STA Dauphin Island. Multi Purpose Repairs SOW 33649495.1.update.pdf
PDF 1 MB Posted
- Solicitation number
- 30332Q270000002
- Issued by
- Not on record
About this file
This is a Contract Specifications document for hurricane damage repairs at United States Coast Guard Station Dauphin Island, Alabama (Project Number 33649495), dated October 2026.
The scope of work constitutes a 1-for-1 like-for-like, in-kind repair and replacement sustainment action across station facilities, waterfront structures, perimeter infrastructure, and mechanical systems. The primary base item is Station Multi-Purpose Building Remediation (Item 1), which involves remediation of storm damage to the Multi-Purpose Building, specifically repair of damaged soffit area and replacement of two exterior soffit light fixtures along the galley area, including necessary electrical wiring. The contractor must provide all labor, tools, equipment, materials, transportation, and supervision necessary to complete the work while ensuring efficient system operation, life safety, and structural integrity. All dimensions, quantities, and field alignments must be verified by the contractor during on-site physical inspection, as no accompanying drawings are provided. The work is located at 251 Aquarium Drive, Dauphin Island, AL 36528, with the Coast Guard Point of Contact being MKC Jeremy Gawlik (Jeremy.J.Gawlik@uscg.mil, (210) 253-0983).
Key contractual requirements include: coordination of staging areas and material laydown with the Coast Guard prior to work commencement while maintaining clear access for emergency response and search-and-rescue assets; submission of personnel rosters for security approval prior to the preconstruction conference with valid Government-issued photo identification required on-site in compliance with the REAL ID Act of 2005; obtaining approved USCG Hot Work Permits at least 48 hours in advance for any welding, cutting, brazing, grinding, or open-flame operations with continuous fire watch required during and 60 minutes after completion; compliance with OSHA requirements (29 CFR 1910 and 1926), USACE Safety and Health Requirements Manual (EM 385-1-1), and State of Florida and local safety laws; maintenance of comprehensive daily cleanup with contractor responsibility for all waste disposal and prohibition on use of Coast Guard waste facilities; compliance with environmental regulations including ESA, BGEPA, MBTA, NHPA, RCRA, Clean Air Act, and CERCLA; and submission of a written request for final inspection and acceptance upon 100% completion, with joint inspection to verify workmanship, functional operation of systems, and site cleanup. Reasonable amounts of electricity (120V branch circuits) and potable water from designated exterior hose bibbs will be provided without charge.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| STA Dauphin Island.Repairs SOW.pdf | ||
| SF1442-14b.solicitation.offer.and.award.docx | DOCX document | |
| Constructions.Solicitation.docx | DOCX document | |
| SF1442-14b.solicitation.offer.and.award.docx | DOCX document | |
| Constructions.Solicitation.docx | DOCX document | |
| STA Dauphin Island.Repairs SOW.1.pdf | ||
| Construction Clauses.docx | DOCX document |
On GovTribe
Work with this file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT SPECIFICATIONS
STA Dauphin Island Hurricane Isaias Repairs
AT
UNITED STATES COAST GUARD
Station Dauphin Island Dauphin Island, Alabama
PROJECT NUMBER 33649495
October 2026
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1. GENERAL DESCRIPTION
General Work Requirements
Request commercial contractor repair services to provide all labor, tools, equipment, materials, transportaƟon, and supervision necessary to perform comprehensive hurricane damage repairs, renewal, and facility sustainment at United States Coast Guard StaƟon Dauphin Island, ensuring efficient system operaƟon, life safety, structural integrity, and complete operaƟonal readiness.
This project consƟtutes a 1-for-1 like-for-like, in-kind repair and replacement sustainment acƟon across staƟon faciliƟes, waterfront structures, perimeter infrastructure, and mechanical systems. All dimensions, quanƟƟes, and field alignments shall be verified by the contractor during physical on-site inspecƟon. This Work Request will generally include, but is not limited to, the following primary scopes of work:
Base Items:
Station Multi-Purpose Building Remediation (Item 1): Remediation of storm damage to the station's Multi-Purpose Building. Two soffit light fixtures were damaged along some of the soffit outside of the galley area. The work includes:
Soffit & Electrical Repair: Repair the damaged soffit area and replace the 2 exterior soffit light fixture, including any necessary electrical wiring.
2. SPECIFIC WORK REQUIREMENTS
N/A.
3. SPECIAL WORK REQUIREMENTS
Staging and Laydown: Coordinate all staging areas, material laydown, and vehicle parking with the Coast Guard Point of Contact prior to commencing physical work.
Maintain clear, unobstructed access for emergency response apparatus and station search-and-rescue (SAR) assets at all times.
Hot Work Operations: Any hot work operations (welding, cutting, brazing, grinding, or open-flame application) require an approved USCG Hot Work Permit issued at least 48 hours in advance through the Station Point of Contact. A continuous fire watch equipped with appropriate fire-extinguishing equipment must remain on-site during all hot work activities and for a minimum of sixty (60) minutes following completion.
4. TEMPORARY FACILITIES OR UTILITIES
None required. The Contractor shall furnish all necessary heavy-duty extension cords, hoses, connectors, and adapters conforming to OSHA requirements.
5. LOCATION
The work is located at:
U.S. Coast Guard StaƟon Dauphin Island 251 Aquarium Dr, Dauphin Island, AL 36528
Arrangements for visiƟng the site, physical inspecƟons, and technical coordinaƟon may be made by contacƟng:
Point of Contact: MKC Jeremy Gawlik Email: Jeremy.J.Gawlik@uscg.mil Telephone: (210) 253-0983
6. DRAWINGS ACCOMPANYING SPECIFICATION
There are no drawings accompanying this specificaƟon. Contractors shall physically inspect the site, verify all field measurements, exisƟng condiƟons, equipment configuraƟons, and scope boundaries during the site visit prior to commencing work.
7. WORK HOURS
This project is for hurricane recovery. This project requires close schedule coordinaƟon to prevent operaƟonal interrupƟons during work execuƟon. The contractor shall plan and execute the schedule to minimize disrupƟons to ongoing staƟon military operaƟons and emergency Search and Rescue (SAR) response missions.
8. SPECIFIC ENVIRONMENTAL REQUIREMENTS
There are no specific environmental permits required for like-for-like repairs. Refer to the secƟon Ɵtled Environmental for general environmental, refrigerant handling, and waterway protecƟon requirements.
9. SAFETY PROGRAM
General
The Contractor is solely responsible for work site safety. Implement a comprehensive safety program that protects the lives and health of personnel in the construcƟon area, prevents damage to property, and avoids work interrupƟons.
Provide appropriate safety measures including, but not limited to, barricades, warning signs, and signal lights, complying with all requirements of applicable federal standards (OSHA 29 CFR 1910 and 29 CFR 1926), USACE Safety and Health Requirements Manual (EM 385-1-1), and State of Florida and local safety laws, rules, and regulaƟons.
10. AVAILABILITY OF UTILITY SERVICES
Reasonable amounts of the following uƟliƟes will be made available to the Contractor without charge:
Electricity (120V branch circuits, provided circuits are not overloaded), and
Potable Water (from designated exterior station hose bibbs).
11. UNDERGROUND AND CONCEALED UTILITIES
Any utility locations provided are diagrammatic, not exact.
Physically verify the location and elevation of existing underground and concealed utilities local to the work area. Employ techniques to scan the construction site, including electromagnetic and sonic equipment, prior to commencing excavation or post-hole drilling. Mark the surface of the ground where existing underground utilities are discovered.
12. USE OF PREMISES
The work shall be performed on an acƟve Coast Guard operaƟonal military installaƟon. Become familiar with and obey staƟon fire, traffic, and security regulaƟons. Personnel shall not stray from the immediate area of work or direct avenues of ingress and egress unless authorized in advance by the StaƟon.
Isolate each construcƟon area with temporary parƟƟons and dust controls. Provide movable high-visibility safety fencing around all work areas and equipment laydown areas located outdoors. Provide temporary covers on excavaƟons or pier deck openings that remain open overnight.
13. CLEANUP
Keep the work area, including the laydown and storage area, free from accumulaƟons of waste materials on a daily basis and comply with all federal, state, and local regulaƟons pertaining to the storage, transport, and disposal of wastes. The Contractor shall not use Coast Guard waste disposal faciliƟes, including garbage cans, trash piles, or staƟon dumpsters. Tools and loose materials shall be secured daily to eliminate Foreign Object Debris (FOD) hazards along waterfront and operaƟonal areas.
14. ENVIRONMENTAL
Protection of the Environment
Comply with all applicable federal, state, and local laws and regulaƟons for the protecƟon of the environment, including but not limited to the Endangered Species Act (ESA), Bald and Golden Eagle ProtecƟon Act (BGEPA), the Migratory Bird Treaty Act (MBTA), NaƟonal Historic PreservaƟon Act (NHPA), the Resource ConservaƟon and Recovery Act (RCRA), Clean Air Act (refrigerant recovery/handling), and Comprehensive Environmental Response, CompensaƟon, and Liability Act (CERCLA). Prevent any construcƟon runoff, paints, solvents, fuel, or debris from entering adjacent marine waterways or storm drains.
Generated Waste
Any waste generated because of the project shall either be recycled or be disposed of in accordance with RCRA requirements.
Any hazardous waste shall be manifested off-site with the Coast Guard unit listed as the Generator and signatory. Any hazardous waste shall be analyzed, characterized, stored, and disposed of in accordance with RCRA and all applicable federal, state, and local laws and ordinances.
Hazardous waste shall be properly transported and delivered to an appropriate licensed facility. The Contractor shall submit for COR approval the proposed disposal facility, qualifications of the transporters, and the draft hazardous waste manifest.
15. DISPOSITION OF MATERIALS
All materials including construction debris, removed hardware, scrap wood, ductwork, and damaged equipment shall be completely removed from Government property. The Government will not be responsible for the condition or loss of, or damage to, such property after notice to proceed. Materials and equipment shall not be viewed by prospective purchasers or sold on the site.
The Contractor shall submit the disposal receipt or certified landfill weight ticket within ten (10) working days of disposal.
16. STORM PROTECTION
Take every pracƟcable precauƟon to minimize danger from storms to personnel, the work, and adjacent property. PrecauƟons shall include, but not be limited to: closing all building openings, securing weatherproofing, removing all loose materials, tools, and equipment from exposed waterfront locaƟons, and dismantling or anchoring scaffolding and temporary works.
17. SECURITY
Submit a list of the names of all personnel working on the project site prior to the preconstruction conference for approval. The roster shall be submitted via email and, at a minimum, include the first name, last name, job description, and company of employment.
Immediately submit an updated list upon any change in on-site project personnel.
Only personnel on the approved list are allowed onto the project site.
All approved personnel shall carry a valid, Government-issued photo identification while on Government property in conformance with the REAL ID Act of 2005. Non-compliant personnel shall be escorted off Government property immediately.
18. FINAL INSPECTION AND ACCEPTANCE
Electronically submit a wriƩen request for final inspecƟon and acceptance to the Coast Guard Technical RepresentaƟve and ContracƟng Officer’s RepresentaƟve (COR) upon 100% compleƟon of all ten (10) repair items. The joint inspecƟon will verify workmanship, funcƟonal operaƟon of mechanical and electrical systems, and thorough site cleanup.
-- End of SecƟon 01 11 00 --