About this file
This is a specification document for Bid 4046 issued by Hudson Valley Community College, a SUNY institution located in Troy, New York, for electrical contracting services. The college seeks a vendor to provide comprehensive electrical contracting services across its 110-acre campus consisting of 24 buildings totaling approximately 1,600,000 square feet. The scope includes routine building lighting and electrical services (outlets, LED lighting, wiring), 480V and below systems maintenance, 13.2KV high-voltage systems repair and maintenance (service entrance equipment, 20 pad-mounted transformers, and 10 pad-mounted switchgear units), and co-generation plant electrical equipment services at 4,160 volts. The vendor must be available on a 7-day, 24-hour schedule and maintain a business location within 50 miles of the Troy campus. The contract term commences September 1, 2026, and extends through August 31, 2027, with the college retaining the right to extend for up to two additional one-year periods. Bids are due by July 14, 2026, submitted through the Euna Solutions (Bonfire) online application system at https://hvcc.bonfirehub.com or mailed sealed to the Purchasing Director at Hudson Valley Community College, Administration Building, Room 240, 80 Vandenburgh Avenue, Troy, NY 12180.
Pricing shall be submitted on the provided bid form with hourly emergency response rates included and must cover all three years of the potential contract period. The award will be made to the lowest responsible bidder meeting all specifications. Vendors must possess a minimum of 10 years' experience in high-voltage electrical work, maintain current licenses and certifications for routine and high-voltage electrical work, and comply with all local codes, OSHA regulations, and New York State prevailing wage requirements. The contractor must self-perform all work using its own employees; subcontracting is strictly prohibited without prior written consent from the college. All services require advance written notice and coordination with the college's Facilities Department and Campus Public Safety, and invoicing must include detailed labor rates and material costs without lump-sum pricing. The contractor shall assign a qualified Project Manager as the primary point of contact and must provide certified payroll documentation upon request.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Insurance.pdf | ||
| 4-Bid Form.pdf | ||
| 2-Non Collusive.pdf | ||
| 5-Bid Legal Information.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS FOR BID 4046
ELECTRICAL CONTRACTING SERVICE
SECTION A – STATEMENT OF PUPROSE
Hudson Valley Community College is seeking bids for electrical contracting service based on the following specifications
SECTION B – INTRODUCTION
Founded in 1953, Hudson Valley Community College is the largest community college in upstate New York and offers degree and certificate programs in three schools: Business and Liberal Arts; Health Sciences; and Science, Technology, Engineering and Math (STEM); and also administers the Educational Opportunity Center for academic and career training at no cost to those who qualify. One of 30 community colleges in the SUNY system, Hudson Valley enrolls more than 19,000 students in credit and non-credit courses and is a recognized leader in distance learning and workforce development. The college has more than 90,000 alumni.
Hudson Valley Community College is a 110-acre community college located in Troy, New York. The facilities consist of 24 buildings with an approximate square footage of 1,600,000.
SECTION C – PROJECT SCOPE
PART 1 DESCRIPTION OF WORK
1.1 SUMMARY
A. The following specifications represent the minimum product and service requirements for electrical contracting service on the campus of Hudson Valley Community College.
B. Contractors are to provide all necessary labor, equipment, material, and supervision to perform required work at the college’s facilities.
C. The college consists of a main campus of 21 buildings and approximately 1,600,000 square feet. The majority of the main campus electrical service is provided by a 4.5 MW natural gas fired powered plant on campus. The Science Center and the new Advanced Manufacturing facility are supplied by the National Grid system.
1.2 QUALITY CONTROL
Hudson Valley Community College may make such investigation as it deems necessary to determine the responsibility of any bidder or to determine the ability of any bidder to perform the work. The college reserves the right to disqualify any prospective bidder or to reject any bid if evidence required by the college from the bidder is not submitted or if the evidence submitted or investigation of any such bidder fails to satisfy the college that any such bidder is responsible, able or qualified to carry out the obligations of the contract or to complete the work as contemplated therein.
1.3 DESCRIPTION OF WORK (Examples but not complete scope)
A. 480V and Below
1. Routine building lighting and electrical services such as adding outlets, powering equipment, running new service to a room, installing new LED lighting, repair/replace lighting systems, and providing energy metering and monitoring as required
2. Switch gear repair and maintenance on campus, main switch gear and distribution systems.
3. Outside electrical repair or installation.
a. Laying conduit or direct burial wire.
b. Service outside lighting.
c. Install new outside lighting.
d. Installing/replacing transformers
B. 13.2KV Systems
1. Service Entrance Equipment – repair and maintenance not able to be performed by college electricians.
2. Pad Mounted Transformers (20 units) – repair and maintenance not able to be performed by college electricians.
3. Pad Mounted Switchgear (10 units) – repair and maintenance not able to be performed by college electricians.
4. De-energize high voltage equipment as required
5. Secondary distribution repair and maintenance not able to be performed by college electricians.
C. Power Plant
1. Any work related to electrical equipment at the co-generation plant that is the responsibility of the college.
2. Service, maintain, and repair co-gen plant distribution, 4,160 volts.
PART 2 PRODUCTS
A. Product Selection
1. Electrical Materials and Equipment: When two or more items of same material or equipment are required they shall be of the same manufacturer. Product manufacturer uniformity does not apply to raw materials, bulk materials, conduit, wire, solder, fasteners, motors for dissimilar equipment units and similar items.
Provide products which are compatible within systems and to other connected items.
SECTION D- SPECIAL REQUIREMENTS
Availability
1. The vendor shall be available on a 7-day, 24-hour schedule.
2. The vendor shall provide the college with a 24-hour phone number and contact person.
Quality Control
1. The vendor must comply with all local codes, regulations and licensing requirements.
SECTION E- VENDOR QUALIFICATIONS
Vendor must maintain a business location within a fifty (50) mile radius of Hudson Valley Community College’s Troy, New York campus.
Vendors should have minimum 10 years’ experience working with high voltage.
Vendors must be licensed and certified in routine and high voltage electrical work.
Vendors must follow proper lockout/tagout procedures.
SECTION F- CONTRACTOR RESPONSIBILITIES
Vendor must receive purchase order prior to performing services.
Vendor must receive permission from the college to enter into any agreements with sub-contractors.
Vendor must follow all OSHA rules and regulations.
Schedule of Work Prior to the commencement of any work under this Agreement, the Contractor’s designated Project Manager shall provide Hudson Valley Community College (“HVCC”) Facilities Department with advance written notice of the proposed work schedule. On the initial day of mobilization, all Contractor personnel shall be required to check in with the HVCC Department of Campus Public Safety and shall provide an estimated duration of their presence on site.
Additionally, the Contractor shall furnish the contact information of both the onsite foreman and the Project Manager to the Campus Public Safety office.
Self-Performance of Work The Contractor agrees to self-perform all work described in this Agreement using its own employees. Subcontracting of any portion of the Work is strictly prohibited without the prior written consent of HVCC, which may be granted or denied at the sole discretion of the College.
Project Manager The Contractor shall assign a qualified and competent individual to serve as the Project Manager for the duration of the Agreement. This individual shall act as the primary point of contact and shall be responsible for the coordination and execution of the Work.
Final Cleaning Upon completion of the Work, and prior to demobilization, the Contractor shall remove all equipment, tools, excess materials, and debris from the site. The Contractor shall notify the designated HVCC Facilities representative to perform a final site inspection and approval.
Campus Operations and Access The College campus shall remain open and operational throughout the duration of the Work.
Any activity that may impact internal services, utilities, or college operations must be pre-approved and coordinated with HVCC personnel to minimize disruption.
Prevailing Wage Requirements As a public institution, HVCC requires that all Contractor personnel engaged in work on site be compensated in accordance with applicable New York State prevailing wage laws. The Contractor shall provide certified payroll documentation and applicable wage rate schedules upon request by the College.
Quotes and Invoicing Requirements All services performed under this Agreement shall be preceded by the submission of a written quote or invoice to the designated HVCC representative. Quotes and invoices must include the contract bid number, applicable and approved labor rates, detailed material costs, and any approved material mark-ups. Lump sum pricing for labor or materials will not be accepted.
Invoices shall be submitted only after services are completed and formally approved by HVCC.
Work Zone Traffic Control The Contractor shall implement appropriate safety measures to protect pedestrians, vehicles, and College property during performance of the Work. This includes, but is not limited to, the use of cones, barrels, barricade tape, or other suitable traffic control devices to delineate active work zones.
SECTION G - TERMS & CONDITIONS
HVCC may make such an investigation as it deems necessary to determine the responsibility of any bidder or to determine the ability of any bidder to perform the work. The College reserves the right to disqualify any prospective bidder or reject any bid if evidence required by the College from the bidder is not submitted or if the evidence submitted or investigation of any such bidder fails to satisfy the College that any budder is responsible, able, or qualified to carry out the obligations of the contract or to complete the work as contemplated therein.
The successful vendor must complete and sign the Service and Supply Agreement located in the purchasing website.
Vendor Agrees to have read and complied with all terms and conditions of the specification and bid legal terms
Awarded contractors may not enter into any subcontracts without prior written consent from Hudson Valley Community College.
SECTION H - TERM OF CONTRACT
This Agreement shall commence on September 1, 2026, and shall remain in effect through August 31, 2027, unless otherwise terminated in accordance with its terms. The College reserves the right, at its sole discretion, to extend the Agreement for up to two (2) additional one-year periods.
SECTION I-SCORING
The bid will be awarded to the lowest responsible bidder who meets all specifications.
All pricing should be submitted on the provided bid form. Vendor should include pricing for all 3 years.
Pricing should include hourly emergency response rates when applicable
SECTION J – SUBMISSION INFORMATION
Vendors must submit bids using our online application system, Euna Solutions (Bonfire), located at: https://hvcc.bonfirehub.com no later than the Submission Deadline. Requests for extensions will not be granted; late applications will not be accepted. Vendors are strongly encouraged to submit at least a few days prior to the deadline given the potential for high website traffic on the due date.
HVCC cannot guarantee availability of Online Application System technical assistance on the deadline date. For assistance in using Bonfire, please email support@gobonfire.com or call 1-800- 354-8010. If email confirmation is not received within two business days, please contact the Purchasing office:
Bids can also be mailed or hand delivered must be sealed and have the Bid name and number on the envelope:
Tabitha D’Attilio Director of Procurement Address: Hudson Valley Community College Administration Building, Room 240 80 Vandenburgh Ave Troy, NY 12180
SECTION K – CONTACTS
Issuing Office
Facilities Daniel Seaman d.seaman@hvcc.edu https://hvcc.bonfirehub.com/ mailto:support@gobonfire.com
| PART 1 DESCRIPTION OF WORK |
| A. 480V and Below |
| C. Power Plant |
| A. Product Selection |