315xxPriceAdjust26.xlsx

XLSX spreadsheet 12 MB Posted

Attached to
Bituminous Concrete Asphalt Mixtures
Contract number
Not on record
Issued by
New York

About this file

This document is a New York State Department of Transportation (NYSDOT) asphalt price adjustment spreadsheet covering monthly adjustments from October 2025 through October 2026. It applies to two primary contract awards: Award #23433 for Bituminous Concrete Asphalt Mixtures (Contract Nos. PC70965-PC70986) and Award #23434 for Liquid Bituminous Materials including chip seal, cold recycling, heater scarification, paver placed surface treatment, and joint & crack filler/sealer (Contract Nos. PC70990-PC70997). Both awards are designated for 2026 VPP NYSDOT Specific Projects funded through Federal and State sources. The contract vehicles are managed through a statewide procurement framework with designated contract managers providing input on pricing adjustments.

The document establishes monthly price adjustments for asphalt-related materials based on Performance Graded Binder (PG 64S-22) pricing. The base index price is $638.00 per ton effective February 1, 2026, with monthly averages ranging from $634.00 to $803.00 per ton throughout the adjustment period. Price adjustments apply to multiple material categories including asphalt fillers, emulsions (RS, MS, SS, CRS, CMS, CSS grades), heater scarification agents, joint and crack fillers, microsurfacing products, quick-set slurry seals, and paver-placed surface treatments. Adjustments are calculated using formulas that apply percentage allowances for asphalt and petroleum content to the variance between monthly average FOB terminal prices and the base index. Minimum thresholds apply before adjustments take effect: $0.010 per gallon, $0.001 per pound, $0.002 per linear foot, or $0.10 per ton. All price adjustments are computed to three decimal places and applied to original contract unit prices per gallon, pound, lane mile, or ton depending on the material category.

View the file

Other files

File Type Posted
3150323433GroupSpec951.pdf PDF
31555PriceAdjust25.xlsx XLSX spreadsheet
3150323433SuperpaveRebates.pdf PDF
3150323433a.pdf PDF
3150323433SuperpaveDimensions.pdf PDF
3150323433FederalAid.pdf PDF
3150323433GroupSpec947.pdf PDF
3150323433Regions.pdf PDF
3150323433SuperpaveDesign.pdf PDF
31502PriceAdjust24.xlsx XLSX spreadsheet
3150323433WorkZone.pdf PDF
3150323433Pricing.pdf PDF
3150323433Insurance.pdf PDF
3150323433DetailedSpec.pdf PDF
3150323433Notes.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

October 2026 Asphalt Price Adjustment - October 2026

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2026 VPP NYSDOT Specific Projects) (Federal & State Funds) 23433 PC70965 - PC70986 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2026 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23434 PC70990 - PC70997

