3-Wastewater System Rehabilitation Services Bid Form 2026.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
Wastewater System Rehabilitation Systems
Solicitation number
St. Pete Beach Wastewater System Rehabilitation Systems 2026
Issued by
Pinellas County, Florida

About this file

This is a Wastewater System Rehabilitation Services bid form issued by the City of St. Pete Beach, Florida for comprehensive infrastructure rehabilitation across three primary service categories: manhole rehabilitation, pipe lining, and point repairs. The bid form itemizes 360 line items with specified quantities for materials, labor, and services required to address various wastewater system deficiencies. Manhole rehabilitation work includes 53 items covering mobilization, traffic control, manhole repairs, casting replacements, sealing operations, and cementitious or polymer coatings in multiple diameter configurations. Pipe lining services encompass 54 items featuring cured-in-place pipe (CIPP) installations across diameter ranges from 6 to 24 inches with varying thickness specifications, bypass pumping operations, cleaning services, and service reconnections. Point repair operations consist of 253 items addressing gravity sewer and forcemain pipe repairs, directional drilling, pipe installations at multiple depths, manhole construction and modifications, valve installations, pavement restoration, and concrete work. The bid document explicitly states that quantities are provided for comparison purposes only and that the contract consists of various projects not yet defined with no guaranteed quantities.

Pricing for all 360 line items is structured as unit prices, with bidders required to submit dollar amounts for each specific item to calculate extended costs and subtotals for each service category and a grand total. The form provides no information regarding set-asides, incumbent contractors, funding sources, or contract award dates. No response deadlines, due dates, site visit requirements, or bidder conference details are included in this bid form document itself, indicating these administrative requirements are specified in accompanying contract documents or the formal Request for Proposal. The contract structure allows for flexible project execution by requiring unit pricing across a comprehensive range of wastewater rehabilitation services rather than committing to fixed quantities, enabling the City of St. Pete Beach to execute work as projects are defined throughout the contract period.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CITY OF ST. PETE BEACH
WASTEWATER SYSTEM REHABILITATION SERVICES
ITEMDESCRIPTIONQTYUNITUNIT PRICEAMOUNT
MANHOLE REHABILITATION
1Mobilization1EA$ - 0
2Flagmen (Per-Flagmen)20HR$ - 0
3Multi Lane, Lane Closures (FDOT Index No. 613)10EA/DY$ - 0
4Multi Lane, Intersection (FDOT Index No. 615)10EA/DY$ - 0
5Arrow Boards - 5' Minimum Horizontal Size10EA/DY$ - 0
6Variable Message Board10EA/DY$ - 0
7Concrete Barrier (FDOT Index No. 100)10EA/DY$ - 0
8Low Profile Barrier (FDOT Index No. 120)10EA/DY$ - 0
9Signs in Work Zones10EA/DY$ - 0
106" Solid line Thermo Plastic - Permanent200LF$ - 0
1124" Stop Bar, Solid, Thermo Plastic, Perm.200LF$ - 0
126" Skip line (6'-10' Skip) Thermo Plastic-Perm.200LF$ - 0
13Barricades Type III, with Warning Lights1000EA/DY$ - 0
14Barricades Type I or II, with Warning Lights1000EA/DY$ - 0
15Repair Manhole Bench and Channel10EA$ - 0
16Repair Chimney, Adjust/Replace MH Casting- Unpaved10EA$ - 0
17Repair Chimney, Adjust/Replace MH Casting- Asphalt Pavement100EA$ - 0
18Rebuild Corbel/Chimney for Type B Manhole Casting10EA$ - 0
19Furnish Manhole Casting - Type B10EA$ - 0
20Furnish Manhole Casting - Type E30EA$ - 0
21Severe Manhole Infiltration Elimination10EA$ - 0
22Chemical Sealing - Grout50GAL$ - 0
23Internal Chimney Sealant - Type B Manhole Casing5EA$ - 0
24Internal Chimney Sealant - Type E Manhole Casing10EA$ - 0
25Additional Access Cost for Manhole Coating10EA$ - 0
26Bypass Pumping Setup - 6-10" diameter5EA$ - 0
27Bypass Pumping Setup - 12" -14" diameter20EA$ - 0
28Bypass Pumping Setup - 15" to 21" diameter10EA$ - 0
29Bypass Pumping Setup - 24" diameter5EA$ - 0
30Bypass Pumping Operation - 6"-10" diameter10DAY$ - 0
31Bypass Pumping Operation - 12"-14" diameter50DAY$ - 0
32Bypass Pumping Operation - 15" to 21" diameter25DAY$ - 0
33Bypass Pumping Operation - 24" diameter15DAY$ - 0
34Pure Calcium Aluminate Cementitious MH Coating - 48" diameter, Initial50EA$ - 0
35Pure Calcium Aluminate Cementitious MH Coating - 60" diameter, Initial10EA$ - 0
36Pure Calcium Aluminate Cementitious MH Coating - 72" diameter, Initial5EA$ - 0
37Pure Calcium Aluminate Cementitious MH Coating - 48" diameter, Additional250VF$ - 0
38Pure Calcium Aluminate Cementitious MH Coating - 60" diameter, Additional50VF$ - 0
39Pure Calcium Aluminate Cementitious MH Coating - 72" diameter, Additional25VF$ - 0
40Reinforced Polymer MH Coating - 48" diameter, Initial5EA$ - 0
41Reinforced Polymer MH Coating - 60" diameter, Initial5EA$ - 0
42Reinforced Polymer MH Coating - 72" diameter, Initial5EA$ - 0
43Reinforced Polymer MH Coating - 48" diameter, Additional25VF$ - 0
44Reinforced Polymer MH Coating - 60" diameter, Additional25VF$ - 0
45Reinforced Polymer MH Coating - 72" diameter, Additional25VF$ - 0
46Concrete Curb Replacement - Type D100LF$ - 0
47Concrete Curb Replacement - Type F100LF$ - 0
48Concrete Curb Replacement - Miami Curb100LF$ - 0
49Concrete Sidewalk Replacement - 4" Thick50SY$ - 0
50Concrete Sidewalk Replacement - 6" Thick50SY$ - 0
51Concrete Driveway Replacement - 4" Thick50SY$ - 0
52Concrete Driveway Replacement - 6" Thick50SY$ - 0
53Inflow Dish100EA$ - 0
SUBTOTAL - MANHOLE REHABILITATION$ - 0
PIPE LINING
1Mobilization1EA$ - 0
2Flagmen (Per-Flagmen)20HR$ - 0
3Multi Lane, Lane Closures (FDOT Index No. 613)10EA/DY$ - 0
4Multi Lane, Intersection (FDOT Index No. 615)10EA/DY$ - 0
5Arrow Boards - 5' Minimum Horizontal Size10EA/DY$ - 0
6Variable Message Board10EA/DY$ - 0
7Concrete Barrier (FDOT Index No. 100)10EA/DY$ - 0
8Low Profile Barrier (FDOT Index No. 120)10EA/DY$ - 0
9Signs in Work Zones10EA/DY$ - 0
106" Solid line Thermo Plastic - Permanent200LF$ - 0
1124" Stop Bar, Solid, Thermo Plastic, Perm.200LF$ - 0
126" Skip line (6'-10' Skip) Thermo Plastic-Perm.200LF$ - 0
13Barricades Type III, with Warning Lights1000EA/DY$ - 0
14Barricades Type I or II, with Warning Lights1000EA/DY$ - 0
15CIPP Main Liner 6" Diameter - 6.0 mm thickness1100LF$ - 0
16CIPP Main Liner 8" Diameter - 6.0 mm thickness72200LF$ - 0
17CIPP Main Liner 10" Diameter - 6.0 mm thickness3600LF$ - 0
18CIPP Main Liner 12" Diameter - 6.0 mm thickness2400LF$ - 0
19CIPP Main Liner 15" Diameter - 7.5 mm thickness1500LF$ - 0
20CIPP Main Liner 18" Diameter - 9.0 mm thickness1800LF$ - 0
21CIPP Main Liner 21" Diameter - 9.0 mm thickness2900LF$ - 0
22CIPP Main Liner 24" Diameter - 10.5 mm thickness3800LF$ - 0
23CIPP Main Liner 6" Diameter - Thickness Variance + 1.5mm300LF$ - 0
24CIPP Main Liner 8" Diameter - Thickness Variance + 1.5mm5000LF$ - 0
25CIPP Main Liner 10" Diameter - Thickness Variance + 1.5mm1000LF$ - 0
26CIPP Main Liner 12" Diameter - Thickness Variance + 1.5mm1000LF$ - 0
27CIPP Main Liner 15" Diameter - Thickness Variance + 1.5mm300LF$ - 0
28CIPP Main Liner 18" Diameter - Thickness Variance + 1.5mm300LF$ - 0
29CIPP Main Liner 21" Diameter - Thickness Variance + 1.5mm300LF$ - 0
30CIPP Main Liner 24" Diameter - Thickness Variance + 1.5mm300LF$ - 0
31Bypass Pumping Setup - 6-10" diameter5EA$ - 0
32Bypass Pumping Setup - 12" -14" diameter45EA$ - 0
33Bypass Pumping Setup - 15" to 21" diameter20EA$ - 0
34Bypass Pumping Setup - 24" diameter5EA$ - 0
35Bypass Pumping Operation - 6"-10" diameter10DAY$ - 0
36Bypass Pumping Operation - 12"-14" diameter90DAY$ - 0
37Bypass Pumping Operation - 15" to 21" diameter40DAY$ - 0
38Bypass Pumping Operation - 24" diameter10DAY$ - 0
39Normal Cleaning - 6" and 8" diameter73300LF$ - 0
40Normal Cleaning - 10" and 12" diameter6000LF$ - 0
41Normal Cleaning - 15" and 18" diameter3300LF$ - 0
42Normal Cleaning - 21" and 24" diameter6700LF$ - 0
43Specialty Cleaning - 6" and 8" diameter1000LF$ - 0
44Specialty Cleaning - 10" and 12" diameter100LF$ - 0
45Specialty Cleaning - 15" and 18" diameter50LF$ - 0
46Specialty Cleaning - 21" and 24" diameter100LF$ - 0
47Chemical Sealing of Host Pipe - 10" diameter and less30EA$ - 0
48Chemical Sealing of Host Pipe - 12" and 15" diameter10EA$ - 0
49Chemical Sealing of Host Pipe - 18" to 24" diameter5EA$ - 0
50Chemical Sealing - Grout100GAL$ - 0
51Removal & Sealing of Protruding Service Connections25EA$ - 0
52Additional Access Cost Main Liner25EA$ - 0
53Service Reconnection200EA$ - 0
54CIPP Liner Testing5EA$ - 0
SUBTOTAL - PIPE LINING$ - 0
POINT REPAIRS
1Mobilization for Routine Response20EA$ - 0
2Mobilization for Emergency Response6EA$ - 0
3Flagmen (Per-Flagmen)20HR$ - 0
4Multi Lane, Lane Closures (FDOT Index No. 613)5EA/DY$ - 0
5Multi Lane, Intersection (FDOT Index No. 615)5EA/DY$ - 0
6Arrow Boards - 5' Minimum Horizontal Size10EA/DY$ - 0
7Variable Message Board10EA/DY$ - 0
8Concrete Barrier (FDOT Index No. 415)10EA/DY$ - 0
9Low Profile Barrier (FDOT Index No. 412)10EA/DY$ - 0
10Signs in Work Zones10EA/DY$ - 0
116" Solid line Thermo Plastic - Permanent200LF$ - 0
1224" Stop Bar, Solid, Thermo Plastic, Perm.200LF$ - 0
136" Skip line (6'-10' Skip) Thermo Plastic-Perm.200LF$ - 0
14Barricades Type III, with Warning Lights1000EA/DY$ - 0
15Barricades Type I or II, with Warning Lights1000EA/DY$ - 0
16As-Built Survey5EA$ - 0
17Excavation, Unsuitable Material100CY$ - 0
18Sheeting & Bracing (Left in Place)500SF$ - 0
19Sheeting & Bracing, Pipe Trenches (Removed)2500SF$ - 0
20Well Point Dewatering Initial - 6'-8' Deep10EA$ - 0
21Well Point Dewatering Initial - 8'-10' Deep10EA$ - 0
22Well Point Dewatering Initial - 10'-12' Deep5EA$ - 0
23Well Point Dewatering Initial - 12'-14' Deep5EA$ - 0
24Well Point Dewatering Initial - 14'-16' Deep3EA$ - 0
25Well Point Dewatering Initial - > 16' Deep3EA$ - 0
26Well Point Dewatering Additional - 6'-8' Deep200EA$ - 0
27Well Point Dewatering Additional - 8'-10' Deep200EA$ - 0
28Well Point Dewatering Additional - 10'-12' Deep100EA$ - 0
29Well Point Dewatering Additional - 12'-14' Deep100EA$ - 0
30Well Point Dewatering Additional - 14'-16' Deep50EA$ - 0
31Well Point Dewatering Additional - > 16' Deep50EA$ - 0
32Jack & Bore 12" x .188" Steel Casing (6" GS)40LF$ - 0
33Jack & Bore 16" x .219" Steel Casing (8" GS)40LF$ - 0
34Jack & Bore 20" x .250" Steel Casing (10" GS)40LF$ - 0
35Jack & Bore 24" x .281" Steel Casing (12" GS)40LF$ - 0
362" Directional Drill HDPE DR 9, IPS OD200LF$ - 0
374" Directional Drill HDPE DR 11, DIPS OD300LF$ - 0
386" Directional Drill HDPE DR 11, DIPS OD500LF$ - 0
398" Directional Drill HDPE DR 11, DIPS OD500LF$ - 0
4010" Directional Drill HDPE DR 11, DIPS OD500LF$ - 0
4112" Directional Drill HDPE DR 11, DIPS OD300LF$ - 0
426" PVC Pipe, C-900 DR 18 (Gravity Sewer) 0' - 6' Depth100LF$ - 0
436" PVC Pipe, C-900 DR 18 (Gravity Sewer) 6' - 8' Depth200LF$ - 0
446" PVC Pipe, C-900 DR 18 (Gravity Sewer) 8' - 10' Depth100LF$ - 0
456" PVC Pipe, C-900 DR 18 (Gravity Sewer) 10' - 12' Depth50LF$ - 0
466" PVC Pipe, C-900 DR 18 (Gravity Sewer) 12' - 14' Depth50LF$ - 0
476" PVC Pipe, C-900 DR 18 (Gravity Sewer) 14' - 16' Depth50LF$ - 0
486" PVC Pipe, C-900 DR 18 (Gravity Sewer) 16' - 18' Depth50LF$ - 0
498" DI Pipe, CL 350 (Gravity Sewer) 0' - 6' Depth50LF$ - 0
508" DI Pipe, CL 350 (Gravity Sewer) 6' - 8' Depth100LF$ - 0
518" DI Pipe, CL 350 (Gravity Sewer) 8' - 10' Depth100LF$ - 0
528" DI Pipe, CL 350 (Gravity Sewer) 10' - 12' Depth50LF$ - 0
538" DI Pipe, CL 350 (Gravity Sewer) 12' - 14' Depth50LF$ - 0
548" DI Pipe, CL 350 (Gravity Sewer) 14' - 16' Depth50LF$ - 0
558" DI Pipe, CL 350 (Gravity Sewer) 16' - 18' Depth50LF$ - 0
568" PVC Pipe, C-900 DR 18 (Gravity Sewer) 0' - 6' Depth200LF$ - 0
578" PVC Pipe, C-900 DR 18 (Gravity Sewer) 6' - 8' Depth400LF$ - 0
588" PVC Pipe, C-900 DR 18 (Gravity Sewer) 8' - 10' Depth400LF$ - 0
598" PVC Pipe, C-900 DR 18 (Gravity Sewer) 10' - 12' Depth400LF$ - 0
608" PVC Pipe, C-900 DR 18 (Gravity Sewer) 12' - 14' Depth400LF$ - 0
618" PVC Pipe, C-900 DR 18 (Gravity Sewer) 14' - 16' Depth200LF$ - 0
628" PVC Pipe, C-900 DR 18 (Gravity Sewer) 16' - 18' Depth200LF$ - 0
6310" DI Pipe, CL 350 (Gravity Sewer) 0' - 6' Depth50LF$ - 0
6410" DI Pipe, CL 350 (Gravity Sewer) 6' - 8' Depth100LF$ - 0
6510" DI Pipe, CL 350 (Gravity Sewer) 8' - 10' Depth100LF$ - 0
6610" DI Pipe, CL 350 (Gravity Sewer) 10' - 12' Depth50LF$ - 0
6710" DI Pipe, CL 350 (Gravity Sewer) 12' - 14' Depth50LF$ - 0
6810" DI Pipe, CL 350 (Gravity Sewer) 14' - 16' Depth50LF$ - 0
6910" DI Pipe, CL 350 (Gravity Sewer) 16' - 18' Depth50LF$ - 0
7010" PVC Pipe, C-900 DR 18 (Gravity Sewer) 0' -6' Depth100LF$ - 0
7110" PVC Pipe, C-900 DR 18 (Gravity Sewer) 6' - 8' Depth400LF$ - 0
7210" PVC Pipe, C-900 DR 18 (Gravity Sewer) 8' - 10' Depth400LF$ - 0
7310" PVC Pipe, C-900 DR 18 (Gravity Sewer) 10' - 12' Depth400LF$ - 0
7410" PVC Pipe, C-900 DR 18 (Gravity Sewer) 12' - 14' Depth400LF$ - 0
7510" PVC Pipe, C-900 DR 18 (Gravity Sewer) 14' - 16' Depth200LF$ - 0
7610" PVC Pipe, C-900 DR 18 (Gravity Sewer) 16' - 18' Depth200LF$ - 0
7712" DI Pipe, CL 350 (Gravity Sewer) 0' - 6' Depth50LF$ - 0
7812" DI Pipe, CL 350 (Gravity Sewer) 6' - 8' Depth100LF$ - 0
7912" DI Pipe, CL 350 (Gravity Sewer) 8' - 10' Depth100LF$ - 0
8012" DI Pipe, CL 350 (Gravity Sewer) 10' - 12' Depth100LF$ - 0
8112" DI Pipe, CL 350 (Gravity Sewer) 12' - 14' Depth100LF$ - 0
8212" DI Pipe, CL 350 (Gravity Sewer) 14' - 16' Depth50LF$ - 0
8312" DI Pipe, CL 350 (Gravity Sewer) 16' - 18' Depth50LF$ - 0
8412" PVC Pipe, C-900 DR 18 (Gravity Sewer) 0' ' 6' Depth100LF$ - 0
8512" PVC Pipe, C-900 DR 18 (Gravity Sewer) 6' - 8' Depth200LF$ - 0
8612" PVC Pipe, C-900 DR 18 (Gravity Sewer) 8' - 10' Depth200LF$ - 0
8712" PVC Pipe, C-900 DR 18 (Gravity Sewer) 10' - 12' Depth100LF$ - 0
8812" PVC Pipe, C-900 DR 18 (Gravity Sewer) 12' - 14' Depth100LF$ - 0
8912" PVC Pipe, C-900 DR 18 (Gravity Sewer) 14' - 16' Depth50LF$ - 0
9012" PVC Pipe, C-900 DR 18 (Gravity Sewer) 16' - 18' Depth50LF$ - 0
9116" DI Pipe, CL 350 (Gravity Sewer) 0' - 6' Depth200LF$ - 0
9216" DI Pipe, CL 350 (Gravity Sewer) 6' - 8' Depth400LF$ - 0
9316" DI Pipe, CL 350 (Gravity Sewer) 8' - 10' Depth400LF$ - 0
9416" DI Pipe, CL 350 (Gravity Sewer) 10' - 12' Depth200LF$ - 0
9516" DI Pipe, CL 350 (Gravity Sewer) 12' - 14' Depth200LF$ - 0
9616" DI Pipe, CL 350 (Gravity Sewer) 14' - 16' Depth100LF$ - 0
9716" DI Pipe, CL 350 (Gravity Sewer) 16' - 18' Depth100LF$ - 0
9816" PVC Pipe, C-905 DR 18 (Gravity Sewer) 0' - 6' Depth100LF$ - 0
9916" PVC Pipe, C-905 DR 18 (Gravity Sewer) 6' - 8' Depth200LF$ - 0
10016" PVC Pipe, C-905 DR 18 (Gravity Sewer) 8' - 10' Depth200LF$ - 0
10116" PVC Pipe, C-905 DR 18 (Gravity Sewer) 10' - 12' Depth100LF$ - 0
10216" PVC Pipe, C-905 DR 18 (Gravity Sewer) 12' - 14' Depth100LF$ - 0
10316" PVC Pipe, C-905 DR 18 (Gravity Sewer) 14' - 16' Depth50LF$ - 0
10416" PVC Pipe, C-905 DR 18 (Gravity Sewer) 16' - 18' Depth50LF$ - 0
10518" DI Pipe, CL 350 (Gravity Sewer) 0' - 6' Depth200LF$ - 0
10618" DI Pipe, CL 350 (Gravity Sewer) 6' - 8' Depth400LF$ - 0
10718" DI Pipe, CL 350 (Gravity Sewer) 8' - 10' Depth400LF$ - 0
10818" DI Pipe, CL 350 (Gravity Sewer) 10' - 12' Depth200LF$ - 0
10918" DI Pipe, CL 350 (Gravity Sewer) 12' - 14' Depth200LF$ - 0
11018" DI Pipe, CL 350 (Gravity Sewer) 14' - 16' Depth100LF$ - 0
11118" DI Pipe, CL 350 (Gravity Sewer) 16' - 18' Depth100LF$ - 0
11218" PVC Pipe, C-905 DR 21 (Gravity Sewer) 0' - 6' Depth100LF$ - 0
11318" PVC Pipe, C-905 DR 21 (Gravity Sewer) 6' - 8' Depth200LF$ - 0
11418" PVC Pipe, C-905 DR 21 (Gravity Sewer) 8' - 10' Depth200LF$ - 0
11518" PVC Pipe, C-905 DR 21 (Gravity Sewer) 10' - 12' Depth100LF$ - 0
11618 PVC Pipe, C-905 DR 21 (Gravity Sewer) 12' - 14' Depth100LF$ - 0
11718" PVC Pipe, C-905 DR 21 (Gravity Sewer) 14' - 16' Depth50LF$ - 0
11818" PVC Pipe, C-905 DR 21 (Gravity Sewer) 16' - 18' Depth50LF$ - 0
11921" DI Pipe, CL 350 (Gravity Sewer) 0' - 6' Depth200LF$ - 0
12021" DI Pipe, CL 350 (Gravity Sewer) 6' - 8' Depth400LF$ - 0
12121" DI Pipe, CL 350 (Gravity Sewer) 8' - 10' Depth400LF$ - 0
12221" DI Pipe, CL 350 (Gravity Sewer) 10' - 12' Depth200LF$ - 0
12321" DI Pipe, CL 350 (Gravity Sewer) 12' - 14' Depth200LF$ - 0
12421" DI Pipe, CL 350 (Gravity Sewer) 14' - 16' Depth100LF$ - 0
12521" DI Pipe, CL 350 (Gravity Sewer) 16' - 18' Depth100LF$ - 0
12621" PVC Pipe, C-905 DR 21 (Gravity Sewer) 0' - 6' Depth100LF$ - 0
12721" PVC Pipe, C-905 DR 21 (Gravity Sewer) 6' - 8' Depth200LF$ - 0
12821" PVC Pipe, C-905 DR 21 (Gravity Sewer) 8' - 10' Depth200LF$ - 0
12921" PVC Pipe, C-905 DR 21 (Gravity Sewer) 10' - 12' Depth100LF$ - 0
13021" PVC Pipe, C-905 DR 21 (Gravity Sewer) 12' - 14' Depth100LF$ - 0
13121" PVC Pipe, C-905 DR 21 (Gravity Sewer) 14' - 16' Depth50LF$ - 0
13221" PVC Pipe, C-905 DR 21 (Gravity Sewer) 16' - 18' Depth50LF$ - 0
13324" DI Pipe, CL 350 (Gravity Sewer) 0' - 6' Depth200LF$ - 0
13424" DI Pipe, CL 350 (Gravity Sewer) 6' - 8' Depth400LF$ - 0
13524" DI Pipe, CL 350 (Gravity Sewer) 8' - 10' Depth400LF$ - 0
13624" DI Pipe, CL 350 (Gravity Sewer) 10' - 12' Depth200LF$ - 0
13724" DI Pipe, CL 350 (Gravity Sewer) 12' - 14' Depth200LF$ - 0
13824" DI Pipe, CL 350 (Gravity Sewer) 14' - 16' Depth100LF$ - 0
13924" DI Pipe, CL 350 (Gravity Sewer) 16' - 18' Depth100LF$ - 0
14024" PVC Pipe, C-905 DR 21 (Gravity Sewer) 0' - 6' Depth100LF$ - 0
14124" PVC Pipe, C-905 DR 21 (Gravity Sewer) 6' - 8' Depth200LF$ - 0
14224" PVC Pipe, C-905 DR 21 (Gravity Sewer) 8' - 10' Depth200LF$ - 0
14324" PVC Pipe, C-905 DR 21 (Gravity Sewer) 10' - 12' Depth100LF$ - 0
14424" PVC Pipe, C-905 DR 21 (Gravity Sewer) 12' - 14' Depth100LF$ - 0
14524" PVC Pipe, C-905 DR 21 (Gravity Sewer) 14' - 16' Depth50LF$ - 0
14624" PVC Pipe, C-905 DR 21 (Gravity Sewer) 16' - 18' Depth50LF$ - 0
147Install PVC Cleanout10EA$ - 0
148Replace PVC Cleanout with Manhole Structure10EA$ - 0
149Remove Pipe 2" or 4" (Gravity Sewer)200LF$ - 0
150Remove Pipe 6" or 8" (Gravity Sewer)400LF$ - 0
151Remove Pipe 10" or 12" (Gravity Sewer)400LF$ - 0
152Remove Pipe 15", 16" or 18" (Gravity Sewer)200LF$ - 0
153Remove Pipe 21" or 24" (Gravity Sewer)200LF$ - 0
1544" Pipe - Install or Adjust Service Lateral 0'-6' Deep3EA$ - 0
1554" Pipe - Install or Adjust Service Lateral 6'-8' Deep3EA$ - 0
1564" Pipe - Install or Adjust Service Lateral 8'-10' Deep3EA$ - 0
1574" Pipe - Install or Adjust Service Lateral 10'-12'
Deep3EA$ - 0
1584" Pipe - Install or Adjust Service Lateral 12'-14'
Deep2EA$ - 0
1594" Pipe - Install or Adjust Service Lateral 14'-16'
Deep2EA$ - 0
1604" Pipe - Install or Adjust Service Lateral 16'-18' Deep2EA$ - 0
1616" Pipe - Install or Adjust Service Lateral 0'-6' Deep3EA$ - 0
1626" Pipe - Install or Adjust Service Lateral 6'-8' Deep3EA$ - 0
1636" Pipe - Install or Adjust Service Lateral 8'-10' Deep3EA$ - 0
1646" Pipe - Install or Adjust Service Lateral 10'-12' Deep3EA$ - 0
1656" Pipe - Install or Adjust Service Lateral 12'-14' Deep2EA$ - 0
1666" Pipe - Install or Adjust Service Lateral 14'-16' Deep2EA$ - 0
1676" Pipe - Install or Adjust Service Lateral 16'-18' Deep2EA$ - 0
1682" Sewer Line Manhole Connection3EA$ - 0
1694" Sewer Line Manhole Connection3EA$ - 0
1706" Sewer Line Manhole Connection5EA$ - 0
1718" Sewer Line Manhole Connection5EA$ - 0
17210" Sewer Line Manhole Connection3EA$ - 0
17312" Sewer Line Manhole Connection3EA$ - 0
17416" Sewer Line Manhole Connection3EA$ - 0
17518" Sewer Line Manhole Connection2EA$ - 0
17621” Sewer Line Manhole Connection2EA$ - 0
17724” Sewer Line Manhole Connection2EA$ - 0
1782" Inside Drop Connection3EA$ - 0
1794" Inside Drop Connection3EA$ - 0
1806" Inside Drop Connection3EA$ - 0
1818" Inside Drop Connection5EA$ - 0
18210" Inside Drop Connection3EA$ - 0
18312" Inside Drop Connection3EA$ - 0
18415"/16" Inside Drop Connection3EA$ - 0
18518" Inside Drop Connection2EA$ - 0
18621" Inside Drop Connection3EA$ - 0
18724" Inside Drop Connection2EA$ - 0
188Grouting Out of Service Pipe (Force Main)30CY$ - 0
189Disconnect & Plug 2" or 4" Pipe5EA$ - 0
190Disconnect & Plug 6" or 8" Pipe5EA$ - 0
191Disconnect & Plug 10" or 12" Pipe5EA$ - 0
1922" PVC Restrained Joint Pipe & Fittings FM, SDR 21200LF$ - 0
1934" PVC Pipe, C-900 DR 18 (Force Main)500LF$ - 0
1944" PVC Restrained Joint Pipe & Fittings FM, C-900 DR 18100LF$ - 0
1956" PVC Pipe, C-900 DR 18 (Force Main)500LF$ - 0
1966" PVC Restrained Joint Pipe & Fittings FM, C-900 DR 18100LF$ - 0
1978" PVC Pipe, C-900 DR 18 (Force Main)500LF$ - 0
1988" PVC Restrained Joint Pipe & Fittings FM, C-900 DR 18100LF$ - 0
19910" PVC Pipe, C-900 DR 18 (Force Main)500LF$ - 0
20010" PVC Restrained Joint Pipe & Fittings FM, C-900 DR 18100LF$ - 0
20112" PVC Pipe, C-900 DR 18 (Force Main)300LF$ - 0
20212" PVC Restrained Joint Pipe & Fittings FM, C-900 DR 18100LF$ - 0
2032" Restrained Joints20EA$ - 0
2044" Restrained Joints20EA$ - 0
2056" Restrained Joints20EA$ - 0
2068" Restrained Joints20EA$ - 0
20710" Restrained Joints20EA$ - 0
20812" Restrained Joints20EA$ - 0
2092"-4" Forcemain Pipe and Appurtenances - Over Depth Excavation400LF$ - 0
2106"-8" Forcemain Pipe and Appurtenances - Over Depth Excavation500LF$ - 0
21110"-12" Forcemain Pipe and Appurtenances - Over Depth Excavation200LF$ - 0
212Remove Out of Service Pipe 2" or 4" (Force Main)500LF$ - 0
213Remove Out of Service Pipe 6" or 8" (Force Main)1000LF$ - 0
214Remove Out of Service Pipe 10" or 12" (Force Main)500LF$ - 0
2152" Sleeved Connection6EA$ - 0
2164" Sleeved Connection6EA$ - 0
2176" Sleeved Connection10EA$ - 0
2188" Sleeved Connection10EA$ - 0
21910" Sleeved Connection4EA$ - 0
22012" Sleeved Connection4EA$ - 0
221Reverse Deadman for 2" or 4" Pipe3EA$ - 0
222Reverse Deadman for 6" or 8" Pipe5EA$ - 0
223Reverse Deadman for 10" or 12" Pipe3EA$ - 0
224DI Fittings FM C 153 (Compact Body)2TN$ - 0
2252" Air Release Assembly (In-line)2EA$ - 0
2262" Air Release Assembly (Offset)2EA$ - 0
2272" RWGV (Resilient Wedge Gate Valve) & Box4EA$ - 0
2284" RWGV & Box C 5154EA$ - 0
2296" RWGV & Box C 51510EA$ - 0
2308" RWGV & Box C 5155EA$ - 0
23110" RWGV & Box C 5152EA$ - 0
23212" RWGV & Box C 5152EA$ - 0
233Adjust Valve Box to Finished Grade (In Pavement)5EA$ - 0
234Adjust Valve Box to Finished Grade (Outside of Pavement)5EA$ - 0
2354" Line Stop1EA$ - 0
2366" Line Stop1EA$ - 0
2378" Line Stop1EA$ - 0
23810" Line Stop1EA$ - 0
23912" Line Stop1EA$ - 0
2404" x 2" Tapping Saddle Valve & Box2EA$ - 0
2414" x 4" Tapping Sleeve Valve & Box2EA$ - 0
2426" x 2" Tapping Saddle Valve & Box2EA$ - 0
2436" x 4" Tapping Sleeve Valve & Box2EA$ - 0
2446" x 6" Tapping Sleeve Valve & Box2EA$ - 0
2458" x 2" Tapping Saddle Valve & Box2EA$ - 0
2468" x 4" Tapping Sleeve Valve & Box2EA$ - 0
2478" x 6" Tapping Sleeve Valve & Box2EA$ - 0
2488" x 8" Tapping Sleeve Valve & Box2EA$ - 0
24910" x 2" Tapping Saddle Valve & Box2EA$ - 0
25010" x 4" Tapping Sleeve Valve & Box2EA$ - 0
25110" x 6" Tapping Sleeve Valve & Box2EA$ - 0
25210" x 8" Tapping Sleeve Valve & Box2EA$ - 0
25310" x 10" Tapping Sleeve Valve & Box2EA$ - 0
25412" x 2" Tapping Saddle Valve & Box2EA$ - 0
25512" x 4" Tapping Sleeve Valve & Box2EA$ - 0
25612" x 6" Tapping Sleeve Valve & Box2EA$ - 0
25712" x 8" Tapping Sleeve Valve & Box2EA$ - 0
25812" x 10" Tapping Sleeve Valve & Box2EA$ - 0
25912" x 12" Tapping Sleeve Valve & Box2EA$ - 0
2604' Dia. - Precast Manhole Standard30VF$ - 0
2614' Dia. - Precast Manhole Inside Drop10VF$ - 0
2624' Dia. - Precast Manhole Outside Drop10VF$ - 0
2635' Dia. - Precast Manhole Standard30VF$ - 0
2645' Dia. - Precast Manhole Inside Drop10VF$ - 0
2655' Dia. - Precast Manhole Outside Drop10VF$ - 0
2665' Dia. - Precast Air Release Manhole10VF$ - 0
2676' Dia. - Precast Manhole Standard30VF$ - 0
2686' Dia. - Precast Manhole Inside Drop10VF$ - 0
2696' Dia. - Precast Manhole Outside Drop10VF$ - 0
270Removal of Existing Manhole3EA$ - 0
271Remove Existing Manhole Additional30VF$ - 0
272Initial Excavation - 0'-6' Deep5EA$ - 0
273Initial Excavation - 6'-8' Deep6EA$ - 0
274Initial Excavation - 8'-10' Deep6EA$ - 0
275Initial Excavation - 10'-12' Deep6EA$ - 0
276Initial Excavation - 12'-14' Deep3EA$ - 0
277Initial Excavation - 14'-16' Deep3EA$ - 0
278Initial Excavation - 16'-18' Deep2EA$ - 0
279Initial Excavation - 18'-20' Deep2EA$ - 0
280Additional Excavation - 0'-6' Deep100LF$ - 0
281Additional Excavation - 6'-8' Deep100LF$ - 0
282Additional Excavation - 8'-10' Deep100LF$ - 0
283Additional Excavation - 10'-12' Deep100LF$ - 0
284Additional Excavation - 12'-14' Deep100LF$ - 0
285Additional Excavation - 14'-16' Deep100LF$ - 0
286Additional Excavation - 16'-18' Deep50LF$ - 0
287Additional Excavation - 18'-20' Deep50LF$ - 0
288Wastewater Bypass Pumping, Set up, 6" - 10" diameter5EA$ - 0
289Wastewater Bypass Pumping, Set up, 12" - 14" diameter2EA$ - 0
290Wastewater Bypass Pumping, Set up, 15" - 21" diameter2EA$ - 0
291Wastewater Bypass Pumping, Set up, 24" diameter2EA$ - 0
292Wastewater Bypass Pumping, Operation, 6" - 10" diameter10DAY$ - 0
293Wastewater Bypass Pumping, Operation, 12" - 14" diameter5DAY$ - 0
294Wastewater Bypass Pumping, Operation, 15" - 21" diameter5DAY$ - 0
295Wastewater Bypass Pumping, Operation, 24" diameter2DAY$ - 0
2966" Dia. Pipe Gravity Sewer Point Repair (DI Replacement Pipe)2EA$ - 0
2976" Dia. Pipe Gravity Sewer Point Repair (PVC Replacement Pipe)5EA$ - 0
2988" Dia. Pipe Gravity Sewer Point Repair (DI Replacement Pipe)2EA$ - 0
2998" Dia. Pipe Gravity Sewer Point Repair (PVC Replacement Pipe)5EA$ - 0
30010" Dia. Pipe Gravity Sewer Point Repair (DI Replacement Pipe)2EA$ - 0
30110" Dia. Pipe Gravity Sewer Point Repair (PVC Replacement Pipe)5EA$ - 0
30212" Dia. Pipe Gravity Sewer Point Repair (DI Replacement Pipe)2EA$ - 0
30312" Dia. Pipe Gravity Sewer Point Repair (PVC Replacement Pipe)5EA$ - 0
30415"/16" Dia. Pipe Gravity Sewer Point Repair (DI Replacement Pipe)2EA$ - 0
30515"/16" Dia. Pipe Gravity Sewer Point Repair (PVC Rplacement Pipe)2EA$ - 0
30618" Dia. Pipe Gravity Sewer Point Repair (DI Replacement Pipe)2EA$ - 0
30718" Dia. Pipe Gravity Sewer Point Repair (PVC Replacement Pipe)2EA$ - 0
30821" Dia. Pipe Gravity Sewer Point Repair (DI Replacement Pipe)2EA$ - 0
30921" Dia. Pipe Gravity Sewer Point Repair(PVC Replacement Pipe)2EA$ - 0
31024" Dia. Pipe Gravity Sewer Point Repair (DI Replacement Pipe)2EA$ - 0
31124" Dia. Pipe Gravity Sewer Point Repair (PVC Replacement Pipe)2EA$ - 0
3126" Dia. Pipe Gravity Sewer Point Repair - Additional Length (DI Replacement Pipe)20LF$ - 0
3136" Dia. Pipe Gravity Sewer Point Repair - Additional Length (PVC Replacement Pipe)50LF$ - 0
3148" Dia. Pipe Gravity Sewer Point Repair - Additional Length (DI Replacement Pipe)20LF$ - 0
3158" Dia. Pipe Gravity Sewer Point Repair - Additional Length (PVC Replacement Pipe)100LF$ - 0
31610" Dia. Pipe Gravity Sewer Point Repair - Additional Length (DI Replacement Pipe)20LF$ - 0
31710" Dia. Pipe Gravity Sewer Point Repair - Additional Length (PVC Replacement Pipe)100LF$ - 0
31812" Dia. Pipe Gravity Sewer Point Repair Additional Length (DI Replacement Pipe)50LF$ - 0
31912" Dia. Pipe Gravity Sewer Point Repair - Additional Length (PVC Replacement Pipe)20LF$ - 0
32015"/16" Dia. Pipe Gravity Sewer Point Repair - Additional Length (DI Replacement Pipe)20LF$ - 0
32115"/16" Dia. Pipe Gravity Sewer Point Repair - Additional Length (PVC Replacement Pipe)50LF$ - 0
32218" Dia. Pipe Gravity Sewer Point Repair - Additional Length (DI Replacement Pipe)20LF$ - 0
32318" Dia. Pipe Gravity Sewer Point Repair - Additional Length (PVC Replacement Pipe)50LF$ - 0
32421" Dia. Pipe Gravity Sewer Point Repair - Additional Length (DI Replacement Pipe)20LF$ - 0
32521" Dia. Pipe Gravity Sewer Point Repair - Additional Length (PVC Replacement Pipe)50LF$ - 0
32624" Dia. Pipe Gravity Sewer Point Repair - Additional Length (DI Replacement Pipe)20LF$ - 0
32724" Dia. Pipe Gravity Sewer Point Repair - Additional Length (PVC Replacement Pipe)50LF$ - 0
3282" Dia. Pipe Forcemain Point Repair3EA$ - 0
3294" Dia. Pipe Forcemain Point Repair3EA$ - 0
3306" Dia. Pipe Forcemain Point Repair3EA$ - 0
3318" Dia. Pipe Forcemain Point Repair3EA$ - 0
33210" Dia. Pipe Forcemain Point Repair2EA$ - 0
33312" Dia. Pipe Forcemain Point Repair2EA$ - 0
334Replace Manhole Ring & Cover (Asphalt Pavement)5EA$ - 0
335Replace Manhole Ring & Cover (Unpaved)5EA$ - 0
336Manhole Bench Replacement, 4' Diameter2EA$ - 0
337Manhole Bench Replacement, 5' Diameter2EA$ - 0
338Manhole Bench Replacement, 6' Diameter2EA$ - 0
339Adjust Manhole Ring & Cover to Finished Grade (In Pavement)5EA$ - 0
340Adjust Manhole Ring & Cover to Finished Grade (Outside of Pavement)5EA$ - 0
341Flowable Concrete Fill100CY$ - 0
342Roadway Base, Lime Rock, Primed, Min. LBR 100, Variable Thickness120CY$ - 0
343Roadway Base, Crushed Concrete/Graded Aggregate, Min. LBR 100, Variable Thickness120CY$ - 0
344Superpave Asphalt Base, Type B 12.5, Variable Thickness50TN$ - 0
345Superpave Asphalt Concrete, Type SP 9.5, Fine, Traffic Level C, Variable Thickness100TN$ - 0
346Superpave Asphalt Concrete, Type SP 12.5, Fine, Traffic Level C, Variable Thickness100TN$ - 0
347Pavement, Cement Concrete, 6" Min Thickness (Driveways)100SY$ - 0
348Pavement, Cement Concrete, 8" Thick100SY$ - 0
349Driveway Restoration, In Kind, Decorative Block50SY$ - 0
350Milling Existing Asphalt Pavement, 1/2" Average Depth150SY$ - 0
351Milling Existing Asphalt Pavement, 3/4" Average Depth150SY$ - 0
352Milling Existing Asphalt Pavement, 1" Average Depth150SY$ - 0
353Curb & Gutter, Concrete, FDOT Type D100LF$ - 0
354Curb & Gutter Concrete, FDOT Type F100LF$ - 0
355Curb & Gutter, Concrete, Miami Curb300LF$ - 0
356Valley Gutter, Concrete, PCED Index 1315100LF$ - 0
357Sidewalk, Concrete, 4" Min. Thickness, Remove and Replace500SF$ - 0
358Sidewalk, Concrete, 6" Min. Thickness, Remove and Replace500SF$ - 0
359Sodding4500SF$ - 0
360Sectional Liner, 6" - 24" Pipe50EA$ - 0
SUBTOTAL - POINT REPAIRS$ - 0
GRAND TOTAL$ - 0
Bid quantities are for comparison purposes only.

This contract consists of various projects which are not yet defined and no quantities are guaranteed.