31555PriceAdjust23.xlsx

XLSX spreadsheet 505 KB Posted

Attached to
Commodity NY|23388|PC70719
Contract number
PC70719
Issued by
New York

About this file

This document is a New York State Department of Transportation (NYSDOT) monthly price adjustment document for a statewide contract (Contract No. 31555) covering comprehensive liquid bituminous materials. The contract involves price adjustments for various bituminous material types across multiple categories, including asphalt emulsions, chip seal, cold recycling, heater scarification, joint and crack filler/sealer, microsurfacing, quick set slurry seal, and paver placed surface treatments.

The contract uses a base index of $630.000 per ton established on November 1, 2023, with monthly price adjustments calculated based on changes in the average posted prices for asphalt performance graded binder. The pricing mechanism allows for adjustments in unit prices per gallon, pound, linear foot, or ton across different material types, with specific calculations for petroleum allowance and total allowable petroleum percentage. Price adjustments are implemented monthly, with changes only applied when they exceed minimal thresholds (e.g., $0.010 per gallon, $0.001 per pound). The document provides detailed tables and formulas for calculating price modifications for each material category, covering a projected period through 2026, with variations for different emulsion grades, application methods, and material specifications.

View the file

Other files

File Type Posted
3150323388federalaidprojectreqs.pdf PDF
315xxPriceAdjust24.xlsx XLSX spreadsheet
3150323388Insurance.pdf PDF
3150323388NYSDOTWorkZone.pdf PDF
3150323388regionalmap.pdf PDF
3150323388spec950.pdf PDF
3150323388superpave.xlsx XLSX spreadsheet
31502PriceAdjust24.xlsx XLSX spreadsheet
3150323388a.pdf PDF
3150323388pricing.pdf PDF
3150323388SpecialNotes.pdf PDF
3150323388detailedspecs.pdf PDF
3150323388spec947.pdf PDF
315xxPriceAdjust25.xlsx XLSX spreadsheet
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

July 2025 Asphalt Price Adjustment - July 2025

GroupDescriptionAward #Contract No.
31555Comprehensive Liquid Bituminous Materials

(Asphalt Emulsions; Chip Seal; Cold Recycling; Heater Scarification; Joint & Crack Filler/Sealer; Microsurfacing and/or Quick Set Slurry Seal; and Paver Placed Surface Treatment – Conventional & Rubber Modified) (Statewide) 23334 PC70336- PC70358

Bituminous materials price adjustment(s) EFFECTIVE on: July 1, 2025 ERROR:#REF! Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder)

Award(s) using November 1, 2023 base index of$630.000per ton.
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Year:2025
the following price adjustments have been calculated.Month:JulyPosted Price2024
MONTHLY PG 64-22 BINDER ADJUSTMENT:The July 2025 Average is$646.000per tonMonth$/ton
(F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent)Asphalt Price AdjustmentJanuary-
The November 1, 2023 Base Average FOB Terminal Price for Asphalt Cement was$630.000per ton.Base Average =$630.000February-
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreNew Average =$646.000March-
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.April604
All Asphalt Price Adjustments will be computed to three decimal places.May623
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJune628
the price adjustments listed below:July636
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.August633
ASPHALT EMULSIONS, CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:October606
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONNovember593
702.0700Asphalt Filler (18-60)100.000.20100.20$0.068ERROR:#VALUE!December591
702.3001RS-155.001.7056.70$0.039ERROR:#VALUE!2025
702.3002RS-1h55.001.7056.70$0.039$0.000Month$/ton
702.3101RS-263.002.7065.70$0.045$0.000January591
702.3102HFRS-263.002.7065.70$0.045$0.000February598
702.3201MS-265.008.2073.20$0.050$0.000March610
702.3301HFMS-265.008.2073.20$0.050ERROR:#REF!April621
702.3401HFMS-2h65.002.7067.70$0.046ERROR:#REF!May626
702.3402HFMS-2s65.008.2073.20$0.050ERROR:#REF!June632
702.3501SS-157.000.2057.20$0.039$0.000July646
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.044ERROR:#REF!August
702.3601SS-1h57.000.2057.20$0.039ERROR:#REF!September
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.044ERROR:#REF!October
702.3101PRS-2p63.002.7065.70$0.045ERROR:#REF!November
702.3102PHFRS-2p63.002.7065.70$0.045ERROR:#REF!December
702.3301PHFMS-2p65.008.2073.20$0.050ERROR:#REF!2026
702.4001CRS-160.002.7062.70$0.043ERROR:#REF!Month$/ton
702.4002CRS-1h60.002.7062.70$0.043ERROR:#REF!January
702.4101CRS-265.002.7067.70$0.046ERROR:#REF!February
702.4201CMS-265.0010.2075.20$0.051ERROR:#REF!March
702.4301CMS-2h65.0010.2075.20$0.051ERROR:#REF!April
702.4401CSS-157.000.2057.20$0.039ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.044ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.039ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.044ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.042ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.043ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.046ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.042ERROR:#REF!
702-XXXXTDiluted Tack Coat40.000.2040.20$0.027ERROR:#REF!
702-XXXXTStraight Tack Coat*See note belowERROR:#REF!
702-XXXXTTNon-Tracking Tack Coat50.000.2050.20$0.034ERROR:#REF!

*Note: For Material Designation 702-XXXXT Straight Tack Coat, use Total Allowable Petroleum % for appropriate emulsion grade

HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.005ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
ASTM D6690 Type IIJoint Sealer56.000.2056.20$0.038ERROR:#REF!
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
ASTM D6690 Type IIJoint Sealer56.000.2056.20$0.004ERROR:#REF!
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
PG 64S-22 + FiberAsphalt Product95.000.2095.20$0.065ERROR:#REF!
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
Mastic MaterialAggregate Reinforced Mastic Mat.40.000.2040.20$0.003ERROR:#REF!
Rout, Clean & Seal Application Method - ASTM D6690 Type II only
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LINEAR FEET
ASTM D6690 Type IIJoint Sealer56.000.2056.20$0.000ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$1.472ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$1.472ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$1.472ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$1.232ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$1.232ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$1.232ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70$1.232ERROR:#REF!
414.02030118Quick-set Slurry, Type II, F313.500.2013.70$2.192ERROR:#REF!
414.03030118Quick-set Slurry, Type III, F312.000.2012.20$1.952ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0x0F0218Paver Placed ST6.501.007.50$1.200ERROR:#REF!
415.1x0F0218Rubber Modified Paver Placed ST6.501.007.50$1.200ERROR:#REF!
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL AND COLD RECYCLING ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 +$0.068=$3.068
Total Material Price After Adjustment:$3.068per gallon
FORMULAS & EXAMPLE
HEATER SCARIFICATION ITEMS

Unit prices per pound will be subject to adjustment based on the following formula:

Price Adjustment = (

(per pound)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
2000
Example: 1 pound of 417.0101 at $0.550/pound (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$0.550 +$0.005=$0.555
Total Material Price After Adjustment:$0.555per pound
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment =

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of ASTM D6690 Type II at $45.000/gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$45.000 +$0.038=$45.038
Total Material Price After Adjustment:$45.038per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per pound will be subject to adjustment based on the following formula:

Price Adjustment =

(per pound)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
2000
Example: 1 pound of Mastic Material at $45.000/pound (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$45.000 +$0.003=$45.003
Total Material Price After Adjustment:$45.003per pound
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Routing, Cleaning and Sealing)

Unit prices per linear foot will be subject to adjustment based on the following formula:

Price Adjustment = (

(per linear foot)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
14,400
Example: 1 linear foot of ASTM D6690 Type II at $1,500.000/LF (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 +$0.000=$1,500.000
Total Material Price After Adjustment:$1,500.000per linear foot
FORMULAS & EXAMPLE
MICROSURFACING, PAVER PLACED SURFACE TREATMENT

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 413.02010118 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 +$1.472=$201.472
Total Material Price After Adjustment:$201.472per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot June 2025 Asphalt Price Adjustment - June 2025

GroupDescriptionAward #Contract No.
31555Comprehensive Liquid Bituminous Materials

(Asphalt Emulsions; Chip Seal; Cold Recycling; Heater Scarification; Joint & Crack Filler/Sealer; Microsurfacing and/or Quick Set Slurry Seal; and Paver Placed Surface Treatment – Conventional & Rubber Modified) (Statewide) 23334 PC70336- PC70358

Bituminous materials price adjustment(s) EFFECTIVE on: June 1, 2025 ERROR:#REF! Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder)

Award(s) using November 1, 2023 base index of$630.000per ton.
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Year:2025
the following price adjustments have been calculated.Month:JunePosted Price2024
MONTHLY PG 64-22 BINDER ADJUSTMENT:The June 2025 Average is$632.000per tonMonth$/ton
(F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent)Asphalt Price AdjustmentJanuary-
The November 1, 2023 Base Average FOB Terminal Price for Asphalt Cement was$630.000per ton.Base Average =$630.000February-
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreNew Average =$632.000March-
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.April604
All Asphalt Price Adjustments will be computed to three decimal places.May623
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJune628
the price adjustments listed below:July636
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.August633
ASPHALT EMULSIONS, CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:October606
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONNovember593
702.0700Asphalt Filler (18-60)100.000.20100.20$0.000ERROR:#VALUE!December591
702.3001RS-155.001.7056.70$0.000ERROR:#VALUE!2025
702.3002RS-1h55.001.7056.70$0.000$0.000Month$/ton
702.3101RS-263.002.7065.70$0.000$0.000January591
702.3102HFRS-263.002.7065.70$0.000$0.000February598
702.3201MS-265.008.2073.20$0.000$0.000March610
702.3301HFMS-265.008.2073.20$0.000ERROR:#REF!April621
702.3401HFMS-2h65.002.7067.70$0.000ERROR:#REF!May626
702.3402HFMS-2s65.008.2073.20$0.000ERROR:#REF!June632
702.3501SS-157.000.2057.20$0.000$0.000July
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.000ERROR:#REF!August
702.3601SS-1h57.000.2057.20$0.000ERROR:#REF!September
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.000ERROR:#REF!October
702.3101PRS-2p63.002.7065.70$0.000ERROR:#REF!November
702.3102PHFRS-2p63.002.7065.70$0.000ERROR:#REF!December
702.3301PHFMS-2p65.008.2073.20$0.000ERROR:#REF!2026
702.4001CRS-160.002.7062.70$0.000ERROR:#REF!Month$/ton
702.4002CRS-1h60.002.7062.70$0.000ERROR:#REF!January
702.4101CRS-265.002.7067.70$0.000ERROR:#REF!February
702.4201CMS-265.0010.2075.20$0.000ERROR:#REF!March
702.4301CMS-2h65.0010.2075.20$0.000ERROR:#REF!April
702.4401CSS-157.000.2057.20$0.000ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.000ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.000ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.000ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.000ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.000ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.000ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.000ERROR:#REF!
702-XXXXTDiluted Tack Coat40.000.2040.20$0.000ERROR:#REF!
702-XXXXTStraight Tack Coat*See note belowERROR:#REF!
702-XXXXTTNon-Tracking Tack Coat50.000.2050.20$0.000ERROR:#REF!

*Note: For Material Designation 702-XXXXT Straight Tack Coat, use Total Allowable Petroleum % for appropriate emulsion grade

HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.000ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
ASTM D6690 Type IIJoint Sealer56.000.2056.20$0.000ERROR:#REF!
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
ASTM D6690 Type IIJoint Sealer56.000.2056.20$0.000ERROR:#REF!
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
PG 64S-22 + FiberAsphalt Product95.000.2095.20$0.000ERROR:#REF!
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
Mastic MaterialAggregate Reinforced Mastic Mat.40.000.2040.20$0.000ERROR:#REF!
Rout, Clean & Seal Application Method - ASTM D6690 Type II only
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LINEAR FEET
ASTM D6690 Type IIJoint Sealer56.000.2056.20$0.000ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$0.184ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$0.184ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$0.184ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$0.154ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$0.154ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$0.154ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70$0.154ERROR:#REF!
414.02030118Quick-set Slurry, Type II, F313.500.2013.70$0.274ERROR:#REF!
414.03030118Quick-set Slurry, Type III, F312.000.2012.20$0.244ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0x0F0218Paver Placed ST6.501.007.50$0.150ERROR:#REF!
415.1x0F0218Rubber Modified Paver Placed ST6.501.007.50$0.150ERROR:#REF!
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL AND COLD RECYCLING ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 +$0.000=$3.000
Total Material Price After Adjustment:$3.000per gallon
FORMULAS & EXAMPLE
HEATER SCARIFICATION ITEMS

Unit prices per pound will be subject to adjustment based on the following formula:

Price Adjustment = (

(per pound)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
2000
Example: 1 pound of 417.0101 at $0.550/pound (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$0.550 +$0.000=$0.550
Total Material Price After Adjustment:$0.550per pound
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment =

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of ASTM D6690 Type II at $45.000/gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$45.000 +$0.000=$45.000
Total Material Price After Adjustment:$45.000per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per pound will be subject to adjustment based on the following formula:

Price Adjustment =

(per pound)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
2000
Example: 1 pound of Mastic Material at $45.000/pound (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$45.000 +$0.000=$45.000
Total Material Price After Adjustment:$45.000per pound
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Routing, Cleaning and Sealing)

Unit prices per linear foot will be subject to adjustment based on the following formula:

Price Adjustment = (

(per linear foot)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
14,400
Example: 1 linear foot of ASTM D6690 Type II at $1,500.000/LF (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 +$0.000=$1,500.000
Total Material Price After Adjustment:$1,500.000per linear foot
FORMULAS & EXAMPLE
MICROSURFACING, PAVER PLACED SURFACE TREATMENT

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 413.02010118 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 +$0.184=$200.184
Total Material Price After Adjustment:$200.184per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot May 2025 Asphalt Price Adjustment - May 2025

GroupDescriptionAward #Contract No.
31555Comprehensive Liquid Bituminous Materials

(Asphalt Emulsions; Chip Seal; Cold Recycling; Heater Scarification; Joint & Crack Filler/Sealer; Microsurfacing and/or Quick Set Slurry Seal; and Paver Placed Surface Treatment – Conventional & Rubber Modified) (Statewide) 23334 PC70336- PC70358

Bituminous materials price adjustment(s) EFFECTIVE on: May 1, 2025 ERROR:#REF! Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder)

Award(s) using November 1, 2023 base index of$630.000per ton.
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Year:2025
the following price adjustments have been calculated.Month:MayPosted Price2024
MONTHLY PG 64-22 BINDER ADJUSTMENT:The May 2025 Average is$626.000per tonMonth$/ton
(F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent)Asphalt Price AdjustmentJanuary-
The November 1, 2023 Base Average FOB Terminal Price for Asphalt Cement was$630.000per ton.Base Average =$630.000February-
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreNew Average =$626.000March-
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.April604
All Asphalt Price Adjustments will be computed to three decimal places.May623
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJune628
the price adjustments listed below:July636
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.August633
Please be aware that this month's Price Adjustments are lower; decreasing the prices of the contract.
See examples below when making calculations.September621
ASPHALT EMULSIONS, CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:October606
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONNovember593
702.0700Asphalt Filler (18-60)100.000.20100.20- $0.017ERROR:#VALUE!December591
702.3001RS-155.001.7056.70$0.000ERROR:#VALUE!2025
702.3002RS-1h55.001.7056.70$0.000$0.000Month$/ton
702.3101RS-263.002.7065.70- $0.011$0.000January591
702.3102HFRS-263.002.7065.70- $0.011$0.000February598
702.3201MS-265.008.2073.20- $0.012$0.000March610
702.3301HFMS-265.008.2073.20- $0.012ERROR:#REF!April621
702.3401HFMS-2h65.002.7067.70- $0.012ERROR:#REF!May626
702.3402HFMS-2s65.008.2073.20- $0.012$0.000June
702.3501SS-157.000.2057.20$0.000$0.000July
702.3501
(Cold Recycling only)SS-165.000.2065.20- $0.011ERROR:#REF!August
702.3601SS-1h57.000.2057.20$0.000ERROR:#REF!September
702.3601
(Cold Recycling only)SS-1h65.000.2065.20- $0.011ERROR:#REF!October
702.3101PRS-2p63.002.7065.70- $0.011ERROR:#REF!November
702.3102PHFRS-2p63.002.7065.70- $0.011ERROR:#REF!December
702.3301PHFMS-2p65.008.2073.20- $0.012ERROR:#REF!2026
702.4001CRS-160.002.7062.70- $0.011ERROR:#REF!Month$/ton
702.4002CRS-1h60.002.7062.70- $0.011ERROR:#REF!January
702.4101CRS-265.002.7067.70- $0.012ERROR:#REF!February
702.4201CMS-265.0010.2075.20- $0.013ERROR:#REF!March
702.4301CMS-2h65.0010.2075.20- $0.013ERROR:#REF!April
702.4401CSS-157.000.2057.20$0.000ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20- $0.011ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.000ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20- $0.011ERROR:#REF!
702.4601CQS-1h62.000.2062.20- $0.011ERROR:#REF!
702.4001PCRS-1p60.002.7062.70- $0.011ERROR:#REF!
702.4101PCRS-2p65.002.7067.70- $0.012ERROR:#REF!
702.4601PCQS-1p62.000.2062.20- $0.011ERROR:#REF!
702-XXXXTDiluted Tack Coat40.000.2040.20$0.000ERROR:#REF!
702-XXXXTStraight Tack Coat*See note belowERROR:#REF!
702-XXXXTTNon-Tracking Tack Coat50.000.2050.20$0.000ERROR:#REF!

*Note: For Material Designation 702-XXXXT Straight Tack Coat, use Total Allowable Petroleum % for appropriate emulsion grade

HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00- $0.001ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
ASTM D6690 Type IIJoint Sealer56.000.2056.20$0.000ERROR:#REF!
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
ASTM D6690 Type IIJoint Sealer56.000.2056.20- $0.001ERROR:#REF!
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
PG 64S-22 + FiberAsphalt Product95.000.2095.20- $0.016ERROR:#REF!
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
Mastic MaterialAggregate Reinforced Mastic Mat.40.000.2040.20$0.000ERROR:#REF!
Rout, Clean & Seal Application Method - ASTM D6690 Type II only
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LINEAR FEET
ASTM D6690 Type IIJoint Sealer56.000.2056.20$0.000ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20- $0.368ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20- $0.368ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20- $0.368ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70- $0.308ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70- $0.308ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70- $0.308ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70- $0.308ERROR:#REF!
414.02030118Quick-set Slurry, Type II, F313.500.2013.70- $0.548ERROR:#REF!
414.03030118Quick-set Slurry, Type III, F312.000.2012.20- $0.488ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0x0F0218Paver Placed ST6.501.007.50- $0.300ERROR:#REF!
415.1x0F0218Rubber Modified Paver Placed ST6.501.007.50- $0.300ERROR:#REF!
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL AND COLD RECYCLING ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 +- $0.017=$2.983
Total Material Price After Adjustment:$2.983per gallon
FORMULAS & EXAMPLE
HEATER SCARIFICATION ITEMS

Unit prices per pound will be subject to adjustment based on the following formula:

Price Adjustment = (

(per pound)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
2000
Example: 1 pound of 417.0101 at $0.550/pound (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$0.550 +- $0.001=$0.549
Total Material Price After Adjustment:$0.549per pound
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment =

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of ASTM D6690 Type II at $45.000/gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$45.000 +$0.000=$45.000
Total Material Price After Adjustment:$45.000per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per pound will be subject to adjustment based on the following formula:

Price Adjustment =

(per pound)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
2000
Example: 1 pound of Mastic Material at $45.000/pound (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$45.000 +$0.000=$45.000
Total Material Price After Adjustment:$45.000per pound
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Routing, Cleaning and Sealing)

Unit prices per linear foot will be subject to adjustment based on the following formula:

Price Adjustment = (

(per linear foot)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
14,400
Example: 1 linear foot of ASTM D6690 Type II at $1,500.000/LF (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 +$0.000=$1,500.000
Total Material Price After Adjustment:$1,500.000per linear foot
FORMULAS & EXAMPLE
MICROSURFACING, PAVER PLACED SURFACE TREATMENT

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 413.02010118 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 +- $0.368=$199.632
Total Material Price After Adjustment:$199.632per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot April 2025 Asphalt Price Adjustment - April 2025

GroupDescriptionAward #Contract No.
31555Comprehensive Liquid Bituminous Materials

(Asphalt Emulsions; Chip Seal; Cold Recycling; Heater Scarification; Joint & Crack Filler/Sealer; Microsurfacing and/or Quick Set Slurry Seal; and Paver Placed Surface Treatment – Conventional & Rubber Modified) (Statewide) 23334 PC70336- PC70358

Bituminous materials price adjustment(s) EFFECTIVE on: April 1, 2025 ERROR:#REF! Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder)

Award(s) using November 1, 2023 base index of$630.000per ton.
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Year:2025
the following price adjustments have been calculated.Month:AprilPosted Price2024
MONTHLY PG 64-22 BINDER ADJUSTMENT:The April 2025 Average is$621.000per tonMonth$/ton
(F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent)Asphalt Price AdjustmentJanuary-
The November 1, 2023 Base Average FOB Terminal Price for Asphalt Cement was$630.000per ton.Base Average =$630.000February-
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreNew Average =$621.000March-
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.April604
All Asphalt Price Adjustments will be computed to three decimal places.May623
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJune628
the price adjustments listed below:July636
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.August633
Please be aware that this month's Price Adjustments are lower; decreasing the prices of the contract.
See examples below when making calculations.September621
ASPHALT EMULSIONS, CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:October606
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONNovember593
702.0700Asphalt Filler (18-60)100.000.20100.20- $0.038ERROR:#VALUE!December591
702.3001RS-155.001.7056.70- $0.022ERROR:#VALUE!2025
702.3002RS-1h55.001.7056.70- $0.022$0.000Month$/ton
702.3101RS-263.002.7065.70- $0.025$0.000January591
702.3102HFRS-263.002.7065.70- $0.025$0.000February598
702.3201MS-265.008.2073.20- $0.028$0.000March610
702.3301HFMS-265.008.2073.20- $0.028ERROR:#REF!April621
702.3401HFMS-2h65.002.7067.70- $0.026ERROR:#REF!May
702.3402HFMS-2s65.008.2073.20- $0.028$0.000June
702.3501SS-157.000.2057.20- $0.022$0.000July
702.3501
(Cold Recycling only)SS-165.000.2065.20- $0.025ERROR:#REF!August
702.3601SS-1h57.000.2057.20- $0.022ERROR:#REF!September
702.3601
(Cold Recycling only)SS-1h65.000.2065.20- $0.025ERROR:#REF!October
702.3101PRS-2p63.002.7065.70- $0.025ERROR:#REF!November
702.3102PHFRS-2p63.002.7065.70- $0.025ERROR:#REF!December
702.3301PHFMS-2p65.008.2073.20- $0.028ERROR:#REF!2026
702.4001CRS-160.002.7062.70- $0.024ERROR:#REF!Month$/ton
702.4002CRS-1h60.002.7062.70- $0.024ERROR:#REF!January
702.4101CRS-265.002.7067.70- $0.026ERROR:#REF!February
702.4201CMS-265.0010.2075.20- $0.029ERROR:#REF!March
702.4301CMS-2h65.0010.2075.20- $0.029ERROR:#REF!April
702.4401CSS-157.000.2057.20- $0.022ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20- $0.025ERROR:#REF!
702.4501CSS-1h57.000.2057.20- $0.022ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20- $0.025ERROR:#REF!
702.4601CQS-1h62.000.2062.20- $0.024ERROR:#REF!
702.4001PCRS-1p60.002.7062.70- $0.024ERROR:#REF!
702.4101PCRS-2p65.002.7067.70- $0.026ERROR:#REF!
702.4601PCQS-1p62.000.2062.20- $0.024ERROR:#REF!
702-XXXXTDiluted Tack Coat40.000.2040.20- $0.015ERROR:#REF!
702-XXXXTStraight Tack Coat*See note belowERROR:#REF!
702-XXXXTTNon-Tracking Tack Coat50.000.2050.20- $0.019ERROR:#REF!

*Note: For Material Designation 702-XXXXT Straight Tack Coat, use Total Allowable Petroleum % for appropriate emulsion grade

HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00- $0.003ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
ASTM D6690 Type IIJoint Sealer56.000.2056.20- $0.022ERROR:#REF!
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
ASTM D6690 Type IIJoint Sealer56.000.2056.20- $0.003ERROR:#REF!
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
PG 64S-22 + FiberAsphalt Product95.000.2095.20- $0.036ERROR:#REF!
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
Mastic MaterialAggregate Reinforced Mastic Mat.40.000.2040.20- $0.002ERROR:#REF!
Rout, Clean & Seal Application Method - ASTM D6690 Type II only
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LINEAR FEET
ASTM D6690 Type IIJoint Sealer56.000.2056.20$0.000ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20- $0.828ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20- $0.828ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20- $0.828ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70- $0.693ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70- $0.693ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70- $0.693ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70- $0.693ERROR:#REF!
414.02030118Quick-set Slurry, Type II, F313.500.2013.70- $1.233ERROR:#REF!
414.03030118Quick-set Slurry, Type III, F312.000.2012.20- $1.098ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0x0F0218Paver Placed ST6.501.007.50- $0.675ERROR:#REF!
415.1x0F0218Rubber Modified Paver Placed ST6.501.007.50- $0.675ERROR:#REF!
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL AND COLD RECYCLING ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 +- $0.038=$2.962
Total Material Price After Adjustment:$2.962per gallon
FORMULAS & EXAMPLE
HEATER SCARIFICATION ITEMS

Unit prices per pound will be subject to adjustment based on the following formula:

Price Adjustment = (

(per pound)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
2000
Example: 1 pound of 417.0101 at $0.550/pound (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$0.550 +- $0.003=$0.547
Total Material Price After Adjustment:$0.547per pound
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment =

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of ASTM D6690 Type II at $45.000/gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$45.000 +- $0.022=$44.978
Total Material Price After Adjustment:$44.978per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per pound will be subject to adjustment based on the following formula:

Price Adjustment =

(per pound)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
2000
Example: 1 pound of Mastic Material at $45.000/pound (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$45.000 +- $0.002=$44.998
Total Material Price After Adjustment:$44.998per pound
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Routing, Cleaning and Sealing)

Unit prices per linear foot will be subject to adjustment based on the following formula:

Price Adjustment = (

(per linear foot)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
14,400
Example: 1 linear foot of ASTM D6690 Type II at $1,500.000/LF (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 +$0.000=$1,500.000
Total Material Price After Adjustment:$1,500.000per linear foot
FORMULAS & EXAMPLE
MICROSURFACING, PAVER PLACED SURFACE TREATMENT

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 413.02010118 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 +- $0.828=$199.172
Total Material Price After Adjustment:$199.172per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot March 2025 Asphalt Price Adjustment - March 2025

GroupDescriptionAward #Contract No.
31555Comprehensive Liquid Bituminous Materials

(Asphalt Emulsions; Chip Seal; Cold Recycling; Heater Scarification; Joint & Crack Filler/Sealer; Microsurfacing and/or Quick Set Slurry Seal; and Paver Placed Surface Treatment – Conventional & Rubber Modified) (Statewide) 23334 PC70336- PC70358

Bituminous materials price adjustment(s) EFFECTIVE on: March 1, 2025 ERROR:#REF! Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder)

Award(s) using November 1, 2023 base index of$630.000per ton.
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Year:2025
the following price adjustments have been calculated.Month:MarchPosted Price2024
MONTHLY PG 64-22 BINDER ADJUSTMENT:The March 2025 Average is$610.000per tonMonth$/ton
(F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent)Asphalt Price AdjustmentJanuary-
The November 1, 2023 Base Average FOB Terminal Price for Asphalt Cement was$630.000per ton.Base Average =$630.000February-
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreNew Average =$610.000March-
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.April604
All Asphalt Price Adjustments will be computed to three decimal places.May623
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJune628
the price adjustments listed below:July636
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.August633
Please be aware that this month's Price Adjustments are lower; decreasing the prices of the contract.
See examples below when making calculations.September621
ASPHALT EMULSIONS, CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:October606
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONNovember593
702.0700Asphalt Filler (18-60)100.000.20100.20- $0.085ERROR:#VALUE!December591
702.3001RS-155.001.7056.70- $0.048ERROR:#VALUE!2025
702.3002RS-1h55.001.7056.70- $0.048$0.000Month$/ton
702.3101RS-263.002.7065.70- $0.056$0.000January591
702.3102HFRS-263.002.7065.70- $0.056$0.000February598
702.3201MS-265.008.2073.20- $0.062$0.000March610
702.3301HFMS-265.008.2073.20- $0.062ERROR:#REF!April
702.3401HFMS-2h65.002.7067.70- $0.058ERROR:#REF!May
702.3402HFMS-2s65.008.2073.20- $0.062$0.000June
702.3501SS-157.000.2057.20- $0.049$0.000July
702.3501
(Cold Recycling only)SS-165.000.2065.20- $0.055ERROR:#REF!August
702.3601SS-1h57.000.2057.20- $0.049ERROR:#REF!September
702.3601
(Cold Recycling only)SS-1h65.000.2065.20- $0.055ERROR:#REF!October
702.3101PRS-2p63.002.7065.70- $0.056ERROR:#REF!November
702.3102PHFRS-2p63.002.7065.70- $0.056ERROR:#REF!December
702.3301PHFMS-2p65.008.2073.20- $0.062ERROR:#REF!2026
702.4001CRS-160.002.7062.70- $0.053ERROR:#REF!Month$/ton
702.4002CRS-1h60.002.7062.70- $0.053ERROR:#REF!January
702.4101CRS-265.002.7067.70- $0.058ERROR:#REF!February
702.4201CMS-265.0010.2075.20- $0.064ERROR:#REF!March
702.4301CMS-2h65.0010.2075.20- $0.064ERROR:#REF!April
702.4401CSS-157.000.2057.20- $0.049ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20- $0.055ERROR:#REF!
702.4501CSS-1h57.000.2057.20- $0.049ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20- $0.055ERROR:#REF!
702.4601CQS-1h62.000.2062.20- $0.053ERROR:#REF!
702.4001PCRS-1p60.002.7062.70- $0.053ERROR:#REF!
702.4101PCRS-2p65.002.7067.70- $0.058ERROR:#REF!
702.4601PCQS-1p62.000.2062.20- $0.053ERROR:#REF!
702-XXXXTDiluted Tack Coat40.000.2040.20- $0.034ERROR:#REF!
702-XXXXTStraight Tack Coat*See note belowERROR:#REF!
702-XXXXTTNon-Tracking Tack Coat50.000.2050.20- $0.043ERROR:#REF!

*Note: For Material Designation 702-XXXXT Straight Tack Coat, use Total Allowable Petroleum % for appropriate emulsion grade

HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00- $0.007ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
ASTM D6690 Type IIJoint Sealer56.000.2056.20- $0.048ERROR:#REF!
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
ASTM D6690 Type IIJoint Sealer56.000.2056.20- $0.006ERROR:#REF!
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
PG 64S-22 + FiberAsphalt Product95.000.2095.20- $0.081ERROR:#REF!
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
Mastic MaterialAggregate Reinforced Mastic Mat.40.000.2040.20- $0.004ERROR:#REF!
Rout, Clean & Seal Application Method - ASTM D6690 Type II only
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LINEAR FEET
ASTM D6690 Type IIJoint Sealer56.000.2056.20$0.000ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20- $1.840ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20- $1.840ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20- $1.840ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70- $1.540ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70- $1.540ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70- $1.540ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70- $1.540ERROR:#REF!
414.02030118Quick-set Slurry, Type II, F313.500.2013.70- $2.740ERROR:#REF!
414.03030118Quick-set Slurry, Type III, F312.000.2012.20- $2.440ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0x0F0218Paver Placed ST6.501.007.50- $1.500ERROR:#REF!
415.1x0F0218Rubber Modified Paver Placed ST6.501.007.50- $1.500ERROR:#REF!
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL AND COLD RECYCLING ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .