXAMPLE |
| ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP) |
Unit prices per ton will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per ton) | New Monthly Average | |
| F.O.B. Terminal Price | - | Base Average F.O.B. |
| Terminal Price | | ) X Total Allowable Petroleum % |
| Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $200.000 + ($14.43) = | $214.430 | |
| Total Material Price After Adjustment: | | $214.430 | per ton |
https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot August 2026 Asphalt Price Adjustment - August 2026
| Group | Description | Award # | Contract No. |
| 31503 | Bituminous Concrete Asphalt Mixtures | | |
(2026 VPP NYSDOT Specific Projects) (Federal & State Funds) 23433 PC70965 - PC70986 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2026 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23434 PC70990 - PC70997
| | Bituminous materials price adjustment(s) EFFECTIVE on: | | | | August 1, 2026 | ERROR:#REF! | | | | | |
| | Award(s) using February 1, 2026 base index of | | | | $638.000 | per ton. | | Year: | 2026 | | |
| | In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s), | | | | | | | Month: | August | Posted Price | 2026 |
| | the following price adjustments have been calculated. | | | | | | | | | Month | $/ton |
| | MONTHLY PG 64S-22 BINDER ADJUSTMENT: | | The August 2026 Average is | | | $799.000 | per ton | Asphalt Price Adjustment | | January | - |
| | (F.O.B. Terminal Price for unmodified PG 64S-22 binder without anti-stripping agent) | | | | | | | Base Average = | $638.000 | February | - |
| | The February 1, 2026 Base Average FOB Terminal Price for Asphalt Cement was | | | | $638.000 | per ton. | | New Average = | $799.000 | March | - |
| | Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to more | | | | | | | | | April | 730 |
| | than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price. | | | | | | | | | May | 777 |
| | All Asphalt Price Adjustments will be computed to three decimal places. | | | | | | | | | June | 793 |
| | Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by using | | | | | | | | | July | 797 |
| | the price adjustments listed below: | | | | | | | | | August | 799 |
| | Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page. | | | | | | | | | September | |
| | CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | | | | October | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | | | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | November | | | | | |
| | 702.0700 | Asphalt Filler (18-60) | 100.00 | 0.20 | 100.20 | $0.686 | ERROR:#VALUE! | | | December | |
| | 702.3001 | RS-1 | 55.00 | 1.70 | 56.70 | $0.388 | ERROR:#VALUE! | | | Month | 2027 |
| | 702.3002 | RS-1h | 55.00 | 1.70 | 56.70 | $0.388 | $0.000 | | | | $/ton |
| | 702.3101 | RS-2 | 63.00 | 2.70 | 65.70 | $0.450 | $0.000 | | | January | |
| | 702.3102 | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.450 | $0.000 | | | February | |
| | 702.3201 | MS-2 | 65.00 | 8.20 | 73.20 | $0.501 | $0.000 | | | March | |
| | 702.3301 | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.501 | $0.000 | | | April | |
| | 702.3401 | HFMS-2h | 65.00 | 2.70 | 67.70 | $0.464 | ERROR:#REF! | | | May | |
| | 702.3402 | HFMS-2s | 65.00 | 8.20 | 73.20 | $0.501 | ERROR:#REF! | | | June | |
| | 702.3501 | SS-1 | 57.00 | 0.20 | 57.20 | $0.392 | ERROR:#REF! | | | July | |
| | 702.3501 | | | | | | | | | | |
| (Cold Recycling only) | SS-1 | 65.00 | 0.20 | 65.20 | $0.447 | ERROR:#REF! | | | | August | | |
| | 702.3601 | SS-1h | 57.00 | 0.20 | 57.20 | $0.392 | ERROR:#REF! | | | September | |
| | 702.3601 | | | | | | | | | | |
| (Cold Recycling only) | SS-1h | 65.00 | 0.20 | 65.20 | $0.447 | ERROR:#REF! | | | | October | | |
| | 702.3101P | RS-2 | 63.00 | 2.70 | 65.70 | $0.450 | ERROR:#REF! | | | November | |
| | 702.3102P | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.450 | ERROR:#REF! | | | December | |