Bituminous materials price adjustment(s) EFFECTIVE on:October 1, 2026ERROR:#REF!
Award(s) using February 1, 2026 base index of$638.000per ton.Year:2026
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:OctoberPosted Price2026
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64S-22 BINDER ADJUSTMENT:The October 2026 Average is$803.000per tonAsphalt Price AdjustmentJanuary-
(F.O.B. Terminal Price for unmodified PG 64S-22 binder without anti-stripping agent)Base Average =$638.000February-
The February 1, 2026 Base Average FOB Terminal Price for Asphalt Cement was$638.000per ton.New Average =$803.000March-
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril730
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May777
All Asphalt Price Adjustments will be computed to three decimal places.June793
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly797
the price adjustments listed below:August799
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September794
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:October803
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONNovember
702.0700Asphalt Filler (18-60)100.000.20100.20$0.704ERROR:#VALUE!December
702.3001RS-155.001.7056.70$0.398ERROR:#VALUE!Month2027
702.3002RS-1h55.001.7056.70$0.398$0.000$/ton
702.3101RS-263.002.7065.70$0.461$0.000January
702.3102HFRS-263.002.7065.70$0.461$0.000February
702.3201MS-265.008.2073.20$0.514$0.000March
702.3301HFMS-265.008.2073.20$0.514$0.000April
702.3401HFMS-2h65.002.7067.70$0.475ERROR:#REF!May
702.3402HFMS-2s65.008.2073.20$0.514ERROR:#REF!June
702.3501SS-157.000.2057.20$0.402ERROR:#REF!July
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.458ERROR:#REF!August
702.3601SS-1h57.000.2057.20$0.402ERROR:#REF!September
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.458ERROR:#REF!October
702.3101PRS-263.002.7065.70$0.461ERROR:#REF!November
702.3102PHFRS-263.002.7065.70$0.461ERROR:#REF!December
702.3301PHFMS-265.008.2073.20$0.514ERROR:#REF!
702.4001CRS-160.002.7062.70$0.440ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.440ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.475ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.528ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.528ERROR:#REF!
702.4401CSS-157.000.2057.20$0.402ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.458ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.402ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.458ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.437ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.440ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.475ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.437ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.054ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$39.460ERROR:#REF!
Mastic Materials-40.000.2040.20$28.226ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$1.748ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$1.748ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$1.748ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$1.463ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$1.463ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$1.463ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70$1.463ERROR:#REF!
414.03030118Quick-set Slurry, Type II13.500.2013.70$2.603ERROR:#REF!
414.04030118Quick-set Slurry, Type III12.000.2012.20$2.318ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0X0F0218Paver Placed ST - Conventional6.501.007.50$12.375ERROR:#REF!
415.1X0F0218Paver Placed ST - Modified6.501.007.50$12.375ERROR:#REF!
ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
404.017901True & Leveling F9, Asphalt, 70 Series****1********ERROR:#REF!
404.018901True & Leveling F9, Asphalt, 80 Series****1********ERROR:#REF!
404.058901Shim Course F9, Asphalt8.2519.25$15.263ERROR:#REF!
404.068X016.3 F1/F2/F3 Top Course Asphalt, 80 Series6.7017.70$12.705ERROR:#REF!
404.09XX019.5 Top Course Asphalt6.2017.20$11.880ERROR:#REF!
404.12XX0112.5 Top Course Asphalt5.5016.50$10.725ERROR:#REF!
404.19XX0119 F9 Binder Course Asphalt, 80 Series4.9015.90$9.735ERROR:#REF!
*** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used
TACK COAT (Per Gallon):
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
407.0102Diluted Tack Coat40.000.2040.20$0.282
407.0103Straight Tack Coat55.000.2055.20$0.388
407.01040009Non - Tracking Tack Coat50.000.2050.20$0.352
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 + ($0.703531914893617) =$3.704
Total Material Price After Adjustment:$3.704per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per Lane Mile will be subject to adjustment based on the following formula:

Price Adjustment = (

(per Lane Mile)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 + ($39.4595744680851) =$1,539.460
Total Material Price After Adjustment:$1,539.460per Lane Mile
FORMULAS & EXAMPLE
ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP)

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 + ($15.2625) =$215.263
Total Material Price After Adjustment:$215.263per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot September 2026 Asphalt Price Adjustment - September 2026

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2026 VPP NYSDOT Specific Projects) (Federal & State Funds) 23433 PC70965 - PC70986 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2026 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23434 PC70990 - PC70997

Bituminous materials price adjustment(s) EFFECTIVE on:September 1, 2026ERROR:#REF!
Award(s) using February 1, 2026 base index of$638.000per ton.Year:2026
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:SeptemberPosted Price2026
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64S-22 BINDER ADJUSTMENT:The September 2026 Average is$794.000per tonAsphalt Price AdjustmentJanuary-
(F.O.B. Terminal Price for unmodified PG 64S-22 binder without anti-stripping agent)Base Average =$638.000February-
The February 1, 2026 Base Average FOB Terminal Price for Asphalt Cement was$638.000per ton.New Average =$794.000March-
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril730
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May777
All Asphalt Price Adjustments will be computed to three decimal places.June793
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly797
the price adjustments listed below:August799
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September794
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:October
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONNovember
702.0700Asphalt Filler (18-60)100.000.20100.20$0.665ERROR:#VALUE!December
702.3001RS-155.001.7056.70$0.376ERROR:#VALUE!Month2027
702.3002RS-1h55.001.7056.70$0.376$0.000$/ton
702.3101RS-263.002.7065.70$0.436$0.000January
702.3102HFRS-263.002.7065.70$0.436$0.000February
702.3201MS-265.008.2073.20$0.486$0.000March
702.3301HFMS-265.008.2073.20$0.486$0.000April
702.3401HFMS-2h65.002.7067.70$0.449ERROR:#REF!May
702.3402HFMS-2s65.008.2073.20$0.486ERROR:#REF!June
702.3501SS-157.000.2057.20$0.380ERROR:#REF!July
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.433ERROR:#REF!August
702.3601SS-1h57.000.2057.20$0.380ERROR:#REF!September
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.433ERROR:#REF!October
702.3101PRS-263.002.7065.70$0.436ERROR:#REF!November
702.3102PHFRS-263.002.7065.70$0.436ERROR:#REF!December
702.3301PHFMS-265.008.2073.20$0.486ERROR:#REF!
702.4001CRS-160.002.7062.70$0.416ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.416ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.449ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.499ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.499ERROR:#REF!
702.4401CSS-157.000.2057.20$0.380ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.433ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.380ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.433ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.413ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.416ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.449ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.413ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.051ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$37.307ERROR:#REF!
Mastic Materials-40.000.2040.20$26.686ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$1.748ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$1.748ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$1.748ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$1.463ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$1.463ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$1.463ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70$1.463ERROR:#REF!
414.03030118Quick-set Slurry, Type II13.500.2013.70$2.603ERROR:#REF!
414.04030118Quick-set Slurry, Type III12.000.2012.20$2.318ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0X0F0218Paver Placed ST - Conventional6.501.007.50$11.700ERROR:#REF!
415.1X0F0218Paver Placed ST - Modified6.501.007.50$11.700ERROR:#REF!
ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
404.017901True & Leveling F9, Asphalt, 70 Series****1********ERROR:#REF!
404.018901True & Leveling F9, Asphalt, 80 Series****1********ERROR:#REF!
404.058901Shim Course F9, Asphalt8.2519.25$14.430ERROR:#REF!
404.068X016.3 F1/F2/F3 Top Course Asphalt, 80 Series6.7017.70$12.012ERROR:#REF!
404.09XX019.5 Top Course Asphalt6.2017.20$11.232ERROR:#REF!
404.12XX0112.5 Top Course Asphalt5.5016.50$10.140ERROR:#REF!
404.19XX0119 F9 Binder Course Asphalt, 80 Series4.9015.90$9.204ERROR:#REF!
*** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used
TACK COAT (Per Gallon):
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
407.0102Diluted Tack Coat40.000.2040.20$0.267
407.0103Straight Tack Coat55.000.2055.20$0.366
407.01040009Non - Tracking Tack Coat50.000.2050.20$0.333
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 + ($0.665157446808511) =$3.665
Total Material Price After Adjustment:$3.665per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per Lane Mile will be subject to adjustment based on the following formula:

Price Adjustment = (

(per Lane Mile)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 + ($37.3072340425532) =$1,537.307
Total Material Price After Adjustment:$1,537.307per Lane Mile
FORMULAS & EXAMPLE
ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP)

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 + ($14.43) =$214.430
Total Material Price After Adjustment:$214.430per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot August 2026 Asphalt Price Adjustment - August 2026

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2026 VPP NYSDOT Specific Projects) (Federal & State Funds) 23433 PC70965 - PC70986 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2026 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23434 PC70990 - PC70997

Bituminous materials price adjustment(s) EFFECTIVE on:August 1, 2026ERROR:#REF!
Award(s) using February 1, 2026 base index of$638.000per ton.Year:2026
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:AugustPosted Price2026
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64S-22 BINDER ADJUSTMENT:The August 2026 Average is$799.000per tonAsphalt Price AdjustmentJanuary-
(F.O.B. Terminal Price for unmodified PG 64S-22 binder without anti-stripping agent)Base Average =$638.000February-
The February 1, 2026 Base Average FOB Terminal Price for Asphalt Cement was$638.000per ton.New Average =$799.000March-
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril730
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May777
All Asphalt Price Adjustments will be computed to three decimal places.June793
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly797
the price adjustments listed below:August799
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:October
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONNovember
702.0700Asphalt Filler (18-60)100.000.20100.20$0.686ERROR:#VALUE!December
702.3001RS-155.001.7056.70$0.388ERROR:#VALUE!Month2027
702.3002RS-1h55.001.7056.70$0.388$0.000$/ton
702.3101RS-263.002.7065.70$0.450$0.000January
702.3102HFRS-263.002.7065.70$0.450$0.000February
702.3201MS-265.008.2073.20$0.501$0.000March
702.3301HFMS-265.008.2073.20$0.501$0.000April
702.3401HFMS-2h65.002.7067.70$0.464ERROR:#REF!May
702.3402HFMS-2s65.008.2073.20$0.501ERROR:#REF!June
702.3501SS-157.000.2057.20$0.392ERROR:#REF!July
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.447ERROR:#REF!August
702.3601SS-1h57.000.2057.20$0.392ERROR:#REF!September
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.447ERROR:#REF!October
702.3101PRS-263.002.7065.70$0.450ERROR:#REF!November
702.3102PHFRS-263.002.7065.70$0.450ERROR:#REF!December
702.3301PHFMS-265.008.2073.20$0.501ERROR:#REF!
702.4001CRS-160.002.7062.70$0.430ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.430ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.464ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.515ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.515ERROR:#REF!
702.4401CSS-157.000.2057.20$0.392ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.447ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.392ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.447ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.426ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.430ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.464ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.426ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.053ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$38.503ERROR:#REF!
Mastic Materials-40.000.2040.20$27.541ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$1.748ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$1.748ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$1.748ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$1.463ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$1.463ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$1.463ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70$1.463ERROR:#REF!
414.03030118Quick-set Slurry, Type II13.500.2013.70$2.603ERROR:#REF!
414.04030118Quick-set Slurry, Type III12.000.2012.20$2.318ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0X0F0218Paver Placed ST - Conventional6.501.007.50$12.075ERROR:#REF!
415.1X0F0218Paver Placed ST - Modified6.501.007.50$12.075ERROR:#REF!
ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
404.017901True & Leveling F9, Asphalt, 70 Series****1********ERROR:#REF!
404.018901True & Leveling F9, Asphalt, 80 Series****1********ERROR:#REF!
404.058901Shim Course F9, Asphalt8.2519.25$14.893ERROR:#REF!
404.068X016.3 F1/F2/F3 Top Course Asphalt, 80 Series6.7017.70$12.397ERROR:#REF!
404.09XX019.5 Top Course Asphalt6.2017.20$11.592ERROR:#REF!
404.12XX0112.5 Top Course Asphalt5.5016.50$10.465ERROR:#REF!
404.19XX0119 F9 Binder Course Asphalt, 80 Series4.9015.90$9.499ERROR:#REF!
*** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used
TACK COAT (Per Gallon):
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
407.0102Diluted Tack Coat40.000.2040.20$0.275
407.0103Straight Tack Coat55.000.2055.20$0.378
407.01040009Non - Tracking Tack Coat50.000.2050.20$0.344
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 + ($0.686476595744681) =$3.686
Total Material Price After Adjustment:$3.686per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per Lane Mile will be subject to adjustment based on the following formula:

Price Adjustment = (

(per Lane Mile)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 + ($38.5029787234043) =$1,538.503
Total Material Price After Adjustment:$1,538.503per Lane Mile
FORMULAS & EXAMPLE
ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP)

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 + ($14.8925) =$214.893
Total Material Price After Adjustment:$214.893per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot July 2026 Asphalt Price Adjustment - July 2026

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2026 VPP NYSDOT Specific Projects) (Federal & State Funds) 23433 PC70965 - PC70986 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2026 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23434 PC70990 - PC70997

Bituminous materials price adjustment(s) EFFECTIVE on:July 1, 2026ERROR:#REF!
Award(s) using February 1, 2026 base index of$638.000per ton.Year:2026
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:JulyPosted Price2026
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64S-22 BINDER ADJUSTMENT:The July 2026 Average is$797.000per tonAsphalt Price AdjustmentJanuary-
(F.O.B. Terminal Price for unmodified PG 64S-22 binder without anti-stripping agent)Base Average =$638.000February-
The February 1, 2026 Base Average FOB Terminal Price for Asphalt Cement was$638.000per ton.New Average =$797.000March-
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril730
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May777
All Asphalt Price Adjustments will be computed to three decimal places.June793
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly797
the price adjustments listed below:August
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:October
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONNovember
702.0700Asphalt Filler (18-60)100.000.20100.20$0.678ERROR:#VALUE!December
702.3001RS-155.001.7056.70$0.384ERROR:#VALUE!Month2027
702.3002RS-1h55.001.7056.70$0.384$0.000$/ton
702.3101RS-263.002.7065.70$0.445$0.000January
702.3102HFRS-263.002.7065.70$0.445$0.000February
702.3201MS-265.008.2073.20$0.495$0.000March
702.3301HFMS-265.008.2073.20$0.495$0.000April
702.3401HFMS-2h65.002.7067.70$0.458ERROR:#REF!May
702.3402HFMS-2s65.008.2073.20$0.495ERROR:#REF!June
702.3501SS-157.000.2057.20$0.387ERROR:#REF!July
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.441ERROR:#REF!August
702.3601SS-1h57.000.2057.20$0.387ERROR:#REF!September
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.441ERROR:#REF!October
702.3101PRS-263.002.7065.70$0.445ERROR:#REF!November
702.3102PHFRS-263.002.7065.70$0.445ERROR:#REF!December
702.3301PHFMS-265.008.2073.20$0.495ERROR:#REF!
702.4001CRS-160.002.7062.70$0.424ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.424ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.458ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.509ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.509ERROR:#REF!
702.4401CSS-157.000.2057.20$0.387ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.441ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.387ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.441ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.421ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.424ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.458ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.421ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.052ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$38.025ERROR:#REF!
Mastic Materials-40.000.2040.20$27.199ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$1.748ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$1.748ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$1.748ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$1.463ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$1.463ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$1.463ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70$1.463ERROR:#REF!
414.03030118Quick-set Slurry, Type II13.500.2013.70$2.603ERROR:#REF!
414.04030118Quick-set Slurry, Type III12.000.2012.20$2.318ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0X0F0218Paver Placed ST - Conventional6.501.007.50$11.925ERROR:#REF!
415.1X0F0218Paver Placed ST - Modified6.501.007.50$11.925ERROR:#REF!
ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
404.017901True & Leveling F9, Asphalt, 70 Series****1********ERROR:#REF!
404.018901True & Leveling F9, Asphalt, 80 Series****1********ERROR:#REF!
404.058901Shim Course F9, Asphalt8.2519.25$14.708ERROR:#REF!
404.068X016.3 F1/F2/F3 Top Course Asphalt, 80 Series6.7017.70$12.243ERROR:#REF!
404.09XX019.5 Top Course Asphalt6.2017.20$11.448ERROR:#REF!
404.12XX0112.5 Top Course Asphalt5.5016.50$10.335ERROR:#REF!
404.19XX0119 F9 Binder Course Asphalt, 80 Series4.9015.90$9.381ERROR:#REF!
*** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used
TACK COAT (Per Gallon):
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
407.0102Diluted Tack Coat40.000.2040.20$0.272
407.0103Straight Tack Coat55.000.2055.20$0.373
407.01040009Non - Tracking Tack Coat50.000.2050.20$0.340
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 + ($0.677948936170213) =$3.678
Total Material Price After Adjustment:$3.678per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per Lane Mile will be subject to adjustment based on the following formula:

Price Adjustment = (

(per Lane Mile)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 + ($38.0246808510638) =$1,538.025
Total Material Price After Adjustment:$1,538.025per Lane Mile
FORMULAS & EXAMPLE
ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP)

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 + ($14.7075) =$214.708
Total Material Price After Adjustment:$214.708per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot June 2026 Asphalt Price Adjustment - June 2026

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2026 VPP NYSDOT Specific Projects) (Federal & State Funds) 23433 PC70965 - PC70986 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2026 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23434 PC70990 - PC70997

Bituminous materials price adjustment(s) EFFECTIVE on:June 1, 2026ERROR:#REF!
Award(s) using February 1, 2026 base index of$638.000per ton.Year:2026
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:JunePosted Price2026
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64S-22 BINDER ADJUSTMENT:The June 2026 Average is$793.000per tonAsphalt Price AdjustmentJanuary-
(F.O.B. Terminal Price for unmodified PG 64S-22 binder without anti-stripping agent)Base Average =$638.000February-
The February 1, 2026 Base Average FOB Terminal Price for Asphalt Cement was$638.000per ton.New Average =$793.000March-
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril730
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May777
All Asphalt Price Adjustments will be computed to three decimal places.June793
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly
the price adjustments listed below:August
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:October
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONNovember
702.0700Asphalt Filler (18-60)100.000.20100.20$0.661ERROR:#VALUE!December
702.3001RS-155.001.7056.70$0.374ERROR:#VALUE!Month2027
702.3002RS-1h55.001.7056.70$0.374$0.000$/ton
702.3101RS-263.002.7065.70$0.433$0.000January
702.3102HFRS-263.002.7065.70$0.433$0.000February
702.3201MS-265.008.2073.20$0.483$0.000March
702.3301HFMS-265.008.2073.20$0.483$0.000April
702.3401HFMS-2h65.002.7067.70$0.447ERROR:#REF!May
702.3402HFMS-2s65.008.2073.20$0.483ERROR:#REF!June
702.3501SS-157.000.2057.20$0.377ERROR:#REF!July
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.430ERROR:#REF!August
702.3601SS-1h57.000.2057.20$0.377ERROR:#REF!September
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.430ERROR:#REF!October
702.3101PRS-263.002.7065.70$0.433ERROR:#REF!November
702.3102PHFRS-263.002.7065.70$0.433ERROR:#REF!December
702.3301PHFMS-265.008.2073.20$0.483ERROR:#REF!
702.4001CRS-160.002.7062.70$0.414ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.414ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.447ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.496ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.496ERROR:#REF!
702.4401CSS-157.000.2057.20$0.377ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.430ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.377ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.430ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.410ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.414ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.447ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.410ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.051ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$37.068ERROR:#REF!
Mastic Materials-40.000.2040.20$26.515ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$1.748ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$1.748ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$1.748ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$1.463ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$1.463ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$1.463ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70$1.463ERROR:#REF!
414.03030118Quick-set Slurry, Type II13.500.2013.70$2.603ERROR:#REF!
414.04030118Quick-set Slurry, Type III12.000.2012.20$2.318ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0X0F0218Paver Placed ST - Conventional6.501.007.50$11.625ERROR:#REF!
415.1X0F0218Paver Placed ST - Modified6.501.007.50$11.625ERROR:#REF!
ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
404.017901True & Leveling F9, Asphalt, 70 Series****1********ERROR:#REF!
404.018901True & Leveling F9, Asphalt, 80 Series****1********ERROR:#REF!
404.058901Shim Course F9, Asphalt8.2519.25$14.338ERROR:#REF!
404.068X016.3 F1/F2/F3 Top Course Asphalt, 80 Series6.7017.70$11.935ERROR:#REF!
404.09XX019.5 Top Course Asphalt6.2017.20$11.160ERROR:#REF!
404.12XX0112.5 Top Course Asphalt5.5016.50$10.075ERROR:#REF!
404.19XX0119 F9 Binder Course Asphalt, 80 Series4.9015.90$9.145ERROR:#REF!
*** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used
TACK COAT (Per Gallon):
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
407.0102Diluted Tack Coat40.000.2040.20$0.265
407.0103Straight Tack Coat55.000.2055.20$0.364
407.01040009Non - Tracking Tack Coat50.000.2050.20$0.331
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 + ($0.660893617021277) =$3.661
Total Material Price After Adjustment:$3.661per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per Lane Mile will be subject to adjustment based on the following formula:

Price Adjustment = (

(per Lane Mile)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 + ($37.068085106383) =$1,537.068
Total Material Price After Adjustment:$1,537.068per Lane Mile
FORMULAS & EXAMPLE
ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP)

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 + ($14.3375) =$214.338
Total Material Price After Adjustment:$214.338per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot May 2026 Asphalt Price Adjustment - May 2026

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2026 VPP NYSDOT Specific Projects) (Federal & State Funds) 23433 PC70965 - PC70986 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2026 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23434 PC70990 - PC70997

Bituminous materials price adjustment(s) EFFECTIVE on:May 1, 2026ERROR:#REF!
Award(s) using February 1, 2026 base index of$638.000per ton.Year:2026
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:MayPosted Price2026
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64S-22 BINDER ADJUSTMENT:The May 2026 Average is$777.000per tonAsphalt Price AdjustmentJanuary-
(F.O.B. Terminal Price for unmodified PG 64S-22 binder without anti-stripping agent)Base Average =$638.000February-
The February 1, 2026 Base Average FOB Terminal Price for Asphalt Cement was$638.000per ton.New Average =$777.000March-
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril730
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May777
All Asphalt Price Adjustments will be computed to three decimal places.June
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly
the price adjustments listed below:August
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:October
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONNovember
702.0700Asphalt Filler (18-60)100.000.20100.20$0.593ERROR:#VALUE!December
702.3001RS-155.001.7056.70$0.335ERROR:#VALUE!Month2027
702.3002RS-1h55.001.7056.70$0.335$0.000$/ton
702.3101RS-263.002.7065.70$0.389$0.000January
702.3102HFRS-263.002.7065.70$0.389$0.000February
702.3201MS-265.008.2073.20$0.433$0.000March
702.3301HFMS-265.008.2073.20$0.433$0.000April
702.3401HFMS-2h65.002.7067.70$0.400ERROR:#REF!May
702.3402HFMS-2s65.008.2073.20$0.433ERROR:#REF!June
702.3501SS-157.000.2057.20$0.338ERROR:#REF!July
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.386ERROR:#REF!August
702.3601SS-1h57.000.2057.20$0.338ERROR:#REF!September
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.386ERROR:#REF!October
702.3101PRS-263.002.7065.70$0.389ERROR:#REF!November
702.3102PHFRS-263.002.7065.70$0.389ERROR:#REF!December
702.3301PHFMS-265.008.2073.20$0.433ERROR:#REF!
702.4001CRS-160.002.7062.70$0.371ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.371ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.400ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.445ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.445ERROR:#REF!
702.4401CSS-157.000.2057.20$0.338ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.386ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.338ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.386ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.368ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.371ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.400ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.368ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.046ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$33.242ERROR:#REF!
Mastic Materials-40.000.2040.20$23.778ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$1.748ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$1.748ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$1.748ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$1.463ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$1.463ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$1.463ERROR:#REF!

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .