Larsen Middle School Domestic Water Piping Replacement Project Manual

This is a comprehensive project manual for School District U-46 in Kane County, Illinois, documenting the domestic water piping replacement project at Larsen Middle School, Project No. 508-25. The work encompasses the complete replacement of domestic water piping and all associated work at the school located at 665 Dundee Avenue, Elgin, Illinois. A mandatory pre-bid meeting is scheduled for December 2, 2025, at 4:00 p.m. CT at the school site, with bidders required to arrive 30 minutes early and enter through Door #20. The sealed lump-sum bids are due December 17, 2025, at 12:00 p.m. CT via the School District's RFP/Bid Portal, with a virtual bid opening conducted via Zoom on the same date and time. The construction schedule requires work commencement on May 26, 2026, following receipt of a Letter of Intent to Proceed anticipated February 10, 2026, with substantial completion targeted for August 14, 2026, and final completion by August 21, 2026. Contractors must submit AIA Document A305 Contractor's Qualification Statement with their bids and guarantee their proposals for 90 days from the bid opening date. The project includes replacement of domestic water piping systems with associated plumbing, HVAC, electrical, and structural work as detailed in the comprehensive specifications.

The bid guarantee requirement is ten percent of the total base bid amount, submitted as either a Bid Bond or Cashier's Check payable to School District U-46, delivered to the Procurement Office at 1474 Sheldon Drive, Elgin, Illinois via Certified Mail, UPS, or FedEx prior to bid opening. Upon contract award, successful contractors must furnish Performance and Payment Bonds equal to 100 percent of the contract sum. The project is subject to the Illinois Prevailing Wage Act, requiring contractors to pay prevailing wages and submit certified payrolls through the Illinois Department of Labor website. Contractors bear responsibility for all overtime and shift work costs necessary to meet the strict construction schedule, with liquidated damages of $1,000 per calendar day assessed for failure to achieve substantial completion by August 14, 2026. All materials, including piping, fittings, and equipment, must be manufactured in the United States. Background checks are required for all on-site personnel prior to the pre-construction meeting, and the school district maintains a Raptor system requiring all staff to sign in daily. The project includes comprehensive mechanical, plumbing, electrical, and structural requirements as detailed in the full project manual specifications, with closeout documentation including two sets of all manuals, warranties, as-built drawings, and operation and maintenance data to be submitted on USB flash drives.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHOOL DISTRICT U-46

355 East Chicago Street

Elgin, Illinois 60120

111 S. Virginia Street, Crystal Lake, Illinois 60014

Office 815-788-8901 | Fax 815-788-8908 MSA P.N. 2444

PROJECT MANUAL

LARSEN MIDDLE SCHOOL

DOMESTIC WATER PIPING REPLACEMENT

U-46 Project No. 508-25

November 24, 2025

Owner: School District U-46 355 East Chicago Street Elgin, Illinois 60120

Engineer: Mechanical Services Associates Corp.

Jeff Leverenz 111 S. Virginia Street Crystal Lake, Illinois 60014 815-788-8901

MANDATORY Pre-Bid Meeting: December 2, 2025, 4:00 p.m. CT Larsen Middle School 665 Dundee Avenue Elgin, Illinois 60120

Virtual Bid Opening: December 17, 2025, 12:00 p.m. CT School District U-46 Link will be posted on the District’s Bid Portal (Bonfire)

TABLE OF CONTENTS TOC - 1

LARSEN MS – DOMESTIC WATER PIPING REPLACEMENT U-46 P.N. 508-25

SCHOOL DISTRICT U-46

LARSEN MIDDLE SCHOOL

DOMESTIC WATER PIPING REPLACEMENT

MSA PROJECT NO. 2444

U-46 PROJECT NO. 508-25

TABLE OF CONTENTS

GENERAL INFORMATION

A1 Advertisement for Bids

A2 Instructions to Bidders

AIA A701 Instruction to Bidders (Latest Edition) (NOT INCLUDED)

A9 Authorization for Criminal Background Investigations

AIA A201 General Conditions of the Contract for Construction

AIA A101 Standard Form of Agreement Between Owner and Contractor (Latest Edition)

(NOT INCLUDED)

AIA A312 Performance Bond and Payment Bond (Latest Edition) (NOT INCLUDED)

BID SUBMITTAL DOCUMENTS

A3 Form of Bid

A4 Bidder Eligibility Certification and Non-Collusion Affidavit Pursuant to

Public Act 85-1295 (720 ILCS 5/33E-1 et seq.)

A5 Prevailing Wage Payment Certification

A6 Certificate of Compliance with Illinois Human Rights Act (775 ILCS 5/1-101 et seq.)

A7 Certificate of Compliance with Illinois Drug-Free Workplace Act

A8 Certificate Regarding Criminal Background Investigations

A10 Asbestos and/or Lead Free Construction Certification

A11 Certification of Sexual Harassment Policy

A12 Certification of Monthly Payroll

AIA A305 Contractor’s Qualification Statement (NOT INCLUDED)

AIA A310 Bid Bond (Latest Edition) (NOT INCLUDED)

SPECIFICATIONS

NOTE: ALL REFERENCES TO "ARCHITECT" WITHIN THE PROJECT DOCUMENTS

SHALL BE REFERRED TO AS "ENGINEER."

Division 00 – Contracting Requirements

Section 003126 Environmental Notes

Division 01 – General Requirements

Section 010200 Completion Date

Section 012100 Allowances

Section 012500 Substitution Procedures

Section 012600 Contract Modification Procedures

Section 012900 Payment Procedures

TABLE OF CONTENTS TOC - 2

Section 012901 Special Provisions for Predetermined Prevailing Wage

Section 013100 Project Management and Coordination

Section 013200 Construction Progress Documentation

Section 013300 Submittal Procedures

Section 015000 Temporary Facilities and Controls

Section 017300 Execution

Section 017700 Closeout Procedures

Section 017823 Operation and Maintenance Data

Section 017839 Project Record Documents

Section 017900 Demonstration and Training

Division 03 – Concrete

Section 033000 Cast-in-Place Concrete

Division 04 – Masonry

Section 042000 Unit Masonry

Division 07 – Thermal and Moisture Protection

Section 078413 Penetration Firestopping

Section 079200 Joint Sealants

Division 09 – Finishes

Section 095123 Acoustical Tile Ceilings

Section 096723 Epoxy Resin Flooring

Section 099123 Interior Painting

Division 10 – Specialties

Section 101550 Toilet Compartments

Division 22 – Plumbing

Section 220500 Common Work Results for Plumbing

Section 220523 General-Duty Valves for Plumbing Piping

Section 220529 Hangers and Supports for Plumbing Piping and Equipment

Section 220553 Identification for Plumbing Piping and Equipment

Section 220700 Plumbing Insulation

Section 221116 Domestic Water Piping

Section 221316 Sanitary Waste and Vent Piping

Section 224000 Plumbing Fixtures

Section 224700 Drinking Fountains and Water Coolers

Division 26 – Electrical

Section 260000 Electrical, General

Section 260500 Common Work Results for Electrical

Section 260519 Low-Voltage Electrical Power Conductors and Cables

Section 260523 Control-Voltage Electrical Power Cables

Section 260526 Grounding and Bonding for Electrical Systems

Section 260529 Hangers and Supports for Electrical Systems

Section 260533 Raceway and Boxes for Electrical Systems

Section 260553 Identification for Electrical Systems

TABLE OF CONTENTS TOC - 3

Section 262726 Wiring Devices

Section 262813 Fuses

Section 262816 Enclosed Switches and Circuit Breakers

END OF TABLE OF CONTENTS

ADVERTISEMENT FOR BIDS A1 - 1

BIDDING REQUIREMENTS

SECTION A1 – ADVERTISEMENT FOR BIDS

The Board of Education of School District U-46, Kane County, Illinois, hereby gives notice that sealed lump sum bids will be received for the Domestic Water Piping Replacement at Larsen Middle School, Project No. 508-25. The work includes the replacement of domestic water piping and all associated work at Larsen Middle School, 665 Dundee Avenue, Elgin, Illinois 60120. Refer to Drawings and Project

Manual for full extent of the work required.

CONSTRUCTION BONDS REQUIRED: Upon award of Contract, a Performance Bond and Material

& Labor Payment Bond will be required from the General Contractor for 100% of the contract sum, payable to the Owner.

PREVAILING WAGE LAW: This project is subject to the Illinois Prevailing Wage Act (820 ILCS

130).

PREQUALIFICATION PROCEDURE: All interested bidders are required to complete an AIA

Document A305 Contractor’s Qualification Statement and submit them with all bidding documents at the time of bid.

MANDATORY PRE-BID MEETING: A MANDATORY Pre-Bid meeting is scheduled for Tuesday, December 2, 2025, at 4:00 p.m. CT at Larsen Middle School, 665 Dundee Avenue, Elgin, Illinois.

Please arrive 30 minutes early to sign in. Enter Door #20.

BID GUARANTEE: Contractors shall guarantee their submitted Bid Proposal for a ninety (90) day period from the date of Bid Opening.

BID PACKAGE SUBMITTAL: Bids will be due on December 17, 2025, at 12:00 p.m. CT via the

School District’s RFP/Bid Portal (refer to BID DOCUMENTS paragraph below for information on portal). Contractors will upload all required bid forms and documentation individually to the bidding portal. Refer to Form of Bid for all required bid documentation.

Receipt of a Bid Bond of ten percent (10%) of the amount of the base bid(s), (including all alternates and allowances) or a Cashier’s Check made payable to School District U-46, is required prior to the time of the virtual bid opening. Contractor shall send the original Bid Bond or Cashier’s Check to School District

U-46 Procurement Office, 1474 Sheldon Drive, Elgin, Illinois 60120, Attn: Danise Smith, via Certified mail, UPS, or FedEx to ensure confirmed delivery prior to the Bid Opening. If Contractor has an electronic certification process, then they will be able to upload the Bid Bond into the bidding portal. Bids will not be accepted without a Bid Bond / Cashier’s Check at Bid Opening. These can be dropped off Monday through Friday, 7:00 a.m. to 4:00 p.m. CT.

A Public Bid Opening will be conducted via a Zoom meeting on the bid’s established bid opening date and time. At that time, the bids will be unsealed and all bid totals will be read aloud and will be able to be visually viewed on the screen. Zoom credentials (sign-in) for attendance at this meeting, along with bid opening date and time, will be posted on the District’s Bid Portal (Bonfire) under “Public Files.” Invites will NOT be provided; therefore, it is the Bidders’ responsibility to obtain these Zoom credentials directly from the Portal prior to the Bid Opening.

BID DOCUMENTS: Bid Documents, including Drawings and Specifications, are available for download from the School District’s RFP/Bid Portal at https://u-46.bonfirehub.com/portal/?tab=login starting on Monday, November 24, 2025, at 8:00 a.m. CT. Registration is required to access the Bid

Documents; however, registration is easy and free!

https://u-46.bonfirehub.com/portal/?tab=login

ADVERTISEMENT FOR BIDS A1 - 2

If needed, registration instructions are available at:

https://customer.eunasolutions.com/public/s/article/vendor-registration

Please direct any questions during bidding through the Bonfire website. Bidders are requested not to contact U-46 Administrators, Staff, or Board Members, etc.

END OF ADVERTISEMENT FOR BIDS

https://customer.eunasolutions.com/public/s/article/vendor-registration

INSTRUCTIONS TO BIDDERS A2 - 1

BIDDING REQUIREMENTS

SECTION A2 – INSTRUCTIONS TO BIDDERS

Notice is hereby given by the Board of Education of School District U-46 in Kane County, Illinois that sealed lump sum bids will be received for the following:

Project: School District U-46

Larsen Middle School

Domestic Water Piping Replacement

U-46 Project No. 508-25

Owner: School District U-46

355 East Chicago Street

Elgin, Illinois 60120

847-888-5000

Engineer: Mechanical Services Associates Corp.

111 S. Virginia Street

Crystal Lake, Illinois 60014

815-788-8901

PROJECT DESCRIPTION

The work includes, but is not limited to, the Domestic Water Piping Replacement and all associated work at

Larsen Middle School, 665 Dundee Avenue, Elgin, Illinois 60120. Refer to the Drawings and Project Manual for the full extent of the Work.