| | 702.3301P | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.501 | ERROR:#REF! | | | | |
| | 702.4001 | CRS-1 | 60.00 | 2.70 | 62.70 | $0.430 | ERROR:#REF! | | | | |
| | 702.4002 | CRS-1h | 60.00 | 2.70 | 62.70 | $0.430 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2 | 65.00 | 2.70 | 67.70 | $0.464 | ERROR:#REF! | | | | |
| | 702.4201 | CMS-2 | 65.00 | 10.20 | 75.20 | $0.515 | ERROR:#REF! | | | | |
| | 702.4301 | CMS-2h | 65.00 | 10.20 | 75.20 | $0.515 | ERROR:#REF! | | | | |
| | 702.4401 | CSS-1 | 57.00 | 0.20 | 57.20 | $0.392 | ERROR:#REF! | | | | |
| | 702.4401 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1 | 65.00 | 0.20 | 65.20 | $0.447 | ERROR:#REF! | | | | | | |
| | 702.4501 | CSS-1h | 57.00 | 0.20 | 57.20 | $0.392 | ERROR:#REF! | | | | |
| | 702.4501 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1h | 65.00 | 0.20 | 65.20 | $0.447 | ERROR:#REF! | | | | | | |
| | 702.4601 | CQS-1h | 62.00 | 0.20 | 62.20 | $0.426 | ERROR:#REF! | | | | |
| | 702.4001P | CRS-1p | 60.00 | 2.70 | 62.70 | $0.430 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2p | 65.00 | 2.70 | 67.70 | $0.464 | ERROR:#REF! | | | | |
| | 702.4601P | CQS-1p | 62.00 | 0.20 | 62.20 | $0.426 | ERROR:#REF! | | | | |
| | HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / POUND | | | | | | | |
| | 417.0101 | Recycling Agent | 65.00 | 1.00 | 66.00 | $0.053 | ERROR:#REF! |
| | JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / LANE MILE | | | | | | | |
| | ASTM D6690 Type II | - | 56.00 | 0.20 | 56.20 | $38.503 | ERROR:#REF! |
| | Mastic Materials | - | 40.00 | 0.20 | 40.20 | $27.541 | ERROR:#REF! |
| | MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 413.02010118 | Microsurfacing, Type II, F1 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.02020118 | Microsurfacing, Type II, F2 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.02030118 | Microsurfacing, Type II, F3 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.03010118 | Microsurfacing, Type III, F1 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.03020118 | Microsurfacing, Type III, F2 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.03030118 | Microsurfacing, Type III, F3 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.04030118 | Microsurfacing, Type III Rut Filling | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 414.03030118 | Quick-set Slurry, Type II | 13.50 | 0.20 | 13.70 | $2.603 | ERROR:#REF! |
| | 414.04030118 | Quick-set Slurry, Type III | 12.00 | 0.20 | 12.20 | $2.318 | ERROR:#REF! |
| | PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 415.0X0F0218 | Paver Placed ST - Conventional | 6.50 | 1.00 | 7.50 | $12.075 | ERROR:#REF! |
| | 415.1X0F0218 | Paver Placed ST - Modified | 6.50 | 1.00 | 7.50 | $12.075 | ERROR:#REF! |
| | ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 404.017901 | True & Leveling F9, Asphalt, 70 Series | **** | 1 | **** | **** | ERROR:#REF! |
| | 404.018901 | True & Leveling F9, Asphalt, 80 Series | **** | 1 | **** | **** | ERROR:#REF! |
| | 404.058901 | Shim Course F9, Asphalt | 8.25 | 1 | 9.25 | $14.893 | ERROR:#REF! |
| | 404.068X01 | 6.3 F1/F2/F3 Top Course Asphalt, 80 Series | 6.70 | 1 | 7.70 | $12.397 | ERROR:#REF! |
| | 404.09XX01 | 9.5 Top Course Asphalt | 6.20 | 1 | 7.20 | $11.592 | ERROR:#REF! |
| | 404.12XX01 | 12.5 Top Course Asphalt | 5.50 | 1 | 6.50 | $10.465 | ERROR:#REF! |
| | 404.19XX01 | 19 F9 Binder Course Asphalt, 80 Series | 4.90 | 1 | 5.90 | $9.499 | ERROR:#REF! |
| | *** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used | | | | | | |
| | TACK COAT (Per Gallon): | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | |
| | 407.0102 | Diluted Tack Coat | 40.00 | 0.20 | 40.20 | $0.275 |
| | 407.0103 | Straight Tack Coat | 55.00 | 0.20 | 55.20 | $0.378 |
| | 407.01040009 | Non - Tracking Tack Coat | 50.00 | 0.20 | 50.20 | $0.344 |
| FORMULAS & EXAMPLE |
| ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS |
Unit prices per gallon will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per gallon) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $3.000 + ($0.686476595744681) = | $3.686 | |
| Total Material Price After Adjustment: | | $3.686 | per gallon |
| FORMULAS & EXAMPLE |
| JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing) |
Unit prices per Lane Mile will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per Lane Mile) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $1,500.000 + ($38.5029787234043) = | $1,538.503 | |
| Total Material Price After Adjustment: | | $1,538.503 | per Lane Mile |
| FORMULAS & EXAMPLE |
| ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP) |
Unit prices per ton will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per ton) | New Monthly Average | |
| F.O.B. Terminal Price | - | Base Average F.O.B. |
| Terminal Price | | ) X Total Allowable Petroleum % |
| Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $200.000 + ($14.8925) = | $214.893 | |
| Total Material Price After Adjustment: | | $214.893 | per ton |
https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot July 2026 Asphalt Price Adjustment - July 2026
| Group | Description | Award # | Contract No. |
| 31503 | Bituminous Concrete Asphalt Mixtures | | |
(2026 VPP NYSDOT Specific Projects) (Federal & State Funds) 23433 PC70965 - PC70986 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2026 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23434 PC70990 - PC70997
| | Bituminous materials price adjustment(s) EFFECTIVE on: | | | | July 1, 2026 | ERROR:#REF! | | | | | |
| | Award(s) using February 1, 2026 base index of | | | | $638.000 | per ton. | | Year: | 2026 | | |
| | In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s), | | | | | | | Month: | July | Posted Price | 2026 |
| | the following price adjustments have been calculated. | | | | | | | | | Month | $/ton |
| | MONTHLY PG 64S-22 BINDER ADJUSTMENT: | | The July 2026 Average is | | | $797.000 | per ton | Asphalt Price Adjustment | | January | - |
| | (F.O.B. Terminal Price for unmodified PG 64S-22 binder without anti-stripping agent) | | | | | | | Base Average = | $638.000 | February | - |
| | The February 1, 2026 Base Average FOB Terminal Price for Asphalt Cement was | | | | $638.000 | per ton. | | New Average = | $797.000 | March | - |
| | Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to more | | | | | | | | | April | 730 |
| | than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price. | | | | | | | | | May | 777 |
| | All Asphalt Price Adjustments will be computed to three decimal places. | | | | | | | | | June | 793 |
| | Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by using | | | | | | | | | July | 797 |
| | the price adjustments listed below: | | | | | | | | | August | |
| | Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page. | | | | | | | | | September | |
| | CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | | | | October | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | | | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | November | | | | | |
| | 702.0700 | Asphalt Filler (18-60) | 100.00 | 0.20 | 100.20 | $0.678 | ERROR:#VALUE! | | | December | |
| | 702.3001 | RS-1 | 55.00 | 1.70 | 56.70 | $0.384 | ERROR:#VALUE! | | | Month | 2027 |
| | 702.3002 | RS-1h | 55.00 | 1.70 | 56.70 | $0.384 | $0.000 | | | | $/ton |
| | 702.3101 | RS-2 | 63.00 | 2.70 | 65.70 | $0.445 | $0.000 | | | January | |
| | 702.3102 | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.445 | $0.000 | | | February | |
| | 702.3201 | MS-2 | 65.00 | 8.20 | 73.20 | $0.495 | $0.000 | | | March | |
| | 702.3301 | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.495 | $0.000 | | | April | |
| | 702.3401 | HFMS-2h | 65.00 | 2.70 | 67.70 | $0.458 | ERROR:#REF! | | | May | |
| | 702.3402 | HFMS-2s | 65.00 | 8.20 | 73.20 | $0.495 | ERROR:#REF! | | | June | |
| | 702.3501 | SS-1 | 57.00 | 0.20 | 57.20 | $0.387 | ERROR:#REF! | | | July | |
| | 702.3501 | | | | | | | | | | |
| (Cold Recycling only) | SS-1 | 65.00 | 0.20 | 65.20 | $0.441 | ERROR:#REF! | | | | August | | |
| | 702.3601 | SS-1h | 57.00 | 0.20 | 57.20 | $0.387 | ERROR:#REF! | | | September | |
| | 702.3601 | | | | | | | | | | |
| (Cold Recycling only) | SS-1h | 65.00 | 0.20 | 65.20 | $0.441 | ERROR:#REF! | | | | October | | |
| | 702.3101P | RS-2 | 63.00 | 2.70 | 65.70 | $0.445 | ERROR:#REF! | | | November | |
| | 702.3102P | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.445 | ERROR:#REF! | | | December | |
| | 702.3301P | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.495 | ERROR:#REF! | | | | |
| | 702.4001 | CRS-1 | 60.00 | 2.70 | 62.70 | $0.424 | ERROR:#REF! | | | | |
| | 702.4002 | CRS-1h | 60.00 | 2.70 | 62.70 | $0.424 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2 | 65.00 | 2.70 | 67.70 | $0.458 | ERROR:#REF! | | | | |
| | 702.4201 | CMS-2 | 65.00 | 10.20 | 75.20 | $0.509 | ERROR:#REF! | | | | |
| | 702.4301 | CMS-2h | 65.00 | 10.20 | 75.20 | $0.509 | ERROR:#REF! | | | | |
| | 702.4401 | CSS-1 | 57.00 | 0.20 | 57.20 | $0.387 | ERROR:#REF! | | | | |
| | 702.4401 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1 | 65.00 | 0.20 | 65.20 | $0.441 | ERROR:#REF! | | | | | | |
| | 702.4501 | CSS-1h | 57.00 | 0.20 | 57.20 | $0.387 | ERROR:#REF! | | | | |
| | 702.4501 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1h | 65.00 | 0.20 | 65.20 | $0.441 | ERROR:#REF! | | | | | | |
| | 702.4601 | CQS-1h | 62.00 | 0.20 | 62.20 | $0.421 | ERROR:#REF! | | | | |
| | 702.4001P | CRS-1p | 60.00 | 2.70 | 62.70 | $0.424 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2p | 65.00 | 2.70 | 67.70 | $0.458 | ERROR:#REF! | | | | |
| | 702.4601P | CQS-1p | 62.00 | 0.20 | 62.20 | $0.421 | ERROR:#REF! | | | | |
| | HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / POUND | | | | | | | |
| | 417.0101 | Recycling Agent | 65.00 | 1.00 | 66.00 | $0.052 | ERROR:#REF! |
| | JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / LANE MILE | | | | | | | |
| | ASTM D6690 Type II | - | 56.00 | 0.20 | 56.20 | $38.025 | ERROR:#REF! |
| | Mastic Materials | - | 40.00 | 0.20 | 40.20 | $27.199 | ERROR:#REF! |
| | MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 413.02010118 | Microsurfacing, Type II, F1 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.02020118 | Microsurfacing, Type II, F2 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.02030118 | Microsurfacing, Type II, F3 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.03010118 | Microsurfacing, Type III, F1 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.03020118 | Microsurfacing, Type III, F2 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.03030118 | Microsurfacing, Type III, F3 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.04030118 | Microsurfacing, Type III Rut Filling | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 414.03030118 | Quick-set Slurry, Type II | 13.50 | 0.20 | 13.70 | $2.603 | ERROR:#REF! |
| | 414.04030118 | Quick-set Slurry, Type III | 12.00 | 0.20 | 12.20 | $2.318 | ERROR:#REF! |
| | PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 415.0X0F0218 | Paver Placed ST - Conventional | 6.50 | 1.00 | 7.50 | $11.925 | ERROR:#REF! |
| | 415.1X0F0218 | Paver Placed ST - Modified | 6.50 | 1.00 | 7.50 | $11.925 | ERROR:#REF! |
| | ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 404.017901 | True & Leveling F9, Asphalt, 70 Series | **** | 1 | **** | **** | ERROR:#REF! |
| | 404.018901 | True & Leveling F9, Asphalt, 80 Series | **** | 1 | **** | **** | ERROR:#REF! |
| | 404.058901 | Shim Course F9, Asphalt | 8.25 | 1 | 9.25 | $14.708 | ERROR:#REF! |
| | 404.068X01 | 6.3 F1/F2/F3 Top Course Asphalt, 80 Series | 6.70 | 1 | 7.70 | $12.243 | ERROR:#REF! |
| | 404.09XX01 | 9.5 Top Course Asphalt | 6.20 | 1 | 7.20 | $11.448 | ERROR:#REF! |
| | 404.12XX01 | 12.5 Top Course Asphalt | 5.50 | 1 | 6.50 | $10.335 | ERROR:#REF! |
