306-1226-0435_CADM_Reno_BioprocessManufacturing_RFQ_Final.pdf

PDF 360 KB Posted

Attached to
Bioprocessing Manufacturing Renovation at CADM - Jamestown Campus
Solicitation number
306-1226-0435
Issued by
Guilford County, North Carolina

About this file

This is a Request for Qualifications (RFQ) issued by Guilford Technical Community College for architectural and engineering design services related to the bioprocessing manufacturing renovation at the Center for Advanced Manufacturing (CADM) on the Jamestown Campus in North Carolina. The project involves the renovation of approximately 7,500 square feet of existing unconditioned mechanical equipment mezzanine space to support the Bioprocess Manufacturing Technology curriculum, converting it into instructional laboratories, classrooms, offices, restrooms, and simulated clean-room spaces for cell culture instruction. The solicitation number is 306-1226-0435, and Letters of Interest and Standard Form 254 (SF-254) must be submitted by Friday, December 11, 2026, at 3 p.m. EST to Matt Gunderson, Director of Construction, at the Construction Office, Campus Operations Building, 1003 Bonner Drive, Jamestown, NC 27282. Short-listed firms will be required to interview in person on the Jamestown Campus with the pre-selection committee, and finalist firms will participate in a final interview with the GTCC Board of Trustees, who will make the final selection. The project does not include creation of operational clean rooms for manufacturing or production, and the project will also install elevator equipment within a previously constructed elevator shaft.

The total project budget is $4 million, funded by County sources. Proposing firms must be properly licensed to practice architecture, engineering, or landscape architecture in the State of North Carolina. Selection criteria include successful delivery of projects under the North Carolina Standard Form of Agreement Between Owner and Designer (OC-22), past performance on similar projects, proposed design approach for cost-effective biomanufacturing instructional environments, construction administration capabilities, adequate staff for both design and construction phases, and proximity to and familiarity with projects in Guilford County. Submittals should include a letter of interest not exceeding two two-sided pages and the current SF-254 form, formatted on 8.5" x 11" pages and stapled in the upper left-hand corner; electronic submittals via email or fax will not be accepted. A pre-design planning study was initiated but only partially completed, with a conceptual drawing provided for informational purposes only.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department/Agency Guilford Technical Community College Project Title Bioprocessing Manufacturing Renovation at CADM – Jamestown Campus

Solicitation # 306-1226-0435 Design Services Architectural/Engineering Project/Agency ID # 31951/3064

Scope of Work

Letters of Interest and Standard Form 254 (SF-254) will be received until Friday, December 11, 2026 at 3 p.m. EST in the Construction Office, Campus Operations Building, 1003 Bonner Drive, Jamestown, NC 27282, Attn: Matt Gunderson to provide architectural and engineering services for the renovation of approximately 7,500 square feet of existing unconditioned mechanical equipment mezzanine space in the Center for Advanced Manufacturing, located at 6012 W. Gate City Boulevard on the Jamestown Campus. The renovated space will support the Bioprocess Manufacturing Technology curriculum.

The existing space consists of a concrete floor on steel decking, steel columns, roof joists, overhead metal decking, and partially installed drywall on metal studs. The space is currently vacant and will be converted into instructional laboratories, classrooms, offices, and restrooms. The laboratories will include simulated clean-room spaces for cell culture intended to support instruction in clean-room procedures and operations.

This project does not include creation of operational clean rooms certified for manufacturing, research, or other production activities. The project will also install elevator equipment within a previously constructed elevator shaft.

Short-listed firms will be required to interview with the pre-selection committee in person on the Jamestown Campus.

Finalist firms will be required to interview in person on the Jamestown Campus with the GTCC Board of Trustees, who will make the final selection.

A pre-design planning study was initiated but only partially completed. The study produced the enclosed conceptual drawing, which is provided for informational purposes only.

Contact Matt Gunderson, PE Telephone (336) 334-4822, extension 50001 Email mcgunderson@gtcc.edu Total Project Budget $4 Million Source of Funds County Publish Date Friday, November 20, 2026 Closing Date Friday, December 11, 2026 at 3 p.m. EST

Submit two (2) copies of Letter of Interest and SF-254 to:

Physical Location for FedEx/UPS or In-person Delivery – Highly Recommended:

(Delivery Address)

Attn: Matt Gunderson, Director of Construction Guilford Technical Community College 1003 Bonner Drive Jamestown, NC 27282

Mailing Address (if using U.S.

Postal Service)

Attn: Matt Gunderson, Director of Construction Guilford Technical Community College PO Box 309 Jamestown, NC 27282

NC Licensing Statement In order to offer architectural, engineering, or landscape architectural services in response to this solicitation, the proposing firm must be properly licensed to practice Architecture, Engineering, or Landscape Architecture in the State of North Carolina. More information on the North Carolina state boards may be found on the following websites:

NC Board of Architecture: (http://www.ncbarch.org) NC Board of Examiners for Engineers & Surveyors: (http://www.ncbels.org) NC Board of Landscape Architects: (http://www.ncbola.org)

SELECTION CRITERIA

The selection committee may take into consideration factors such as:

1. Record of successfully delivering projects under the North Carolina Standard Form of Agreement Between Owner and Designer (OC-22), or a substantially similar agreement used by the University of North Carolina System and/or the North Carolina Community College System.

2. Past performance on similar projects, primarily determined by the project and owner information provided in

SF-254.

3. Proposed design approach for developing cost-effective biomanufacturing instructional environments that support realistic, hands-on training while maintaining effective instructor oversight, student safety, operational flexibility, and alignment with current industry practices.

4. Construction administration capabilities consistent with the requirements of the OC-22 and the State Construction Manual.

5. Adequate staff for both design and construction phases, including a record of successful partnerships with a variety of consultants.

6. Proximity to and familiarity with projects in Guilford County.

SUBMITTAL CRITERIA

The letter of interest shall not exceed two (2) two-sided pages. The owner does not prescribe a format or page limit for the SF-254. The current SF-254 is located at the following website:

http://ncadmin.nc.gov/businesses/construction/forms-documents and is the State Building Commission approved form.

In the interest of cost savings, consistency of submittals, and ease of review by the selection committee, please format your submissions on 8.5”x 11” pages, stapled in the upper lefthand corner. Please do not include removable storage devices such as flash drives.

Email and fax submittals will not be accepted.

L

87653 4

468 SF

BIOMANUFACTURING LAB

273 SF

PREP ROOM

1212 SF

LAB

639 SF

PREP ROOM

1228 SF

LAB

249 SF

CELL CULTURE

580 SF

PREP ROOM

102 SF

VESTIBULE

FUTURE RESTROOM

771 SF

LOBBY

147 SF

OFFICE

146 SF

OFFICE

147 SF

OFFICE

146 SF

OFFICE

CPL

CPLteam.com

ARCHITECTURE

ENGINEERING

PLANNING

Project Number

Date

SCALE: 1/8" = 1'-0"R26.19930.00

- GUILFORD TECHNICAL COMMUNITY COLLEGE

CAM BIOMANUFATURING STUDY

260702_GTCC_CAM_BIOMANUFACTURING STUDY 1.pdf
S004 -

File details come from the government source that posted it. Updated .