About this file

This document is a Sub-Contractors form from the Kane County Forest Preserve District, located at 1996 South Kirk Road, Suite 320, in Geneva, Illinois. The form is designed for contractors to list any sub-contractors who will be performing work on a project, with space provided for up to three sub-contractors to be named along with their specific work assignments. The form includes a checkbox option to indicate if no sub-contractors will be used for the project. The document is part of the organization's 100-year celebration (1925-2025), focusing on conservation, recreation, and education.

The form requires the primary contractor to certify the accuracy of the information provided, with space for a signature, printed name, and date. Contact information for the Kane County Forest Preserve District is included, with Bill Lenert listed as President and Benjamin Haberthur as Executive Director. The organization can be reached at (630) 232-5980, with a fax number of (630) 232-5924, and their website is www.kaneforest.com. The form's bottom includes the organization's mission statement: "To preserve and restore the nature of Kane County."

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

To preserve and restore the nature of Kane County

1996 South Kirk Road, Suite 320, Geneva, Illinois 60134

Bill Lenert, President Benjamin Haberthur, Executive Director

(630) 232-5980 Fax: (630) 232-5924 www.kaneforest.com

SUB-CONTRACTORS

The listed Sub-contractors will perform the work indicated herein:

1. Sub-Contractor__________________________________________________________________

Work Performed__________________________________________________________________

2. Sub-Contractor__________________________________________________________________

3. Sub-Contractor__________________________________________________________________

No Sub-Contractors will be used for this project.

I certify that all information above is correct.

Signed:________________________________________________Date:___________________________

Printed Name:__________________________________________ http://www.kaneforest.com/

1. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
2. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
3. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
No Sub-Contractors will be used for this project.
I certify that all information above is correct.
Signed:________________________________________________Date:___________________________
Printed Name:__________________________________________
1 SubContractor:
Work Performed:
2 SubContractor:
Work Performed_2:
3 SubContractor:
Work Performed_3:
I certify that all information above is correct: Off
Date:
Printed Name:

File details come from the government source that posted it. Updated .