** CONSTRUCTION SCHEDULE IS CRITICAL** Contractor shall commence work on the dates shown in the table on page 2 and shall complete all work in a diligent and professional manner by the dates indicated in the schedule on page 2. Any and all possible overtime, first and second shift work, and weekend work in order to accomplish completion of project in accordance with the construction schedules shall be included in the Contractor’s Bid. No extension of time or additional costs will be accepted after Contract Award.

Owner needs to be notified immediately of any known equipment delivery delays pertaining to this project which may affect substantial completion. Identify any known equipment delivery delays on

Section A3, Form of Bid.

PROJECT SCHEDULE

A Letter of Intent to Proceed, if deemed necessary, is anticipated to be issued by the School District on

February 10, 2026.

The construction schedule is as follows:

INSTRUCTIONS TO BIDDERS A2 - 2

CONSTRUCTION SCHEDULE

February 10, 2026

Possible Letter of Intent/Notice to Proceed to be Issued.

• Start Shop Drawings and submit to Engineer within one week of receipt of Letter of Intent.

• Generate Construction Schedule for each school awarded and submit with signed AIA Contract

February 23, 2026 Anticipated Award of Contract by School District U-46 Board of

Education. Contract to be issued immediately the next day.

May 26, 2026

Work shall commence once: project is approved by the ROE;

Contractor has submitted signed Contract, Performance &

Payment Bonds, and Certificate of Insurance; AND receipt of

U46 Executed AIA Contract. Contractor may not start work on site until notified by Engineer.

August 14, 2026

Substantial Completion. Work has been reviewed by the authorities having jurisdiction, Regional Office of Education

(ROE), manufacturer’s representative and Engineer, all system certifications have been provided and all electrical devices connected and safe. Punchlist inspection has been requested and performed by the Engineer.

August 21, 2026

Final Completion (This means that all Punchlist items shall be completed and all closeout documents and final pay application shall be submitted no later than this date.)

The schedule of construction shall be closely coordinated with individual schools’ ongoing activities, sporting events, concerts, etc. The contractor will be required to coordinate site access and actual schedule of working dates.

The Contractor shall schedule work to achieve Substantial Completion, including working overtime, shift work, and/or weekends to complete work on the scheduled target dates and to not adversely inconvenience the

District in noted areas of work. Any and all possible overtime/second shift premium for this work in order to accomplish completion of project in accordance with the construction schedule shall be included in the

Contractor’s Bid. Contractor will be required to pay the School District for custodian straight time and overtime when working beyond normal school hours, or if working on Sundays or Holidays, at the following rates.

• Contractor will be charged for 3-hour minimum for out-of-hours work per occurrence.

• All Schools Weekdays after 10:00 p.m.: $71.33 per hour

• High Schools Saturdays after 3:00 p.m.: $71.33 per hour

• Elementary and Middle Schools Saturdays: $71.33 per hour

• All Schools Sundays and Holidays: $95.11 per hour

By submitting a bid, the Contractor guarantees he can meet this time schedule. No extension of time or additional costs will be accepted after Contract Award.

RADAR SCANNING

Radar Scan all floors before coring or saw cutting. Notify GC, Owner and Engineer of findings and if new work will conflict with any existing conduit or piping that may have been discovered in the floor system. If

INSTRUCTIONS TO BIDDERS A2 - 3

radar scans are not performed, the contractor will be responsible for all repair work needed to return the existing systems back to an operational condition.

DAILY SITE CLEAN UP:

Contractor shall protect the work area from all garbage/debris and clean up site at the end of the shift so that area is clean and ready for staff/students in the morning. Contractors shall cooperate with the Owner at all times and coordinate construction work to maintain the safety, health, and welfare of students, staff, workers and other contractors.

SCHOOL DISTRICT U-46 RAPTOR SYSTEM:

All staff will be required to sign in daily. All on-site personnel are required to be run through School District

U-46 Raptor System. This will need to be scheduled through BASCO as appointments are required.

Appointments can be scheduled from 6:30 a.m. to 10:30 a.m. CT and from 1:00 p.m. to 2:30 p.m. CT, Monday through Friday. Contact Jolene Linneman, Construction Project Coordinator at School District U-46, at 847-888-5000, ext. 2269, with any questions or concerns.

WARRANTY:

Warranty Letters will be required by all Contractors / Sub-contractors showing minimum 2 years coverage, or greater if specified in the Plans and Specifications. Submit with Close Out Documentation.

CLOSE OUT DOCUMENTATION:

Two sets of all close out documentation shall be required, including O&M’s, As-Built Drawings, Warranty

Letters, etc., saved on two USB flash drives. Refer to Division 01 Specifications for additional requirements.

BACKGROUND CHECKS

Prior to the Pre-Construction meeting, Contractor is required to submit all background checks for each employee working on the project site, including employees of all subcontractors on the project. Refer to the

Project Manual Specification Section A8, Certificate Regarding Criminal Background Investigations for information on background checks.

LIQUIDATED DAMAGES

If the Contractor has not reached Substantial Completion on the dates as identified, it is the intent of the

School District to assess liquidated damages from the Contractual Substantial Completion dates until the actual Substantial Completion dates. Refer to the Project Manual for complete information regarding the specified Liquidated Damages: AIA A201 General Conditions of the Contract, and Specification Section

010200 Completion Date.

PRE-BID MEETING

There shall be a Mandatory Pre-bid Meeting on December 2, 2025, at 4:00 p.m. CT at Larsen Middle

School, 665 Dundee Avenue, Elgin, Illinois. Please arrive 30 minutes early to sign in. Enter Door #20.

INSTRUCTIONS TO BIDDERS A2 - 4

PROPOSALS

Bids are invited from qualified Contractors for the complete construction of this Project, under one General

Contract (AIA A101), including all trades as specified in the Project Manual.

Bids will be due on Thursday, March 13, 2025, at 9:00 a.m. CT via the School District’s RFP/Bid Portal

(as explained in the Advertisement for Bids). Contractors will upload all required bid forms and documentation individually to the bidding portal. Refer to Form of Bid for all required bid documentation.

