STA Dauphin Island.Repairs SOW.1.pdf
PDF 442 KB Posted
- Solicitation number
- 30332Q270000002
- Issued by
- Not on record
About this file
This document is a Contract Specifications file for hurricane damage repairs at United States Coast Guard Station Dauphin Island, Alabama, dated October 2026, with Project Number 33646870.
The primary scope of work consists of comprehensive hurricane damage repairs and facility sustainment for Station Dauphin Island located at 251 Aquarium Drive, Dauphin Island, AL 36528. The contract requires commercial contractor repair services to provide all labor, tools, equipment, materials, transportation, and supervision for 1-for-1 like-for-like repairs across station facilities, waterfront structures, perimeter infrastructure, and mechanical systems. The base item (Item 1) involves Station Multi-Purpose Building Remediation, which includes: installation of a temporary moisture membrane over a 5'x5' hole in the roof leading to the attic; procurement and installation of a new vent hood on the roof; and repair of the damaged soffit area with replacement of two exterior soffit light fixtures and associated electrical wiring. No drawings accompany the specification; contractors must physically inspect the site and verify all field measurements and existing conditions during the site visit.
Special requirements include coordination of staging areas, material laydown, and vehicle parking with the Coast Guard Point of Contact (MKC Jeremy Gawlik, Jeremy.J.Gawlik@uscg.mil, (251)604-1788) prior to commencing work. Hot work operations require an approved USCG Hot Work Permit issued 48 hours in advance with continuous fire watch for 60 minutes after completion. The contractor is responsible for site safety per OSHA standards and USACE Safety and Health Requirements Manual (EM 385-1-1). Reasonable amounts of 120V electricity and potable water will be provided at no charge. Contractors must comply with environmental protection laws including ESA, BGEPA, MBTA, NHPA, RCRA, and Clean Air Act provisions. All project-generated waste must be recycled or disposed of per RCRA requirements, with hazardous waste manifested off-site. All construction debris and removed materials must be completely removed from Government property with disposal receipts submitted within ten working days. Personnel must be pre-approved with valid Government-issued photo identification per the REAL ID Act of 2005. Final inspection and acceptance require submission of a written request upon 100% completion of all repair items, with joint inspection verifying workmanship, functional operation of systems, and site cleanup.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF1442-14b.solicitation.offer.and.award.docx | DOCX document | |
| Constructions.Solicitation.docx | DOCX document | |
| Construction Clauses.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT SPECIFICATIONS
STA Dauphin Island Hurricane Isaias Repairs
AT
UNITED STATES COAST GUARD
Station Dauphin Island Dauphin Island, PROJECT NUMBER 33646870
October 2026
SSECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1. GENERAL DESCRIPTION
General Work Requirements
Request commercial contractor repair services to provide all labor, tools, equipment, materials, transportaƟon, and supervision necessary to perform comprehensive hurricane damage repairs, renewal, and facility sustainment at United States Coast Guard StaƟon D , ensuring efficient system operaƟon, life safety, structural integrity, and complete operaƟonal readiness.
This project consƟtutes a 1-for-1 like-for-like, in-kind repair and replacement sustainment acƟon across staƟon faciliƟes, waterfront structures, perimeter infrastructure, and mechanical systems. All dimensions, quanƟƟes, and field alignments shall be verified by the contractor during physical on-site inspecƟon. This Work Request will generally include, but is not limited to, the following primary scopes of work:
Base Items:
Station Multi-Purpose Building Remediation (Item 1): Remediation of storm damage to the station's Multi-Purpose Building. The vent hood on the roof is missing, and the exterior building soffit light above the rear entrance was destroyed, leaving a 5’x5’ hole that leads to the attic. The work includes:
Temporary Repairs: Install a temporary moisture membrane over the 5'x5' hole to secure the attic from weather.
Roof Repair: Procure and install a new vent hood on the roof.
Soffit & Electrical Repair: Repair the damaged soffit area and replace the exterior soffit light fixture, including any necessary electrical wiring.
2. SPECIFIC WORK REQUIREMENTS
N/A.
33. SPECIAL WORK REQUIREMENTS
Staging and Laydown: Coordinate all staging areas, material laydown, and vehicle parking with the Coast Guard Point of Contact prior to commencing physical work.
Maintain clear, unobstructed access for emergency response apparatus and station search-and-rescue (SAR) assets at all times.
Hot Work Operations: Any hot work operations (welding, cutting, brazing, grinding, or open-flame application) require an approved USCG Hot Work Permit issued at least 48 hours in advance through the Station Point of Contact. A continuous fire watch equipped with appropriate fire-extinguishing equipment must remain on-site during all hot work activities and for a minimum of sixty (60) minutes following completion.
4. TEMPORARY FACILITIES OR UTILITIES
None required. The Contractor shall furnish all necessary heavy-duty extension cords, hoses, connectors, and adapters conforming to OSHA requirements.
5. LOCATION
The work is located at:
U.S. Coast Guard StaƟon Dauphin Island 251 Aquarium Dr, Dauphin Island, AL 36528
Arrangements for visiƟng the site, physical inspecƟons, and technical coordinaƟon may be made by contacƟng:
Point of Contact: MKC Jeremy Gawlik Email: Jeremy.J.Gawlik@uscg.mil Telephone: (
66. DRAWINGS ACCOMPANYING SPECIFICATION
There are no drawings accompanying this specificaƟon. Contractors shall physically inspect the site, verify all field measurements, exisƟng condiƟons, equipment configuraƟons, and scope boundaries during the site visit prior to commencing work.
7. WORK HOURS
This project is for hurricane recovery. This project requires close schedule coordinaƟon to prevent operaƟonal interrupƟons during work execuƟon. The contractor shall plan and execute the schedule to minimize disrupƟons to ongoing staƟon military operaƟons and emergency Search and Rescue (SAR) response missions.
8. SPECIFIC ENVIRONMENTAL REQUIREMENTS
There are no specific environmental permits required for like-for-like repairs. Refer to the secƟon Ɵtled Environmental for general environmental, refrigerant handling, and waterway protecƟon requirements.
9. SAFETY PROGRAM
General
The Contractor is solely responsible for work site safety. Implement a comprehensive safety program that protects the lives and health of personnel in the construcƟon area, prevents damage to property, and avoids work interrupƟons.
Provide appropriate safety measures including, but not limited to, barricades, warning signs, and signal lights, complying with all requirements of applicable federal standards (OSHA 29 CFR 1910 and 29 CFR 1926), USACE Safety and Health Requirements Manual (EM 385-1-1), and State of Florida and local safety laws, rules, and regulaƟons.
10. AVAILABILITY OF UTILITY SERVICES
Reasonable amounts of the following uƟliƟes will be made available to the Contractor without charge:
Electricity (120V branch circuits, provided circuits are not overloaded), and
Potable Water (from designated exterior station hose bibbs).
111. UNDERGROUND AND CONCEALED UTILITIES
Any utility locations provided are diagrammatic, not exact.
Physically verify the location and elevation of existing underground and concealed utilities local to the work area. Employ techniques to scan the construction site, including electromagnetic and sonic equipment, prior to commencing excavation or post-hole drilling. Mark the surface of the ground where existing underground utilities are discovered.
12. USE OF PREMISES
The work shall be performed on an acƟve Coast Guard operaƟonal military installaƟon. Become familiar with and obey staƟon fire, traffic, and security regulaƟons. Personnel shall not stray from the immediate area of work or direct avenues of ingress and egress unless authorized in advance by the StaƟon.
Isolate each construcƟon area with temporary parƟƟons and dust controls. Provide movable high-visibility safety fencing around all work areas and equipment laydown areas located outdoors. Provide temporary covers on excavaƟons or pier deck openings that remain open overnight.
13. CLEANUP
Keep the work area, including the laydown and storage area, free from accumulaƟons of waste materials on a daily basis and comply with all federal, state, and local regulaƟons pertaining to the storage, transport, and disposal of wastes. The Contractor shall not use Coast Guard waste disposal faciliƟes, including garbage cans, trash piles, or staƟon dumpsters. Tools and loose materials shall be secured daily to eliminate Foreign Object Debris (FOD) hazards along waterfront and operaƟonal areas.
114. ENVIRONMENTAL
Protection of the Environment
Comply with all applicable federal, state, and local laws and regulaƟons for the protecƟon of the environment, including but not limited to the Endangered Species Act (ESA), Bald and Golden Eagle ProtecƟon Act (BGEPA), the Migratory Bird Treaty Act (MBTA), NaƟonal Historic PreservaƟon Act (NHPA), the Resource ConservaƟon and Recovery Act (RCRA), Clean Air Act (refrigerant recovery/handling), and Comprehensive Environmental Response, CompensaƟon, and Liability Act (CERCLA). Prevent any construcƟon runoff, paints, solvents, fuel, or debris from entering adjacent marine waterways or storm drains.
Generated Waste
Any waste generated because of the project shall either be recycled or be disposed of in accordance with RCRA requirements.
Any hazardous waste shall be manifested off-site with the Coast Guard unit listed as the Generator and signatory. Any hazardous waste shall be analyzed, characterized, stored, and disposed of in accordance with RCRA and all applicable federal, state, and local laws and ordinances.
Hazardous waste shall be properly transported and delivered to an appropriate licensed facility. The Contractor shall submit for COR approval the proposed disposal facility, qualifications of the transporters, and the draft hazardous waste manifest.
15. DISPOSITION OF MATERIALS
All materials including construction debris, removed hardware, scrap wood, ductwork, and damaged equipment shall be completely removed from Government property. The Government will not be responsible for the condition or loss of, or damage to, such property after notice to proceed. Materials and equipment shall not be viewed by prospective purchasers or sold on the site.
The Contractor shall submit the disposal receipt or certified landfill weight ticket within ten (10) working days of disposal.
16. STORM PROTECTION
Take every pracƟcable precauƟon to minimize danger from storms to personnel, the work, and adjacent property. PrecauƟons shall include, but not be limited to: closing all building openings, securing weatherproofing, removing all loose materials, tools, and equipment from exposed waterfront locaƟons, and dismantling or anchoring scaffolding and temporary works.
117. SECURITY
Submit a list of the names of all personnel working on the project site prior to the preconstruction conference for approval. The roster shall be submitted via email and, at a minimum, include the first name, last name, job description, and company of employment.
Immediately submit an updated list upon any change in on-site project personnel.
Only personnel on the approved list are allowed onto the project site.
All approved personnel shall carry a valid, Government-issued photo identification while on Government property in conformance with the REAL ID Act of 2005. Non-compliant personnel shall be escorted off Government property immediately.
18. FINAL INSPECTION AND ACCEPTANCE
Electronically submit a wriƩen request for final inspecƟon and acceptance to the Coast Guard Technical RepresentaƟve and ContracƟng Officer’s RepresentaƟve (COR) upon 100% compleƟon of all ten (10) repair items. The joint inspecƟon will verify workmanship, funcƟonal operaƟon of mechanical and electrical systems, and thorough site cleanup.
-- End of Sec on 01 11 00 --