| | 404.19XX01 | 19 F9 Binder Course Asphalt, 80 Series | 4.90 | 1 | 5.90 | $9.381 | ERROR:#REF! |
| | *** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used | | | | | | |
| | TACK COAT (Per Gallon): | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | |
| | 407.0102 | Diluted Tack Coat | 40.00 | 0.20 | 40.20 | $0.272 |
| | 407.0103 | Straight Tack Coat | 55.00 | 0.20 | 55.20 | $0.373 |
| | 407.01040009 | Non - Tracking Tack Coat | 50.00 | 0.20 | 50.20 | $0.340 |
| FORMULAS & EXAMPLE |
| ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS |
Unit prices per gallon will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per gallon) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $3.000 + ($0.677948936170213) = | $3.678 | |
| Total Material Price After Adjustment: | | $3.678 | per gallon |
| FORMULAS & EXAMPLE |
| JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing) |
Unit prices per Lane Mile will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per Lane Mile) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $1,500.000 + ($38.0246808510638) = | $1,538.025 | |
| Total Material Price After Adjustment: | | $1,538.025 | per Lane Mile |
| FORMULAS & EXAMPLE |
| ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP) |
Unit prices per ton will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per ton) | New Monthly Average | |
| F.O.B. Terminal Price | - | Base Average F.O.B. |
| Terminal Price | | ) X Total Allowable Petroleum % |
| Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $200.000 + ($14.7075) = | $214.708 | |
| Total Material Price After Adjustment: | | $214.708 | per ton |
https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot June 2026 Asphalt Price Adjustment - June 2026
| Group | Description | Award # | Contract No. |
| 31503 | Bituminous Concrete Asphalt Mixtures | | |
(2026 VPP NYSDOT Specific Projects) (Federal & State Funds) 23433 PC70965 - PC70986 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2026 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23434 PC70990 - PC70997
| | Bituminous materials price adjustment(s) EFFECTIVE on: | | | | June 1, 2026 | ERROR:#REF! | | | | | |
| | Award(s) using February 1, 2026 base index of | | | | $638.000 | per ton. | | Year: | 2026 | | |
| | In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s), | | | | | | | Month: | June | Posted Price | 2026 |
| | the following price adjustments have been calculated. | | | | | | | | | Month | $/ton |
| | MONTHLY PG 64S-22 BINDER ADJUSTMENT: | | The June 2026 Average is | | | $793.000 | per ton | Asphalt Price Adjustment | | January | - |
| | (F.O.B. Terminal Price for unmodified PG 64S-22 binder without anti-stripping agent) | | | | | | | Base Average = | $638.000 | February | - |
| | The February 1, 2026 Base Average FOB Terminal Price for Asphalt Cement was | | | | $638.000 | per ton. | | New Average = | $793.000 | March | - |
| | Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to more | | | | | | | | | April | 730 |
| | than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price. | | | | | | | | | May | 777 |
| | All Asphalt Price Adjustments will be computed to three decimal places. | | | | | | | | | June | 793 |
| | Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by using | | | | | | | | | July | |
| | the price adjustments listed below: | | | | | | | | | August | |
| | Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page. | | | | | | | | | September | |
| | CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | | | | October | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | | | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | November | | | | | |
| | 702.0700 | Asphalt Filler (18-60) | 100.00 | 0.20 | 100.20 | $0.661 | ERROR:#VALUE! | | | December | |
| | 702.3001 | RS-1 | 55.00 | 1.70 | 56.70 | $0.374 | ERROR:#VALUE! | | | Month | 2027 |
| | 702.3002 | RS-1h | 55.00 | 1.70 | 56.70 | $0.374 | $0.000 | | | | $/ton |
| | 702.3101 | RS-2 | 63.00 | 2.70 | 65.70 | $0.433 | $0.000 | | | January | |
| | 702.3102 | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.433 | $0.000 | | | February | |
| | 702.3201 | MS-2 | 65.00 | 8.20 | 73.20 | $0.483 | $0.000 | | | March | |
| | 702.3301 | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.483 | $0.000 | | | April | |
| | 702.3401 | HFMS-2h | 65.00 | 2.70 | 67.70 | $0.447 | ERROR:#REF! | | | May | |
| | 702.3402 | HFMS-2s | 65.00 | 8.20 | 73.20 | $0.483 | ERROR:#REF! | | | June | |
| | 702.3501 | SS-1 | 57.00 | 0.20 | 57.20 | $0.377 | ERROR:#REF! | | | July | |
| | 702.3501 | | | | | | | | | | |
| (Cold Recycling only) | SS-1 | 65.00 | 0.20 | 65.20 | $0.430 | ERROR:#REF! | | | | August | | |
| | 702.3601 | SS-1h | 57.00 | 0.20 | 57.20 | $0.377 | ERROR:#REF! | | | September | |
| | 702.3601 | | | | | | | | | | |
| (Cold Recycling only) | SS-1h | 65.00 | 0.20 | 65.20 | $0.430 | ERROR:#REF! | | | | October | | |
| | 702.3101P | RS-2 | 63.00 | 2.70 | 65.70 | $0.433 | ERROR:#REF! | | | November | |
| | 702.3102P | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.433 | ERROR:#REF! | | | December | |
| | 702.3301P | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.483 | ERROR:#REF! | | | | |
| | 702.4001 | CRS-1 | 60.00 | 2.70 | 62.70 | $0.414 | ERROR:#REF! | | | | |
| | 702.4002 | CRS-1h | 60.00 | 2.70 | 62.70 | $0.414 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2 | 65.00 | 2.70 | 67.70 | $0.447 | ERROR:#REF! | | | | |
| | 702.4201 | CMS-2 | 65.00 | 10.20 | 75.20 | $0.496 | ERROR:#REF! | | | | |
| | 702.4301 | CMS-2h | 65.00 | 10.20 | 75.20 | $0.496 | ERROR:#REF! | | | | |
| | 702.4401 | CSS-1 | 57.00 | 0.20 | 57.20 | $0.377 | ERROR:#REF! | | | | |
| | 702.4401 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1 | 65.00 | 0.20 | 65.20 | $0.430 | ERROR:#REF! | | | | | | |
| | 702.4501 | CSS-1h | 57.00 | 0.20 | 57.20 | $0.377 | ERROR:#REF! | | | | |
| | 702.4501 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1h | 65.00 | 0.20 | 65.20 | $0.430 | ERROR:#REF! | | | | | | |
| | 702.4601 | CQS-1h | 62.00 | 0.20 | 62.20 | $0.410 | ERROR:#REF! | | | | |
| | 702.4001P | CRS-1p | 60.00 | 2.70 | 62.70 | $0.414 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2p | 65.00 | 2.70 | 67.70 | $0.447 | ERROR:#REF! | | | | |
| | 702.4601P | CQS-1p | 62.00 | 0.20 | 62.20 | $0.410 | ERROR:#REF! | | | | |
| | HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / POUND | | | | | | | |
| | 417.0101 | Recycling Agent | 65.00 | 1.00 | 66.00 | $0.051 | ERROR:#REF! |
| | JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / LANE MILE | | | | | | | |
| | ASTM D6690 Type II | - | 56.00 | 0.20 | 56.20 | $37.068 | ERROR:#REF! |
| | Mastic Materials | - | 40.00 | 0.20 | 40.20 | $26.515 | ERROR:#REF! |
| | MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 413.02010118 | Microsurfacing, Type II, F1 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.02020118 | Microsurfacing, Type II, F2 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.02030118 | Microsurfacing, Type II, F3 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.03010118 | Microsurfacing, Type III, F1 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.03020118 | Microsurfacing, Type III, F2 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.03030118 | Microsurfacing, Type III, F3 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.04030118 | Microsurfacing, Type III Rut Filling | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 414.03030118 | Quick-set Slurry, Type II | 13.50 | 0.20 | 13.70 | $2.603 | ERROR:#REF! |
| | 414.04030118 | Quick-set Slurry, Type III | 12.00 | 0.20 | 12.20 | $2.318 | ERROR:#REF! |
| | PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 415.0X0F0218 | Paver Placed ST - Conventional | 6.50 | 1.00 | 7.50 | $11.625 | ERROR:#REF! |
| | 415.1X0F0218 | Paver Placed ST - Modified | 6.50 | 1.00 | 7.50 | $11.625 | ERROR:#REF! |
| | ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 404.017901 | True & Leveling F9, Asphalt, 70 Series | **** | 1 | **** | **** | ERROR:#REF! |
| | 404.018901 | True & Leveling F9, Asphalt, 80 Series | **** | 1 | **** | **** | ERROR:#REF! |
| | 404.058901 | Shim Course F9, Asphalt | 8.25 | 1 | 9.25 | $14.338 | ERROR:#REF! |
| | 404.068X01 | 6.3 F1/F2/F3 Top Course Asphalt, 80 Series | 6.70 | 1 | 7.70 | $11.935 | ERROR:#REF! |
| | 404.09XX01 | 9.5 Top Course Asphalt | 6.20 | 1 | 7.20 | $11.160 | ERROR:#REF! |
| | 404.12XX01 | 12.5 Top Course Asphalt | 5.50 | 1 | 6.50 | $10.075 | ERROR:#REF! |
| | 404.19XX01 | 19 F9 Binder Course Asphalt, 80 Series | 4.90 | 1 | 5.90 | $9.145 | ERROR:#REF! |
| | *** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used | | | | | | |
| | TACK COAT (Per Gallon): | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | |
| | 407.0102 | Diluted Tack Coat | 40.00 | 0.20 | 40.20 | $0.265 |
| | 407.0103 | Straight Tack Coat | 55.00 | 0.20 | 55.20 | $0.364 |
| | 407.01040009 | Non - Tracking Tack Coat | 50.00 | 0.20 | 50.20 | $0.331 |
| FORMULAS & EXAMPLE |
| ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS |
Unit prices per gallon will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per gallon) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $3.000 + ($0.660893617021277) = | $3.661 | |
| Total Material Price After Adjustment: | | $3.661 | per gallon |
| FORMULAS & EXAMPLE |
| JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing) |
Unit prices per Lane Mile will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per Lane Mile) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $1,500.000 + ($37.068085106383) = | $1,537.068 | |
| Total Material Price After Adjustment: | | $1,537.068 | per Lane Mile |
| FORMULAS & EXAMPLE |
| ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP) |
Unit prices per ton will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per ton) | New Monthly Average | |
| F.O.B. Terminal Price | - | Base Average F.O.B. |
| Terminal Price | | ) X Total Allowable Petroleum % |
| Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract) | | | |
| Binder Adjustment: | | | |
| $200.000 + ($14.3375) = | $214.338 | |
| Total Material Price After Adjustment: | | $214.338 | per ton |
https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot May 2026 Asphalt Price Adjustment - May 2026
| Group | Description | Award # | Contract No. |
| 31503 | Bituminous Concrete Asphalt Mixtures | | |
(2026 VPP NYSDOT Specific Projects) (Federal & State Funds) 23433 PC70965 - PC70986 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2026 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23434 PC70990 - PC70997
| | Bituminous materials price adjustment(s) EFFECTIVE on: | | | | May 1, 2026 | ERROR:#REF! | | | | | |
| | Award(s) using February 1, 2026 base index of | | | | $638.000 | per ton. | | Year: | 2026 | | |
| | In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s), | | | | | | | Month: | May | Posted Price | 2026 |
| | the following price adjustments have been calculated. | | | | | | | | | Month | $/ton |
| | MONTHLY PG 64S-22 BINDER ADJUSTMENT: | | The May 2026 Average is | | | $777.000 | per ton | Asphalt Price Adjustment | | January | - |
| | (F.O.B. Terminal Price for unmodified PG 64S-22 binder without anti-stripping agent) | | | | | | | Base Average = | $638.000 | February | - |
| | The February 1, 2026 Base Average FOB Terminal Price for Asphalt Cement was | | | | $638.000 | per ton. | | New Average = | $777.000 | March | - |
| | Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to more | | | | | | | | | April | 730 |
| | than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price. | | | | | | | | | May | 777 |
| | All Asphalt Price Adjustments will be computed to three decimal places. | | | | | | | | | June | |
| | Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by using | | | | | | | | | July | |
| | the price adjustments listed below: | | | | | | | | | August | |
| | Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page. | | | | | | | | | September | |
| | CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | | | | October | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | | | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | November | | | | | |
| | 702.0700 | Asphalt Filler (18-60) | 100.00 | 0.20 | 100.20 | $0.593 | ERROR:#VALUE! | | | December | |
| | 702.3001 | RS-1 | 55.00 | 1.70 | 56.70 | $0.335 | ERROR:#VALUE! | | | Month | 2027 |
| | 702.3002 | RS-1h | 55.00 | 1.70 | 56.70 | $0.335 | $0.000 | | | | $/ton |
| | 702.3101 | RS-2 | 63.00 | 2.70 | 65.70 | $0.389 | $0.000 | | | January | |
| | 702.3102 | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.389 | $0.000 | | | February | |
| | 702.3201 | MS-2 | 65.00 | 8.20 | 73.20 | $0.433 | $0.000 | | | March | |
| | 702.3301 | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.433 | $0.000 | | | April | |
| | 702.3401 | HFMS-2h | 65.00 | 2.70 | 67.70 | $0.400 | ERROR:#REF! | | | May | |
| | 702.3402 | HFMS-2s | 65.00 | 8.20 | 73.20 | $0.433 | ERROR:#REF! | | | June | |
| | 702.3501 | SS-1 | 57.00 | 0.20 | 57.20 | $0.338 | ERROR:#REF! | | | July | |
| | 702.3501 | | | | | | | | | | |
| (Cold Recycling only) | SS-1 | 65.00 | 0.20 | 65.20 | $0.386 | ERROR:#REF! | | | | August | | |
| | 702.3601 | SS-1h | 57.00 | 0.20 | 57.20 | $0.338 | ERROR:#REF! | | | September | |
| | 702.3601 | | | | | | | | | | |
| (Cold Recycling only) | SS-1h | 65.00 | 0.20 | 65.20 | $0.386 | ERROR:#REF! | | | | October | | |
| | 702.3101P | RS-2 | 63.00 | 2.70 | 65.70 | $0.389 | ERROR:#REF! | | | November | |
| | 702.3102P | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.389 | ERROR:#REF! | | | December | |
| | 702.3301P | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.433 | ERROR:#REF! | | | | |
| | 702.4001 | CRS-1 | 60.00 | 2.70 | 62.70 | $0.371 | ERROR:#REF! | | | | |
| | 702.4002 | CRS-1h | 60.00 | 2.70 | 62.70 | $0.371 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2 | 65.00 | 2.70 | 67.70 | $0.400 | ERROR:#REF! | | | | |
| | 702.4201 | CMS-2 | 65.00 | 10.20 | 75.20 | $0.445 | ERROR:#REF! | | | | |
| | 702.4301 | CMS-2h | 65.00 | 10.20 | 75.20 | $0.445 | ERROR:#REF! | | | | |
| | 702.4401 | CSS-1 | 57.00 | 0.20 | 57.20 | $0.338 | ERROR:#REF! | | | | |
| | 702.4401 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1 | 65.00 | 0.20 | 65.20 | $0.386 | ERROR:#REF! | | | | | | |
| | 702.4501 | CSS-1h | 57.00 | 0.20 | 57.20 | $0.338 | ERROR:#REF! | | | | |
| | 702.4501 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1h | 65.00 | 0.20 | 65.20 | $0.386 | ERROR:#REF! | | | | | | |
| | 702.4601 | CQS-1h | 62.00 | 0.20 | 62.20 | $0.368 | ERROR:#REF! | | | | |
| | 702.4001P | CRS-1p | 60.00 | 2.70 | 62.70 | $0.371 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2p | 65.00 | 2.70 | 67.70 | $0.400 | ERROR:#REF! | | | | |
| | 702.4601P | CQS-1p | 62.00 | 0.20 | 62.20 | $0.368 | ERROR:#REF! | | | | |
| | HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / POUND | | | | | | | |
| | 417.0101 | Recycling Agent | 65.00 | 1.00 | 66.00 | $0.046 | ERROR:#REF! |
| | JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / LANE MILE | | | | | | | |
| | ASTM D6690 Type II | - | 56.00 | 0.20 | 56.20 | $33.242 | ERROR:#REF! |
| | Mastic Materials | - | 40.00 | 0.20 | 40.20 | $23.778 | ERROR:#REF! |
| | MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 413.02010118 | Microsurfacing, Type II, F1 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.02020118 | Microsurfacing, Type II, F2 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.02030118 | Microsurfacing, Type II, F3 | 9.00 | 0.20 | 9.20 | $1.748 | ERROR:#REF! |
| | 413.03010118 | Microsurfacing, Type III, F1 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.03020118 | Microsurfacing, Type III, F2 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |
| | 413.03030118 | Microsurfacing, Type III, F3 | 7.50 | 0.20 | 7.70 | $1.463 | ERROR:#REF! |