315xxPriceAdjust26.xlsx

XLSX spreadsheet 9 MB Posted

Attached to
Bituminous Concrete Asphalt Mixtures (2026 VPP)
Contract number
Bituminous Concrete Asphalt Mixtures (2026 VPP)
Issued by
New York

About this file

Document Summary

This document is a New York State Department of Transportation (NYSDOT) monthly asphalt price adjustment schedule covering the period from June 2025 through June 2026. It applies to two primary contract awards: Award #23433 for Bituminous Concrete Asphalt Mixtures (Contract Nos. PC70965–PC70986) and Award #23434 for Liquid Bituminous Materials including chip seal, cold recycling, heater scarification, paver-placed surface treatment, and joint and crack filler/sealer (Contract Nos. PC70990–PC70997). Both awards are designated for 2025 and 2026 VPP NYSDOT Specific Projects and are funded through Federal and State sources.

The price adjustments are calculated based on monthly variations in Performance Graded (PG) 64-22 binder prices relative to a February 2025 base index of $598.00 per ton (or February 2026 base index of $638.00 per ton for 2026 contracts). Monthly averages tracked throughout the adjustment period range from $621.00 to $793.00 per ton. Price adjustments are applied to unit prices for asphalt emulsions (per gallon), asphalt mixtures and microsurfacing items (per ton), joint and crack filler/sealer (per lane mile), and heater scarification items (per pound), with adjustments calculated using standardized formulas that account for petroleum allowance percentages. Adjustments become effective on the first day of each month and are computed to three decimal places. No price adjustment is applied unless the change exceeds $0.010 per gallon, $0.001 per pound, $0.002 per linear foot, or $0.10 per ton from the original contract price.

View the file

Other files

File Type Posted
3150323433FederalAid.pdf PDF
31502PriceAdjust24.xlsx XLSX spreadsheet
3150323433SuperpaveRebates.pdf PDF
3150323433GroupSpec951.pdf PDF
3150323433SuperpaveDesign.pdf PDF
3150323433GroupSpec947.pdf PDF
3150323433DetailedSpec.pdf PDF
3150323433Regions.pdf PDF
3150323433Insurance.pdf PDF
3150323433a.pdf PDF
3150323433SuperpaveDimensions.pdf PDF
3150323433Notes.pdf PDF
31555PriceAdjust25.xlsx XLSX spreadsheet
3150323433WorkZone.pdf PDF
3150323433Pricing.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

June 2026 Asphalt Price Adjustment - June 2026

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2026 VPP NYSDOT Specific Projects) (Federal & State Funds) 23433 PC70965 - PC70986 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2026 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23434 PC70990 - PC70997

Bituminous materials price adjustment(s) EFFECTIVE on:June 1, 2026ERROR:#REF!
Award(s) using February 1, 2026 base index of$638.000per ton.Year:2026
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:JunePosted Price2026
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64S-22 BINDER ADJUSTMENT:The June 2026 Average is$793.000per tonAsphalt Price AdjustmentJanuary-
(F.O.B. Terminal Price for unmodified PG 64S-22 binder without anti-stripping agent)Base Average =$638.000February-
The February 1, 2026 Base Average FOB Terminal Price for Asphalt Cement was$638.000per ton.New Average =$793.000March-
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril730
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May777
All Asphalt Price Adjustments will be computed to three decimal places.June793
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly
the price adjustments listed below:August
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:October
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONNovember
702.0700Asphalt Filler (18-60)100.000.20100.20$0.661ERROR:#VALUE!December
702.3001RS-155.001.7056.70$0.374ERROR:#VALUE!Month2027
702.3002RS-1h55.001.7056.70$0.374$0.000$/ton
702.3101RS-263.002.7065.70$0.433$0.000January
702.3102HFRS-263.002.7065.70$0.433$0.000February
702.3201MS-265.008.2073.20$0.483$0.000March
702.3301HFMS-265.008.2073.20$0.483$0.000April
702.3401HFMS-2h65.002.7067.70$0.447ERROR:#REF!May
702.3402HFMS-2s65.008.2073.20$0.483ERROR:#REF!June
702.3501SS-157.000.2057.20$0.377ERROR:#REF!July
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.430ERROR:#REF!August
702.3601SS-1h57.000.2057.20$0.377ERROR:#REF!September
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.430ERROR:#REF!October
702.3101PRS-263.002.7065.70$0.433ERROR:#REF!November
702.3102PHFRS-263.002.7065.70$0.433ERROR:#REF!December
702.3301PHFMS-265.008.2073.20$0.483ERROR:#REF!
702.4001CRS-160.002.7062.70$0.414ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.414ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.447ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.496ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.496ERROR:#REF!
702.4401CSS-157.000.2057.20$0.377ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.430ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.377ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.430ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.410ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.414ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.447ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.410ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.051ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$37.068ERROR:#REF!
Mastic Materials-40.000.2040.20$26.515ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$1.748ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$1.748ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$1.748ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$1.463ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$1.463ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$1.463ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70$1.463ERROR:#REF!
414.03030118Quick-set Slurry, Type II13.500.2013.70$2.603ERROR:#REF!
414.04030118Quick-set Slurry, Type III12.000.2012.20$2.318ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0X0F0218Paver Placed ST - Conventional6.501.007.50$11.625ERROR:#REF!
415.1X0F0218Paver Placed ST - Modified6.501.007.50$11.625ERROR:#REF!
ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
404.017901True & Leveling F9, Asphalt, 70 Series****1********ERROR:#REF!
404.018901True & Leveling F9, Asphalt, 80 Series****1********ERROR:#REF!
404.058901Shim Course F9, Asphalt8.2519.25$14.338ERROR:#REF!
404.068X016.3 F1/F2/F3 Top Course Asphalt, 80 Series6.7017.70$11.935ERROR:#REF!
404.09XX019.5 Top Course Asphalt6.2017.20$11.160ERROR:#REF!
404.12XX0112.5 Top Course Asphalt5.5016.50$10.075ERROR:#REF!
404.19XX0119 F9 Binder Course Asphalt, 80 Series4.9015.90$9.145ERROR:#REF!
*** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used
TACK COAT (Per Gallon):
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
407.0102Diluted Tack Coat40.000.2040.20$0.265
407.0103Straight Tack Coat55.000.2055.20$0.364
407.01040009Non - Tracking Tack Coat50.000.2050.20$0.331
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 + ($0.660893617021277) =$3.661
Total Material Price After Adjustment:$3.661per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per Lane Mile will be subject to adjustment based on the following formula:

Price Adjustment = (

(per Lane Mile)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 + ($37.068085106383) =$1,537.068
Total Material Price After Adjustment:$1,537.068per Lane Mile
FORMULAS & EXAMPLE
ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP)

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 + ($14.3375) =$214.338
Total Material Price After Adjustment:$214.338per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot May 2026 Asphalt Price Adjustment - May 2026

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2026 VPP NYSDOT Specific Projects) (Federal & State Funds) 23433 PC70965 - PC70986 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2026 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23434 PC70990 - PC70997

Bituminous materials price adjustment(s) EFFECTIVE on:May 1, 2026ERROR:#REF!
Award(s) using February 1, 2026 base index of$638.000per ton.Year:2026
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:MayPosted Price2026
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64S-22 BINDER ADJUSTMENT:The May 2026 Average is$777.000per tonAsphalt Price AdjustmentJanuary-
(F.O.B. Terminal Price for unmodified PG 64S-22 binder without anti-stripping agent)Base Average =$638.000February-
The February 1, 2026 Base Average FOB Terminal Price for Asphalt Cement was$638.000per ton.New Average =$777.000March-
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril730
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May777
All Asphalt Price Adjustments will be computed to three decimal places.June
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly
the price adjustments listed below:August
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:October
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONNovember
702.0700Asphalt Filler (18-60)100.000.20100.20$0.593ERROR:#VALUE!December
702.3001RS-155.001.7056.70$0.335ERROR:#VALUE!Month2027
702.3002RS-1h55.001.7056.70$0.335$0.000$/ton
702.3101RS-263.002.7065.70$0.389$0.000January
702.3102HFRS-263.002.7065.70$0.389$0.000February
702.3201MS-265.008.2073.20$0.433$0.000March
702.3301HFMS-265.008.2073.20$0.433$0.000April
702.3401HFMS-2h65.002.7067.70$0.400ERROR:#REF!May
702.3402HFMS-2s65.008.2073.20$0.433ERROR:#REF!June
702.3501SS-157.000.2057.20$0.338ERROR:#REF!July
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.386ERROR:#REF!August
702.3601SS-1h57.000.2057.20$0.338ERROR:#REF!September
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.386ERROR:#REF!October
702.3101PRS-263.002.7065.70$0.389ERROR:#REF!November
702.3102PHFRS-263.002.7065.70$0.389ERROR:#REF!December
702.3301PHFMS-265.008.2073.20$0.433ERROR:#REF!
702.4001CRS-160.002.7062.70$0.371ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.371ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.400ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.445ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.445ERROR:#REF!
702.4401CSS-157.000.2057.20$0.338ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.386ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.338ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.386ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.368ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.371ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.400ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.368ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.046ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$33.242ERROR:#REF!
Mastic Materials-40.000.2040.20$23.778ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$1.748ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$1.748ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$1.748ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$1.463ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$1.463ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$1.463ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70$1.463ERROR:#REF!
414.03030118Quick-set Slurry, Type II13.500.2013.70$2.603ERROR:#REF!
414.04030118Quick-set Slurry, Type III12.000.2012.20$2.318ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0X0F0218Paver Placed ST - Conventional6.501.007.50$10.425ERROR:#REF!
415.1X0F0218Paver Placed ST - Modified6.501.007.50$10.425ERROR:#REF!
ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
404.017901True & Leveling F9, Asphalt, 70 Series****1********ERROR:#REF!
404.018901True & Leveling F9, Asphalt, 80 Series****1********ERROR:#REF!
404.058901Shim Course F9, Asphalt8.2519.25$12.858ERROR:#REF!
404.068X016.3 F1/F2/F3 Top Course Asphalt, 80 Series6.7017.70$10.703ERROR:#REF!
404.09XX019.5 Top Course Asphalt6.2017.20$10.008ERROR:#REF!
404.12XX0112.5 Top Course Asphalt5.5016.50$9.035ERROR:#REF!
404.19XX0119 F9 Binder Course Asphalt, 80 Series4.9015.90$8.201ERROR:#REF!
*** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used
TACK COAT (Per Gallon):
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
407.0102Diluted Tack Coat40.000.2040.20$0.238
407.0103Straight Tack Coat55.000.2055.20$0.327
407.01040009Non - Tracking Tack Coat50.000.2050.20$0.297
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 + ($0.592672340425532) =$3.593
Total Material Price After Adjustment:$3.593per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per Lane Mile will be subject to adjustment based on the following formula:

Price Adjustment = (

(per Lane Mile)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 + ($33.2417021276596) =$1,533.242
Total Material Price After Adjustment:$1,533.242per Lane Mile
FORMULAS & EXAMPLE
ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP)

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 + ($12.8575) =$212.858
Total Material Price After Adjustment:$212.858per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot March 2026 Asphalt Price Adjustment - March 2026

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2025 VPP NYSDOT Specific Projects) (Federal & State Funds) 23388 PC70701 - PC70719 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2025 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23389 PC70720 - PC70724