Receipt of a Bid Bond of ten percent (10%) of the amount of the base bid(s), (including all alternates and allowances) or a Cashier’s Check made payable to School District U-46, is required prior to the time of the virtual bid opening. Contractor shall send the original Bid Bond or Cashier’s Check to School District U-46

Procurement Office, 1474 Sheldon Drive, Elgin, Illinois 60120, Attn: Danise Smith, via Certified mail, UPS, or FedEx to ensure confirmed delivery prior to the Bid Opening. If Contractor has an electronic certification process, then they will be able to upload the Bid Bond into the bidding portal. Bids will not be accepted without a Bid Bond / Cashier’s Check at Bid Opening. These can be dropped off Monday through

Friday, 7:00 a.m. to 4:00 p.m. CT.

A Public Bid Opening will be conducted via a Zoom meeting on the bid’s established bid opening date and time. At that time, the bids will be unsealed and all bid totals will be read aloud and will be able to be visually viewed on the screen. Zoom credentials (sign-in) for attendance at this meeting, along with bid opening date and time, will be posted on the District’s Bid Portal (Bonfire) under “Public Files.” Invites will NOT be provided; therefore, it is the Bidders’ responsibility to obtain these Zoom credentials directly from the Portal prior to the Bid Opening.

Contractors shall guarantee their submitted proposal for a ninety (90) day period from Date of Bid Opening.

BID GUARANTEE

Bid Guarantee via Bid Bond / Cashier’s Check shall be submitted with the understanding that it shall guarantee that:

1. The Bidder will not withdraw his Bid within 90 days after the date of the opening of Bids.

2. That the successful Bidder will enter into a formal Contract with the Owner and give such bonds as are required by the GENERAL CONDITIONS and SUPPLEMENTARY

GENERAL CONDITIONS.

3. In the event the Bid is withdrawn within the 90-day period after the date of the Bid opening, the Bidder shall be liable to the Owner for the full amount of the Bid Bond, and the Owners shall have the right to retain the proceeds of said Bid Bond to apply on the account of damages and excess costs which they may incur because of such withdrawal.

4. In case the Bid Guarantee is in the form of a Certified Check or Bank Draft, the Owner may make such disposition of same as will accomplish the purpose for which submitted.

Certified checks or Bank Drafts of all but the three lowest Bidders will be returned as soon as practicable after the opening of the Bids.

BID DOCUMENTS

Bid Documents, including Drawings and Specifications, are available for download from the School

District’s RFP/Bid Portal at https://u-46.bonfirehub.com/portal/?tab=login starting on Monday, November 24, 2025, at 8:00 a.m. CT. Registration is required to access the Bid Documents; however, registration is easy and free!

https://u-46.bonfirehub.com/portal/?tab=login

INSTRUCTIONS TO BIDDERS A2 - 5

If needed, registration instructions are available at:

https://customer.eunasolutions.com/public/s/article/vendor-registration

Please direct any questions during bidding through the Bonfire website. Bidders are requested not to contact

U-46 Administrators, Staff, or Board Members, etc.

QUESTION & ANSWERS

No oral interpretations will be made to any Bidder as to the meaning of the Specifications or the Drawings.

Every request for an interpretation shall be made through Bonfire “Opportunity Q&A”.

Deadline to submit questions in Bonfire will be Friday, December 5, 2025, by 12:000 p.m. CT. All questions will be responded to by Thursday, December 11, 2025, 12:00 p.m. CT, and posted in the form of an Addendum. No questions will be responded through district email or by phone call.

All Addenda will be issued via Bonfire. Contractor will be required to sign and submit all Addenda acknowledgement pages (last page of Addenda) as part of their Bid Package.

QUALIFICATION FORMS

Contractors submitting bids on the above project must submit a completed AIA Document A305 General

Contractors Qualification Form (furnished by Contractor) with the Bid Documents. Form must include names and telephone numbers of architects, owners, and contact persons for each project listed. See Supplemental

Contractor Qualification Statement for more information. Contractor qualifications may be a determining factor in identifying the lowest responsible bidder.

AWARD OF CONTRACTS: REJECTION OF BIDS

Contract will be awarded to the responsible Bidder submitting the lowest proposal complying with the conditions of the Bidding Documents, provided their Bid is reasonable and it is to the best interest of the

Owner to accept it. The Bidder to whom the Contract is awarded will be notified at the earliest practicable date. The Owner, however, reserves the right to reject any and all Bids and to waive any informality, irregularity, or qualifications in the Bids received whenever such rejection or waiver is in the best interest of the Owner.

The Owner also reserves the right to reject the Bid of any Bidder who:

▪ Has previously failed to perform properly.

▪ Has failed to complete on time Contracts of similar nature.

▪ Is not in a position to perform the work required promptly.

▪ Has habitually, and without just cause, neglected the payment of bills or otherwise disregarded his obligations to subcontractors, materialmen and/or employees.

In determining the lowest responsible Bidder, the following elements, in addition to those heretofore mentioned, will be considered, whether the Bidder involved:

▪ Maintains a permanent place of business.

▪ Has adequate plant, equipment and men available to do the work properly and expeditiously.

▪ Has suitable financial resources to meet the obligations incidental to the work.

https://customer.eunasolutions.com/public/s/article/vendor-registration

INSTRUCTIONS TO BIDDERS A2 - 6

▪ Has the appropriate technical experience, qualified project management and project superintendent personnel.

The Owner reserves the right to consider as unqualified to perform the General Contract Work any Bidder who does not habitually perform with his own forces at least one major trade (e.g., cast-in-place concrete;

carpentry; demolition; general laborers; masonry).

The ability of a Bidder to obtain a Performance and Payment Bond shall not be regarded as the sole test of such Bidder’s competency or responsibility.

EXECUTION OF CONTRACT

Subsequent to the award and within ten days after the Agreement forms are presented for signature, successful

Bidder shall sign the Agreement and deliver it to the Owner via Mechanical Services Associates Corp. in such number of counterparts as the Owner may require. The Agreement will be on AIA Document A101, 2017

Edition.

Having satisfied all conditions of the award as set forth elsewhere in these Documents, successful Bidders shall, within the ten days specified above, furnish a Performance and a Labor and Material Payment bond each in the amount of the Contract as awarded, as a security for the faithful performance of the Contract, and for the Payment of all persons, firms, or corporations to whom the Contractor may become legally indebted for labor, materials, tools, equipment, or services, of any nature, employed or used by him in performing the work. Such bonds shall be in the form of AIA Document A312 and shall bear the same date as, or a date subsequent to date of Contract Agreement.

Each Bidder must be bondable at time bids are due, and he shall so state in his bid. The failure of successful

Bidders to execute such Contract and to supply the required Bonds within ten days after the prescribed forms are presented for signature or if bonding company finds that a Bidder is NOT bondable, shall constitute a default, and the Owner may either award the Contract to the next responsible Bidder or re-advertise for Bids, and may charge against such Bidder the difference between amount of his Bid and amount for which the

Contract for the work is subsequently executed, irrespective of whether the amount thus due exceeds amount of his Bid Guarantee.

END OF INSTRUCTIONS TO BIDDERS

AUTHORIZATION FOR CRIMINAL BACKGROUND INVESTIGATIONS A9 - 1

BIDDING REQUIREMENTS

SECTION A9 – AUTHORIZATION FOR CRIMINAL BACKGROUND INVESTIGATIONS

NOTE: This form is not required for submittal with bid. This is the form referred to in Section A8 for use with employment applications.

AUTHORIZATION FOR CRIMINAL BACKGROUND INVESTIGATION INFORMATION

The undersigned hereby authorizes the Board of Education, School District U-46, Kane County, Illinois, to request a criminal background investigation from the Illinois State Police, pursuant to Section 5/1-21.9 of the

School Code of Illinois, 105 ILCS 5/10-21.9 and to receive criminal history record information thereto.

By: _________________________________________________________________________

Printed Name of Applicant Employee

Signature of Applicant Employee

Date

END OF SECTION A9

FORM OF BID A3 - 1

BIDDING REQUIREMENTS

SECTION A3 – FORM OF BID

Bid To: Board of Education

School District U-46

355 East Chicago Street

Elgin, Illinois 60120

Bid From:

Bidder’s Name

Bidder’s Street Address

Bidder’s City, State, Zip Code

Telephone No. Fax No.

Primary Contact Name / Email Address

The Undersigned:

1.1 ACKNOWLEDGES RECEIPT OF

A. Project manual/drawings for the Domestic Water Piping Replacement and all associated work at

Larsen Middle School, located at 665 Dundee Avenue, Elgin, Illinois 60120.

1. U-46 Project No. 508-25; MSA Project No. 2444.

2. Out-to-Bid Date: November 24, 2025.

3. Mandatory Pre-Bid Meeting and Walk-Through: December 2, 2025, 4:00 p.m. CT at

Larsen Middle School, 665 Dundee Avenue, Elgin, Illinois 60123.

4. Virtual Bid Opening: December 17, 2025, 12:00 p.m. CT.

B. Warranty Requirements: Warranty Letters will be required by all Contractors / Sub-contractors showing minimum 2 years coverage, or greater if specified in the Plans and Specification.

Submit with Close Out Documentation.

C. Close Out Documentation Requirements: Two sets of all close out documentation shall be required, including O&M’s, As-Built Drawings, Warranty Letters, etc., also saved on two USB flash drives. Refer to Division 01 Specifications for additional requirements.

1.2 Has examined the site(s) where the work is to be executed and has become familiar with local conditions as they might in any way affect the cost and/or execution of this work, and has carefully examined the bidding documents and addenda thereto.

1.3 AGREES

A. That this bid may not be withdrawn until 90 calendar days after bid opening date without permission of Owner.

FORM OF BID A3 - 2

B. To accept the provisions of the Instructions to Bidders regarding disposition of bid security and project requirements.

C. To enter into the execution of a contract with School District U-46, if awarded on the basis of this bid and in connection therewith to:

1. Letter of Intent, if needed, is scheduled to be issued on February 10, 2026.

Contractor shall complete and submit remaining shop drawings to

Architect/Engineer within one week of receipt of Letter of Intent.

2. Furnish all bonds and insurance and certification required by the bidding documents.

3. Accomplish the work in accordance with the contract and provide all labor, materials, equipment, transportation and other facilities as necessary and/or required for the completed and satisfactory execution of the work for each Base Bid.

4. Any and all fees related to overtime and second shift work in order to accomplish completion of project in accordance with the construction schedule are included in the Contractor’s Bid. No extension of time or additional costs will be accepted after

Contract Award.

5. Complete the work within the contract time herein specified. Refer to Specification

Section 010200 “Completion Date” for more information.

a. Contract Date: February 24, 2026.

b. Estimated Start Date is May 26, 2026. Work shall commence once: project is approved by the ROE; Contractor has submitted signed Contract, Performance &

Payment Bonds, and Certificate of Insurance; AND receipt of U46 Executed AIA

Contract. Contractor may not start work on site until notified by Engineer.

c. Substantial Completion Date: August 14, 2026. Work has been reviewed by the authorities having jurisdiction, Regional Office of Education (ROE), manufacturer’s representative and Engineer, all system certifications have been provided and all electrical devices connected and safe. Punchlist inspection has been requested and performed by the Engineer.

d. Final Completion and Closeout Date: August 21, 2026. (This means that all

Punchlist items shall be completed and all closeout documents and final pay application shall be submitted no later than this date.)

FORM OF BID A3 - 3

6. Base Bid A: Replace existing domestic water piping as identified and provide all associated trades work at Larsen Middle School, U-46 P.N. 508-25, as identified on the plans and specifications.

**Contractor’s dollar amounts below MUST MATCH the dollar amounts

Contractor enters in the Pricing Spreadsheet on the Bid Portal. If numbers do not match, Bid may be rejected.**

Bidder agrees to perform all work as set forth in the bidding documents for the sum of:

Sub-Total Base Bid A: $

General Allowance: $ 250,000.00

TOTAL BASE BID A: $

7. Bid Security for 10% of TOTAL base bids, including allowances, and any alternate bids, must be submitted to School District U-46 prior to Bid Opening.

D. Identify below any known equipment delivery delays pertaining to this project which may affect substantial completion:

E. In case the contractor fails or neglects to appear within the specified time to execute the contract, the contractor will be considered as having abandoned the project. The bid security accompanying this proposal will be forfeited to the Owner as liquidated damages for the delay and loss caused to the Owner by reason of such failure on the part of the contractor.

F. Prior to the Pre-Construction meeting, Contractor is required to submit all background checks for each employee working on the project site, including employees of all subcontractors on the project. Refer to the Project Manual Specification Section A8, Certificate Regarding Criminal

Background Investigations for information on background checks.

G. Failure to complete the work by the scheduled completion date (refer to Section 010200) will result in the work being rescheduled and will result in liquidated damages to the contractor

(refer to Section 010200 for details).

H. Surety: The contractor has notified a surety company of the bid for work to be performed on the project. The surety company has agreed to issue a Performance Bond and Labor and Material

Payment Bond for the work for each school/contract awarded if the bid is accepted.

I. Availability: The number and amount of other contracts and awards pending which the contractor will become obligated to perform, now and during the course of the work on this project will not interfere with or hinder the timely prosecution of the work.

FORM OF BID A3 - 4

J. Material or equipment substitution sheet: The following is a schedule of substitute materials or equipment bidder proposes to furnish on this project with the difference of price being added to or deducted from the base bid. The base bid is understood to include only those items which are definitely specified by trade or brand names.

1. Bidder understands that the selection of materials is optional with the Owner and approval or rejection of the substitutions below will be indicated prior to execution of the contract.

Manufacturer’s Name and Product Add Deduct

2. Cost of investigating or approving substitutions by the Architect, Engineer, Owner, or

Owner’s Attorneys shall be borne by the Bidder proposing the substitution.

K. Bidder must provide the following required bid documentation:

1. Receipt of a Bid Bond of ten percent (10%) of the amount of the base bid(s), (including all alternates and allowances) or a Cashier’s Check made payable to School District

U-46, is required prior to the time of the virtual bid opening. Contractor shall send the original Bid Bond or Cashier’s Check to School District U-46 Procurement Office, 1474 Sheldon Drive, Elgin, Illinois 60120, Attn: Danise Smith, via Certified mail, UPS, or FedEx to ensure confirmed delivery prior to the Bid Opening. If Contractor has an electronic certification process, then they will be able to upload the Bid Bond into the bidding portal. Bids will not be accepted without a Bid Bond / Cashier’s Check at Bid

Opening. These can be dropped off Monday through Friday, 7:00 a.m. to 4:00 p.m. CT.

2. The following documentation shall be INDIVIDUALLY uploaded to the Bid Portal:

a. Completed AIA Document A305 Contractor’s Qualification Statement. Form must include names and telephone numbers of architects, owners and contact persons for each project listed.

b. All Signed Addenda.

c. Project Manual Forms (Provided in Project Manual):

1) Form A3, Form of Bid

2) Form A4, Bidder Eligibility Certification and Non-Collusion Affidavit

Pursuant to Public Act 85-1295 (720 ILCS 5/33E-1 et seq.)

3) Form A5, Prevailing Wage Payment Certification

4) Form A6, Certificate of Compliance with Illinois Human Rights Act

(775 ILCS 5/1-101 et seq.)

5) Form A7, Certificate of Compliance with Illinois Drug-Free Workplace Act

6) Form A8, Certificate Regarding Criminal Background Investigations

7) Form A10, Asbestos and/or Lead Free Construction Certification

8) Form A11, Certification of Sexual Harassment Policy

9) Form A12, Certification of Monthly Payroll

FORM OF BID A3 - 5

3. The successful bidder for the project will be required to enter into a Performance Bond, for each AIA Contract/school award, equal to one hundred percent (100%) of the amount of the bid, with sureties to be approved by the Owner, which surety bond shall be conditioned upon proper and faithful performance by the contractor of the work specified in accordance with the plans and specifications therefore, and according to the time and terms and conditions of the contract, and also that the bidder and contractor shall properly pay all debts incurred by him in the prosecution of the work, including those for labor and material furnished.

4. The contractor shall be required to furnish sufficient insurance of guarantee to indemnify the School District U-46, Architect/Engineer and their consultants against any and all claims which might arise from damages caused to persons or property due to the negligence or accidents caused by himself, his employees or agents, during the construction of said improvements and until the said improvements have been finally accepted as complete by School District U-46.

L. Contractor shall include contingency allowances in the respective amounts shown and shall be included in the Base Bids as follows:

1. Base Bid A General Allowance: .................................................................... $ 250,000.00

Use of any portion of the allowance shall be by an approved U-46 Allowance or Credit

Authorization form only. Any portion of the contingency allowance not used in construction phase shall be deducted from Contract via AIA G701 Change Order.

1.4 CONSIDERATION:

A. Contract will be awarded to the responsible Bidder submitting the lowest proposal complying with the conditions of the Bidding Documents, provided their Bid is reasonable and it is to the best interest of School District U-46 to accept it. The Bidder to whom the Contract is awarded will be notified at the earliest practicable date. School District U-46, however, reserves the right to reject any and all Bids and to waive any informality, irregularity, or qualifications in the Bids received whenever such rejection or waiver is in the best interest of School

District U-46.

B. Any bidder challenging bids by other contractors or bid award by School District U-46 will be responsible for all costs to School District U-46, Architect, Engineer, and their Attorneys to investigate and defend such challenges.

C. School District U-46 also reserves the right to reject the Bid of any Bidder who:

1. Has previously failed to perform properly.

2. Has failed to complete on time Contracts of similar nature.

3. Is not in a position to perform the work required promptly.

4. Has habitually, and without just cause, neglected the payment of bills or otherwise disregarded his obligations to subcontractors, materialmen and/or employees.

D. In determining the lowest responsible Bidder, the following elements, in addition to those heretofore mentioned, will be considered, whether the Bidder involved:

1. Maintains a permanent place of business.

2. Has adequate plant, equipment and manpower available to do the work properly and expeditiously.

3. Has suitable financial resources to meet the obligations incidental to the work.

FORM OF BID A3 - 6

4. Has the appropriate technical experience, qualified project management and project superintendent personnel.

5. Has a minimum of five (5) years’ experience operating under current company name with multiple similar projects successfully completed with equal or greater value.

6. Is licensed and/or certified to complete work associated with this bid.

E. School District U-46 reserves the right to consider as unqualified to perform the General

Contract Work any Bidder who does not habitually perform with his own forces at least two major trades. Examples include Cast-in-Place Concrete, Carpentry, Demolition, General

Laborers and Masonry.

F. The ability of a Bidder to obtain a Performance Bond shall not be regarded as the sole test of such Bidder’s competency or responsibility.

1.5 BIDDER REPRESENTATION: In proposing the material and equipment substitutions herein the bidder represents:

A. He has personally investigated the proposed substitutions and has determined that it is equal or superior in all respects to the specified.

B. He will provide the same guarantee for the substitution as for the item specified.

C. He will coordinate installation of an accepted substitution into the work, making all such changes as may be required for the work to be complete in all respects.

D. He waives all claims for additional costs related to the substitution.

E. Cost data is complete and includes all related costs under his contract and will pay all required architect/engineer's redesign costs.

F. Contract award will not be based on substitute cost difference.

G. All permit fees (if applicable) are included in this bid.

1.6 GENERAL STATEMENT

A. The undersigned has checked all of the figures contained in this proposal and further understands that School District U-46 will not be responsible for any errors or omissions made therein by the undersigned. This bid constitutes all work.

B. It is understood that the right is reserved by School District U-46 to reject any or all proposals and to waive all informalities in connection therewith.

C. The undersigned declares that the person(s) signing this bid is/are fully authorized to sign on behalf of the named firm and to fully bind the named firm to all the conditions and provisions thereof.

D. It is agreed that no person(s) or company other than the firm listed below or as otherwise indicated hereinafter has any interest whatsoever in this proposal or the contract that may be entered into as a result thereof, and that in all respects the proposal is legal and fair and submitted in good faith without collusion or fraud.

FORM OF BID A3 - 7

E. It is agreed that the undersigned has complied and/or will comply with all requirements concerning licensing and with all other local, state and national laws, including prevailing wages of the county working in, and that no legal requirement has been or will be violated in making or accepting this bid, in awarding the contract to him, and/or in the prosecution of the work required thereunder.

F. Contractor and all sub-contractors must pay prevailing wages to all employees working on public funded projects during the course of this project. Prevailing wage shall be as scheduled by the county for which the work is contracted. Payment of Prevailing Wages must conform to the Illinois Prevailing Wage Act, 820 ILCS section 130/0.01 and all related sections.

Additionally, Contractors and sub-contractors must enter ALL Certified Payrolls for all employees for this project via the Illinois Department of Labor (IDOL) website at:

https://www2.illinois.gov/idol/Laws-Rules/CONMED/Pages/Prevailing-Wage-Portal.aspx

Certified Payrolls are NOT to submitted with Applications for Payment. The primary

Contractor shall have the responsibility to be sure all Certified Payrolls related to this project have been uploaded to the IDOL website.

G. All bidders must comply with applicable Illinois Statutory requirements regarding labor including equal employment opportunity laws. Per Employment of Illinois Workers on Public

Works Projects Act (30 ILCS 570/3), Ch. 48, par. 2203, Sec. 3: Whenever there is a period of excessive unemployment in Illinois, every person who is charged with the duty, either by law or contract, of constructing or building any public works project or improvement or for the clean-up and on-site disposal of hazardous waste for the State of Illinois or any political subdivision, municipal corporation or other governmental unit thereof shall employ only Illinois laborers on such project or improvement, and every contract that such labor be used: Provided, that other laborers may be available, or are incapable of performing the particular type of work involved, if so certified by the contractor and approved by the contracting officer.

1.7 LITIGATION

A. Previous Litigation, Past Five (5) Years:

1.

Status:

2.

https://www2.illinois.gov/idol/Laws-Rules/CONMED/Pages/Prevailing-Wage-Portal.aspx

FORM OF BID A3 - 8

B. Current Litigation:

1.

2.

1.8 SIMILAR PROJECT EXPERIENCE

A. Client: Contract Amount:

1.

2.

3.

Respectfully submitted this ____________________ day of ____________________________, 20_____.

Firm Name of Bidding Contractor Printed Name of Authorized Agent of Contractor

By:

Signature of Authorized Agent of Contractor Title

END OF SECTION A3

Subscribed and sworn to before me this ____________ day of

____________________, 20_____.

Notary Public Signature

SSSTTTAAAMMMPPP

ELIGIBILITY CERTIFICATION AND NON-COLLUSION AFFIDAVIT PURSUANT A4 - 1

TO PUBLIC ACT 85-1295 (720 ILCS 5/33E-1 et seq.)

LARSEN MS – DOMESTIC WATER PIPING REPLACEMENT U-46 P.N. 508-25

BIDDING REQUIREMENTS

SECTION A4 – BIDDER ELIGIBILITY CERTIFICATION AND NON-COLLUSION AFFIDAVIT

PURSUANT TO PUBLIC ACT 85-1295 (720 ILCS 5/33E-1 et seq.)

The following certification must be completed, signed, and submitted with the Bidder’s Form of Bid.

FAILURE TO DO SO WILL RESULT IN DISQUALIFICATION OF THE BIDDER.

_______________________________________________, as part of its bid on a contract for:

(Firm Name of Bidding Contractor)

School District U-46

Larsen Middle School

665 Dundee Avenue

Elgin, Illinois 60120

Domestic Water Piping Replacement

U-46 Project No. 508-25 hereby certifies that the bidding part/contracting party is not barred from bidding on the aforementioned contract as a result of a violation of Section 33E-3, Section 33E-4, or the Act.

AFFIDAVIT: The undersigned further certifies and affirms that this proposal was prepared independently for this project and that it contains no fees or amounts other than for the legitimate execution of this work as specified and that it includes no understandings or agreements in restraint of trade.

By: ______________________________________________ Signature of Authorized Agent of Contractor

Printed Name of Authorized Agent of Contractor

Title

END OF SECTION A4

PREVAILING WAGE PAYMENT CERTIFICATION A5 - 1

BIDDING REQUIREMENTS

SECTION A5 – PREVAILING WAGE PAYMENT CERTIFICATION

The following certification must be completed, signed, and submitted with the Bidder’s Form of Bid.

FAILURE TO DO SO WILL RESULT IN DISQUALIFICATION OF THE BIDDER.

The Illinois Department of Labor requires that all contractors and sub-contractors pay the general prevailing rate of hourly wages in the locality in which work is to be performed. Reference Specification Section 012901, “Special Provisions for Predetermined Prevailing Wage,” for details.

_________________________________________________, as part of its bid on a contract for

665 Dundee Avenue

Elgin, Illinois 60120

Domestic Water Piping Replacement

U-46 Project No. 508-25 hereby certifies that all laborers, workers and mechanics performing work under the contract shall not be paid less than the prevailing wage as found by the Illinois Department of Labor, and that contractor and all subcontractors shall in all other respects comply with the Prevailing Wage Act in carrying out work under the contract. If, during the course of work under this contract, the Department of Labor revises the prevailing rate of hourly wages to be paid under this contract, contractor shall have the sole responsibility and duty to ensure that the revised prevailing rate of hourly wages is paid by contractor and all subcontractors to each worker to whom a revised rate is applicable. Revision to the prevailing wage as set forth above shall not result in an increase in the Contract Sum. Contractor shall protect, defend, indemnify and hold the Owner harmless for any claims or demands made as a result of Contractor’s failure to comply with this certification.

By: ______________________________________________ Signature of Authorized Agent of Contractor

Printed Name of Authorized Agent of Contractor

END OF SECTION A5

CERTIFICATE OF COMPLIANCE WITH ILLINOIS HUMAN RIGHTS ACT (775 ILCS 5/1-101 et. seq.) A6 - 1

BIDDING REQUIREMENTS

SECTION A6 – CERTIFICATE OF COMPLIANCE WITH ILLINOIS HUMAN RIGHTS ACT (775 ILCS

5/1-101 et. seq.)

The following certification must be signed and submitted with bidder's bid proposal. FAILURE TO DO SO

MAY RESULT IN DISQUALIFICATION OF THE BIDDER.

Public Act 87-1257, Section 2-105 (A) of the Illinois Human Rights Act, requires that all Public Contracts have adopted written sexual harassment policies.

__________________________________________________, as part of its bid on a contract for

665 Dundee Avenue

Elgin, Illinois 60120

Domestic Water Piping Replacement

U-46 Project No. 508-25 hereby certifies that said contractor is in compliance with the Equal Employment Opportunity Clause and the Illinois Fair Employment Practices Act as stated under Compliance with Legislation and is not barred from bidding on the aforementioned contract as a result of a violation of Section 2-105 (A).

By: ______________________________________________ Signature of Authorized Agent of Contractor

Printed Name of Authorized Agent of Contractor

END OF SECTION A6

CERTIFICATE OF COMPLIANCE WITH ILLINOIS DRUG-FREE WORKPLACE ACT A7 - 1

BIDDING REQUIREMENTS

SECTION A7 – CERTIFICATE OF COMPLIANCE WITH ILLINOIS DRUG-FREE WORKPLACE ACT

The following certification must be signed and submitted with bidder's bid proposal. FAILURE TO DO SO

MAY RESULT IN DISQUALIFICATION OF THE BIDDER.

665 Dundee Avenue

Elgin, Illinois 60120

Domestic Water Piping Replacement

U-46 Project No. 508-25 does hereby certify pursuant to Section 3 of the Illinois Drug-Free Workplace Act (30 ILCS 580/3) that [he, she, it] shall provide a drug-free workplace for all employees engaged in the performance of work under the contract by complying with the requirements of the Illinois Drug-Free Workplace Act and, further certifies, that [he, she, it] is not ineligible for award of this contract by reason of debarment for a violation of the Illinois Drug-Fee Workplace Act.

By: ______________________________________________ Signature of Authorized Agent of Contractor

Printed Name of Authorized Agent of Contractor

END OF SECTION A7

CERTIFICATE REGARDING CRIMINAL BACKGROUND INVESTIGATIONS A8 - 1

BIDDING REQUIREMENTS

SECTION A8 – CERTIFICATE REGARDING CRIMINAL BACKGROUND INVESTIGATIONS

The following certification must be signed and submitted with bidder's bid proposal. FAILURE TO DO SO

MAY RESULT IN DISQUALIFICATION OF THE BIDDER.

The Bidding Contractor listed below hereby represents, warrants, and certifies that no officer or director thereof has any knowledge that any employee thereof has been convicted of committing or attempting to commit “Criminal Code of 1961,” 720 ILCS, Sections 5/11-6 (Indecent solicitation of a child), 5/11-9 (Public indecency), 5/11-14 (Prostitution), 5/11-15 (Soliciting for a prostitute), 5/11-15.1 (Soliciting for a juvenile prostitute), 5/11-19 (Pimping), 5/11-19.1 (Juvenile pimping), 5/11-19.2 (Exploitation of a child), 5/11-20

(Obscenity), 5/11-20.1 (Sexual assault), 5/12-14 (Aggravated criminal sexual assault), 5/12-15 (Criminal sexual abuse), and 5/12-16 (Aggravated criminal sexual abuse), and/or those offenses defined in the

“Cannabis Control Act,” 720 ILCS, 550/1 et. seq. (except the “Illinois Controlled Substances Act,” 720 ILCS

570/100 et. seq.) and/or any offense committed or attempted in any other state or against the laws of the

United States, which if committed or attempted in this State, would have been punishable as one or more of the foregoing offenses. Contractor further agrees that it shall not employ any person who have or may have direct, daily contact with the pupils and for whom a criminal background investigation has not been conducted pursuant hereto, and further represents and agrees that all applicants for any such employment shall furnish with their applications the attached written “Authorization for Criminal Background Information” form, Section A9 of this project manual, authorizing the Board of Education to request a criminal background investigation of said applicant pursuant to Section 5/10-21.9 of the School Code of Illinois and to receive criminal history record information pursuant thereto to determine if the applicant has been convicted of committing or attempting to commit any of the criminal or drug offenses enumerated above. Contractor shall incur any costs and expenses associated with the criminal background investigation. Contractor further represents, warrants, and certifies that no applicant for employment with respect to whom the criminal investigation reveals any conviction for committing and/or attempting to commit any of the above enumerated offenses, shall be employed thereby in any position that involves or may involve contact with the students.

This certification is executed on…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .