3-Subcontractors Fillable.pdf
PDF 45 KB Posted
- Solicitation number
- Quote-FP-04-2526 Aerial Thermal Survey for White-Tailed Deer
- Issued by
- Kane County, Illinois
About this file
The document is a Sub-Contractors form from the Kane County Forest Preserve District, located at 1996 South Kirk Road, Suite 320 in Geneva, Illinois. The form appears to be a standard template for contractors to list potential sub-contractors for a project, with space for three sub-contractors to be named along with their specific work assignments. There is also a checkbox option to indicate that no sub-contractors will be used for the project. The form includes contact information for Bill Lenert (President) and Benjamin Haberthur (Executive Director), and the organization is currently celebrating its 100-year anniversary, spanning from 1925-2025, with a mission to preserve and restore the nature of Kane County.
The document provides no specific details about a particular project, contract value, or scope of work. It is simply a blank form designed to capture sub-contractor information, with a certification statement at the bottom for the primary contractor to sign, confirming the accuracy of the information provided. The form is part of the Kane County Forest Preserve District's standard documentation process, likely used across various conservation, recreation, and education projects.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5-Thermal Deer.zip | ZIP file | |
| 4-Invitation to Quote and Specs-Aerial Thermal Survey.pdf | ||
| 1-Contract Draft.pdf | ||
| 2-Aeria Thermal Survey Quotation Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
To preserve and restore the nature of Kane County
1996 South Kirk Road, Suite 320, Geneva, Illinois 60134
Bill Lenert, President Benjamin Haberthur, Executive Director
(630) 232-5980 Fax: (630) 232-5924 www.kaneforest.com
SUB-CONTRACTORS
The listed Sub-contractors will perform the work indicated herein:
1. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
2. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
3. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
No Sub-Contractors will be used for this project.
I certify that all information above is correct.
Signed:________________________________________________Date:___________________________
Printed Name:__________________________________________ http://www.kaneforest.com/
| 1 SubContractor: |
| Work Performed: |
| 2 SubContractor: |
| Work Performed_2: |
| 3 SubContractor: |
| Work Performed_3: |
| No SubContractors will be used for this project: Off |
| Date: |
| Printed Name: |
File details come from the government source that posted it. Updated .