RFI QUESTIONS AND ANSWERS TO RFI’S FROM SITE VISIT
GUAM
1. When is the closing date for this project? Because according to your email the closing date is June 14, 2018 but we had a site visit at the same date around 10:00 AM.
2. Where is the supply fan schedule? Please refer to Drawing No. ZUA-1303391-M005. The equipment schedules are shown on sheet M002.
3. Are we going to replace the whole AHU with a new one or just replace some of the old parts into new parts? AHU-2 & AHU-3 will be refurbished and FCU-3 is new. Please refer to the plans on specs for more detailed information.
4. Regarding the Sheet Note No. 4 on Drawing No. ZUA-1303391-M003, are we going to replace the Damper or re-use it? Damper and actuator will be replaced.
5. Where can we get a power supply for the temporary A/C unit that is located outside the CERAP Building? Please refer to Drawing No. ZUA-1303391-M003. The Constructor must provide an Engine Generator to power the temp AC units. Please refer to General Notes on sheet M003 and the Specs for more information.
6. Regarding the Sheet Note No. 4 on Drawing No. ZUA-1303391-M004, are we going to install a new electrical wiring and breakers for fan coil and control devices on the electrical panel MPF? The Contractor must provide all conduit, wire and misc. electrical accessories to fully install the fan coil. Please see plans on spec for more information.
7. Regarding the repainting of the stairway (115) on Drawing No. ZUA-1303391-M004, are we going to repaint the stairway from bottom to rooftop? This contract is for the painting of the basement level only, which is defined as just above the finished floor of basement to the finished floor of the first floor level. Coordinate paint color with COR.