3-Specifications- 200 South 900 E 1300 E Traffic Signals and Bus Lanes- All specials 111026.pdf
PDF 8 MB Posted
- Solicitation number
- 26-04074
- Issued by
- Utah
About this file
This is a specifications document for an Invitational For Bid (IFB) issued by the State of Utah for traffic signal replacement and transit bus lane improvements on 200 South between 400 West and 700 East in Salt Lake City. The project encompasses replacement of traffic signals at the intersections of 900 East and 1300 East, along with comprehensive improvements to Transit Bus/BAT lane signing and striping throughout the specified corridor. The specifications establish detailed technical requirements for all work components, including signal equipment, installation standards, and lane marking protocols. The document provides the foundation for bidders to understand project scope, materials, and performance standards required for successful project completion.
The specifications document does not contain information regarding pricing terms, set-asides, contract duration, renewal options, funding sources, or award dates. These details would typically be found in the associated IFB notice or bid documents. Bidders should refer to the complete IFB package and any issued addenda for comprehensive procurement information, including bid submission deadlines, evaluation criteria, and contract terms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .