306_-_Contractor_Safety_Responsibilites.pdf

PDF 6 MB Posted

Attached to
Environmental Monitoring and Biological Sampling Services for the Newport Bay Watershed
Solicitation number
080-2997708-RE
Issued by
Orange County, San Francisco City, California

About this file

This is a Safety Responsibilities document for contractors working on projects with the County of Orange, California. The document establishes mandatory safety requirements and compliance standards that all contractors must acknowledge and adhere to throughout project execution. Key safety requirements include submission of an Injury and Illness Prevention Program (IIPP) prior to project start, mandatory use of personal protective equipment with contractor-enforced compliance, Cal/OSHA reporting of fatal or serious injuries within eight hours (subject to minimum $5,000 penalties for non-compliance), evacuation procedures for hazardous situations with 150-foot clearance distances, and provision of competent persons at excavation sites. Additional mandatory compliance areas encompass asbestos and lead handling, confined space operations, fall protection, boatswain's chair usage, hazardous materials storage in properly labeled safety cans, lockout/tagout procedures, scaffolding standards per manufacturer requirements and applicable articles, air emissions and environmental permits, hazardous waste management, storm drain and sanitary sewer protection, and comprehensive training documentation. All contractors must sign an acknowledgment form certifying they have read and understood the safety policy and agree to comply with all outlined procedures and provisions.

The document references multiple California Title 8 Labor Code sections, Cal/OSHA regulations, and industry standards as the regulatory framework governing contractor safety obligations. The policy establishes that the County retains authority to determine when contractor actions expose non-employees to hazards and may halt operations accordingly. Projects involving offending odors may require after-hours work scheduling. The contractor bears full responsibility for safety enforcement, including personnel supervision and adherence to evacuation protocols. No pricing, insurance requirements, or contract term information is specified in this safety responsibilities document; those details are addressed separately in the related RFP for Environmental Monitoring and Biological Sampling Services, which includes insurance requirements of $1,000,000 Commercial General Liability, $2,000,000 Professional Liability, $1,000,000 Automobile Liability, and $1,000,000 Pollution Liability coverage.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Safety Responsibilities, Contractors

306 07

Safety Responsibilities

PURPOSE:

SCOPE:

at any time it determines that the contractor’s actions are exposing non y

9 1 1

714 285 5535

714 558 4451

As of January 1, 2003 – If an employer fails to report to Cal/OSHA a fatal injury or serious injury or illness to an employee within 8 hours will be subject to a minimum civil penalty of $5,000.

to Cal/OSHA .

5535 6288 furnish person is person’s condition through the County Project Manager.

Those projects involving offending odor ents may require work during “after hours” ontractor’s personnel shall evacuate to a location 150 feet away from the “ALL CLEAR” is announced and they are instruc .

, 19, , 8, 3220 undo risk.

h.

, 8, 1513

Injury and Illness Prevention Program to the Project Manager prior to the start of the project. The contractor’s IIPP shall in evaluating the contractor’s IIPP.

, 8 1509 3203

, 8, 5194

Personal Protection use is mandatory and enforcement is the responsibility of the contractor. Contractor’s

, 8, 1514

Smoking

7 1

Trash, Waste, and Scrap Disposal

, 8, 1736 b

, 8, 1707

Asbestos / Lead

, 8, 5208

Confined Space ontractor’s Con

, 8, 5157

, 8, 2974 providing a “Competent Person” at every excavation site. This individual must be

, 8 1541

Fall Protection

● Boatswain’s chairs are

, , 1671.1

Hazardous Materials

“safety” cans that have been properly labeled as to their contents.

bungs, top

, 8, 5191

Lockout/Tagout ontractor’s Locko

, , Sections 3314 and 4413

Scaffolding

, Article 21, 22 and 23 and the manufacturer’s requirements. Each two

Air Emissions

Environmental Permits, Registrations, and Notifications

Hazardous Waste

Storm Drains / Sanitary Sewer formed during “off hours”

Training Documentation a , CONTRACTOR SAFETY POLICY ACKNOWLEDGEMENT FORM

I, ________________________________________, certify that I have read the contractor Safety Policy and fully understand my responsibilities with respect to the policy and procedures as outlined. I further agree to comply with the provisions of this program.

File details come from the government source that posted it. Updated .