Bituminous materials price adjustment(s) EFFECTIVE on:March 1, 2026ERROR:#REF!
Award(s) using February 1, 2025 base index of$598.000per ton.Year:2026
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:MarchPosted Price2025
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64-22 BINDER ADJUSTMENT:The March 2026 Average is$638.000per tonAsphalt Price AdjustmentJanuary
(F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent)Base Average =$598.000February
The February 1, 2025 Base Average FOB Terminal Price for Asphalt Cement was$598.000per ton.New Average =$638.000March
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril621
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May626
All Asphalt Price Adjustments will be computed to three decimal places.June632
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly646
the price adjustments listed below:August648
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September642
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:October642
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONNovember638
702.0700Asphalt Filler (18-60)100.000.20100.20$0.171ERROR:#VALUE!December634
702.3001RS-155.001.7056.70$0.097ERROR:#VALUE!Month2026
702.3002RS-1h55.001.7056.70$0.097$0.000$/ton
702.3101RS-263.002.7065.70$0.112$0.000January643
702.3102HFRS-263.002.7065.70$0.112$0.000February638
702.3201MS-265.008.2073.20$0.125$0.000March638
702.3301HFMS-265.008.2073.20$0.125$0.000April
702.3401HFMS-2h65.002.7067.70$0.115ERROR:#REF!May
702.3402HFMS-2s65.008.2073.20$0.125ERROR:#REF!June
702.3501SS-157.000.2057.20$0.097ERROR:#REF!July
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.111ERROR:#REF!August
702.3601SS-1h57.000.2057.20$0.097ERROR:#REF!September
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.111ERROR:#REF!October
702.3101PRS-263.002.7065.70$0.112ERROR:#REF!November
702.3102PHFRS-263.002.7065.70$0.112ERROR:#REF!December
702.3301PHFMS-265.008.2073.20$0.125ERROR:#REF!
702.4001CRS-160.002.7062.70$0.107ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.107ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.115ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.128ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.128ERROR:#REF!
702.4401CSS-157.000.2057.20$0.097ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.111ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.097ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.111ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.106ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.107ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.115ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.106ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.013ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$9.566ERROR:#REF!
Mastic Materials-40.000.2040.20$6.843ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$1.748ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$1.748ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$1.748ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$1.463ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$1.463ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$1.463ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70$1.463ERROR:#REF!
414.03030118Quick-set Slurry, Type II13.500.2013.70$2.603ERROR:#REF!
414.04030118Quick-set Slurry, Type III12.000.2012.20$2.318ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0X0F0218Paver Placed ST - Conventional6.501.007.50$3.000ERROR:#REF!
415.1X0F0218Paver Placed ST - Modified6.501.007.50$3.000ERROR:#REF!
ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
404.017901True & Leveling F9, Asphalt, 70 Series****1********ERROR:#REF!
404.018901True & Leveling F9, Asphalt, 80 Series****1********ERROR:#REF!
404.058901Shim Course F9, Asphalt8.2519.25$3.700ERROR:#REF!
404.068X016.3 F1/F2/F3 Top Course Asphalt, 80 Series6.7017.70$3.080ERROR:#REF!
404.09XX019.5 Top Course Asphalt6.2017.20$2.880ERROR:#REF!
404.12XX0112.5 Top Course Asphalt5.5016.50$2.600ERROR:#REF!
404.19XX0119 F9 Binder Course Asphalt, 80 Series4.9015.90$2.360ERROR:#REF!
*** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used
TACK COAT (Per Gallon):
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
407.0102Diluted Tack Coat40.000.2040.20$0.068
407.0103Straight Tack Coat55.000.2055.20$0.094
407.01040009Non - Tracking Tack Coat50.000.2050.20$0.085
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 + ($0.170553191489362) =$3.171
Total Material Price After Adjustment:$3.171per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per Lane Mile will be subject to adjustment based on the following formula:

Price Adjustment = (

(per Lane Mile)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 + ($9.56595744680851) =$1,509.566
Total Material Price After Adjustment:$1,509.566per Lane Mile
FORMULAS & EXAMPLE
ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP)

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 + ($3.7) =$203.700
Total Material Price After Adjustment:$203.700per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot February 2026 Asphalt Price Adjustment - February 2026

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2025 VPP NYSDOT Specific Projects) (Federal & State Funds) 23388 PC70701 - PC70719 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2025 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23389 PC70720 - PC70724

Bituminous materials price adjustment(s) EFFECTIVE on:February 1, 2026ERROR:#REF!
Award(s) using February 1, 2025 base index of$598.000per ton.Year:2026
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:FebruaryPosted Price2025
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64-22 BINDER ADJUSTMENT:The February 2026 Average is$638.000per tonAsphalt Price AdjustmentJanuary
(F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent)Base Average =$598.000February
The February 1, 2025 Base Average FOB Terminal Price for Asphalt Cement was$598.000per ton.New Average =$638.000March
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril621
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May626
All Asphalt Price Adjustments will be computed to three decimal places.June632
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly646
the price adjustments listed below:August648
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September642
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:October642
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONNovember638
702.0700Asphalt Filler (18-60)100.000.20100.20$0.171ERROR:#VALUE!December634
702.3001RS-155.001.7056.70$0.097ERROR:#VALUE!Month2026
702.3002RS-1h55.001.7056.70$0.097$0.000$/ton
702.3101RS-263.002.7065.70$0.112$0.000January643
702.3102HFRS-263.002.7065.70$0.112$0.000February638
702.3201MS-265.008.2073.20$0.125$0.000March
702.3301HFMS-265.008.2073.20$0.125$0.000April
702.3401HFMS-2h65.002.7067.70$0.115ERROR:#REF!May
702.3402HFMS-2s65.008.2073.20$0.125ERROR:#REF!June
702.3501SS-157.000.2057.20$0.097ERROR:#REF!July
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.111ERROR:#REF!August
702.3601SS-1h57.000.2057.20$0.097ERROR:#REF!September
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.111ERROR:#REF!October
702.3101PRS-263.002.7065.70$0.112ERROR:#REF!November
702.3102PHFRS-263.002.7065.70$0.112ERROR:#REF!December
702.3301PHFMS-265.008.2073.20$0.125ERROR:#REF!
702.4001CRS-160.002.7062.70$0.107ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.107ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.115ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.128ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.128ERROR:#REF!
702.4401CSS-157.000.2057.20$0.097ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.111ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.097ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.111ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.106ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.107ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.115ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.106ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.013ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$9.566ERROR:#REF!
Mastic Materials-40.000.2040.20$6.843ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$1.748ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$1.748ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$1.748ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$1.463ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$1.463ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$1.463ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70$1.463ERROR:#REF!
414.03030118Quick-set Slurry, Type II13.500.2013.70$2.603ERROR:#REF!
414.04030118Quick-set Slurry, Type III12.000.2012.20$2.318ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0X0F0218Paver Placed ST - Conventional6.501.007.50$3.000ERROR:#REF!
415.1X0F0218Paver Placed ST - Modified6.501.007.50$3.000ERROR:#REF!
ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
404.017901True & Leveling F9, Asphalt, 70 Series****1********ERROR:#REF!
404.018901True & Leveling F9, Asphalt, 80 Series****1********ERROR:#REF!
404.058901Shim Course F9, Asphalt8.2519.25$3.700ERROR:#REF!
404.068X016.3 F1/F2/F3 Top Course Asphalt, 80 Series6.7017.70$3.080ERROR:#REF!
404.09XX019.5 Top Course Asphalt6.2017.20$2.880ERROR:#REF!
404.12XX0112.5 Top Course Asphalt5.5016.50$2.600ERROR:#REF!
404.19XX0119 F9 Binder Course Asphalt, 80 Series4.9015.90$2.360ERROR:#REF!
*** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used
TACK COAT (Per Gallon):
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
407.0102Diluted Tack Coat40.000.2040.20$0.068
407.0103Straight Tack Coat55.000.2055.20$0.094
407.01040009Non - Tracking Tack Coat50.000.2050.20$0.085
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 + ($0.170553191489362) =$3.171
Total Material Price After Adjustment:$3.171per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per Lane Mile will be subject to adjustment based on the following formula:

Price Adjustment = (

(per Lane Mile)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 + ($9.56595744680851) =$1,509.566
Total Material Price After Adjustment:$1,509.566per Lane Mile
FORMULAS & EXAMPLE
ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP)

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 + ($3.7) =$203.700
Total Material Price After Adjustment:$203.700per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot January 2026 Asphalt Price Adjustment - January 2026

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2025 VPP NYSDOT Specific Projects) (Federal & State Funds) 23388 PC70701 - PC70719 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2025 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23389 PC70720 - PC70724

Bituminous materials price adjustment(s) EFFECTIVE on:January 1, 2026ERROR:#REF!
Award(s) using February 1, 2025 base index of$598.000per ton.Year:2026
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:JanuaryPosted Price2025
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64-22 BINDER ADJUSTMENT:The January 2026 Average is$643.000per tonAsphalt Price AdjustmentJanuary
(F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent)Base Average =$598.000February
The February 1, 2025 Base Average FOB Terminal Price for Asphalt Cement was$598.000per ton.New Average =$643.000March
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril621
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May626
All Asphalt Price Adjustments will be computed to three decimal places.June632
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly646
the price adjustments listed below:August648
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September642
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:October642
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONNovember638
702.0700Asphalt Filler (18-60)100.000.20100.20$0.192ERROR:#VALUE!December634
702.3001RS-155.001.7056.70$0.109ERROR:#VALUE!Month2026
702.3002RS-1h55.001.7056.70$0.109$0.000$/ton
702.3101RS-263.002.7065.70$0.126$0.000January643
702.3102HFRS-263.002.7065.70$0.126$0.000February
702.3201MS-265.008.2073.20$0.140$0.000March
702.3301HFMS-265.008.2073.20$0.140$0.000April
702.3401HFMS-2h65.002.7067.70$0.130ERROR:#REF!May
702.3402HFMS-2s65.008.2073.20$0.140ERROR:#REF!June
702.3501SS-157.000.2057.20$0.110ERROR:#REF!July
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.125ERROR:#REF!August
702.3601SS-1h57.000.2057.20$0.110ERROR:#REF!September
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.125ERROR:#REF!October
702.3101PRS-263.002.7065.70$0.126ERROR:#REF!November
702.3102PHFRS-263.002.7065.70$0.126ERROR:#REF!December
702.3301PHFMS-265.008.2073.20$0.140ERROR:#REF!
702.4001CRS-160.002.7062.70$0.120ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.120ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.130ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.144ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.144ERROR:#REF!
702.4401CSS-157.000.2057.20$0.110ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.125ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.110ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.125ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.119ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.120ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.130ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.119ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.015ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$10.762ERROR:#REF!
Mastic Materials-40.000.2040.20$7.698ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$1.748ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$1.748ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$1.748ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$1.463ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$1.463ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$1.463ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70$1.463ERROR:#REF!
414.03030118Quick-set Slurry, Type II13.500.2013.70$2.603ERROR:#REF!
414.04030118Quick-set Slurry, Type III12.000.2012.20$2.318ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0X0F0218Paver Placed ST - Conventional6.501.007.50$3.375ERROR:#REF!
415.1X0F0218Paver Placed ST - Modified6.501.007.50$3.375ERROR:#REF!
ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
404.017901True & Leveling F9, Asphalt, 70 Series****1********ERROR:#REF!
404.018901True & Leveling F9, Asphalt, 80 Series****1********ERROR:#REF!
404.058901Shim Course F9, Asphalt8.2519.25$4.163ERROR:#REF!
404.068X016.3 F1/F2/F3 Top Course Asphalt, 80 Series6.7017.70$3.465ERROR:#REF!
404.09XX019.5 Top Course Asphalt6.2017.20$3.240ERROR:#REF!
404.12XX0112.5 Top Course Asphalt5.5016.50$2.925ERROR:#REF!
404.19XX0119 F9 Binder Course Asphalt, 80 Series4.9015.90$2.655ERROR:#REF!
*** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used
TACK COAT (Per Gallon):
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
407.0102Diluted Tack Coat40.000.2040.20$0.077
407.0103Straight Tack Coat55.000.2055.20$0.106
407.01040009Non - Tracking Tack Coat50.000.2050.20$0.096
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 + ($0.191872340425532) =$3.192
Total Material Price After Adjustment:$3.192per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per Lane Mile will be subject to adjustment based on the following formula:

Price Adjustment = (

(per Lane Mile)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 + ($10.7617021276596) =$1,510.762
Total Material Price After Adjustment:$1,510.762per Lane Mile
FORMULAS & EXAMPLE
ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP)

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 + ($4.1625) =$204.163
Total Material Price After Adjustment:$204.163per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot December 2025 Asphalt Price Adjustment - December 2025

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2025 VPP NYSDOT Specific Projects) (Federal & State Funds) 23388 PC70701 - PC70719 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2025 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23389 PC70720 - PC70724

Bituminous materials price adjustment(s) EFFECTIVE on:December 1, 2025ERROR:#REF!
Award(s) using February 1, 2025 base index of$598.000per ton.Year:2025
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:DecemberPosted Price2025
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64-22 BINDER ADJUSTMENT:The December 2025 Average is$634.000per tonAsphalt Price AdjustmentJanuary
(F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent)Base Average =$598.000February
The February 1, 2025 Base Average FOB Terminal Price for Asphalt Cement was$598.000per ton.New Average =$634.000March
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril621
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May626
All Asphalt Price Adjustments will be computed to three decimal places.June632
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly646
the price adjustments listed below:August648
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September642
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:October642
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONNovember638
702.0700Asphalt Filler (18-60)100.000.20100.20$0.153ERROR:#VALUE!December634
702.3001RS-155.001.7056.70$0.087ERROR:#VALUE!Month2026
702.3002RS-1h55.001.7056.70$0.087$0.000$/ton
702.3101RS-263.002.7065.70$0.101$0.000January
702.3102HFRS-263.002.7065.70$0.101$0.000February
702.3201MS-265.008.2073.20$0.112$0.000March
702.3301HFMS-265.008.2073.20$0.112$0.000April
702.3401HFMS-2h65.002.7067.70$0.104ERROR:#REF!May
702.3402HFMS-2s65.008.2073.20$0.112ERROR:#REF!June
702.3501SS-157.000.2057.20$0.088ERROR:#REF!July
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.100ERROR:#REF!August
702.3601SS-1h57.000.2057.20$0.088ERROR:#REF!September
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.100ERROR:#REF!October
702.3101PRS-263.002.7065.70$0.101ERROR:#REF!November
702.3102PHFRS-263.002.7065.70$0.101ERROR:#REF!December
702.3301PHFMS-265.008.2073.20$0.112ERROR:#REF!
702.4001CRS-160.002.7062.70$0.096ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.096ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.104ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.115ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.115ERROR:#REF!
702.4401CSS-157.000.2057.20$0.088ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.100ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.088ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.100ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.095ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.096ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.104ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.095ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.012ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$8.609ERROR:#REF!
Mastic Materials-40.000.2040.20$6.158ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$1.748ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$1.748ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$1.748ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$1.463ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$1.463ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$1.463ERROR:#REF!

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .