306-09-0533 Vertical Structures RFP Amendment 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP 306-09-0533 Amendment 7.pdf | ||
| RFP 306-09-0533 Amendment 6.pdf | ||
| RFP 306-09-0533 Amendment No. 05.pdf | ||
| RFP 306-09-0533 Amendment No 03 final 04152010.pdf | ||
| RFP 306-09-0533 Amendment No 03 .pdf | ||
| RFP 306-09-0533 Amendment 2.pdf | ||
| RFP 306-09-0533 Vertical Structures IQC.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
Office of Acquisition & Assistance
USAID/Afghanistan
American Embassy, Great Massoud Road
Kabul, Afghanistan
1. Incorporate USAID responses to potential offeror questions 1 through 8 as detailed in Attachment A.
2. Incorporate the illustrative task order bill of quantities as detailed in Attachment B.
3. Clarify electronic proposal delivery requirements of RFP Section L.7(e)as per the attached continuation page.
The purposes of this amendment are to:
* Offerors shall also acknowledge receipt of this amendment in block 19 of SF 1442.
306-09-0533
All Offerors
One (1) 03/12/2010
X X one (1)*
N/A
1 17
Deborah Simms-Brown, Contracting Officer
Continuation Page Solicitation Amendment 1
Request for Proposal (RFP) 306-09-0533 Vertical Structures Indefinite-Quantity Contract (VS-IQC)
Section L.7(e) of the solicitation is revised as follows (addition in bole italics):
(e) Mailing Addresses.
Electronic submission:
Submission of proposals by email versus hardcopy is acceptable subject to the following understanding:
The USAID email gateway accepts messages whose total size with attachments is 8MB
(no zipped or compressed files);
An email proposal must be submitted to kabulaidoaamailbox@usaid.gov, the subject line of the email must contain the solicitation number RFP No. 306-09-0533, “Vertical Structures IQC;”
Acceptable native file formats are Microsoft Office Suite applications (.doc, .xls, mdb) or Adobe Acrobat (.pdf);
Time of receipt of the email is the USAID email gateway time-stamped of the message header; and
Offerors shall follow up electronic proposal submittals with delivery to USAID of the number of originals and copies specified in Section L.7(d) of the RFP. Offerors shall dispatch the said copies by Express Mail or express courier by close of business on the Closing Date. Offerors is responsible for delivery of said copies and shall provide USAID with the Express Mail or express courier tracking number.
For proposals submitted by email, respondents are encouraged to request a return receipt.
If sent via U.S. Postal Service:
Office of Acquisition and Assistance USAID/Afghanistan U.S. Embassy
APO AE 09806
Attn: Ted Sanderson/Deborah Simms-Brown
Hand-Carried, or via Courier Service:
USAID/Afghanistan Office of Acquisition and Assistance Café Compound U.S. Embassy Great Massoud Road
Continuation Page Solicitation Amendment 1
Kabul, Afghanistan Attn: Ted Sanderson/Deborah Simms-Brown
If your firm utilizes the services of an independent agent in Kabul to deliver proposals, please be certain they understand that additional time may be needed to allow for security review of any packages and that the closing date and time are firm. USAID and the State Department accept no liability for late delivery, or non-delivery, attributable to the diplomatic pouch. Offerors should plan accordingly and are advised not to send their proposal via diplomatic pouch. Any proposal not received in the designated office listed above by the closing date and time will be processed as late. Delivery to the post office or air courier representative does not constitute meeting the statutory requirement that proposals are received timely at the designated office. For purposes of recording the official receipt of proposals, the date/time stamp by the Office of Acquisition and Assistance, USAID/Afghanistan will govern.
Attachment A
Responses to Potential Offeror Questions
Potential offerors have raised the following questions regarding the request for proposal for the VS-IQC. To assure that all offerors are treated fairly, questions are answered herein so that all offerors receive the same information. Some questions were asked by multiple offerors and those questions have been paraphrased by USAID. USAID’s responses to the questions appear in italics after the question.
1. In regard to electronic submission of the proposal as stated on page 118, may we also submit at the same time the required number of copies by express mail to facilitate review of the proposal by USAID staff?
USAID desires offerors to follow-up electronic submittals with Express Mail or express courier shipment of the hard copies as described L.7(c) of the RFP. Section L.7(e) of the RFP has been amended accordingly.
2. We are a small business. Can we get a piece of the IQC as a subcontractor?
USAID is seeking proposals from offerors who can perform as prime contractors for VS- IQCs. However, USAID encourages small businesses that prefer not to propose as primes to market themselves as subcontractors. Interested small businesses are reminded that an “Interested Vendors List” for this RFP is available at FedBizOpps and that once the IQCs are awarded, the awards will be announced at FedBizOpps.
3 My bonding company is asking the maximum limit for single order.
Please refer to Section B of the RFP for requirements relating to IQC and task order values.
4. Is a bid bond required when an offeror responds to this RFP?.
The RFP is clear on this matter
5. We can not find the BOQ for the illustrative task order.
The BOQ for the illustrative task order is provided as an attachment to RFP amendment one.
6. Please advise the maximum limit for single order.
Potential task order amounts can not be provided at this time as the amounts will be determined based on USAID’s future requirements. Terms regarding task order amounts are provided in Section B of the IQC including Section B.10.
7. Is a bid bond required?
No.
8. Taking into consideration the aggregate order limitations of $500 Million please confirm the requirement that offeror must submit a letter of commitment from a surety that identifies the offeror’s available bonding capacity and limits that the surety will bond.
We confirm the RFP requirement for a letter of commitment from a surety that identifies the offeror’s available bonding capacity. The RFP requirement on this matter is clear.
The statement advising offerors to take into consideration the Order Limitations is advice to the offerors, not a monetary bonding requirement.
Attachment B
Illustrative Task Order Bill of Quantities
See attached pages 1 through 11
One Hundered Bed Hospital Bill of Quantities
SUMMARY OF BILL OF QUANTITIES
CLIN Description Total
1 CONSTRUCTION COST: Building Cost
2 CONSTRUCTION COST: Site Works
TOTAL CEILING PRICE
SUMMARY OF BILL OF QUANTITIES
CLIN Description Total
1 CONSTRUCTION COST: Building Cost
2 CONSTRUCTION COST: Site Works
TOTAL CEILING PRICE
BILL OF QUANTITIES - CONSTRUCTION COST - Building
Building - Foundations
CLIN Description Quantity Unit Unit Rate Total
Standard Foundation
100 cm x 40 cm Footing incl. Concrete, Formwork, Rebars and Earthwork 1,284 m
100 cm x 40 cm Footing incl. Concrete, Formwork, Rebars and Earthwork - Sheer Walls 522 m
Exterior Wall 36cmx122cm Foundation Wall incl Concrete, Formwork, rebars 1,284 m
Sheer wall 20cmx122cm Fooundation Wall incl. Concrete, Formwork, Rebars 522 m
5 Keyway 1,806 m 6 7.62 cm Rigid Insulation 2,203 m2 7 Membrane Sheet Waterproofing 2,203 m2
Substructure - Slab on Grade
13cm Concrete Slab on Grade Incl. Gravel Base,WWF, Vapor Barrier 9,271 m2
60cmx30cm Thickened Slab Incl Concrete, Formwork, Rebars 2,765 m
3 7.62cm Thick Rigid Insulation 899 m2
Superstructure - Floor construction 1 Auditorium Seating Structure 52 m2
Superstructure - Roof Construction
Roof Structure incl. Steel Trussses, Cross Bridging, Misc Steel - 39.4Kg/m2 (8lb/sf) Arch. Allow. 365,277 kg
40mm Deep, 18 Gauge, Galvanized Wide Rib Mtl Decking, Open, Over 500 sq 9,271 m2
Exterior Closure - Exterior Walls 1 254 mm CMU Reinforced 1,027 m2 2 200mm CMU Reinforced 2,895 m2
Glazed Ceramic Tiles with Four Colors & Mosaic Patter on 200mmCMU Back-up 35 m2
4 300mmx300mmx100mm Thick, Plain Glass Block Wall 911 m2 5 2.54cm Lath & Plaster 6,050 m2 6 7.62cm Thick Rigid Insulation 6,050 m2
7 Plaster on Lath each sde on CMU Back-up @ Screen wall 39 m2 8 Pre-finished Metal Fascia 565 m2 9 6.23cm Metal Studs, Plaster on lath Overhang Soffit 1,284 m2 10 Interior Window Sill 179 m
Exterior - Doors and Windows 1 Operable Vinyl Window Wall 199 m2 2 Operable Vinyl windows 75 m2 3 Aluminum and Glass Storefront 169 m2
BILL OF QUANTITIES - CONSTRUCTION COST - Building
Single Hollow Metal Door with frame & Hardware - 900mm x 2000mm 13 each
Double Hollow metal door with frame hardware - 1800mm x 2000m 21 each
Double Hollow metal door with frame hardware - 2500mm x 2000m - Unequal 3 each
Double Hollow Metal door withframe Hardware - 2200mm x 2000mm 2 each
8 3000mm x 2000mm Sliding Glass Door 1 each
Roofing
Standard Seam Roof, Roof Membrane, Nailable 4" Insullated Gymsum Roof Board 10,541 m2
Interior Construction - Partitions 1 200mm CMU 12,773 m2 2 200mm Bond Beam with 2#15M Horizontal Rebar 2,765 m 3 254 mm CMU Reinforced - Shear walls 2,412 m2
Pumped Grouting for Solid grout Filled Concrete Block - Sheer Walls 2,412 m2
INTERIOR DOORS
Single Hollow Metal Door with Frame and Hardware - 900mm x 2000mm 261 each
Single Hollow Metal Door with Frame and Hardware - 700mm x 2000mm 6 each
Single Hollow Metal Door with Frame and Hardware - 600mm x 2000mm 44 each
Single Hollow Metal Door with Frame and Hardware - 1200mm x 2000mm 50 each
Double Hollow Metal Door with Frame & Hardware - 1800mm x 2000mm 20 each
Double Hollow Metal Door with Frame & Hardware - 2200mm x 2000mm 18 each
Double Hollow Metal Door with Frame & Hardware - 1600mm x 2000m 4 each
Double Hollow Metal Door with Frame & Hardware - 1800mm x 2000m - Unequal 6 each
Double Hollow Metal Door with Frame & Hardware - 1400mm x 2000mm 2 each
Double Hollow Metal Door with Frame & Hardware - 1500mm x 2000mm 1 each
Double Hollow Metal Door with Frame & Hardware- 1800mm x 2000mm 3 each
Single Solid Core Wood Door, HM Frame, hardware - 900mm x 2000 mm 29 each
Single Solid Core Wood Door, HM Frame, hardware - 900mm x 2000 mm 3 each
18 2910mm x 2000mm - Sliding Glass Door 1 each
19 2498mm x 2000mm Aluminum Glass Doors @ Emergency 4 each
BILL OF QUANTITIES - CONSTRUCTION COST - Building
21 Interior Glazing 72 m2 20 2m Long Conference Hall Window 1 each 21 Cont. Angle @ Partitions 6,574 m
Floor Finishes 1 Sealed Concrete 365 m2 2 Terrazo - Pre-cast Base - 8" High Cove - White cement 8,862 m2
Base Finshes 1 Terrazo Base 6,971 m2
Wall Finishes
Ceramic Tile, Walls, Interior, Thin Set 200mm x 200mm Tile 29 m2
2 2.54 cm lath & Plaster Painted 25,896 m2
Ceiling Finishes 1 2'-0" x 2'-0" ACT with Suspension system 696 m2 2 Gypsum Board with Suspension System 283 m2 3 6.23cm Metal Studs, Plaster on lath Painted 8,646 m2
6.23cm Metal Studs, Plaster on lath Painted - Soffit/Bulkhead 101 m2
Miscellaneous Specialties
Structural Steel Support for Ceiling Hung Lights & Monitors @ Operating Rooms, Xray Room 8 each
2 Conference Hall Seating 74 each 3 Marker Board Allowance 10 each 4 Projection Screen - Allowance 10 each
Hospital Partitions, Curtain Track, Box channel, Ceiling mounted 894 m
6 Hospital Partition Curtains, Fire Resistant 894 m 7 Bumper Rail 814 m 8 Interior Signage Allowance 1 L SUM 9 Exterior Wall Mounted Letters 19 each
Lockers 1 Lockers 89 each
Toilet Specialties 1 Single stall, Floor Mounted, (1) Standard 32 each 2 Single stall, Floor Mounted, (1) ADA 24 each 3 40mm Diameter Stainless Steel, 1070mm 24 each 4 40mm Diameter Stainless Steel, 910mm 24 each 5 Soap Dispenser, Lavatory Mounted 171 each 6 Double Roll, Chrome Plated Steel, Surface Mounted 115 each 7 Paper Towel Dispenser with Disposal, Surface Mounted 62 each 8 Mirror with Stainless Steel frame 72 m2 9 Broom/Mop Holder 3 each
BILL OF QUANTITIES - CONSTRUCTION COST - Building
Miscellaneous Built-in Cabinet Works
CUSTOM CASEWORK
1 Nurse Station 37 M 2 Nurse Substation@Wards 16 M 3 Reception desk@Emergency 9 M 4 Triage Registration desk 8 M
MANUFACTURED CASEWORK
5 Base Cabinet@Exam Rooms 43 M 6 Wall cabinet@Exam Rooms 30 M 7 Base cabinet@Plaster Storage 1 M 8 Base cabinet@Operating Room 20 M 9 Wall cabinet@Exam Rooms 20 M 10 Base Cabinet@Soiled Workroom 6 M 11 Base cabinet @ Xray Room 4 M 12 Wall Cabinet@Xray Room 4 M 13 Patient Room Wardrobe 96 each 14 1m Wide Tall cabinet 76 each 15 Counter @Emergency Isolation Room 1 M 16 Base Cabinet @ Ante 1 M 17 Wall Cabinet@ Ante 1 M 18 Counter @Emergency Isolation Room 2 M 19 Worksurface @Office 3 M 20 Base cabinet @ Ultrasound 2 M 21 Wall cabinet@Ultrasound 2 M 22 Base cabinet@Dentist 8 M 23 Worksurface@Dentist Workshop 3 M 24 Counter@Public Pharmacy 2 M 25 Worksurface @ dentist Workshop 3 M 26 Counter @ Lab Collection 2 M
MANUFACTURED METAL CASEWORK
27 Metal Casework 38 M
Furnishings 1 Blinds 385 m2
Mechanical - Plumbing 1 Eastern Water Closets 98 each 2 Residential-Type Water Closet - ADA Type 21 each
Lavatory. Wall Hung, Vit. China, w/Trim & Bksplsh.. 19" x 17". Single Bowl Incl. Rough-In 182 each
4 VANITY 8 each 5 Shower, Stall-Type Fixture 7 each
Kitchen Sink, Self Rimming. P.E. On C.I., 24" x 21", Single Bowi W/ Trim 7 each
Kitchen Sink, Self Rimming, P.E. On C.I., 24" x 21", Single Bowl W/ Trim 4 each
Kitchen Sink, Self Rimming, P.E. On C.I., 24" x 21", Single Bowl W/ Trim 6 each
Kitchen Sink. Self Rimming, P.E. On C.I.. 24" x 21", Single Bowl W/ Trim 47 each
BILL OF QUANTITIES - CONSTRUCTION COST - Building
Water Heater, Oil Fired Flush Jacket, 137 MBH, 161 GPH
2 each 11 1500 Gal Storage Tank, 3/16" Shell, Coating and Fittings 2 each
Dom. Water Booster Pump Sys. Duplex, W/Diaphram Tk., Ctrl.. Press. Sw.. 7.5 HP. 400 GPM 1 each
VFD / AFD - Standard - Nema 1 - 480 V - 3 Ph - 7-1/2 HP
2 each 14 3000 Gal Storage Tank. 3/16" Shell, Coating and Fittings 1 each 15 200 Gal Jacket & Insulated 150 PSi, ASME 1 each
Medium Duty Floor Drain, Duco Cast Iron Body, Flashing Collar, 8 1/2" Cast Iron Grate, Botton 60 each
Medium Duty Floor Drain, Duco Cast Iron Body, Flashing Collar, 8 1/2" Cast Iron Grate, Botton 60 each
Medium Duty Floor Drain, Duco Cast Iron Body, Flashing Collar, 8 1/2" Cast Iron Grate, Botton 60 each
Roof Drain. Integral Exp. Joint, C.I. Body, 12" C.I. Dome, 4" Pipe Size 28 each
Wall Hyd., Non-Freeze, Bronze, Encased, 3/4" IPS, 10"- 14" Wall 24 each
21 3/4" x 10". thd'd.Sillcock W/ Vac. Brkr. 12 each 22 Incoming Water Service 1 each
Water Softener, Automatic. 900K Grains.185 GPM Cont..
270 GPM Peak 2 each
24 Water Purification Equipment System 1 each 25 4" Sanitary Waste. Hub & Spigot, A/G 1,646 M 26 3" Vent Pipe. C.I.. No Hub. A/G 1,372 M 27 4" Storm Pipe. C.I., Push-On. A/G, Horiz. 1,036 M 28 Fiberglass Insulation W/ ASJ, 1" Thick. 4" Pipe Size 316 M 29 2" Type "L" Copper Pipe W/Hangers 3,840 M 30 Fiberglass Insulation W/ASJ, 1" Thick. 2-1/2" Pipe Size 1,171 M 31 Pipe Identification Labels, Self-Adhesive 2,406 M 32 Hydraulic Pressure Testing, 1" - 4" Pipe, 1,000-2,000 LF 733 M 33 Commissioning 1 L Sum
Mechanical HVAC 1 Rectangular Diffuser - 610 mm x 610 mm 435 each 2 Galvanized Steel Duct 44,419 KG 3 Duct Insulation 5,913 m2 4 Air Test and Balance 435 Hour
Fintube- Two 32 mm Cu Tube - 18g Slant Stl End. 125 mm X 225 mm 1,380 M
6 Fan Coil Unit - Heating Water - Ceiling Mount 25 each
Fan Coil Unit - Water Cooling & Water Heating - Ceiling Mount 6 each
Boiler, Packaged Scotch Marine, Steam, 150 PSI. #2 Oil - 50HP 1 each
Boiler, High Efficiency, Hot Water Copper Fin II Condensing Boiler, 1440 MBH, Oil Fired 3 each
Hot Gas Vent. All Fuel. Press. Tight, Dbl. Wall, SS Liner.
24" Dia. 24 M
BILL OF QUANTITIES - CONSTRUCTION COST - Building
Centrifigal Pump, End Suction, Horiz.Split Case, 1 Stg. 20 HP -100 mm 4 each
Suction Diffuser. C.I. Body, Flanged Inlet -100 mm. Pump Side -100 mm 4 each
13 Tripple Duty Valve, Cast Iron, Flanged -100 mm 4 each 14 VFD / AFD - Standard - Nema 1 - 480 V - 3 Ph - 20 HP 4 each 15 6" Air Separator W/Strainer 1 each 16 Expansion Tank, Steel, Ruber Bladder - 31 Gal. 1 each
Cabinet Unit Heater - Electric - Recessed Wall Mounted - 12 KW 1,366 m2
Condensers, Air Cooled, Direct Drive, Propeller Fan. 5 Ton
6 each 19 C.S. Pipe, S/40, W/Hanger 2,073 M 20 Fiberglass Insulation W/ASJ. 2" Thick, 4" Pipe Size 1,310 M 21 C.S. Pipe, S/40, W/Hanger 975 M 22 Fiberglass Insulation W/ ASJ, 2" Thick, 8" Pipe Size 297 M 23 8" C.S. Pipe, S/40, Welded, W/ Hanger 488 M 24 Cal-Sil Insulation No Cover. 3" Thick, 8" Pipe Size 149 M 25 1" C.S. Pipe, S/40, Threaded W/Hanger 3,800 each 26 Steam Specialities 1 L Sum 27 Pipe Identification Labels, Self-Adhesive 2,236 M
28 Hydraulic Pressure Testing. 1" - 4" Pipe, 1,000-2,000 LF 682 M 29 Automatic Temperature Control 1 L Sum 30 Commissioning 1 L Sum
Mechanical Fire Protection
Standpipe. Complete, Class 1. Wet, Sch 40.10' Hgt, 4" Dia
6 each 2 2 1/2" Angle Valve, 150#, Rising Stem, Threaded 6 each 3 Tamper Switch 6 each
Waterflow Indicator With 2 Retard Switches. 2"-6" Pipe Sizes 6 each
5 Fire Hose Valve Cabinet, 75' Hose and Extinguisher 45 each 6 Diesel Fire Pump. 500 GPM, 100 Psi, 62 HP, 4" Pump 1 each 7 Jockey pump 1", 3 HP, with controls 1 each 8 4" C.S. Grooved Pipe, Sch. 10, W/ Hangers 884 M
9 Hydraulic Pressure Testing, 1" - 4" Pipe. 1,000-2,000 LF 269 M 10 Commissioning 1 L Sum
Mechanical - Special Mechanical Systems 1 Wall Outlet, Single Recessed, Quick Disconnect 18 each
Stationary Ceiling Column- Less Outlets. I.V. Hooks and Phone Ports 6 each
3 Digital Master Alarm 1 each
Area Alarm with Local or Remote Sensors - 3 Gas Area Alarrm 6 each
5 Quadruplex Zone Valve Box 6 each 6 Oxygen Manifold w/ Mounting Stand 6 each 7 1/2" Lockable Valve With Extensions 18 each
BILL OF QUANTITIES - CONSTRUCTION COST - Building
8 1" Type "L" Copper Pipe W/Hangers 110 M 9 Pipe Identification, Valve Tags and Charts 110 M 10 Hydraulic Pressure Testing 110 M 11 Commissioning 1 L Sum
Electrical - Service and Distribution 1 Generator & Accessories (Complete Unit) - 1000KW 1 each
COMMENT: weight 15.6111b or 7081 kg 2 Housekeeping Pad -150 mm Deep 11 m2 3 Shipping Freight for Generator 6130 kg 1 L Sum
Switchboard SES-1 1600A. 220/380V Main with Tie-switch Nema 1 1 each
5 Distribution Panel -DPN1 800A, MLO 220/380V. NEMA 1 1 each 6 Distribution Panel -DPN2 400A. MCB, 220/380V 1 each
Circuit Breaker Enclosed, 1600A, 220/380V in Nema 1 Enclosure 1 each
COMMENT: MAINTENANCE BACK-FEED TO SES-1
Panelboard -100A, MLO 220/380V42C 1-SECTION NEMA 1 10 each
Panelboard -100A , MLO 220/380V 84C 2-SECTION NEMA 1 8 each
(4) 100 mm PVC GRS - Galv. Rigid StI Conduit with Elbows & Hangers - 4#600 24 M
(2) 100 mm PVC GRS - Galv. Rigid StI Conduit with Elbows & Hangers - 4#600,1-1 /0G 3 M
32 mm PVC GRS - Galv. Rigid StI Conduit with Elbows & Hangers - 4#2,1#8G 677 M
100 mm PVC GRS - Galv. Rigid StI Conduit with Elbows & Hangers - 4#600,1-3G 91 M
14 Generator & Accessories (Complete Unit) - 500KW 1 each 15 Housekeeping Pad -150 mm Deep 2 m2 16 Shipping Freight for Generator 3320 kg 1 L Sum
Automatic Transfer Switch - Isolation / Bypass - 600V -100 Amp 1 each
Automatic Transfer Switch - Isolation / Bypass - 600V - 600 Amp 1 each
Switchboard DPE-1 800A MCB 220/380V with Tie-Switch Nema 1 1 each
20 Distribution Panel -DPC1 600A MCB 220/380V NEMA 1 1 each 21 Distribution Panel -DPC2 400A MCB 220/380V NEMA 1 1 each
Panelboard -100A, MLO 220/380V 42C 1-SECTION NEMA 1 14 each
Panelboard -100A, MLO 220/380V 84C 2-SECTION NEMA 1 5 each
(2) 100 mm PVC GRS - Galv. Rigid StI Conduit with Elbows & Hangers - 4#600.1-1/0G 2 M
32 mm PVC GRS - Galv. Rigid StI Conduit with Elbows & Hangers - 4#2,1#8G 466 M
100 mm PVC GRS - Galv. Rigid StI Conduit with Elbows & Hangers - 4#600,1-3G 98 M
BILL OF QUANTITIES - CONSTRUCTION COST - Building
27 Copper Bonded Ground Rod - 20 mm x 3.0 m 47 each 28 Mechanical Ground Lug - #6 - #2 42 each 29 Grounding Exothermic Bond - Load 51 each 30 Grounding Exothermic Bond - Cable to Ground Rod 47 each 31 Grounding Exothermic Bond - Cable to Building Steel 2 each 32 Cold Water Pipe Clamp -125 mm Pipe 2 each
Electrical - Motor & Equipment Connections 1 Mechanical Wiring and Connection Allowance 9,271 m2
Electrical - Miscellaneous Power Systems
Operating Room Isolation Panel - 120V - 7.5 KVA - (8) 20A/1P 3 each
Delivery / Intensive Care Isolation Panel - 120V - 7.5 KVA -
(8) 20A/1P 3 each
3 X-Ray Isolation Panel - 208V/240V - 25 KVA - (1) 60A/2P 3 each 4 X-Ray Indicator and Receptacle Module 3 each
5 Line Isolation Monitor Remote Indicator Alarm with Meter 18 each 6 Master Ground Module - Multi-Point 6 each 7 Ground Slave Module with (4) Ground Outlets 18 each 8 Ground Cord Assembly - 4.5 m 72 each
Hospital Power / Ground Module with (4) Twist-Lock and
(4) Ground 18 each
20 mm EMT with Elbows. Couplings & Hangers - 2#10,1#10G 274 M
32 mm EMT with Elbows. Couplings & Hangers - 4#2.1#8G
457 M 12 Kitchen Equipment Wiring Allowance 1 L Sum 13 X-Ray Equipment Wiring Allowance 3 each 14 X-Ray Wall Duct & Control Allowance 3 each
Electrical - Lighting
610 mm x 1220 mm - 4 Lamp Acrylic Lens Fluorescent Lay In 9,271 m2
COMMENT: AVERAGE FOR .125 ACRYLIC LAY-IN OR
SURFACE AND CORRIDOR D/INDIRECT
2 Exit / Emergency Lighting 9,271 m2 3 Exterior Perimeter Lighting 9,271 m2 4 Patient Bed Light 104 each
Operating and Delivery Room Surgery Exam Light Allowance 6 each
Clean Room Type Surgical Troffeers for OR & Delivery Lights 120 each
Electrical - Switches and Lighting Control 1 Light Switching Allowance 9,271 m2
Electrical - Receptacles 1 Hospital Grade General Receptacle 9,271 m2
BILL OF QUANTITIES - CONSTRUCTION COST - Building
Electrical - Special Electrical Systems 1 Lighting protection System Allowance 9,271 m2
Electrical - Tele/Data Rough-in 1 Telecommunication Structured Horizontal Cabling 9,271 m2
Electrical - Tele/Data Cable & Frames 1 Fire Rated Plywood Backboard - 4' x 8' 112 each 2 Floor Mounted Distribution Rack -19" x 84" 32 each 3 Horizontal Cable Manager for 19" Rack 64 each
Rack Mounted Surge Suppression Power Strip with 8 Outlets 32 each
5 Rack Mounted UPS -1000 VA 8 each 6 Tele - Data Wiring Block -110 Style - 300 Pair 32 each 7 19" Rack Patch Panel with (48) Cat. 6 Ports 96 each 8 Fiber Optic Type ST / SC Connector 96 each
19" Rack Fiber Optic Patch Panel with (48) ST / SC Couplers 16 each
10 Cable Tray - Wire Mesh - 50 mm Deep x 100 mm 457 M 11 Cable Tray - Wire Mesh - Field Cut & Shape - 90 Elbow 6 each 12 Cable Tray - Wire Mesh - Field Cut & Shape - Tee 12 each 13 Cable Tray - Wire Mesh - Splice Coupling 20 each 14 Cable Tray - Wire Mesh - Wall Support 350 each 15 Category 3. PVC Jacketed Cable -100 Pair 610 M 16 Fiber optic Cable - MM - (6) Strands 610 M 17 *"**DUCTBANK 1-100mm CONDUIT PVC 80 ***** 411 M 18 Copper Ground Bar - 7 mm X 100 mm X 910 mm 8 each 19 Insulated Ground Bar Support 16 each 20 20 mm EMT with Elbows. Couplings & Hangers -1- #6 G 457 M
Electrical - Fire Alarm Systems 1 Fire Alarm System Allowance 9,271 m2
Electrical- Television system 1 Television System Allowance 9,271 m2
Electrical - nurses Call System 1 Nurse Call System Allowance 9,271 m2
Sitework - Electrical - Lighting 1 Site Parking Lot Lighting Installed 40 each 2 Site Roadway Lighting Installed 35 each
Sitework - Electrical - Tele/Data Cable & Frames 1 DUCTBANK 2-100mm CONDUIT PVC 80 122 M
Sitework - Site Preparation 1 Cut 8,945 m3 2 Fill 7,446 m3
BILL OF QUANTITIES - CONSTRUCTION COST - Building
3 Disposal 1,423 m3 4 Demolish - Retaining Wall 582 m2
Sitework - Site Improvement
***** SITE PAVING *****
1 Sidewalks - Concrete 8,448 m2
*** CONCRETE CURBS, GUTTERS & SIDEWALKS *****
2 Sidewalks - Concrete 3,611 m2 3 Concrete Pavers 715 m2 4 Concrete Curb 1,070 M 5 Cast Concrete Stairs 79 m2
***** ROAD - PARKING APPURTENANCES *****
6 Parking Stall - Painted 77 each
Parking Stall Handicapped Striping Including Signage and Steel Post 8 each
8 Paint Road Markings 16 each
***** LANDSCAPING *****
9 Trees - Large 84 each 10 Trees - Medium 53 each 11 Rain Cistern 9 each 12 Fine Grading 3,425 m2 13 Planted Flowers 247 m2 14 Planted Ground Cover 2,068 m2 15 Import Top Soil 6,352 m3
***** TRELLIS *****
16 Trellis - Steel Frame w/ Aluminum Rafters 295 m2
***** RETAINING WALL *****
17 Retaining Wall - Perimeter of Property 316 m2 18 Retaining Wall - Interior of Property 266 m2
Sitework- Site Utilities 19 Bulk Double Wall LP Steel Storage Tank, 40000 Gal. 2 each 20 Fuel Oil Tank, Steel, Dbl. Wall, 60566 Liters 4 each 21 Storm Piping and Structures 1 each 22 Sanitary Piping and Structures 1 each 23 Water Piping and Structures 1 each 24 Gray Water Sewage Treatment Station, Concrete, 378 L 1 each 25 Generator Unit, Concrete, 378 L 1 each 26 Sewage Lift Station, Stl., Cone, or Fiberglass, 606 L 1 each 27 Generator Unit, Concrete, 606 L 1 each 28 Rain Water Collection 1 each
Placing Concrete, Slab On Grade, 100 mm Thick, Pumped
1 each
Placing Concrete, Slab On Grade, 100 mm Thick, Pumped
1 each 31 Incinerator - 800 Lb. Per Hr. - Maximum (With Feeder) 2 each