This document is a Questions and Answers (Q&A) file for a federal sewage pump-out service contract. The government requires three pump-out visits per week (Monday/Wednesday/Friday) at up to 2,000 gallons per visit at a lift station with a 2,000-gallon wet well capacity. Missed holiday visits must be rescheduled for the following day, including weekends. The contract is for a six-month base period with an expected start date of November 18, and services must commence no later than three days after award. Contractors may quote pricing either per month or per visit, with approximately 72 total visits anticipated during the contract period.

Operationally, truck access is unrestricted at the front gate with a 10-foot hose distance and no clearance or weight limits. No confined-space entry is required, and all work can be performed externally. Contractors must ensure all crew members possess valid Real ID for site access; no escort or advance onboarding lead time is necessary. For disposal, contractors may select any legally authorized facility and must maintain volume logs. The applicable wage determination is SCA 2015-4327 (revision 35, dated August 22, 2026), and no additional insurance coverage beyond FAR 28.307-2 is required. Eligible small-business primes may subcontract the pumping, hauling, and disposal work to a qualified local sewage pump-out subcontractor with no subcontracting limitations. Monthly invoicing is permitted with submission of disposal records. The government will provide truck access and staging; the contractor may select the wastewater disposal facility. If repairs to the lift station pump are completed before the six-month period expires, the government may terminate the contract for convenience. The previous service provider was Bundick Well and Pump.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1) Service quantities and additional calls: SOW 2.2 calls for Monday/Wednesday/Friday pump-out up to 2,000 gallons per visit. Section 4.3 excludes federal holidays but permits weekend/holiday or other adjusted-hour service. Are missed holiday visits skipped or rescheduled? What additional-call quantity should the firm-fixed monthly price include, and how are visits above the regular schedule or volumes above 2,000 gallons authorized and priced?

3 visits per week pumping 2000 gallons, missed days should happen the following morning.

2) Access and safe pumping: Please identify the truck access/parking point, restrictions on truck size/weight, approximate hose distance and vertical lift, connection/opening type, and whether all pumping can be performed from outside without confined-space entry. Please confirm ongoing crew/vehicle badging, escort requirements and onboarding lead time, given the November 18 start.

No size restrictions,10ft distance, no confined space entry, just ensure real ID for all contractors, no escort required, no lead time.

3) Disposal: Is there a designated or restricted receiving facility, or may the contractor select any legally authorized facility? Are manifests, disposal receipts, volume logs or other acceptance records required? Please identify any known non-domestic constituents or special disposal/testing requirements.

Any legal facility, volume log required.

4) Wage basis: Please confirm that the attached SCA wage determination 2015-4327, revision 35 dated August 22, 2026, applies. The equivalent federal hire statement lists heavy truckdriver $26.52 plus $5.92 H&W, while the WD lists 31363 at $23.82 and H&W $5.42 for EO 13706-covered work ($5.92 otherwise). We understand the equivalent hire statement is informational, not the wage determination. Please confirm the applicable H&W/paid-sick-leave basis and whether there is a predecessor collective bargaining agreement or successor-service benefit information we need to price.

The wage rate applies.

5) Insurance: Please confirm the required prime-contractor insurance evidence/timing under HSAR 3052.228-70 and whether additional insured endorsements or pollution/environmental liability coverage are required beyond the referenced FAR 28.307-2 coverage. We understand the subcontractor's coverage does not by itself establish that the prime meets its obligations.

No additional coverage required.

6) SOW 2.2 requires Monday/Wednesday/Friday pumping up to 2,000 gallons each visit. Section 4.3 excludes federal holidays but also anticipates other hours, weekends and holidays. Please confirm holiday replacement visits, any emergency response time, whether extra trips or volumes above 2,000 gallons are within the fixed monthly price, and how additional authorized service would be priced.

If a visit is missed, a pumped out would be required the next day including weekends

7) Please confirm the November 18 start and whether any access processing or mobilization lead time is available following award. Are there hose-length/access constraints or disposal-facility requirements beyond SOW 2.3 that quoters should use?

Services will be expected NLT 03 day after award.

8) For a prime using a licensed local performing subcontractor, please confirm applicable subcontracting/workshare limits and whether any licenses or permits must be held by the prime or included at quote submission. We did not locate FAR 52.219-14 in Attachment IV; please identify any applicable requirement. Please also confirm whether the technical approach and named project manager/alternates are sufficient technical submission evidence, or whether reference projects or other qualifications are required.

If a FAR clauses wasn’t listed then it does not apply, technical approach will suffice.

9) The SOW identifies IPP but not the billing interval. May the contractor invoice monthly after completed service, and what supporting service/disposal records and acceptance process are required?

Monthly invoice, disposal records required.

10) May an eligible small-business prime contractor propose a qualified local sewage pump-out subcontractor to perform the on-site pumping, hauling, and permitted disposal work, while the prime manages contract administration and quality oversight? If so, are there specific limitations-on-subcontracting or documentation requirements we should address in our quotation?

You may sub-contract, no limitations

11) What is the lift station wet well capacity, and what is the typical and peak volume per visit?

If a visit exceeds about 2,000 gallons, how should the overage be priced?

The capacity is 2000 gallons

12) The SF-18 CLIN unit is "MO." Should pricing be per month or per visit, and how are missed or holiday visits credited?

You may quote per month or per visit we expect 72 visits during the 6 month period, missed days should happen the following day.

13) Where is truck access to the wet well, and are there weight limits or a long hose run from the gate?

The truck access is the front gate, there is no hose limit.

14) Beyond the site visit registration, are there base access lead times or background checks for drivers?

No lead times.

15) If the station needs an off-hours or emergency pump-out, how would that be requested and paid?

All visits will fall with the contract.

16) SOW Section 5 states the Government will provide basic facilities and utilities.

Please specify which (e.g., water for wash-down, truck access/staging). Is there a Government-recommended or required wastewater treatment/disposal facility for the pumped sewage, or may the contractor use any permitted facility?

Truck access and staging is availbe The contractor may determine the facility

17) Is the lift station pump currently out of service, and is the pump out requirement temporary until a repair is completed? If the repair is completed during the base period, how will the contract be handled?

Yes, repairs are required, if the repairs are completed before the 6 months the contract, the government may terminate for the government’s convenience.

18) Over recent pump outs, about how many gallons have actually been removed per visit, and has the volume ever exceeded 2,000 gallons?

2000 gallons never exceeded.

19) What is the approximate distance from the truck access point to the wet well, and are there any weight or clearance limits on the access route for a vacuum truck?

10 feet distance. There are no clearance limits on the Base.

20) Should the monthly unit price on the SF-18 cover all visits in the month, and will the government pay the full monthly price in months with federal holidays that fall on a service day?

You can price per month or per visit, missed visits due to holikdays service should either the day before or the day after

21) Is there an incumbent or prior contractor currently providing this service, and if so, under what contract number?

Services have previously been provided by Bundick Well and Pump